HomeMy WebLinkAboutMFP24005703.pdfNote: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
DEPARTMENT OF PUBLIC WORKS
Page 1 of 3 | Published: 10/27/2021
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN APPLICATION
Published: 10/27/2021
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control
plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents.
2. The following items are all required for submittal of the TCP Application:
☐Electronic Copy of the TCP Application
☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall:
Include map(s) showing the location of the project and work area.
Be legible lettering and clear, contrasting, symbols of viewing or printing.
Must indicate street names, and north arrow and scale.
Types of plans required:
o Work hour plan – show all mobility impacts during construction hours.
o Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
o Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
o Pedestrian access/detour plan, if applicable.
- Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the
Evergreen Safety Council.
3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].”
Project Name: Permit #:
Site Address:
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Construction Company:
Contact Name: Phone/Cell: _________________________
Business Address: City/State: Zip:
Description of Work:
Approval By: _________________________________________________ Date:____________________
Transportation Engineering
PLEASE SEE ATTACHED
POTELCO, INC
6905 S 228TH ST KENT, WA 98032
105101868
18429 SE 108TH ST
SUZANNE PONTECORVO 206-565-5863
MFP24005703
Monday Friday 8:00am 3:00pm
Scott Warlick CED 11/21/2024
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 3 | Published: 10/27/2021
PERMIT HOLDER AGREES TO ALL THE FOLLOWING:
Must have approved Traffic Control Plan (TCP) prior to commencing the work.
Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time,
with the least possible inconvenience or delay to pedestrians.
WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the
traveled way.
Comply with all traffic regulations of the City of Renton and the State of Washington.
Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street
and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control
Devices.
Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public
transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends
and holidays) prior to starting any work.
Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum
of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a
temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a
minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140
with any questions.
Any lane or street closures not in conformance with the approved traffic control plan and/or without notification
of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at
thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles and
the acts of the Permit Holder’s agents and employees.
The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in
such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable
attorney’s fees and litigation costs incurred resulting from such claim.
In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for
legal counsel chosen by the City to defend against same.
Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
All permit conditions shall be met.
NOTES:
Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by a traffic control plan layout or reference to WSDOT.
Approved Temporary Traffic Control Plan must be at the work site during work hours.
Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery
road conditions during work and non-work hours.
Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company
logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous
place on the vehicle or equipment.
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 3 of 3 | Published: 10/27/2021
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555
NE 2nd Street).
I certify that the information on this application and within the submittal documents are accurate to the best of my
