HomeMy WebLinkAboutW-4290040
0
I
2
8
w
M
a
Z
J
0
N
,It
►7
90' BEND
45' BEND
C
CAP / PLUG 221z0 BEND
VJ B D
W
2
0
z
MINIMUM BEARING AREA
AGAINST UNDISTURBED SOIL (SF)PIPE
SIZE
PR RE
AO
Q
4J
Q
(PS)
4'
200
2/(1)
1/(NONE)
1/(NONE)
NONE
NONE
300
3/(2)
2/(2)
2/(1)
1/(1)
NONE
6"
200
4/(3)
3/(2)
3/(1)
1/(1)
1/(NONE)
300
6/(4)
4/(3)
3/(2)
2/(1)
1/(NONE)
8„
200
7/(5)
5/(3)
4/(3)
2/(2)
1/(1)
300
11/(8)
8/(5)
6/(4)
6/(4)
3/(2)
2/(1)
10"
200
11/(8)
8/(6)
3/(2)
2/(1)
275
16/(11)
11/(7)
9/(6)
5/(3)
3/(2)
12'
200
16/(11)
11/(8)
9/(6)
5/(3)
3/(2)
250
24/(16)
17/(11)
13/(9)
7/(5)
4/(3)
14"
200
22/(13)
16/(11)
12/(8)
6/(4)
3/(2)
250
33/(22)
23/(16)
18/(12)
9/(6)
5/(3)
16"
200
29/(19)
21/(14)
16/(11)
8/(6)
5/(3)
225
32 21)
23/(16)
17/(12)
9/(6)
5/(3)
18"
200
36/(24)
26/(17)
20/(13)
10/(7)
5/(4)
20"
200
45/(29)
32/(21)
24/(16)
13/(8)
7/(4)
24"
200
64/(43)
46/(30)
35/(23)
18Al2)
WWI
TEE 11 Y4- BEND * VALUES BASED ON SAFE BEARING LOAD OF 2,000/(3,000) PSF
0
B E SOIL TYPE SAFE BEARING LOAD (PSF)
o
w MUCK OR PEAT 0
U SOFT CLAY 1,000
Q SAND 2,000
J/� SAND AND GRAVEL 3,000
n CEMENTED WITH CLAY 4,000
HARD SHALE 10,000
z NOTES:
Q
1. MINIMUM BEARING AREA MUST BE ADJUSTED FOR PIPE SIZE, PRESSURE, AND SOIL CONDITIONS.
2. FITTINGS SHALL BE POLYWRAPPED PRIOR TO POURING CONCRETE BLOCKING.
3. CONCRETE BLOCKING SHALL BE CAST IN PLACE AND SHALL HAVE A MINIMUM OF 0.25 SF BEARING AREA AGAINST THE FITTING.
4. CONCRETE BLOCKING SHALL BEAR AGAINST FITTINGS ONLY AND SHALL BE CLEAR OF JOINTS TO PERMIT TAKING UP OR DISMANTLING
co JOINT.
5. CONTRACTOR SHALL INSTALL BLOCKING ADEQUATE TO WITHSTAND FULL HYDROSTATIC TEST PRESSURE AS WELL AS TO CONTINUOUSLY
WITHSTAND OPERATING PRESSURE UNDER ALL CONDITIONS OF SERVICE.
U 6. ALL CONCRETE SHALL BE MECHANICALLY MIXED. JOB SITE MIXING, HAND -MIXED CONCRETE, AND MOBILE CONCRETE MIXERS ARE NOT
ALLOWED.
7. IN MUCK OR PEAT, ALL THRUSTS SHALL BE RESTRAINED BY PILES OR TIE RODS TO SOLID FOUNDATION OR MUCK OR PEAT SHALL BE
REMOVED AND REPLACED WITH BALLAST OF SUFFICIENT STABILITY TO RESIST THRUST.
