Loading...
HomeMy WebLinkAboutR-381239N T 00 CM I Lu I— PLANT MATERIAL SETBACK CHART THIS CHART SUPPLEMENTS SECTION 8.02.3(7) OF THE STANDARD SPECIFICATIONS EXISTING EXISTING GUARDRAIL/ EDGE OF WALL FENCE SIGNS** TREE VEGETATION LIGHT J-BOX/ EDGE OF OVERHEAD BARRIER* ROADWAY (TRUNK) MASS POLE PULL BOX ACCESS ROAD POWERLINES*** CORRIDOR EVERGREEN 10, 20' 10, 10, 15' 15' 10, 20' 6' 20' 16' TREE CORRIDOR DECIDUOUS 10, 20' 10, 10, 15' 15' 10, 20' 6' 20' 16' TREE SHRUB 5' 20' 5' 6' 6' 10, 10, 6' 3' 10, N/A * MEASURED FROM BACK FACE OF BARRIER OR BACK OF GUARDRAIL POST. **TREES AND SHRUBS SHALL BE PLACED SO THAT AT ALL STAGES OF GROWTH THEY WILL NOT OBSTRUCT SIGHT DISTANCE SO SIGNS CAN BE CLEARLY DISPLAYED. *** MEASURED FROM OUTERMOST POWERLINE WHERE THERE ARE MULTIPLE LINES IG WALL OR NOISE WALL NT AT ORIGINAL ;ET PLANT VERTICALLY OF WALL. DIRECT FACE OF WALL WITH 00 STAKE. R RETENTION YP. i WOOD CHIP MULCH, t TO STEM. MULCH OT CONTACT STEM. AMENDED SOIL, TYP. EXISTING SOIL Y MIN. _ I AMENDMENTS & MULCH VINE PLANTING N.T.S. SET PLANT VERTICALLY — NOT PERPENDICULAR TO SLOPE SEE PLANT MATERIAL LIST FOR SIZE AND TYPE UPPERMOST ROOT SHALL BE NO MORE THAN 1" BELOW SOIL SURFACE S=BUILT AI KINDON NOV 09 2017 -V V v v BIODEGRADABLE EROSION - CONTROL BLANKET EXTEND Y BEYOND LIMITS OF PLANTING PIT ON ALL SIDES. T MIN. CLR. FROM EXCAVATION FOR EXISTING GRADE ----\ BLOCK WALLS 1.5 1� PLANTING PIT WIDTH VARIES SEE LANDSCAPE PLANS =IIIIII TAPER TO EXISTING-1-1 GRADE III=1—III— —I 11-1 11-1 11-1 I I TOPSOIL TYPE 'A':::'' 11—III—III—III—III—I —III—III—I11=III=11I— EXISTING SANDSTONE TAPER TO EXISTING GRADE EXISTING GRADE SCARIFY SUBGRADE COIR LOG STAKE PLANT DRIFT 16" DIA. PLANTING PIT COIR LOG NOTES: THIS DETAIL TO BE USED FOR NEW PLANT MIX AREAS ONLY. TYPICAL REMEDIAL SHRUB PLANTING PIT RELEASED FOR CONSTRUCTION TOPSOIL TYPE 'A' BIODEGRADABLE EROSION CONTROL BLANKET EXTEND 3' BEYOND LIMITS OF PLANTING PIT ON ALL SIDES. 5 5��J6 QUARRY SPALLS CHOKED WITH TOPSOIL C� TYPE A AND COVERED W/ 1%2" TOPSOIL 3" DEPTH WOOD CHIP MULCH, FEATHER \III=III=III= DEPTH TO STEM. \/�\ II IIIIII IIIIII II MULCH SHALL NOT * /\/// III —III— III=III=III OVER EXCAVATE EXIST. CONTACT STEM. 2" WATER \\/\\ III II SANDSTONE AS REQUIRED TO ALLOW FOR 6" MIN. TOPSOIL RETENTION BASIN /jV\/\/j IIII ';; A//A III —III —I BACKFILL BENEATH ROOTBALL. EXISTING SOIL AAjA III III j // / 1— — * NOTE: FOR SEEDED AREAS AND BACKFILL WITH SOIL REMOVED INTERPLANTING AREAS PROVIDE INTERPLANTING 4' DIA. MULCH RING AROUND FROM HOLE ,� � 3 TIMES ROOT SPREAD EACH PLANT SEE DETAIL 1/LD03 FOR REMEDIAL SHRUB OR ROOT BALL DIAMETER INTERPLANTING ADDITIONAL LAYOUT INFORMATION AND DIMENSIONS. 