knowledge and I acknowledge all the requirements on this application.
Applicant’s Signature Date
Applicant’s Name (Print)
CORRIE RYDBERG
11/11/2024
18429 108th Ave SE
Renton
WA 98055
USA
1
0
8
T
H
A
V
E
S
E
SE
1
8
6
T
H
S
T
SE 186TH ST
SE 186TH ST
1
0
8
T
H
A
V
E
S
E
1
0
7
T
H
A
V
E
S
E
SE 184TH LN
SE 184TH LN
SE 184TH LN
1
0
8
T
H
A
V
E
S
E
1
0
7
T
H
P
L
S
E
1111111111
1111111111
1111111111
SP1
P01
P02
HH01
11
maintain (2) 11' lanes
RESIDENT(S) WILL BE INFORMED OF
TEMPORARY DRIVEWAY CLOSURE
W20-1
RO
A
D
WO
R
K
AH
E
A
D
RI
G
H
T
L
A
N
E
CL
O
S
E
D
AH
E
A
D
W20-5R
W4-2R
X'≥X'≥X'≥
W2
0
-
1
ROAD
WORK
AHEAD
USE MAXIMUM AVAILABLE
SPACE FOR SIGNS
W20-1
RO
A
D
WO
R
K
AH
E
A
D
ARRW-BRD
W2
0
-
1
ROAD
WORK
AHEAD
RIGHT LANE
CLOSED
AHEADW2
0
-
5
R
W4
-
2
R
X'
≥
X'
≥
X'
≥
W20-1
RO
A
D
WO
R
K
AH
E
A
D
W2
0
-
1
RO
A
D
WO
R
K
AH
E
A
D
W2
0
-
1
ROAD
WORK
AHEAD
1
0
9
T
H
A
V
E
S
E
THE CREW SHALL CEASE
WORK AND ESCORT
PEDESTRIANS AROUND/THRU
WORK AREA IF NEEDED
SEE PAGE 2 FOR PEDESTRIANS
DIVERSION DETAILS
AROUND/THRU WORK AREA
SEE PAGE 3 FOR WSDOT
NOTES & TABLES
S/W
CLOSEDR9
-
9
S/
W
CL
O
S
E
D
R9-9
0'70'35'
N
Project Address:
Page
PSE PUGET
SOUND
ENERGY
Designer:
Job #
REV
Yuriy Bashtovoy
425-424-6425
yuriy.bashtovoy@pse.com
1 OF 318429 108TH AVE SE Renton, WA 98055
0
513443613
08/01/2024
LEGEND
28" TRAFFIC CONE
SIGN LOCATION
TRAFFIC FLOW
WORK VEHICLE/
FLASHING LIGHTS
RIGHT OF WAY
WORK AREA
CHEVRON
ARROW BOARD
FLAGGER
UNIFORMED
POLICE OFFICERPOLICE
STOP
HANDHOLE
TEMPORARY TRAFFIC CONTROL PLAN
Puget Sound Energy
Traffic Control Supervisor:
Gregory Harwood
Card No. ES2 000299
Card Exp. 09/30/2027
gregory.harwood@pse.com
(425)424-6425
Notes:
1. All signs and spacing to conform to the
MUTCD and City of RENTON standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise indicated.
3. Channelizing devices are 28" traffic cones.
Use traffic drums (barrels) with steady burning
Type C lights on all State State Routes and Hwys.
4. Sign size can be a minimum of 36" x 36" and
shall not obstruct pedestrian access.
5. Crew is required to leave a minimum of 10' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place during approved work hours
as per jurisdictional requirements. (Generally
between 9 a.m. and 4 p.m. on non-arterials and
from 9 a.m. to 3 p.m. on arterials. If night time
work is approved, Night time work to take place between
_____________and ______________.)
8. All Flagger and Downstream tapers shall be 50'-100'.
X'
X'
PLACE W20-1 SIGNS ON ALL
ADJACENT STREETS WITHIN
FEET OF WORK AREA
ROAD
WORK
AHEAD W2
0
-
1
ROAD
WORK
AHEADW2
0
-
1
350
5'
8'
Cold Mix
5' x 8'
steel plate
3/4"-1" thick,
non-skid
material
cold mixcold mix
non-skid plate
SIDEWALK
CLOSED
SIDEWALK
CLOSED
Crew will create pedestrian/
wheelchair ADA compliant ramps
and assist pedestrians around
work area.
TYPICAL CONFIGURATION
FOR PEDESTRIAN AND BIKE
DIVERSION FOR SIDEWALK OR
WALKWAY CLOSURES (OUTSIDE)
5' Miniumum
Crew will create pedestrian/
wheelchair compliant ramps
and assist pedestrians around
work area.
Add additional cones
for safety
SIDEWALK
CLOSEDR9
-
9
SIDEWALK
CLOSEDR9
-
9
TYPICAL CONFIGURATION
FOR PEDESTRIAN AND BIKE
DIVERSION FOR SIDEWALK OR
WALKWAY CLOSURES (INSIDE)
curb faceLevel Landing
from Sidewalk to curb edge
non-skid material
Level Landing
from Ramp onto
street surface
non-skid material
Ramp Surface ADA compliant (12:1 slope)
non-skid material (crew will assist)
Stabilized material for
full ramp support
12:
1
s
l
o
p
e
4' Minim
u
m
6" Min ADA compliant
detectable strip
N
Project Address:
Page
PSE PUGET
SOUND
ENERGY
Designer:
Job #
REV
Yuriy Bashtovoy
425-424-6425
yuriy.bashtovoy@pse.com
2 OF 318429 108TH AVE SE Renton, WA 98055
0
513443613
08/01/2024
LEGEND
28" TRAFFIC CONE
SIGN LOCATION
TRAFFIC FLOW
WORK VEHICLE/
FLASHING LIGHTS
RIGHT OF WAY
WORK AREA
CHEVRON
ARROW BOARD
FLAGGER
UNIFORMED
POLICE OFFICERPOLICE
STOP
HANDHOLE
TEMPORARY TRAFFIC CONTROL PLAN
Puget Sound Energy
Traffic Control Supervisor:
Gregory Harwood
Card No. ES2 000299
Card Exp. 09/30/2027
gregory.harwood@pse.com
(425)424-6425
Notes:
1. All signs and spacing to conform to the
MUTCD and City of RENTON standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise indicated.