S. CONCRETE BLOCKING SHALL BE LEFT OPEN OR SHEETED FOR MINIMUM 24 HOURS.
STD. PLAN - 330.1
PUBLIC WORKS CONCRETE BLOCKING APPROVED:
DEPARTMENT FOR HORIZONTAL FITTINGS �k� 6/28/2(
v-N-h.
nim w«waemmbirta DATE
WATER PLAN GENERAL NOTES Standard Plan No. 300
1. ALL WORK AND MATERIALS SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF THE CITY OF RENTON PUBLIC WORKS
STANDARD SPECIFICATIONS AND SPECIAL PROVISIONS AND WSDOT / APWA STANDARD SPECIFICATIONS, LATEST EDITION AS
AMENDED BY THE CITY OF RENTON. A SET OF CITY APPROVED PLANS SHALL BE KEPT AT THE JOB SITE WHENEVER CONSTRUCTION
IS IN PROGRESS. A PRE -CONSTRUCTION CONFERENCE SHALL BE HELD PRIOR TO THE START OF CONSTRUCTION. THE CONTRACTOR
AND OR DEVELOPER SHALL BE RESPONSIBLE FOR SECURING ALL NECESSARY PERMITS PRIOR TO CONSTRUCTION.
2. ALL EXISTING UTILITIES SHALL REMAIN IN SERVICE DURING CONSTRUCTION UNLESS OTHERWISE NOTED. THE CONTRACTOR SHALL
CALL 1-800-424-5555 TO VERIFY UTILITY LOCATIONS BEFORE BEGINNING EXCAVATION.
3. ALL MATERIALS USED FOR THE CONSTRUCTION OF WATER SYSTEM IMPROVEMENTS SHALL BE NEW AND UNDAMAGED, AND
"CATALOG CUTS" FOR ALL MATERIALS SHALL BE APPROVED IN WRITING BY THE CITY OF RENTON PRIOR TO BRINGING ANY
MATERIALS ON -SITE.
4. ALL WATER MAIN PIPE MATERIALS SHALL BE CEMENT LINED DUCTILE IRON PIPE, THICKNESS CLASS 52 PER AWWA C 151 AND C
104. PIPE JOINTS SHALL BE PUSH -ON OR MECHANICAL JOINT. CAST IRON OR DUCTILE IRON PIPE FITTINGS SHALL BE CLASS 250 AS
PER ANSI/AWWA C110/A21.10-82. ALL DUCTILE IRON PIPE AND FITTINGS SHALL BE WRAPPED WITH 8-MIL BLACK, TUBE -TYPE,
POLYETHYLENE PLASTIC PER AWWA C105 STANDARDS.
5. MINIMUM COVER FROM TOP OF WATER MAINS TO FINISHED GRADE SHALL BE 36 INCHES FOR PIPE DIAMETER OF 10-INCH OR LESS
AND 48 INCHES FOR PIPE DIAMETER OF 12-INCH AND LARGER. MAXIMUM COVER FOR ALL WATER MAINS SHALL BE 60 INCHES.
ANY DEVIATIONS MUST BE APPROVED BY THE CITY OF RENTON PRIOR TO CONSTRUCTION. WHERE UTILITY CONFLICTS OCCUR,
THE PROFILE OF THE WATER MAIN SHALL BE ADJUSTED AS NECESSARY TO CLEAR CONFLICTS AND TO PROVIDE MINIMUM COVER.
PIPE DEFLECTION SHALL NOT EXCEED ONE-HALF OF PIPE MANUFACTURER'S SPECIFICATION FOR SIZE OF PIPE USED. ALL TRENCH
BACKFILL SHALL BE COMPACTED TO 95 PERCENT MAXIMUM DRY DENSITY AS DETERMINED BYTHE MODIFIED PROCTOR TEST
METHOD (MDD) IN ROADWAYS, ROADWAY SHOULDERS, ROADWAY PRISM AND DRIVEWAYS, AND 85 PERCENT MOD IN UNPAVED
AREAS. ALL PIPE ZONE COMPACTION SHALL BE 95 MDD.
6. CONCRETE BLOCKING FOR WATER MAINS SHALL BE DESIGNED, INSTALLED AND POURED IN PLACE IN ACCORDANCE WITH CITY OF
RENTON STANDARD DETAILS AND SPECIFICATIONS AND SHALL BE INSTALLED AT ALL VERTICAL AND HORIZONTAL BENDS, FITTINGS
AND BASE OF HYDRANTS. MEGA -LUGS (OR SIMILAR PRODUCT) MAY BE REQUIRED ON ALL MECHANICAL JOINTS IN ADDITION TO
CONCRETE BLOCKING.
