Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutW-4290020
N
N
To
U)
Cw
G
O
z
O
w
U
J
I-
z
Q
Ir
T
U
0
0
N
+
00
U)
W
Z
J
2
U
Q
75
355
350
345
340
335
330
325
320
315
310
305
300
295
290
285
280
275
NE 1/4 OF THE SW 1/4 OF SEC. 20, T. 23N., R. 05 E, W.M.
GRANT PLACE TOWNHOMES
E
.CB #14
BLDG 1
BLD
2
BLDG
3
1-10" 45° BEND (MJxMJ)
X.SSMH #6
1-10"
22.5° BEND (MJxMJ_
BLIDE
BLDG
7
M EL 297.71
I
I
6
R
13 LF
10" D.I.
I
I
I
I
WITH BLOCK 3 LF 10" D.I.
TA 5+51.20
STA:
5+89.07
1
" IE 288.17E
a
STA: 4+72.80 „
IM EL 345.05
CP:
335.65
"
"
1 IE 288.37 (SE)
"
EX
FMH#1
I
�-
4 LF 10 D.I.
CP: 333.44
IE IN 335.16 (E
RI
EL 300.76
1 IE 288.16 (W)
I
I
I
I
I
I z
I
15 LF 10' D.I.
" IE OUT 335.16
S)
„
26 LF 10 D.I.
12"
E 290.82 S
J
8 LF 10" D.I.
51 LF
10" D.I
1-
j`
12"
E 288.52 (W)
�
I
�
RELOCATE EX. WATER MAIN
50 LF SECTION. SEE NOTES
I
I
I
� �
I
I
�
39LF 10" D.I. -
- - �
CP: 333. 6
EX.SS H #8
1107 LF
10" D.I.
r
o�
_�
19 LF 10" D.I.
/
I I M
I PROVIDE ETHOFOAM PAD
6 LF 10" D.I.
STA 1+50.07
I
I
-1
I
z_
I r-
F
EX
RIM EL 313.68
I
I
-
I r
_
I
I I I
/
-
z
I I
91 LF
I I I
10 D.I.
I I
AT EWE SIDE AND WATER
I
8" IE IN 306.30
E)
I
/
SERVICE
R.O.W.
1-10"4" F.H. ASSEMBLY
8" IE OUT 306.
0 (S)-
2' ROW DEDICATION
STA: 0+75.54
r/
I
r
I
I
I I I
I -
CP: 299.17
I
-
�
-1
I
z
II
I_
- -
1-10" VALVE MJxMJ
(
r
16 LF 10" D.I.
1-10" 11.25°
STA: 5+47.96
I
-
EX.CB #8
I
oI
I
I I I
I
BEND MJxMJ)
CP: 338.17
EX SDMH-
RIM EL 3.51
I
_
of 10
LF 1.0� D.I.
I
I
_
WITHBLOCKRim-F-..
r
fi
- -
STA: 5+11.43zz�
CP: 337.22
12" IE 286.71
(E)
I
12" IE 30).63 (S)
I
N
-
12" IE 287.21
(SE)
- ' 11.25° (MJxMJ) BEND
I
I
12" IE 290.01 (N)
I
_ _
12" IE 290.1 (NE) I
WITH CONC BLOCK I
EX.CB #1
ND (11.25°
BEND (MJxMJ)
INSTALL V
1-10" 11.25°
BEND MJxMJ
(MJxMJ)
_
.01
STA: 1+03.29
RIM EL 33
WITH BLOCK
AIR -VAC
STA: 6+25.67
CONNECT TO EX 12" WA
CP: 303.18
�,
STA: 5+18.91 -
RELEASE
CP: 331.47
1 10 x6 F.H. AS EMBLY
-
1-12"x10" CUT -IN TEE)
/
/
coM
1-10 x6 F.H. ASSE
BLY
12" IE 332.9E
CP: 337.22
ASSEMBLY
STA: 7+16.14
ti
PER COR STD DTL 300.40
/ /
1 -1
"VALVE (MJx
J)
STA: 3+65.70
ON HIGH
10 LF 10" D.I.
C : 324.93
1-10" VALVE (FLxMJ)
Lu
/
rn
�
CP: 324.89
�, -
1-10 VALVE (MJxMJ)
POINT OF
WATER LINE
+
o
2-10" 45° BEND (MJxMJ) � I
/ / o
6,
N
CP:
317.94
1-10' TEE (MJxMJ)
I
EX #4
0
„
WITH CONC BLOCK Z
>
co
159 LF 10
D.I.
EX.SSMH
#9
WITH BLOCK
PER RENTON
STA 6 27.31
121 LF 10 D.I. usi
N
IIIo
1-2LF 10" SPOOL (MJxMJ) a
; _z
1 10
STA: 5+38.45
STD PLAN 340.3RIMEl-
+
co
6 F.H. ASSEM
LY
coo
12 GATES VALVES (FLxMJ) I Q I
ri
RIM EL 327.
2
RIM EL 3
5.10
CP: 337.22
8" IE I
328.75 NE
( )
IN CASE VERTICAL SEPARATION IS LESS
w z
STA: 0+00.00 Z >
EX.
