Loading...
HomeMy WebLinkAboutMFP24005703.pdfNote: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. DEPARTMENT OF PUBLIC WORKS Page 1 of 3 | Published: 10/27/2021 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN APPLICATION Published: 10/27/2021 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. 1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents. 2. The following items are all required for submittal of the TCP Application: ☐Electronic Copy of the TCP Application ☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall: Include map(s) showing the location of the project and work area. Be legible lettering and clear, contrasting, symbols of viewing or printing. Must indicate street names, and north arrow and scale. Types of plans required: o Work hour plan – show all mobility impacts during construction hours. o Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. o Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. o Pedestrian access/detour plan, if applicable. - Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. 3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].” Project Name: Permit #: Site Address: Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Construction Company: Contact Name: Phone/Cell: _________________________ Business Address: City/State: Zip: Description of Work: Approval By: _________________________________________________ Date:____________________ Transportation Engineering PLEASE SEE ATTACHED POTELCO, INC 6905 S 228TH ST KENT, WA 98032 105101868 18429 SE 108TH ST SUZANNE PONTECORVO 206-565-5863 MFP24005703 Monday Friday 8:00am 3:00pm Scott Warlick CED 11/21/2024 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 3 | Published: 10/27/2021 PERMIT HOLDER AGREES TO ALL THE FOLLOWING: Must have approved Traffic Control Plan (TCP) prior to commencing the work. Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the traveled way. Comply with all traffic regulations of the City of Renton and the State of Washington. Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends and holidays) prior to starting any work. Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140 with any questions. Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes. Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. All permit conditions shall be met. NOTES: Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by a traffic control plan layout or reference to WSDOT. Approved Temporary Traffic Control Plan must be at the work site during work hours. Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 3 of 3 | Published: 10/27/2021 In the case of Temporary No Parking Zones, all the following apply in addition to previous: Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). I certify that the information on this application and within the submittal documents are accurate to the best of my knowledge and I acknowledge all the requirements on this application. Applicant’s Signature Date Applicant’s Name (Print) CORRIE RYDBERG 11/11/2024 18429 108th Ave SE Renton WA 98055 USA 1 0 8 T H A V E S E SE 1 8 6 T H S T SE 186TH ST SE 186TH ST 1 0 8 T H A V E S E 1 0 7 T H A V E S E SE 184TH LN SE 184TH LN SE 184TH LN 1 0 8 T H A V E S E 1 0 7 T H P L S E 1111111111 1111111111 1111111111 SP1 P01 P02 HH01 11 maintain (2) 11' lanes RESIDENT(S) WILL BE INFORMED OF TEMPORARY DRIVEWAY CLOSURE W20-1 RO A D WO R K AH E A D RI G H T L A N E CL O S E D AH E A D W20-5R W4-2R X'≥X'≥X'≥ W2 0 - 1 ROAD WORK AHEAD USE MAXIMUM AVAILABLE SPACE FOR SIGNS W20-1 RO A D WO R K AH E A D ARRW-BRD W2 0 - 1 ROAD WORK AHEAD RIGHT LANE CLOSED AHEADW2 0 - 5 R W4 - 2 R X' ≥ X' ≥ X' ≥ W20-1 RO A D WO R K AH E A D W2 0 - 1 RO A D WO R K AH E A D W2 0 - 1 ROAD WORK AHEAD 1 0 9 T H A V E S E THE CREW SHALL CEASE WORK AND ESCORT PEDESTRIANS AROUND/THRU WORK AREA IF NEEDED SEE PAGE 2 FOR PEDESTRIANS DIVERSION DETAILS AROUND/THRU WORK AREA SEE PAGE 3 FOR WSDOT NOTES & TABLES S/W CLOSEDR9 - 9 S/ W CL O S E D R9-9 0'70'35' N Project Address: Page