Loading...
HomeMy WebLinkAboutS-42780900 N I N Is's own - EYJSITNG PIPE " I * '' I t i- p F "+f 4 + f .7.hir w, IF # r F I F+ , + F - ,4 { r�f CAST-IN-PLAGE CONCRETE BA5I UDDER PRE -CAST SADDLE t :.� LAANHCLE S�CTJON I y M i•.. TOP IAEW REMOVE UPPED HALF 4F THE - EXISTING PIPE (PVC PIPE DNLY) SHELF AND CHANNEI_ SHAIrE eE 3000 PSI CONCRETE DIAMETER VARIES -�-•I BASE POURED 4' UNDER SEWER MAIN At A MINIMUM DE 1 a" THICK OPEN PIPE Ch4ANNLL PRECAST SADDLE MANHOLE SECrnON (4)-4"(W) X 9'(14) X 18"(L) SOLID CON CrgE iE BLOCKS (kllNlhA�M) 04 RESAR PRECAST SADDLE MANHOLE SECTION -BUILD THE CHANNEL FLUSH WITH DOTTOM OF PFPE AND SHELF AT SLOPE - fr PER FOOT 0R 2% (TYP ) NEW PIPE - CAST -IN -PLACE CONCRETE BASE POURED 4" AE30VE THE SOLID CONCRETE BLOCKS (WNIMUY 12" THICK) (4)-4+('W) X S'(FI) X 16"(L. SDLI11 CONCRETE BLOCKS COMPACTED SJ8 GH AW "Ti4 CRUSHED ROCK OR ADDITIONAL_ FOUNDARON ROCK T4 SUPPORT STRUCTURE NOTES. >I. EXISTING FIDE SHALL BE SUPPORTED At ALL 71MES 2 NO WEIGHT OF THE PRECAST MANHOLE UNIT SHALL BEAR ON rHE EXISTING PIPE 3 CAST -IN -PLACE BASE SFtiALL OE 3000 PSI COMMERCIAL CONCRETE e4 PRECAs? MANHOLE SECTIONS SHAI_L BE INSTALLE-a IN ACQORUANCE WTIi4 THE: STANDARD PLAN FOR THE SPECIFIED MANHOLE SIZE ANO TYPE 5 PRECAST MANHOLE SECTIONS SHALL HAVE tHE ONTERIUR SUR' ACv S FACTORY -COATED (SEALEG) WITH A HIGH SOLIDS URETHA`IE CGA'ING. WA5SER MC-SHIELDCQAT TOO OR APPROVED EQUAL. COLOR SHALL DE WHITE 6 THE PRECAST MANHOLE SECTION SHALL SIT ON �4)-A"(W) X El"(H) X is"(L) SOLID CONCRETE EL KS PLACED ON COMPACTED SUB -GRADE 7 THE UPPER HALF OF THE EXISTING PIPE {PVC 'IPE ONLY) SHALL BE REMOVED WHILE THE 6aTTGM SHALL REMAIN AS THE C4ANNEL DF THE NEVY MANHOLE. O THE CAST -IN -PLACE MANKOLE SHALL NOT BE INSTALLED OVER A BELL SECTION OR JOINT OF THE SEWER MAIN TkiE MINIMUM ❑'STANCE FROU TIME OU'TSID:E WALL OF THE MANHOLE AND A BEL_ SECTION OR JOINT SHALL OE 2' I . sTA, PLAN - 400.6 UR)PUBLIC WORKS ADDLE MANHOLE APN DEPARTMEENT WITH GIST -IN -PLACE BASE iVl�TtiEEI P1� t�I G/202 DATE SADDLE MANHOLE WITH CAST -IN -PLACE BASE NOT TO SCALE 0 0 �O Y Know what's below. Call before you dig. T. G rr of wasglN`� l �tr GIST 97, �ssto NAL 09/10/2024 CCTV INSPECTION SPECIFICATIONS 1. ALL NEWLY -INSTALLED AND NEWLY -REHABILITATED (PUBLIC AND) PRIVATE SANITARY SEWER AND STORM DRAIN MAIN LINES SHALL BE INSPECTED BY MEANS OF REMOTE CCTV. CCTV INSPECTIONS AND REPORTS SHALL BE SUBMITTED TO THE CITY OF RENTON INSPECTOR ASSIGNED TO THE PROJECT PRIOR TO RECEIVING APPROVAL TO INSTALL PROJECT CURBS, GUTTERS, AND/OR PAVEMENT. 