Loading...
HomeMy WebLinkAboutR-381238DECOMPACT EXISTING SOIL EXISTING SOIL I STEP 1 R I DECOMPACT, COMPACTED SOILS TO 10" MIN. DEPTH STEP 2 INSTALL FINE COMPOST TO 2" NON -COMPACTED DEPTH 0 STEP 1 TOP OF CURB, PAVEMENT, - JUNCTION BOX, VALVE BOX, OR STRUCTURE SEEDED AREA PREPARATION SECTION VIEW SET PLANT VERTICALLY NOT PERPENDICULAR TO SLOPE WOOD STAKE OR #6 REBAR OR (TREES >24" HT.), SEE NOTE 3 FOR TREES 24" HT. OR LESS. 6" FINE COMPOST STEP 2 SEE PLANT MATERIAL LIST FOR SIZE AND TYPE HOSE/WIRE TIE OR APPROVED SUBSTITUTE L 1/3 TO 'h TREE HT. UPPERMOST ROOT / SHALL MORE THAN 1"" BELOW SOIL SURFACE 3" DEPTH WOOD CHIP MULCH, FEATHER DEPTH TO STEM. MULCH SHALL NOT CONTACT STEM.* 2" WATER r RETENTION — EXISTING SOIL BACKFILL WITH 3 TIMES ROOT SPREAD SOIL REMOVED OR ROOT BALL DIAMETER FROM HOLE SLOPE CONDITION TREE AND SHRUB PLANTING N.T.S. APPLY REMAINING 50% OF HYDROSEED TO TOP LAYER OF TOPSOIL APPLY TOPSOIL TYPE A TO TOP OF - EROSION CONTROL BLANKET TO BARELY COVER TOP RIDGES OF _ PYRAMIDAL PROJECTIONS (APPROX.1") 1 APPLY EROSION CONTROL BLANKET OVER SEEDED SLOPE 2 APPLY 50% OF EROSION - CONTROL SEED MIX (PLANT MIX S) OVER TOPSOIL. PRIOR TO PLACEMENT OF BLANKET 10" TYP. TOPSOIL TYPE A — PLACED IN 6" LIFTS 6" LIFT OF TOPSOIL TYPE A INCORPORATED TO 10" DEPTH COMMON BORROW SUBGRADE NOTE: EROSION CONTROL BLANKET SHALL BE ARMORMAX ANCHOR REINFORCED VEGETATION SYSTEM (ARVS). FOLLOW MANUFACTURER'S RECOMMENDATIONS FOR SEEDING. 1. ONCE DECOMPACTION & SOIL AMENDMENT ARE COMPLETE NO DRIVING ON PLANTING AREAS SHALL BE ALLOWED EXCEPT FOR BARK INSTALLATION. BARK INSTALLATION EQUIPMENT SHALL NOT BE ALLOWED WITHIN STREAM RESTORATION PLANTING AREAS. (ASSUMED INSTALLATION METHOD IS BLOWER TRUCK WITH HOSE.) 2. DECOMPACTION TESTING BY WSDOT IS REQUIRED PRIOR TO REMOVAL OF EQUIPMENT. D003. OMIT STEPS 2, 3, & 5 FOR RESTORATIONTozoo. MIX TYPE 1. 4. OMIT STEP 3 FOR RESTORATION MIX TYPES 2 & 3. DECOMPACTED SUBGRADE, TYP. STEP 1 DECOMPACT SUBGRADE TO 12" DEPTH STEP 2 12" PLACE SOIL AMENDMENT STEP 3 INCORPORATE SOIL AMENDMENT TO 10" DEPTH INSTALL PLANT (SEE PLANTING DETAIL) INSTALL WOOD CHIP MULCH 3" DEEP. FEATHER INTO ADJACENT SEEDING AREAS. 4" NON -COMPACTED DEPTH FINE COMPOST SOIL AMENDMENT PLANT FINISH GRADE AMENDED SOIL 1 SUBGRADE, TYP.