7. ALL NEW WATER MAIN PIPES AND FITTINGS SHALL HAVE A FOAM PIPE PIG RUN THROUGH THEM PRIOR TO BEING FLUSHED,
DISINFECTED, AND TESTED. CLEANING, PRESSURE AND PURITY TESTING SHALL BE DONE IN THE PRESENCE OF AND UNDER THE
SUPERVISION OF A CITY OF RENTON UTILITY INSPECTOR. THE CONTRACTOR SHALL SUPPLY, INSTALL AND REMOVE PLUGS,
CORPORATION STOPS, BLOW -OFF ASSEMBLIES, AND THRUST RESTRAINT / BLOCKING FOR TESTING AND PURITY ACCEPTANCE. NO
CONNECTION SHALL BE MADE BETWEEN THE NEW MAIN OR BETWEEN THE NEW WET -TAP VALVE TO AN EXISTING MAIN UNTIL
THE NEW PIPING HAS BEEN FOAM -PIGGED, DISINFECTED, FLUSHED, AND PASSED BOTH PRESSURE AND PURITY TESTING.
8. NEW WATER MAINS INCLUDING SERVICE LATERALS SHALL BE TESTED AT A STATIC PRESSURE OF 150 PSI ABOVE WORKING
PRESSURE WITH A MINIMUM OF 225 PSI TEST PRESSURE FOR 120 MINUTES WITH A MAXIMUM OF 5 PSI PRESSURE DROP DURING
THE ENTIRE TEST PERIOD. UPON SATISFACTORY COMPLETION OF THE PRESSURE TEST, THE LINE SHALL BE DISINFECTED, FLUSHED,
AND THEN WATER SAMPLES SHALL BE TAKEN FOR PURITY TESTING BY THE PUBLIC WORKS INSPECTOR.
9. THE CONTRACTOR SHALL NOTIFY THE CITY OF RENTON WATER UTILITY AND MAINTENANCE DEPARTMENTS AT LEAST 10 WORKING
DAYS PRIOR TO MAKING CONNECTIONS TO THE EXISTING WATER SYSTEM. THE CONTRACTOR SHALL EXPOSE THE EXISTING WATER
MAIN AND FITTINGS AT THE CONNECTION POINT BEFORE ORDERING THE NECESSARY ADAPTORS AND FITTINGS REQUIRED FOR
THE FINAL CONNECTION. THE CONTRACTOR SHALL EXCAVATE, REMOVE ALL SURFACE MATERIALS, AND PROVIDE SHORING AND
ALL MATERIALS REQUIRED FOR THE CITY OF RENTON TO PERFORM THE CONNECTION TO THE EXISTING WATER SYSTEM. THE
CONTRACTOR SHALL PROVIDE AND INSTALL BACKFILL, CONCRETE BLOCKING, AND COMPLETE SURFACE RESTORATION.
ti�Y o STD. PLAN - 300.0
�'a► PUBLIC WORKS WATER PLAN GENERAL NOTES
DEPARTMENT
MARCH 2O10
TOPOGRAPHY, BOUNDARY, AND UTILITIES STATEMENT.
FURR ENGINEERING SERVICES PLLC. DOES NOT WARRANT THE TOPOGRAPHY,
BOUNDARY, AND/OR EXISTING UTILITIES SHOWN ON THESE PLANS. IT IS THE
CONTRACTORS' RESPONSIBILITY TO HAVE ALL EXISTING IMPROVEMENTS FIELD
VERIFIED PRIOR TO CONSTRUCTION. ANY SUBSURFACE EXPLORATION OF EXISTING
UNDERGROUND UTILITIES (POWER, WATER, SEWER, TELECOM, ETC.) SHALL BE
PERFORMED BY THE CONTRACTOR. DISCREPANCIES BETWEEN WHAT IS SHOWN ON THE
PLANS AND LOCATED BY THE CONTRACTOR SHALL BE BROUGHT TO THE ATTENTION OF
FURR ENGINEERING SERVICES PLLC.. PRIOR TO CONSTRUCTION ACTIVITIES.
11 i/4* AND 221/ ° BENDS
PIPE CLAMP AND
ANCHORROD
DL
\� L o
\/ \ ° �v A
// y
I- A -1
45' BEND
PIPE CLAMP AND
ANCHOR ROD
L w
v� o
L >
A
jj o 0
v
A
NE 1 /4 OF THE SW 1 /4 OF SEC. 20, T. 23N., R. 05 E, W.M.