2. THE CONTRACTOR SHALL PERFORM ALL CCTV INSPECTIONS IN ACCORDANCE WITH THE NATIONAL ASSOCIATION OF SEWER SERVICE COMPANIES (NASSCO) PIPELINE ASSESSMENT CERTIFICATION PROGRAM (PACP) 3. ALL CCTV OPERATOR SHALL HAVE CURRENT NASSCO PACP CERTIFICATION. 4. CCTV INSPECTIONS SHALL BE RECORDED IN A GRANITENET COMPATIBLE FORMAT DATABASE USING THE LATEST SOFTWARE VERSION AND SUBMITTED WITH ELECTRONIC LINKS BETWEEN THE DATA AND THE VIDEO ON AN EXTERNAL HDD, DVD, OR FLASH DRIVE 5. ALL CCTV INSPECTION REPORTS SHALL BE WITH -IN +/- TWO (2) FEET OF THE MEASURED LINEAR FOOTAGE BETWEEN MANHOLES ALONG THE EXISTING PIPELINE CENTERLINE FROM THE START OF PIPE TO END OF PIPE. "4 A, :'er RE� o SEWER COVER & FRAME PLAN VIEW HQL.THQL,E — � �LE� EQUALLY 'SPACED 120' 1PAF'T Rh 2.2 L/16 ti59-r ,� DIA B.0 CSEE DE7A.'L) 25' DIA. 314" - 1.1�rrr�7 i - 4.i I — T COVER SECTION VIEW t 673mml Z5 1/4' WA [��1rru�I 1 1�I6' I <r�r�} 1tsA E27rnr*d f NEOPRENE GASKET + Tl�f wlr�l L 23 3/9' MA CL 17RIEN 27 1/16' DIA 24 1/8' MA 6. ALL OWNER AND PACP REQUIRED HEADER INFORMATION MUST BE FILLY AND ACCURATELY ENTERED ON ALL CCTV REPORTS. WORK NOT FOLLOWING THESE SPECIFICATIONS WILL BE REJECTED AND THE CONTRACTOR SHALL BE REQUIRED TO RE -CCTV THE WORK. 7. DOCUMENTATION OF THE WORK SHALL CONSIST OF PACP CCTV REPORTS, PACP DATABASE, LOGS, ELECTRONIC REPORTS, ETC. NOTING IMPORTANT FEATURES ENCOUNTERED DURING THE INSPECTION. THE SPEED OF TRAVEL SHALL BE SLOW ENOUGH TO INSPECT EACH PIPE JOINT, TEE CONNECTION, STRUCTURAL DETERIORATION, INFILTRATION AND INFLOW SOURCES, AND DEPOSITS, BUT SHOULD NOT, AT ANY TIME, BE FASTER THAN 30 FEET PER MINUTE, EXCEPT AS NOTED OTHERWISE IN THIS DOCUMENT. 8. THE CAMERA MUST BE CENTERED IN THE PIPE TO PROVIDE ACCURATE DISTANCE MEASUREMENTS TO PROVIDE LOCATIONS OF FEATURES IN THE SEWER AND THESE FOOTAGE MEASUREMENTS SHALL BE DISPLAYED AND DOCUMENTED ON THE VIDEO. ALL PACP OBSERVATIONS SHALL BE IDENTIFIED BY AUDIO AND ON A PACP LOG. ALL VIDEO MUST BE CONTINUOUSLY METERED FROM MANHOLE TO MANHOLE. ALL VIDEO RECORDING SHALL BE CONTINUOUS FROM STRUCTURE TO STRUCTURE WITH NO "PAUSING" OF THE VIDEO RECORDING DURING EACH PIPELINE INSPECTION. THE PIPE SHALL BE CLEANED PRIOR TO CCTV INSPECTION TO ENSURE ALL DEFECTS, FEATURES AND OBSERVATIONS ARE SEEN AND LOGGED. COVER BOTTOM VIEW r0) BL T 30C, �-ALLEN HEAD•' I�U1�i�E� ��FII:F• BOLTING