2 3 N.T.S. TAPER TO 1 EXISTING GRADE —:: EXISTING GRADE -III- 2 EXISTING SANDSTONE GEOTEXTILE FABRIC SCARIFY SUBGRADE QUARRY SPALLS REMEDIAL SHRUB PLANTING PIT 'N' REMEDIAL SHRUB PLANTING PIT FILE NAME c:\pwworking\nai\ex-phanlXd0321992\C8811_DE_LD02.dgn TIME 11:40:29 AM REGION O. STATE FED.AID PROJ.NO. DATE 11/9/2017 REV 2 - RFC RFI0046 RELOCATED NOTES & DETAILS 11/07/17 10 WAS PLOTTED BY LaniP REV C -FINAL REVIEW-PKG. 6D 06/09/17 DESIGNED BY C. PETERSEN REV 1 -LAYOUT NOTE 4, DETAIL 2/1-0102 02/10/17 JOB NUMBER ENTERED BY L. PHAN REV 0 - RELEASED FOR CONSTRUCTION 02/08/17 CHECKED BY C. PETERSEN REV B -FINAL REVIEW 12/09/16 CONTRACT NO. C8811 LOCATION NO. PROJ. ENGR. C. CHEN REV A - PRELIMINARY REVIEW 10/31/16 REGIONAL ADM. L. ENG REVISION DATE BY DATE I ­�^/ DATE P.E.STAMP BOX P.E. STAMP BOX N.T.S. 1. CALL BEFORE YOU DIG. CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING UTILITIES PRIOR TO BEGINNING WORK. NOT ALL UTILITIES ARE SHOWN ON LANDSCAPE SHEETS. SEE EXISTING UTILITY PLANS FOR UTILITIES REFER TO ITS AND ILLUMINATION PLANS FOR BURIED CONDUIT LOCATIONS. 2. THE CONTRACTOR IS ADVISED THAT PLANTING AREA CHANGES MAY BE REQUIRED IN THE FIELD DUE TO ADDITIONAL CONSTRUCTION DISTURBANCE ALL DISTURBED AREAS SHALL BE PLANTED EXCEPT AS LIMITED BY CLEAR ZONE, SITE DISTANCE AND SETBACK CHART. 3. PLANTING AREA OFFSETS SHALL BE STAKED IN THE FIELD BY CONTRACTOR AND APPROVED BY THE ENGINEER PRIOR TO PLANTING. 4. BAREROOT PLANT MATERIALS SHALL ONLY BE ALLOWED IF DORMANT AT TIME OF PLANTING. 5. PLANTS OF THE SAME SPECIES SHALL BE PLANTED IN GROUPS OF VARYING QUANTITY PER THE PLANT LIST. GROUPS SHALL BE IRREGULARLY SHAPED, LINEAR MASSES ROUGHLY PARALLEL TO THE PLANT ZONE GRADE CONTOURS. SPECIES SHALL BE RANDOMLY MIXED THROUGHOUT EACH PLANTING ZONE. TREE GROUPINGS MAY BE INTERPLANTED WITH SHRUBS. 6. ALL SEEDING AND PLANTING AREAS SHALL BE WEED FREE PRIOR TO APPLICATION OF SOIL AMENDMENT, TOPSOIL, AND COMPOST. 7. ALL PLANTING AND INTERPLANTED AREAS SHALL BE TREATED WITH AN APPROVED NON -SELECTIVE, NON -RESIDUAL, HERBICIDE A MINIMUM OF TWO WEEKS PRIOR TO PLANTING. 8. REED CANARY GRASS, KNOTWEED, AND BLACKBERRY SHALL BE TREATED WITH AN APPROVED NON -SELECTIVE, NON -RESIDUAL, HERBICIDE A MINIMUM OF TWO TIMES PRIOR TO PLANTING. THE SECOND APPLICATION OF HERBICIDE SHALL BE MADE AFTER A MINIMUM OF SIX WEEKS, OR WHEN THE REMAINING REED CANARY GRASS, KNOTWEED, OR BLACKBERRY HAS RE -GROWN TO A HEIGHT OF 6 INCHES TO 12 INCHES, WHICHEVER IS EARLIER. 9. FOR REED CANARY GRASS, HERBICIDE APPLICATIONS SHALL BE MADE BETWEEN THE MONTHS OF APRIL AND SEPTEMBER. FOR KNOTWEED AND BLACKBERRY, HERBICIDE APPLICATIONS SHALL BE APPLIED NO EARLIER THAN JUNE 15TH. NO CUTTING OF LIVE KNOTWEED SHALL OCCUR. 