GENERAL NOTES:
1. ALL WORK SHALL BE IN ACCORDANCE WITH CITY OF
RENTON STANDARDS AND SPECIFICATIONS.
2. THE LOCATION AND FEATURES OF UTILITIES SHOWN ARE
APPROXIMATE AND SHALL BE VERIFIED BY THE CONTRACTOR
PRIOR TO CONSTRUCTION START.
3. THE CONTRACTOR SHALL INVESTIGATE FOR UNDERGROUND
UTILITIES PRIOR TO ANY POLE FOUNDATION EXCAVATION OR
CONDUIT TRENCHING TO AVOID DAMAGE TO ANY
UNDERGROUND UTILITIES.
4. JUNCTION BOXES SHALL BE INSTALLED WITH CONCRETE
PADS PER CITY OF RENTON STANDARD PLAN 120.
5. CONDUIT RUNS AND JUNCTION BOXES ARE SHOWN FOR
ILLUSTRATIVE PURPOSES. ACTUAL LOCATIONS SHALL BE
DETERMINED BY THE CONTRACTOR IN THE FILED.
CONSTRUCTION NOTES
OPROTECT AND MAINTAIN EXISTING WOOD UTILITY POLE AND
LUMINAIRE ARM.
OCONSTRUCT FOUNDATION AND INSTALL POLE PER CITY OF
RENTON STANDARD PLANS 115 AND 119.FOUNDATION TO
INCLUDE REINFORCEMENT AS SHOWN ON CITY OF RENTON
STANDARD PLAN 117.1. LUMINAIRE POLE SHALL BE LABELED PER
CITY OF RENTON STANDARD PLAN 121.
OCONSTRUCT SERVICE CABINET FOUNDATION PER CITY OF
RENTON STANDARD PLAN 126.1. INSTALL SERVICE CABINET
WITHOUT BBS ON FOUNDATION PER CITY OF RENTON STANDARD
PLAN 122.1.
O4 ROUTE CONDUIT AROUND FIRE HYDRANT.
O5 INSTALL NEW UTILITY SERVICE CONDUIT AND CONDUCTORS
FROM EXISTING UTILITY TRANSFORMER TO NEW SERVICE
COR-14TH PER UTILITY COMPANY REQUIREMENTS. COORDINATE
POWER CONNECTION WITH THE UTILITY.
WIRING SCHEDULE
SERVICE
CONDUIT SIZE
CONDUCTORS
CIRCUIT
COMMENTS
NO.
EXISTING
NEW
1
COR-14TH
2" SCH 40
248, 148G
A
ILLUMINATION
2
COR-14TH
2" SCH 80
248, 148G
A
ILLUMINATION
3
COR-14TH
2" SCH 40
248, 148G
B
ILLUMINATION
4
COR-14TH
2" SCH 40
248, 148G
A
ILLUMINATION
248, 148G
B
ILLUMINATION
5
COR-14TH
2" SCH 80
248, 148G
A
ILLUMINATION
248, 148G
B
ILLUMINATION
6
COR-14TH
2" SCH 40
SPARE
7
COR-14TH
2" RGS
343, 148G
SERVICE FEEDER
BREAKER SCHEDULE COR-14TH
CITY OF RENTON SERVICE WITHOUT BBS 120/240V
CIRCUIT
DESCRIPTION
BREAKER
RATING
CONTACTOR
RATING
VOLTAGE
LOAD
(KVA)
MAIN
100 AMP
---
A
ILLUMINATION A
20 AMP
30 AMP
240
0.286
B
ILLUMINATION B
20 AMP
30 AMP
240
0.286
C
SPARE
20 AMP
NIA
240
0.0
D
INTERNAL PHOTOCELL
15 AMP
N/A
120
0.001
E
GFCI
20 AMP
NIA
120
1.8
BUSSWORK SHALL BE RATED
AT 225 AMP MINIMUM
PEAK
2.373
CONTINUOUS
0.573
EXISSTIING\/ NEW
TIMBER POLE LIGHT STANDARD
TEMPORARY LIGHT STANDARD
---------- CONDUIT
F7 TYPE 1 JUNCTION BOX
❑ TYPE 2 JUNCTION BOX
ELECTRICAL SERVICE CABINET
1, A�ll CONSTRUCTION NOTE
14WIRE NOTE
LUMINAIRE SCHEDULE
LUMINAIRE CIRCUIT LOCATION
NUMBER STATION OFFSET
TYPE -DISTRIBUTION -WATTAGE
SERVICE
MAST H1
ARM
NO. COR-14TH
BASE COMMENTS
TYPE
FS1
A
14ST 14+98.5
21.5' RT
V - MED CUTOFF 133
ED
6'
30'
FIXED
POLE PER COR STANDARD PLAN #115
FS2
B
14ST 18+07.5
32.5' RT
V - MED CUTOFF 133
ED
10,
30'
FIXED
POLE PER COR STANDARD PLAN #115
FS3
A
14ST 20+72.0
39.5' RT
V - MED CUTOFF C 133
ED
10'
30'
FIXED
POLE PER COR STANDARD PLAN #115
FS4
B
14ST 23+40.0
28.5' RT
V -MED CUTOFF - 133
ED
10,
30'
FIXED
POLE PER COR STANDARD PLAN #115
AS -BUILT
I►VA
FILE NAME c:lpwworkingknai\bartonbm\d0321992\C8811_DE_ILD01.dgn
1E W.
ohs Qq
oaRN14yf�o 2'
o ww
S. TER�ri1►�
TONAL �'" /V�/
DATE
P.E. STAMP BOX
P.E. STAMP Box DATE
_�
-„
Washington State
on ranspor
Department of Transportation
I-405 / SR 167 INTERCHANGE
DIRECT CONNECTOR
PLAN REF No
ILD01
TIME 12:54:19 PM
REV 3 - RFC, RF10181, REV WATTAGES
11/27/17
REGION
STATE
FED.AID PROJ.NO.
DATE 11121/2017
REV C -FINAL REVIEW CHANGE ORDER
11/3117
10
WAS
PLOTTED BY bartonbm
REV 2 - RFC RFI0029 ADDED FDN STD
5/3/17
DESIGNED BY B. BARTON
REV 1 - RFC, RFI0017, ADDED FDN STD
4114117
JOB NUMBER
SHEET
603
887
SHEETS
ENTERED BY W. QI
REV 0 - RELEASED FOR CONSTRUCTION
1123117
CHECKED BY R. STOLEN
REV B -FINAL REVIEW
12/14/16
CONTRACT NO.
c8811
LOCATION NO.
PROJ. ENGR. C. CHEN
REV A - PRELIMINARY REVIEW
10/10/16
ILLUMINATION NOTES AND SCHEDULES
S 14TH STREET
REGIONAL ADM. L. ENG
REVISION
DATE
BY