3. Channelizing devices are 28" traffic cones.
Use traffic drums (barrels) with steady burning
Type C lights on all State State Routes and Hwys.
4. Sign size can be a minimum of 36" x 36" and
shall not obstruct pedestrian access.
5. Crew is required to leave a minimum of 10' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place during approved work hours
as per jurisdictional requirements. (Generally
between 9 a.m. and 4 p.m. on non-arterials and
from 9 a.m. to 3 p.m. on arterials. If night time
work is approved, Night time work to take place between
_____________and ______________.)
8. All Flagger and Downstream tapers shall be 50'-100'.
TEMPORARY TRAFFIC CONTROL PLAN
WSDOT NOTES & TABLES
””
–
Project Address:
Page
PSE PUGET
SOUND
ENERGY
Designer:
Job #
REV
Yuriy Bashtovoy
425-424-6425
yuriy.bashtovoy@pse.com
3 OF 318429 108TH AVE SE Renton, WA 98055
0
513443613
08/01/2024
Puget Sound Energy
Traffic Control Supervisor:
Gregory Harwood
Card No. ES2 000299
Card Exp. 09/30/2027
gregory.harwood@pse.com
(425)424-6425
1-3" DB120 L______'
350 UG TPX
EXISTING
#2 OH TPX
1-2" COND
2-WIRE #4
CUSTOMER SERVICE
F
100T
UNK
10
8
T
H
A
V
E
S
E
SE 186TH ST
10
8
t
h
A
V
E
S
E
SE
1
8
6
T
H
S
T
SE 186TH ST
F
W
W
WWWWWWWWWWWWWWWWWWW
10714
18603
10808
10809
10803
18429
OPEN TRENCH ~ 10'
SE 186TH ST
SE
1
8
6
T
H
S
T
10
8
T
H
A
V
E
S
E
100T
UNK
PROPOSED
CUSTOMER
SERVICE
POINT SP1
SITE PLAN
SCALE: 1:50
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
J. LENGEL 425-449-9954 10/5/23
A. SHATHI 425-603-5906 06/23/22
N/A N/A N/A
C. CHAVEZ 253-691-2840 06/23/22
N/A CITY OF RENTON
57300 - I LINE RENTON
OH/UG SECONDARY L/E
18429 108TH AVE SE, RENTON, WA 98055
N/A N/A
N/A 105101868
AS NOTED 1 OF 1
KING N/A N/A QCSOKE
SW-32-23-05 N/A N/A
2305E127 2305E136 2305E127 PAN-15
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
10
5
1
0
1
8
6
8
Potelco, Inc.DESIGNED BY
ONE LINE DIAGRAM
SCALE: NOT TO SCALE
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
No
No
No
Yes
Yes
Yes
"Flagging Required"
"Outages Required"
"Locates Required"
JOB SITE
MAKE NO CHANGES TO THIS JOB WITHOUT PRIOR APPROVAL
Notify Customers and Service Area
48 HRS Prior To Planned Outages
VICINITY MAP
For contacts below dial 1-888-CALL PSE (225-5773)
EST. TOTAL XFMR DEMAND: 9 KW
SEGMENT 1:
SVC SIZE: #2 OH TPX
SVC LENGTH: 45'
SEGMENT 2:
SVC SIZE: 350 UG TPX
SVC LENGTH: 60'
TOTAL % V. DROP 2.0%
SINGLE PHASE SECONDARY CONCRETE HANDHOLE @HH01
Not to scale 6050.2020-2
Steel Door
Handhole
1900 lbs
Typical customer run
service conductors in duct
Seal conduit
with foam
INSTALLall PVC bell ends
and grout into wall
Conduits and conductors shall enter from
ends of handhole through knockouts provided
TOP VIEW
SIDE VIEW
3'-4"
EXCAVATION: 5-1/3 CUBIC YARDS
7'-0"
6'-0"
6" Crushed rock
2"
Customer-INSTALLalled grounding wires ( the "4th" wire on the single-phase systems and the "5th"
wire on
the three-phase systems) shall not be connected to PSE's ground or neutral bus. They shall be
removed by customer or cut off at the vault wall.
