Loading...
HomeMy WebLinkAboutR-381211T 00 CM Lu SEC.19 T.23N. R.5E. W.M. CURVE DATA P.I. STATION DELTA RADIUS ITANGENT LENGTH S DESIGN SPEED MATCH LINE E167 11003+80.00 SEE SHEET AL20 NB405 1189+09.41 04°06'06" RT 3470.00' 124.25' 248.40' 4% 60 MPH NBCD 11+69.23 04°09'46" RT 4154.50' 150.98' 301.83' 2% 45 MPH E405 1180+36.88 I WN167 10+72.93 29°18'49" RT 300.00' 78.46' 153.49' 6% 20 MPH (275.35- LT) ` I j'1 -I I I WN167 13+22.30 96°43'23" RT 155.00' 174.34' 261.66' 10% 20 MPH I I l 4 N-N167 15+83.25 96°29'31" RT 155.00' 173.64' 261.04' 10% 20 MPH w SB405 1186+11.33 /0 W MP 2.32 _ _ "-- /j N-N167 300.00' 119.86' 820 MPH z' E167 11001+16.62 = V N167-N 22+92.39 43°51'44" RT 540.00, 217.42' 413.39' 10% 45 MPH MP 26'29 DC-F 40+84.24 80°37'07" RT 1063.00' 901.79' 1495.70' 7% 45 MPH tv NB405 1184+90.86 72.1T RT w i SB167 249+23.31 03°16'15" LT 4030.00' 115.06' 230.06' 2% 45 MPH SURVEY CONTROL POINT w x o GP17167-29 ; I _ NB 348+60.88 04°46'34" RT 4030.00' 168.07' 335.94' 2/0 45 MPH iv �- NB405 1185+01.03 NB405 1190+33.56 PT\ MP 2.32 = GENERAL NOTES: o+7s.21 � _ � � � '''(0 SB405 1191+08.61 AP - / / _ zi ___ �16�-.-'��� ---------------------- --- - 1. RIGHT-OF-WAY CALLOUTS ARE FOR CONTRACT INFORMATION 7 i� _-MB gR''- NB405 1189+09.41 PI ONLY. SEE APPROVED RIGHT-OF-WAY PLANS FOR EXACT R l -- SB405 1183+43.06 LOCATION. E405 1183+00.00, 21.67 N 173743.39 - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - 2. SEE SITE PREPARATION PLANS FOR CUT AND FILL LINES. E 1297689.83 _ _ - --- --- -- -ti-'' -----Y' ----- - --------- -�'-"_- - ---'- -- S 405 I 3 -_ N 86°tg•32" E�9 5°5 '25" n .ANY MONUMENT OR CORNER DISTURBED BY THE DESIGN x -- -------�„�__} _ _ REPLACED AT NO COST - --1185-` -- 1990- _ z TO THE CONTRACTING AGENCY. ------- ; ----- __- - __ -- --SB I-405 .F. ==-_ _S_89°35!w,i: m E405 1183+00.00 POE - - - ----- _ _ _ - - z -- - _ -- cu i -_--------- -------- ____ ___ - NBCD 11+69.23 PI a _ _. N-N167 _10+72.93 PI - _�- - o N 86°18'36" E NB 1-405 _ , 1F - - 89°3t'38" -E o - -- - E4S7=a 1M0+00.00 =- _ ". N-B6°50' E-------------- N - - - - _ - - I _ _ - - - - - - - 13+20.08 PT N167-N 22+92.39 PI 0 --------- -- "- NBCD NB167 352+56.71, 19.29' LT _ ----------- SB167 252+69.43, 7.05' RT- ' ? --- N-N167 11+47.95 PCC 0 N 173644.01 - w __-- 297954.31_ _ _ - - - N-N167 13+22.30 PI m --- - ----------------- WN167 9+94.47 POB/PC - ---------- NB405 1182+36.56 = -S = SB167 252+69.43 POE NBCD 10+56.26, 14.00' RT 63° E405 1183+00.00, 19.63' RT NBCD 10+18.24 PC S7p�� m N 173702.17 ; �F E 1297692.48 j; I N 86°78'36" E i ;' D j ; I w NBCD 10+00.00 POB = �� DC-F 40+84.24 PI ; N6405 1185+94.51, 38.30' RT BEARING IN N 00°30'S5" E I ; BEARING OUT N 81°08'02" E j jW IN I' B767 352+56.71 POE �`O �� I � I&I, ash i z N-N167 18+98.71 PT/POE % 'p IY' N6167 351+95.78, 12.00' RT E405 1180+23.48 �A lz MI �0 N 7°04'47" W / (355.59' RT) I I z R� I i� ✓� / N-N167 16+70.65 PCC�F *0 O z N-S167 19+07.00 POE = i; ) N 6 20+74.97 PC 67 249+65.16, 416.44' LT SB167 250+38 31 PT 6` _ j0, ; \ I -N167 14+09.61 PCC cm ------ �� �� ;;'� 28. 'PT WN167 17+90.51 PI B 5 1189+90.18 0� NB167 50 'O 4.98'RT) 'I -� JbIto pX I 3B jx n �80 • tie - I J•, \ `� 0 -- 0S ^� B405 1189+18.69 Q\ I x- -x- -x 7x SB167 249+23.31 PI �'`O �I 2486.50' RT) L E405 1181+39.21 I I y rl tV (472.29' RT) 1 RAW N-S167 16+48.96 PT p - x I x �' rnI 167 15+83.25 PI NB405 ;1188+37.7 �m 00 �p (549.52",RT) x z l NB167 34 60.88 PI ? , MATCH LINE NB167 348+00.00 SEE SHEET AL09 AS=BUILT 0 50 100 SCALE IN FEET R_ S21'�11 FILE NAME c:Ipwworkingknai\schmidal\d03219921CB811_PS_AL10.dgn �E SUM e� Fwas = _ �� 47018 0 S/ONAL GIsTERE ��� E� 2O P.E. STAMP BOX GATE GATE P.E. STAMP BOX Aloft MP Washington State 9 ortation Transportation of DepartmentP 1-405 / SR 167 INTERCHANGE DIRECT CONNECTOR PLAN REF No AL10 TIME 11:28:25 AM REV 4 - RFC RF10054 06/20/17 REGION' STATE FED.AID PROJ.NO. DATE 6/1612017 REV 3 - RFC RF10033 05/15/17 10 WAS PLOTTED BY schmidal REV 2 -RFC RF10011 04/04/17 DESIGNED BY A. SCHMIDTMAN REV 1 - RFC RF10004 02/17/17 JOB NUMBER SHEET 78 OF 887 SHEETS ENTERED BY A. KIRDAHY REV 0 - RELEASED FOR CONSTRUCTION 12/13/16 CHECKED BY P. CROWLEY REV B -FINAL REVIEW 11/15/16 CONTRACT NO. C8811 LOCATION NO. PROJ. ENGR. C. CHEN REV A - PRELIMINARY REVIEW 10/10/16 ALIGNMENT PLAN REGIONAL ADM. L. ENG REVISION DATE BY