PSE PUGET SOUND ENERGY Designer: Job # REV Yuriy Bashtovoy 425-424-6425 yuriy.bashtovoy@pse.com 1 OF 318429 108TH AVE SE Renton, WA 98055 0 513443613 08/01/2024 LEGEND 28" TRAFFIC CONE SIGN LOCATION TRAFFIC FLOW WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY WORK AREA CHEVRON ARROW BOARD FLAGGER UNIFORMED POLICE OFFICERPOLICE STOP HANDHOLE TEMPORARY TRAFFIC CONTROL PLAN Puget Sound Energy Traffic Control Supervisor: Gregory Harwood Card No. ES2 000299 Card Exp. 09/30/2027 gregory.harwood@pse.com (425)424-6425 Notes: 1. All signs and spacing to conform to the MUTCD and City of RENTON standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 10' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place during approved work hours as per jurisdictional requirements. (Generally between 9 a.m. and 4 p.m. on non-arterials and from 9 a.m. to 3 p.m. on arterials. If night time work is approved, Night time work to take place between _____________and ______________.) 8. All Flagger and Downstream tapers shall be 50'-100'. X' X' PLACE W20-1 SIGNS ON ALL ADJACENT STREETS WITHIN FEET OF WORK AREA ROAD WORK AHEAD W2 0 - 1 ROAD WORK AHEADW2 0 - 1 350 5' 8' Cold Mix 5' x 8' steel plate 3/4"-1" thick, non-skid material cold mixcold mix non-skid plate SIDEWALK CLOSED SIDEWALK CLOSED Crew will create pedestrian/ wheelchair ADA compliant ramps and assist pedestrians around work area. TYPICAL CONFIGURATION FOR PEDESTRIAN AND BIKE DIVERSION FOR SIDEWALK OR WALKWAY CLOSURES (OUTSIDE) 5' Miniumum Crew will create pedestrian/ wheelchair compliant ramps and assist pedestrians around work area. Add additional cones for safety SIDEWALK CLOSEDR9 - 9 SIDEWALK CLOSEDR9 - 9 TYPICAL CONFIGURATION FOR PEDESTRIAN AND BIKE DIVERSION FOR SIDEWALK OR WALKWAY CLOSURES (INSIDE) curb faceLevel Landing from Sidewalk to curb edge non-skid material Level Landing from Ramp onto street surface non-skid material Ramp Surface ADA compliant (12:1 slope) non-skid material (crew will assist) Stabilized material for full ramp support 12: 1 s l o p e 4' Minim u m 6" Min ADA compliant detectable strip N Project Address: Page PSE PUGET SOUND ENERGY Designer: Job # REV Yuriy Bashtovoy 425-424-6425 yuriy.bashtovoy@pse.com 2 OF 318429 108TH AVE SE Renton, WA 98055 0 513443613 08/01/2024 LEGEND 28" TRAFFIC CONE SIGN LOCATION TRAFFIC FLOW WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY WORK AREA CHEVRON ARROW BOARD FLAGGER UNIFORMED POLICE OFFICERPOLICE STOP HANDHOLE TEMPORARY TRAFFIC CONTROL PLAN Puget Sound Energy Traffic Control Supervisor: Gregory Harwood Card No. ES2 000299 Card Exp. 09/30/2027 gregory.harwood@pse.com (425)424-6425 Notes: 1. All signs and spacing to conform to the MUTCD and City of RENTON standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 10' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place during approved work hours as per jurisdictional requirements. (Generally between 9 a.m. and 4 p.m. on non-arterials and from 9 a.m. to 3 p.m. on arterials. If night time work is approved, Night time work to take place between _____________and ______________.) 8. All Flagger and Downstream tapers shall be 50'-100'. TEMPORARY TRAFFIC CONTROL PLAN WSDOT NOTES & TABLES ”” – Project Address: Page PSE PUGET SOUND ENERGY Designer: Job # REV Yuriy Bashtovoy 425-424-6425 yuriy.bashtovoy@pse.com 3 OF 318429 108TH AVE SE Renton, WA 98055 0 513443613 08/01/2024 Puget Sound Energy Traffic Control Supervisor: Gregory Harwood Card No. ES2 000299 Card Exp. 09/30/2027 gregory.harwood@pse.com (425)424-6425 1-3" DB120 L______' 350 UG TPX EXISTING #2 OH TPX 1-2" COND 2-WIRE #4 CUSTOMER SERVICE F 100T UNK 10 8 T H A V E S E SE 186TH ST 10 8 t h A V E S E SE 1 8 6 T H S T SE 186TH ST F W W WWWWWWWWWWWWWWWWWWW 10714 18603 10808 10809 10803 18429 OPEN TRENCH ~ 10' SE 186TH ST SE 1 8 6 T H S T 10 8 T H A V E S E 100T UNK PROPOSED CUSTOMER SERVICE POINT SP1 SITE PLAN SCALE: 1:50 UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP J. LENGEL 425-449-9954 10/5/23 A. SHATHI 