B #9L
STA:
+62.16
12" IE 323.9
(E)
8" IE OU
326.75 (W)
8" IE
UT 328.65 (W)
THAN 18"PROVIDE LAYER OF ETHOFOAM Q
CP:291.75 - -PIPES.-
PROTECTION BETWEEN ~
- ��
12"(/)
1312.18
28 LF 10" D.I.
(E)
J
Q
RIME
340.60
LLJ
12" I
312.18 (W)
1-10"x6" F.H. ASSEMBLY
12" IE
37.92 (NW)
VERIFY FIELD CONDITIONS -
S +41.74
4 LF 10" D.I. -
1-10" 11.25° (MJxMJ) BEND WITH CONC BLOC
CP5337.22
=
EX. S
MH #5
STA: 0+69.41
RIM EL 319.95
STA 5
1.45
U
CP: 298.41
12" IE 315.99 ()
EX.
B #6
RIME
341.84
3 LF 10" D.I.
1-10" 11.25° (MJxMJ) BEND WITH CONC BLOCK
Q
12" 1341.60E
()
8" IE I
332.81 (N)
TOP OF EX. 12" 14 LF 0" D.I.
STA: 0+56.55
12" I
341.59 (NW)
8" IE OJT
332.76 (SW)
STORM PIPE
CP: 295.96
STA: 0+10.29 1-10" 11.25° (MJxMJ) COUPLING
WATER
PROFILE
GRANT CIRCLE
SE (F
RIVATE ALLEY)
CP: 291.41 TOP OF EX. 8" STA: 0+24.40
1-10" 22.5° (MJxMJ) BEND WITH CON
BLOCK
-
-
_
HIGH PRESSURE GAS PIPE CP: 293.31
STA: 0+38.01
STA: 0+25.13 INSTALL POLYPIG
CP: 293.27
CP PER COR STD PLAN 300.7
I
0+00
BLDG 8 -
I I
0+50
I
I
EX.S MH #3
STA 9 F57.59
RIM El. 312.84
8" IE IN 305.28 (N
1 +00
TOP OF EX. 8"
HIGH PRESSURE GAS PIPE
STA: 10+28.75
CP: 302.01
TOP OF EX. 8"
HIGH PRESSURE GAS PIPE
STA: 10+23.57
. CP: 301.71
EL 309.41
1 +50
2+00
355
350
345
340
335
8 IE 11305.28
8" I
(E)
39;.23 (S)
V)
L JVJ.VV 1VV)
PROVIDE ETHOFOAM PAD
cn
AT GAS AND STORM
116 LF 10" D.I.
CROSSINGS
330
RIM EL 307.
6
ZD
I `Z
6 LF 10" D.I.
PROVIDE
I
12" IE 303.89
(W)
12LF10"D.I.
ETHOFOAM PAD
Q
325
711
F-AATSE-V'E f �
I
12" IE 303.89
(N)
F-
z
CONNECT TO
„
X 12 WA
AND WET R r
I
<
1-12"x10" CUT -IN TEE (FLxFL)
SERV I
I
I
(�IF
1 10° VALVE (FLxMJ)
320
o
0
2-10 45 VERT BEND (MJxMJ
x
I
WITH CONC BLOCK
-
2
1-2LF 10" SPOOL(MJxMJ)
315
'
ROD
2-12" GATE VALVES (FLxMJ)
-'
DED.
STA: 10+46.54
310
"' � CP:302.26
z
v co c�i
co
1 10"x6" F.H. ASSEMBLY 1-10"x6" F.H. A o -1 305
-STA: 8+37.33 STA:: 308.81 TOP OF EX. 12'
_CP: 315.59 CP: 308.81 STORM PIPE
37 LF 10" D.I. 300
1 10" VALVE MJxMJ 10" WATER MAIN STA: 10+35.63
(MJxMJ) RELOCATE EX. WATER MAIN STA: 10+30.27 CP: 301.27
STA: 8+34.11 50 LF SECTION. SEE NOTES o 22 LF 10" D.I. CP: 300.23 295
CP: 315.59
1-10" 11.250 BEND (MJxMJ) W/ CONC. BLOCK 1-10" 22.5° (MJxMJ) VERT BEND
STA: 9+89.90 WITH CONC BLOCK 1 290
ALL MECHANICAL JOINT FITTINGS CP: 302.29 STA: 10+07.54
SHALL HAVE MEGALUG RESTRAINT CP: 300.22
RETAINER GLANDS (OR APPROVED 12 LF 10" D.I. 5 LF 10" D.I. 285
EQUAL) EX. CB #1
TOP OF EX. 12" 1 10" 11.25° (MJxMJ) COUPLING WI CONC. BLOCK
RIM EL 306.95 STA: 10+02.28
_T STORM PIPE 280
STA: 9+93.68 12" 1302.54 (N) CP: 301.50
CP: 298.10 INSTALL POLYPIG
PER COR STD PLAN 300.7 275
9+00 9+50 10+00 10+50 11+00
WATER PROFILE - GRANT CIRCLE SE (PRIVATE ALLEY)
V: 1 "=10' H: 1 "=30' _
8+50
TOPOGRAPHY, BOUNDARY, AND UTILITIES STATEMENT
FURR ENGINEERING SERVICES PLLC. DOES NOT WARRANT THE TOPOGRAPHY,
BOUNDARY, AND/OR EXISTING UTILITIES SHOWN ON THESE PLANS. IT IS THE
CONTRACTORS' RESPONSIBILITY TO HAVE ALL EXISTING IMPROVEMENTS FIELD
VERIFIED PRIOR TO CONSTRUCTION. ANY SUBSURFACE EXPLORATION OF EXISTING
UNDERGROUND UTILITIES (POWER, WATER, SEWER, TELECOM, ETC.) SHALL BE
PERFORMED BY THE CONTRACTOR. DISCREPANCIES BETWEEN WHAT IS SHOWN ON THE
PLANS AND LOCATED BY THE CONTRACTOR SHALL BE BROUGHT TO THE ATTENTION OF
FURR ENGINEERING SERVICES PLLC.. PRIOR TO CONSTRUCTION ACTIVITIES.