— STEP 1 STEP 2 STEP 3 STEP 4 ( ,- TREE PIT AREA PREPARATION �� PLANTING AREA PREPARATION N.T.S. SECTION VIEW STAKING SAME AS AS=BUILT SLOPE CONDITION NOTES: PLANTING BED SEEDING AREA 1. FOR SEEDED AREAS, BLOCK WALL TREE PITS, REMEDIAL SHRUB PLANTING PITS AND INTERPLANTING AREAS PROVIDE 3" MULCH 2' 4' DIA. MULCH RING AROUND MULCH EACH PLANT. DEPTH 2. FOR BLOCK WALL TREE PITS TRANSITION AND REMEDIAL SHRUB PLANTING MMMANIAAMAIMANUMAl PITS CUT "CROSSHAIR" PATTERN SLITS IN EROSION CONTROL BLANKET FOR PLANTING. FASTEN FLAPS DOWN WITH 6" MIN. U-SHAPE WIRE STAPLES AFTER \/ PLANTING. TYP, PLANTING BED EDGE TREATMENT � SIII—j 3. FOR TREES 24" HT. OR LESS TAKE WITH BAMBOO STAKE :I I - FASTENED TO TREE WITH PLASTIC -COATED OR X = PLANT SPACING FOAM -COATED GALV. WIRE AT (SEE PLANTING PLAN) APPROX.1ATREE HT. ®=PLANT 3 TIMES ROOT SPREAD 4. REMOVE TREE STAKES ONE OR ROOT BALL DIAMETER YEAR AFTER INSTALLATION TYPICAL CONDITION 5. SEE DETAIL 1/LD03 FOR ADDITIONAL LAYOUT INFORMATION 3" WOOD CHIP MULCH, TYP. STEP 5 N.T.S. IF PLANTING WITHIN EXISTING VEGETATION, ® SEE SPECIAL PROVISIONS ® FOR SELECTIVE CLEARING IF VEGETATION EXISTS EXISTING ® ® AND PRUNING WITHIN PLANTING AREA, VEGETATION SEE SETBACK CHART AREA FOR SPACING ® //®ED ADJUSTMENT ® / ��� ® 2/3 X ® j ® x�x j (1) (9) (D / ® ® ® ® 0 ® ® ® ® ® ® SEE SETBACK PLANTING AREA WEED CONTROL SHALL INCLUDE CHART ON THE AREA BOUNDED BY THE BACK OF THE PLANT DWG LD02 INSTALLATION AREA, THE FRONT OF EXISTING VEGETATION, AND THE ROADWAY. SEE SECTION 8-02.3(3) PLANTING AREA WEED CONTROL. AND DIMENSIONS. ('-� PLANTING AREA LAYOUT, SETBACK, AND WEED CONTROL 4 N.T.S. 14 BARRIER, GUARDRAIL OR EDGE OF ROADWAY N.T.S. FILE NAME c:kpwworking\nai\ex-phanlXd0321992\C8811_DE_LD01.dgn —IV I O �0% �S� L'Q S // C P,E. STAMP eoz OF W AS H� a J\VA Eq ST tiC ��Erw 0 39 �1 ti� a s BExP o61 �. /0 -Io-lg �a a ?- P.E. STAMP eox DATE Washington State Department of Transportation p p 1-405 / SR 167 INTERCHANGE DIRECT CONNECTOR TIME PM NO REGION4SH TE FED.AID OJ.NO. ED PLAN REF NO LD01 10/8/26 DATE 10/8/2018 10 PLOTTED ev Iphan REV 1 - RFI0306 10/04/18 DESIGNED BY C. PETERSEN REV C -FINAL REVIEW-PKG. 6D 06/09/17 doe NUMBER SHE 287 2oF 887 SHEETS ENTERED By L. PHAN REV 0 -RELEASED FOR CONSTRUCTION 02108/17 CHECKED BY C. PETERSEN REV B -FINAL REVIEW 12/09/16 CONTRACT NO. C8811 LOCATION NO. PROJ. ENGR. C. CHEN REV A -PRELIMINARY REVIEW 10/31/16 LANDSCAPE DETAILS REGIONAL ADM. L. ENG REVISION DATE By