425-603-5906 06/23/22 N/A N/A N/A C. CHAVEZ 253-691-2840 06/23/22 N/A CITY OF RENTON 57300 - I LINE RENTON OH/UG SECONDARY L/E 18429 108TH AVE SE, RENTON, WA 98055 N/A N/A N/A 105101868 AS NOTED 1 OF 1 KING N/A N/A QCSOKE SW-32-23-05 N/A N/A 2305E127 2305E136 2305E127 PAN-15 N/A N/A N/A N/A N/A N/A N/A N/A N/A 10 5 1 0 1 8 6 8 Potelco, Inc.DESIGNED BY ONE LINE DIAGRAM SCALE: NOT TO SCALE THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG No No No Yes Yes Yes "Flagging Required" "Outages Required" "Locates Required" JOB SITE MAKE NO CHANGES TO THIS JOB WITHOUT PRIOR APPROVAL Notify Customers and Service Area 48 HRS Prior To Planned Outages VICINITY MAP For contacts below dial 1-888-CALL PSE (225-5773) EST. TOTAL XFMR DEMAND: 9 KW SEGMENT 1: SVC SIZE: #2 OH TPX SVC LENGTH: 45' SEGMENT 2: SVC SIZE: 350 UG TPX SVC LENGTH: 60' TOTAL % V. DROP 2.0% SINGLE PHASE SECONDARY CONCRETE HANDHOLE @HH01 Not to scale 6050.2020-2 Steel Door Handhole 1900 lbs Typical customer run service conductors in duct Seal conduit with foam INSTALLall PVC bell ends and grout into wall Conduits and conductors shall enter from ends of handhole through knockouts provided TOP VIEW SIDE VIEW 3'-4" EXCAVATION: 5-1/3 CUBIC YARDS 7'-0" 6'-0" 6" Crushed rock 2" Customer-INSTALLalled grounding wires ( the "4th" wire on the single-phase systems and the "5th" wire on the three-phase systems) shall not be connected to PSE's ground or neutral bus. They shall be removed by customer or cut off at the vault wall. SITE SPECIFIC NOTES P02 (EXISTING) 316224-166282 -INSTALL NEW 3" RISER (STD 6042.1000 - RIS3CSS) HH01 (NEW) -INSTALL SECONDARY 233 CONCRETE HH (6050.2020 HH16500AS)3-22 SPAN SPECIFIC NOTES P02 - HH01 -INSTALL 350 UG TRIPLEX, + 30' (L=______' ) TO EXISTING TPX 3-8 -INSTALL 3" DB120 CONDUIT, +10' (L=______' ) SECONDARY CABLE & CONDUIT TABLE LOCATION CABLE Assumed Lot Corner CONDUIT VOLTAGE DROP ASBUILT INFORMATION SIZE LENGTH Design (ft) SIZE LENGTH Design (ft) BENDS Foreman - Complete FROM TO (1/0,4/0,350)to Meter(ft)(in)90°45°22°11°(Percent)Actual Amount INSTALLalled (Conduit & Cable) P02 HH01 350 30 3 10 2.0% POWER GENERAL NOTES - COMMERCIAL PROJECT EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. All materials to be INSTALLalled in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. Roads shall be paved or have a compacted , crushed rock base in place. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them, or as required by your local municipality. All work is to be done in accordance with local municipal and county permit requirements as applicable. Customer/Developer is responsible to provide, INSTALLall and maintain all secondary service cables, conduits and crossings from the individual unit's meter base to the designated connection point on private property. Inclement weather conditions may cause delays in construction times and dates. FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. 360-784-4212 7/14/22 FAULT CURRENT TABLE 1Ø PM TRANSFORMERS (120/240V) 120V WINDINGS 240V WINDINGS LOCATION SIZE R/X MIN. %Z FAULT CURRENT MIN. %Z FAULT CURRENT P01 15 0.9 2.5 5,000 AMPS 2 3,100 AMPS OVERHEAD CIRCUIT MAP (2305E136) SCALE: 1:880 SECONDARY HH/PEDESTAL TABLE Site Pedestal or Handhole Number of Positions Required Remarks HH01 Handhole 6 ORDER#NOTIF#PROJECT PHASE MAINTENENCE O & M SUPERIOR FAILED SILICONE REMOVAL EXPENSE 513443613 105101868 N/A N/A PM Contact Information Owner / Developer Contact Info officeATTN: King County Metro 201 S Jackson St, Mailstop KSC-TR-0435 Seattle, WA 98104 Son Do 206-263-2212 VOLUME OF DISTURBANCE TABLE TYPE DESCRIPTION PROPERTY CLASSIFCATION SIZE (FT)REM CU YD (APPX) GRAVEL FILL CU YD (APPX) TYPE OF SURFACE REMARKS OPEN TRENCH TRENCH ROW 1 X 10 0.0 0.0 SOFT HH VAULT EXC ROW 7X6X2.33 3.6 3.2 HARD TOTAL PVT PROP CU YDS (APPX)0.0 0.0 TOTAL ROW CU YDS (APPX)3.6 3.2 TOTAL CU YDS (APPX)3.6 3.2 JOB SITE CUSTOMER SERVICE NOTES -INSTALL AND CONNECT 2-WIRE #4 CUSTOMER SERVICE BETWEEN SP1 & HH01 JAMES_LENGEL 425-449-9954