Loading...
HomeMy WebLinkAboutR-381233N T 00 CM I 0 i LLI LANDSCAPE LEGEND PLANT MIX S - EROSION CONTROL SEED MIX SYMBOL ITEM LBS OF PURE LIVE SEED PER ACRE VARIETY OF SEED IN MIXTURE PERENNIAL RYE (LOLIUM PERENNE) 60.0 RED FESCUE (FESTUCA RUBRA SSP. RUBRA 17.0 TOTAL 77.0 NOTES: 1 1. SEE DETAIL 1/LD01 AND SPEC SECTION 8-01.3(2)A FOR SEEDED AREA PREPARATION. 2. EROSION CONTROL SEED SHALL BE APPLIED USING A TWO -PASS PROCESS. THE FIRST PASS SHALL INCLUDE THE SEED AND A TRACER, ENSURING EVEN DISTRIBUTION OF THE SEED OVER THE FULL GROUND AREA. THE SECOND PASS SHALL CONSIST OF THE MULCH AND TACKIFIER, IF SPECIFIED. THE CONTRACTOR SHALL ENSURE THAT SOIL IS FULLY COVERED WITH THE MULCH, PROVIDING COMPLETE EROSION CONTROL. 3. SEE PLANTING NOTE 15 ON SHEET LD02 FOR FERTILIZER SPECIFICATIONS. 4.HYDROSEED MULCH SHALL BE SHORT-TERM MULCH APPLIED AT A RATE OF 2,500 POUNDS PER ACRE AND PER REQUIREMENTS OF 8-01-3(2). 5. FOR SEEDING AREAS NEAR ROADWAY PAVING, SEED TO WITHIN 18" OF EDGE OF PAVEMENT. PLANT MIX RE - REMEDIAL ENHANCEMENT MIX SYMBOL ITEM % MIX =_= TREES - 12' O.C. SPACING, TYP. DOUGLAS FIR 5% INCENSE CEDAR 5% == SHRUBS-- 4' O. SP C G �TY. == WHITE ROCKROSE 30% SNOWBERRY 30% BURNING BUSH 30% NOTES: 1. SEE DETAIL 2/LD01 FOR PLANTING AREA PREPARATION LAYOUT AND DETAILS 3 & 4/LD01 FOR PLANT LAYOUT AND INSTALLATION. PLANT MIX T -TREES FOR TREE WELLS SYMBOL ITEM % MIX TREES - INCENSE CEDAR 33.3% ( OREGON OAK 33.3% O° SHORE PINE 33.3% NOTES: 1. SEE DETAIL 1B/LD01 FOR TREE PIT AREA PREPARATION AND DETAIL 3/LD01 FOR PLANT INSTALLATION. 2. REFERENCE SHEET RW02 FOR LANDSCAPE ECOLOGY BLOCK WALL DETAIL (TREE WELL IS AREA BEHIND WALL) 3. PLANT TREE T BEHIND BLOCKWALL PLANT MATERIAL LIST MIX RE MIX RT MIX T TOTAL COMMON NAME BOTANICAL NAME SIZE REMARKS 1 TREES 25 45 7 77 INCENSE CEDAR CALOCEDRUS DECURRENS 4' HT 7 FOR MIX T, 37 FOR MIX RT, UNSHEARED 6 6 OREGON OAK QUERUS GARRYANA 4'HT 7 7 SHORE PINE PINUS CONTORTA V. CONTORTA 4' HT UNSHEARED 25 45 70 DOUGLAS FIR PSEUDOTSUGA MENZIESII 4' HT MIX RT, UNSHEARED MIX RE MIX RC NEW MIX RC INFILL TOTAL SHRUBS 72 47 119 VINE MAPLE ACER CIRCINATUM 24" HT. GROUPS OF 1-3 72 47 119 AUTUMN FIRE COTONEASTER COTONEASTER SALICIFOLUS 'AUTUMN FIRE' 1 GAL. GROUPS OF 1-5 72 47 119 BEARBERRY COTONEASTER COTONEASTER DAMMERI 1 GAL. INFILL BETW. SHRUB GROUPS 150 150 BURNING BUSH EUONYMUS ALATUS 18" HT. GROUPS OF 1-5 72 47 119 NOOTKA ROSE ROSA NUTKANA 18" HT. GROUPS OF 