DETAIL 1,4' [= 7-mI I} GASKET ET GROOVE DETAIL 186 7rqm 1 NOTES: FRAME SECTION VIEW I. ALL C IER`3 SHALL HE LOCKING Llb PER F-AS JURDAN IRCIN 4YOR S INC. No, 3717CI QR EOI, 2 IJSF FRAME AND COVER FOR STORM (SPECIF "DRAN' ON COVER), SANITARY (SPECIFY "SEWER"'). OR WATER (SPECIFY 'VATER"), STD. PLAN - 401 RbEPARTMENT PUBLIC DR�C MANHOLE FRAME AND COVERGAZ911019 , 0AIT MANHOLE FRAME AND COVER NOT TO SCALE T A C O M A S E A T T L E S P O K A N E T R I -CITIES 2 REVISED PER CITY COMMENTS DATED 04/02/24 RI 2215 North 30th Street, Suite 300 Tacoma, WA 98403 1 REVISED PER CITY COMMENTS DATED 10/25/23 JMT 253.383.2422 TEL 253.383.2572 FAX www.ahbl.com WEB N0. REVISION BY 2 9. JUST PRIOR TO BEGINNING THE CCTV INSPECTION, WHILE THE CCTV CAMERA IS IN PLACE AND RECORDING, WATER (CONTAINING DYE) SHALL BE INTRODUCED INTO THE UPSTREAM MANHOLE OF EACH PIPE SEGMENT UNTIL IT IS OBSERVED AND RECORDED FLOWING PAST THE CAMERA'S FIELD OF VISION IN ITS ENTIRETY. 10. THE CCTV CAMERA SHALL HAVE A WATER -LEVEL MEASURING DEVICE (BALL, CYLINDER, ETC.) ATTACHED THAT HAS -1" MARKINGS TO SHAL THE DEPTH OF WATER IN THE PIPE DURING CCTV INSPECTION. 11. ALL MANHOLES SHALL BE CHANNELED AND COATED PRIOR TO CCTV INSPECTION 12. PER CITY OF RENTON SPECIFICATION 7-08.3(2)B, SEWER AND STORM DRAIN PIPELINE SHALL HAVE NO MORE THAN -1" OF PONDING TO BE CONSIDERED ACCEPTABLE. 9 � UNDISTURBED NATIVE MATERIAL DIARIES 9' OR E`E1UNDATION E RAVILL IN. CUNCRLTE ENCASEMFNT SE TIEN -- 20 LF 041N.) COMMERCIAL LUNURETE CI-1I2' MAX. AGGREGATE SIZE) t all I T - It y y. + •_.#•, r -,k-r` .N' Try •�-' •iy, A , , - .:. - ., . ',q -1 .�.d ."i , eL _ �_ It PLAN VIEW CONCRETE ENCASEMENT S-427809 IN COMPLIANCE WITH CITY OF RENTON STANDARDS WASTEWATER UTILITY * jstowel 111 /26/2024 ul NOT TO SCALE ANITARY SEWER MAIN NOTEi CONCRETE ENCASEMENT USED FOR DEDUCED VERTICAL SEPARATIDN FRUM EITHER UTILITIES SHALL EXTEND 10' BEYOND EACH SIDE DF THE CEO❑SSING, DEVELOPMENT ENGINEERING HHuynh 12/04/2024 ' SURVEYED: SCALE: DATE: VERTICAL: AD 1 1988 • MAPLE HIGHLANDS / / HORIZONTAL: NAD 1983/1991 CITY OF 9 6 2024 DESIGNF�Q,, / RI JJ I FIELDBOOK: RENTON PAGE ;R 9/6/24 DRAWN: GB N429V AHBL JOB #2221005.10 ONE INCH DATUM DRAWING N0: �/16/24 CHECK§K/ MW AT FULL SCALE Planning/Building/Public Works Dept. SEWER STANDARD C6,3 IF NOT ONE INCH DATE APPR APPROVED: SCALE ACCORDINGLY SHEE: NOTES & DETAILS 36 OF: 39 R- C6.3 M Cfl C) C'7 N LJ N T 0 C) I N a _J 0 T O N Ir 'i1