10. ALL KING COUNTY CLASS A AND CLASS B NOXIOUS WEEDS SHALL BE ERADICATED. 11. CONTRACTOR SHALL NOT DRIVE EQUIPMENT OVER THE MEDIA FILTER DRAIN (MFD) OR COMPOST -AMENDED VEGETATED FILTER STRIP CAVFS BMP INSTALLATIONS ONCE INSTALLED PER WSDOT STANDARD SPECIFICATION 7-01.3. REFER TO DRAINAGE DETAIL SHEET DD08 FOR MFD AND CAVFS LOCATIONS. 12. CONTRACTOR SHALL NOT SEED, FERTILIZE OR MULCH MEDIA FILTER DRAIN MIX AREAS PER WSDOT STANDARD SPECIFICATION 7-01.3. REFER TO DRAINAGE DETAIL SHEET DD08 FOR MFD LOCATIONS. 13. IMPACT LINES SHOWN ON PLANS ARE APPROXIMATE. ANY ADDITIONAL IMPACTS AND DISTURBANCE WILL REQUIRE ADDITIONAL PLANTING. 14. SEE STD. SPEC. 1-07.16(2) FOR VEGETATION PROTECTION AND RESTORATION REQUIREMENTS OUTSIDE IMPACT LINES AND CUT/FILL LINES OR IN ANY AREAS WHERE EXISTING VEGETATION IS TO BE PRESERVED. 15. FOR EROSION CONTROL SEEDING AREAS SUFFICIENT QUANTITIES OF FERTILIZER SHALL BE APPLIED TO SUPPLY THE FOLLOWING AMOUNTS OF NUTRIENTS: TOTAL NITROGEN AS N - 135 POUNDS PER ACRE. AVAILABLE PHOSPHORIC ACID AS P205 - 60 POUNDS PER ACRE. SOLUBLE POTASH AS K20 -60 POUNDS PER ACRE. THE CONTRACTOR SHALL PROVIDE A MANUFACTURER'S CERTIFICATE THAT THE PRODUCT CONTAINS 67% OR GREATER SLOW RELEASE NITROGEN WITH A RELEASE TIME PERIOD GREATER THAN SIX WEEKS AND THAT HYDROSEEDING IS AN ACCEPTABLE APPLICATION METHOD. THE FERTILIZER FORMULATION AND APPLICATION RATE SHALL BE APPROVED BY THE ENGINEER BEFORE USE. 16. TOPSOIL TYPE A SHALL BE 60% TO 70% SANDY LOAM AND 40% TO 30% FINE COMPOST BY VOLUME. SANDY LOAM SHALL BE AS DEFINED BY THE US DEPARTMENT OF AGRICULTURE SOIL TEXTURE TRIANGLE AND DOCUMENTED WITH A PARTICLE SIZE ANALYSIS FROM A LABORATORY THAT IS ACCREDITED TO PERFORM AASHTO T 88 "PARTICLE SIZE ANALYSIS OF SOILS." THE FINE COMPOST SHALL CONFORM TO THE REQUIREMENTS OF 9-14.4(8). TOPSOIL TYPE A SHALL BE THOROUGHLY BLENDED OFF SITE BEFORE PLACEMENT AND SHALL MEET THE FOLLOWING REQUIREMENT: ORGANIC CONTENT GREATER THAT 8% BUT LESS THAN 15% AS MEASURED ON A DRY WEIGHT BASIS USING AASHTO T 267 DETERMINATION OF ORGANIC CONTENT IN SOILS BY LOSS ON IGNITION. AT LEAST 14 CALENDAR DAYS PRIOR TO PLACEMENT,THE CONTRACTOR SHALL SUBMIT TO THE ENGINEER A REQUEST FOR APPROVAL OF MATERIAL SOURCE CONTAINING INDEPENDENT TEST RESULTS FROM A WASHINGTON STATE DEPARTMENT OF ECOLOGY ACCREDITED LABORATORY SHOWING THE TOPSOIL TYPE A_MEETS _ALL REQUIREMENTS. Admk -- Washington State Department of Transportation PLAN REF NO 1-405 / SR 167 INTERCHANGE LD02 DIRECT CONNECTOR SHEET 288 OF LANDSCAPE DETAILS 88 SHEETT S