MINIMUM DIMENSIONS
PIPE
SIZE
BEND
VOLUME
(CF)
A
D
L
11 Y4'
8
2.0'
3/q"
1.5'
4"
221l2
11
2.2'
2.0'
45°
30
3.1'
6"
11 Y4-
221/2°
11
2.2'
2.9'
3j4'
2.0'
25
45•
68
4.1'
8"
11 %4
16
2.5'
'/4'
2.0'
22Y2*
47
3.6'
45°
123
5.0'
12"
111/4'
32
3.2'
3/4'
2.0'
22Y2*
88
4.5'
3.0'
45°
232
6.1'
2.5'
11 %4
70
4.1'
V.
3.0'
16"
221/z°
184
5.7'
11/s,
4.0'
45°
478
7.8'
20"
111/4
91
4.5'
11/4"
3.0'
221/z°
225
6.V
4.0'
45°
560
8.2'
11 Y4
128
5.0'
11/4"
3.5'
24"
22Y2*
320
6.8'
1 %11
4.5'
45°
820
9.4'
* D = ANCHOR ROD DIAMETER
NOTES:
1. CONCRETE BLOCKING SIZES BASED ON 200 PSI HYDROSTATIC PRESSURE AND 3,000 PSI CONCRETE.
2. ALL CONCRETE SHALL BE MECHANICALLY MIXED. JOB SITE MIXING, HAND -MIXED CONCRETE, AND MOBILE CONCRETE MIXERS ARE NOT
ALLOWED.
3. PIPE CLAMPS AND ANCHOR RODS SHALL BE INSTALLED PER STD PLAN 330.4.
4. FITTINGS SHALL BE POLYWRAPPED AFTER INSTALLATION OF PIPE CLAMPS AND ANCHOR RODS PRIOR TO POURING CONCRETE BLOCKING.
5. WATER MAIN SHALL NOT BE PRESSURIZED UNTIL ALL TRENCHING WITHIN 100' OF VERTICAL BEND IS BACKFILLED AND COMPACTED TO
MINIMUM 3' COVER.
6. CONCRETE BLOCKING SHALL BE LEFT OPEN OR SHEETED FOR MINIMUM 24 HOURS.
PUBLIC WORKS CONCRETE BLOCKING
DEPARTMENT FOR VERTICAL FITTINGS
METERED BACKFLOW ASSEMBLY
(TO BE OBTAINED FROM CITY)
(1) 2 %" CONTROL VALVE
(1) CONSTRUCTION METER
(1) RPBA
iMETER SUPPORT (BY CONTRACTOR)
NSF 61 SUPPLY HOSE
HYDRANT ON EXISTING WATER MAIN
TEMPORARY BLOW -OFF ASSEMBLY
(1) 2" GALVANIZED PIPE
(1) 2" 90° BEND
(1) 2" GATE VALVE
'- II POLYPIG
POLYPIG STATION
(1) VERTICAL CROSS (MJxFL), SIZE TO MATCH WATER MAIN
(1) BLIND FLANGE WITH 2" TAP ON TOP OF CROSS
(1) TEMPORARY BLOW -OFF ASSEMBLY
(1) BLIND FLANGE ON BOTTOM OF CROSS
(1) PLUG (MJ) ON END OF CROSS WITH TEMPORARY THRUST BLOCKING
STD. PLAN - 330.2
DATE
NOTES:
1. THE BACKFLOW PREVENTION ASSEMBLY AND SUPPLY HOSE MUST BE DISCONNECTED DURING HYDROSTATIC PRESSURE TESTING OF THE
NEW WATER MAIN.
2. POLYPIG AND ALL DEBRIS SHALL BE REMOVED FROM SUMP OF VERTICAL CROSS VIA SANITARY METHOD PRIOR TO DISINFECTION OF NEW
WATER MAIN.
3. UPON REMOVAL OF POLYPIG, REMOVE TEMPORARY BLOW -OFF ASSEMBLY AND INSTALL 2" PLUG.
4. THE NEW WATER MAIN SHALL BE CONNECTED TO THE EXISTING SYSTEM ONLY AFTER NEW WATER MAIN IS POLYPIGGED, DISINFECTED
AND SATISFACTORY BACTERIOLOGICAL SAMPLE RESULTS ARE OBTAINED.