Know what's below.
Call before you dig.
8/23/2024
2+50
385
380
375
370
365
360
355
350
345
340
335
330
325
320
3+00
3+50
4+00
4+50
5+00
PVI STA: 0+28.74
PVI EL: 346.93
K: 1.86
12'VC
BLDG
4 & 5
04 co
+ +
0 0
0LO
I
�.
fn V U) �
U co U M
J
MLU ww
I- .
OJ
w
��
'
PVI STA: 0+16.10
PVI EL: 345.00LIJ
-
K. 98
END
QF �V
cn -
r
ENT
w
12' VC
I
ST : 1+�2.20
II
o o
��
�IELV:35.1
U
CD N
o o BLOW -OFF
CR
�r � .ri I I I
-
ASSEMBLY
STA: 0+00.00
U "' U "' I
'
STA:1+15.83
ELEV: 344.51
m ED w w �_
o
ELEV:349.28
3.0000
° 1-10" CAP (MJ)
��
1"AIR VAC
WITH CONC. BLOCK
STA: 1 +11.84
CP: 349.28
r' 119LF10"D.I.
c
M
1-10" TEE (MJxMJ)
EX.SSM #7
1-10" 450 BEND (MJxMJ)
STA 1+09. 9
STA:-0+06.81
CP: 337.22
8" IE OUT
343.49 (W)
STA 5+ 1.20
RIM EL 345.05
1-10" VAVLE (MJxMJ)
STA:-0+04.47
8" IE 01 JT 335.16 (S)
CP: 337.22
4 PER CITY COMMENTS
3 PER CITY COMMENTS
2 PER CITY COMMENTS
1 PER CITY COMMENTS
H0
0+00
0+50
WATER PROFILE - ALLEY BLDG 4 AND 5
V: 1"=10' H: 1"=30'
FITIRM •►
1 +00
SURVEYED:
DAF
08/26/24
DESIGNED: DAF
DAF
07/29/24
DAF
05/21 /24
DRAWN:
TJW, FEM
DAF
04/04/24
CHECKED:
DAF
BY
DATE
APPR
�PRovm:
385
380
375
370
365
360
355
350
345
340
335
330
325
320
1 +50
5+50
6+00
6+50
7+00
NOTE:
LOCATION AND ELEVATIONS FOR
THE WATER MAIN ARE BASED ON
POTHOLING AND AS -BUILT SURVEY
NOTE:
REPLACEMENT OF WATER MAIN
WILL REQUIRE SHUT DOWN OF
WATER SYSTEM. CITY FORCES
SHALL PERFORM SHUT DOWN.
1' URR
CNOINEERIN6
SERVICES, PLLC
4715 142nd PI. SW #B,
Edmonds, WA 98026
ph 206.890.8291
SCALE:VEffn_
1 "=309 HORIZONTAL- N DV 1983/1991
CITY OF
RENTON
ONE INCH DATU M vugv
AT FULL SCALE Planning/Building/Public Works Dept.
IF NOT ONE INCH
SCALE ACCORDINGLY
7+50
8+00
355
350
345
340
335
330
325
320
315
310
305
300
295
290
285
280
275
NOTES:
- ALL WATER MAIN PIPES ARE 10" D.I. CL52
STATIONS ON THE GRANT CIRCLE SE PROFILE ARE AS PER PIPE CL
- STATIONS ON THE ALLEY AREAS PER ACCESS END ALIGNMENT
0
N
�1
u
N
Q
J
N
T
0
0
0
N
W-429002 I�
IN COMPLIANCE WITH CITY OF RENTON STANDARDS 0
DEVELOPMENT ENGINEERING z
WATER UTILITY �,� .�
ABDOUL GAFOUR 09/13/2024 NJanders 09/16/2024 0
W
U
Q
GRANT PLACE TOWNHOMES 11/21/23
1600 GRANT AVE S RENTON, WA 98055 FIELDBOOK:
PAGE
PARCEL 2023059052 DRAWING NO:
20069 oC
WATER PROFILES SHEEP: OF: %•
C6.1 28 �/