SITE SPECIFIC NOTES
P02 (EXISTING) 316224-166282
-INSTALL NEW 3" RISER (STD 6042.1000 - RIS3CSS)
HH01 (NEW)
-INSTALL SECONDARY 233 CONCRETE HH (6050.2020 HH16500AS)3-22
SPAN SPECIFIC NOTES
P02 - HH01
-INSTALL 350 UG TRIPLEX, + 30' (L=______' ) TO EXISTING TPX 3-8
-INSTALL 3" DB120 CONDUIT, +10' (L=______' )
SECONDARY CABLE & CONDUIT TABLE
LOCATION CABLE Assumed
Lot Corner
CONDUIT VOLTAGE
DROP ASBUILT INFORMATION
SIZE LENGTH
Design
(ft)
SIZE LENGTH
Design
(ft)
BENDS
Foreman - Complete
FROM TO (1/0,4/0,350)to Meter(ft)(in)90°45°22°11°(Percent)Actual Amount INSTALLalled (Conduit & Cable)
P02 HH01 350 30 3 10 2.0%
POWER GENERAL NOTES - COMMERCIAL PROJECT
EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer
will provide any and all shoring or they will side slope the trench to 1:1.
All materials to be INSTALLalled in accordance with Puget Sound Energy's (PSE) standards. Any deviation
from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans'
Copy.
All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing
work to get the underground facilities located.
STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.
SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
Roads shall be paved or have a compacted , crushed rock base in place.
CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard
posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,
storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them, or
as required by your local municipality.
All work is to be done in accordance with local municipal and county permit requirements as applicable.
Customer/Developer is responsible to provide, INSTALLall and maintain all secondary service cables,
conduits and crossings from the individual unit's meter base to the designated connection point on private
property.
Inclement weather conditions may cause delays in construction times and dates.
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
360-784-4212 7/14/22
FAULT CURRENT TABLE
1Ø PM TRANSFORMERS (120/240V)
120V WINDINGS 240V WINDINGS
LOCATION SIZE R/X MIN.
%Z
FAULT
CURRENT
MIN.
%Z
FAULT
CURRENT
P01 15 0.9 2.5 5,000 AMPS 2 3,100 AMPS
OVERHEAD CIRCUIT MAP (2305E136)
SCALE: 1:880
SECONDARY HH/PEDESTAL TABLE
Site Pedestal
or
Handhole
Number of
Positions
Required
Remarks
HH01 Handhole 6
ORDER#NOTIF#PROJECT PHASE
MAINTENENCE
O & M
SUPERIOR
FAILED SILICONE
REMOVAL
EXPENSE
513443613 105101868
N/A
N/A
PM Contact Information
Owner / Developer Contact Info
officeATTN:
King County Metro
201 S Jackson St, Mailstop KSC-TR-0435
Seattle, WA 98104
Son Do 206-263-2212
VOLUME OF DISTURBANCE TABLE
TYPE DESCRIPTION PROPERTY
CLASSIFCATION
SIZE (FT)REM CU YD
(APPX)
GRAVEL FILL
CU YD (APPX)
TYPE OF SURFACE REMARKS
OPEN TRENCH TRENCH ROW 1 X 10 0.0 0.0 SOFT
HH VAULT EXC ROW 7X6X2.33 3.6 3.2 HARD
TOTAL PVT PROP CU YDS (APPX)0.0 0.0
TOTAL ROW CU YDS (APPX)3.6 3.2
TOTAL CU YDS (APPX)3.6 3.2
JOB SITE
CUSTOMER SERVICE NOTES
-INSTALL AND CONNECT 2-WIRE #4 CUSTOMER
SERVICE BETWEEN SP1 & HH01
JAMES_LENGEL
425-449-9954