5. THE INTERIORS OF ALL PIPES AND FITTINGS TO BE USED IN FINAL CONNECTION MUST BE SWABBED OR SPRAYED WITH A 5-6%AVAILABLE
CHLORINE SOLUTION.
STD. PLAN - 300.7
PUBLIC WORKS APPROVED:
DEPARTMENT POLYPIGGING NEW WATER MAINS
6/28/2023
Ma --h.
Punnc wo.�ndmm�".ro, DATE
Know what's below.
Call before you dig.
8/23/2024
4 PER CITY COMMENTS
3 PER CITY COMMENTS
2 PER CITY COMMENTS
1 PER CITY COMMENTS
i•I•a
REVISION
PLACE TOWNHOMES
GARAGE DOOR
OPENING
8.25'
GARAGE DOOR
OPENING
8.25'
GARAGE DOOR
GARAGE DOOR
GARAGE DOOR
OPENING
OPENING
OPENING -
16.25'
16.25'
16.25'
#14
#15
#16
#17 8.58'
#18
4" CIP
F-G E 354.5
WALLLf
AB 354.4
TOW=349.5
FGE 351.5-
AB 352.7
_
AB 351.3
AB 349.8
AB 348.3
-
79
0.82'
RAMP TO GARAGE
FLOOR
0.62'
EDGE OF
CENTER OF
RAMP TO GARAGE METER BOX
TRAVEL LANE
DRIVE LANE
FLOOR
VIEW LOOKING FROM ALLEY INTO
GARAGES
SECTION VIEW
1.50'
BETWEEN GFE'
1.50'
BLDG #4
BETWEEN GFE'S
#14
#15
#16
#17
#18
11 J
s
t
L -
DETAIL "B"
DETAIL "A"
1.00,
10.00'
FOOTING
-
- -
-
20.00'
-
-
- -
L-
PRIVATE ALLEY
6C I VVCCIV UrC o
BUILDING 4 WATER METERS SHOWN
BUILDING 5 ARE OPPOSITE
PLAN VIEW
1.00,
EDGE OF
GARAGEDOOR
2.15
0.52'
2.15'
FURR
ENGINEERING
SERVICES,
4715142nd PI. SW #B,
Edmonds, WA 98026
ph 206.890.8291
EDGE OF Uj
GARAGE DOOR
4.03' I L
DRIVE LANE
4" THK REINFORCED
CIP WALL)
DETAIL "A"
EDGE OF
GARAGE DOOR
2.69' I
4" THK REINFORCED
CIP WALL
0.52' J .--- -- J
DETAIL "B"
C)
O
0-
U)
X
O�
o
O U)
ffLOn
V
=
�
z
zw
OQ
Ln
Z
Q�
00
O
0
CD
:1:
CD
1
U)
z o
Lc)
Q C-0
Q
z
O
_j
0
J_
CY]
VIEW OF METER BOXES
SCALE: 1 "=5' p
By:
DAF
me..
_ 03/23/2021
Project No:
20069
Reference Sheet:
10 5 0 10 20 Drowing No:
SCALE: 1 INCH = 10 FEET
ruRR
ENGINEERING
SERVICES, PLLC
4715142nd PI. SW #B,
Edmonds, WA 98026
ph 206.890.8291
CO
O
N
LJ
�,
M,
H
co
Q
J
CO
N
T
O
O
co
I^
0-
�J
W-429004
-
75
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
0
[DEVELOPMENT ENGINEERING � O%)
z
Janders 09/16/2024
0
I-
LU
U
Q
SURVEYED:
SCALE:
1 "=30'
"ERT'°"` NAVD 1981
HORIZONTAL: NAD 1983/1991
CITY 0 F
0Q
GRANT PLACE TOWNHOMES
1600 GRANT AVE S RENTON, WA 98055
DATE:
11 21 23
/ /
DAF
08/26/24
DESIGNS DAF
FIELDBooK:
DAF
07/29/24
RENTON
PAGE.
J
L
DRAWN:FEM
DAF
05/21/24
TJW,
ONE INCH
DATUM
Planning/Building/Public Buildin Public Works Dept.
g/ g/ P
PARCEL 2023059052
DRAWING N0:
20069
DAF
04/04/24
CHECKED:
AT FULL SCALE
IF NOT ONE INCH
BY
DATE
APPR
SCALE ACCORDINGLY
WATER DETAILS
APPROVED:
SHEET: OF:
C6.3 28