1-5 72 47 119 PACIFIC WAX MYRTLE MYRICA CALIFORNICA 2 GAL. GROUPS OF 1-5 72 47 119 FRAGRANT SUMAC RHUS AROMATICA 1 GAL. GROUPS OF 1-5 72 47g26 SERVICEBERRY AMELANCHIER ALNIFOLIA 1 GAL. GROUPS OF 1-5 150 7247SNOWBERRY SYMPHORICARPUS ALBUS 12" HT. GROUPS OF 1-5 72 47THIMBLEBERRY RUBUS PARVIFLORUS 1 GAL. GROUPS OF 1-5 150 7247WHITE ROCKROSE CISTUS X HYBRIDUS 12" HT. GROUPS OF 1-5 72 47 119 WILD MOCK ORANGE PHILADELPHUS LEWISII 12" HT. GROUPS OF 1-5 PLANT MIX RC - REMEDIAL CORRIDOR !Oi•OOi ••••♦ ►000•� AUTUMN FIRE COTONEASTER 9.09% !000•� SOOT:NOOTKA ROSE• " ••..� PACIFIC 909% !000•� l000•� FRAGRANT SUMAC 9.09% !p•�❖� SERVICEBERRY . i0•iii ••••� i•OOOi i•OOOi I SNOWBERRY 90 9 � ' ►000•� l000•� i !••.• VINE MAPLE 9.09% !•ppp ••••• ►❖.❖, WHITE ROCKROSE 9.09% !000•� !000•� l000•� WILD MOCK ORANGE 9.09% !Oi'O•� SEEDING '00•p� WILD FLOWER NOTES: 1. SEE DETAIL 2/LD02 FOR PLANTING PIT DETAIL TO BE USED FOR ALL NEW PLANT MIX RC AREAS 2. SEE DETAIL 3 /LD02 FOR INTERPLANTING DETAIL TO BE USED FOR ALL INFILL PLANT MIX RC AREAS. INFILL QUANTITIES DO NOT INCLUDE GAPS OR DEAD PLANT REPLACEMENT WITHIN EXISTING SHRUB GROUPINGS. ACTUAL QUANTITIES MAY REQUIRE ADJUSTMENT TO ACCOUNT FOR THESE. NOTES: 1. SPECIFICATIONS FOR SIZE AND CONDITION ARE MINIMUM. 2. ABBREVIATIONS: B&B = BALLED AND BURLAPPED CONT. = CONTAINER HT. = HEIGHT O.C. = ON CENTER SPR.= SPREAD PLANT MIX RT -REPLACEMENT TREES SYMBOL ITEM % MIX TREES - \ \. DOUGLAS FIR 50% \ \ INCENSE CEDAR 50% NOTES: 1. SEE DETAIL 3/LD01 FOR TREE INSTALLATION. 3. SEE DETAILS 3 & 4/LD01 FOR PLANT LAYOUT AND INSTALLATION. 4. FOR WILD FLOWER MIX CONFORM TO SP 8-01.3(2)B.OPT9.LSP.DT1 FILE NAME c:\pwworking\nai\ex-phanlXd0321992\C8811_PS_LSO.dgn TIME 4:19:38 PM REGION O. STATE FED.AID PROJ.NO. DATE 12/11/2017 REV 1 - RFC-PKG. 6D 12111/17 10 WAS PLOTTED BY LaniP REV D -FINAL REVIEW-PKG. 6D 06/09/17 DESIGNED BY C. PETERSEN REV C -PRELIM. REVIEW-PKG. 6D 04/05/17 JOB NUMBER ENTERED BY L. PHAN REV 0 - RELEASED FOR CONSTRUCTION 02/08/17 CHECKED BY C. PETERSEN REV B -FINAL REVIEW 12/09/16 CONTRACT NO. C8811 LOCATION NO. PROD. ENGR. C. CHEN REV A - PRELIMINARY REVIEW 10/31/15 REGIONAL ADM. L. ENG REVISION DATE BY ATKINSON DEC 12 Z017 RELEASED FOR CONSTRUCTION AS=BUILT OF WAS J\ STD Y F� T TAP �r Washington State .9**** ExP.06I�\ti�`� _�I_I Department of Transportation PLAN REF NO 1-405 / SR 167 INTERCHANGE LSO DIRECT CONNECTOR SHEET 261 OF 88 LANDSCAPE DETAILS SHEETS