HomeMy WebLinkAboutCH_Conditional_Use_And_Variance_Checklist_241007_v1Conditional Use/Variance Application Combined Checklist
⊠1: Pre-Application Meeting Summary
–See PRE_PRE22-000119StaffComments_220421_v1.pdf
⊠3: Land Use Permit Master Application Form
–See A_Land_Use_Master_Application_241007_v1.pdf
⊠6: Variance Request Justification
–See J_Conditional_Use_and_Variance_Justification_241007_v1.pdf
⊠9: Easements **Existing
–See L_Title_Report_210707_v1.pdf
⊠5: Project Narrative
–See PN_Project_Narrative_241007_v1.pdf
⊠7: Conditional Use Permit Justification
–See J_Conditional_Use_and_Variance_Justification_241007_v1.pdf
⊠10: Construction Mitigation Description
–See J_Conditional_Use_and_Variance_Justification_241007_v1.pdf
⊠13: Neighborhood Detail Map
–See “Vicinity Map” on P_Site Plan_241007_v1.pdf
□14: Affidavit of Installation of Public Information Sign(s)
–Not required yet per Brianna
⊠15: Site Plan
–See P_Site Plan_241007_v1.pdf
⊠11: Title Report
–See L_Title_Report_210707_v1.pdf and L_Title_Insurance_Policy_210830_v1.pdf
⊠16: Architectural Elevations
–See CA_Stamped_Engineering_Calculations_240829_v1.pdf
⊠19: Floor Plans
–See CA_Stamped_Engineering_Calculations_240829_v1.pdf
⊠20: Topography Map
–See M_Signed_Topo_Survey_241007_v1.pdf
⊠21: Tree Retention/Land Clearing (Tree Inventory) Plan
–See TR_Tree_Retention_and_Tree_Credit Worksheet_241007_v1.pdf
–Tree inventory on M_Signed_Topo_Survey_241007_v1.pdf
⊠22: Tree Retention Worksheet
–See TR_Tree_Retention_and_Tree_Credit Worksheet_241007_v1.pdf
⊠24: Wetland Assessment
–See RS_Wetland_Assessment_241007_v1.pdf
⊠25: Wetland Mitigation Plan - Preliminary
–We don’t hey have a formal plan. Our understanding was that this would come out of the
environmental review process?
–See RS_Wetland_Assessment_241007_v1.pdf and J_Conditional_Use_and_Variance_Justification_241007_v1.pdf
⊠27: Wetland Delineation Map
–See RS_Wetland_Assessment_241007_v1.pdf
⊠28: Habitat Data Report
–See RS_Wetland_Assessment_241007_v1.pdf
⊠29: Standard Stream Study
–See RS_Stream_Study_241007_v1.pdf
□29: Photographs of the Property
–No photos requested at this time
⊠32: Geotechnical Report
–See RS_Geotechnical_Report_241007_v1.pdf
⊠33: Letter of Understanding Geologic Risk
–See RS_Geotechnical_Report_241007_v1.pdf
⊠34: Utilities Plan, Generalized
1
–See M_Signed_Topo_Survey_241007_v1.pdf
□35: Drainage Control Plan
–Not required at this time per Scott Warlick
□36: Drainage Report
–Not required at this time per Scott Warlick
⊠37: Grading Plan
–See P_Site Plan_241007_v1.pdf
2