Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutPRE24-000370 1824 Aberdeen Ave NE DADU_commentsDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 |www.rentonwa.gov
PREAPPLICATION MEETING FOR
Lam and Yan's DADU
1824 Aberdeen Ave NE
PRE24-000370
December 19, 2024
Contact Information:
Planner: Ashley Wragge, 425-430-7314, awragge@rentonwa.gov
Public Works Plan Reviewer: Scott Warlick, 425-430-7216, swarlick@rentonwa.gov
Fire Prevention Reviewer: Corey Thomas, 425.276.9582, cthomas@RentonRFA.org
Building Department Reviewer: Rob Shuey, 206.550.8523, rshuey@rentonwa.gov
Please retain this packet throughout the course of your project as a reference. Consider giving
copies to engineers, architects, and contractors who will work on the project. You will need to
submit an PDF copy of this packet when you apply for land use and/or environmental permits.
When the project application is ready for submittal, you may email the project planner to start
the prescreen process. Similarly, you may contact the assigned planner if there are any
questions regarding submittal requirements.
The pre-application meeting is informal and non-binding. The comments provided on the
proposal are based on the codes and policies in effect at the time of review. The applicant is
cautioned that the development regulations are regularly amended and the proposal will be
formally reviewed under the regulations in effect at the time of project submittal. The
information contained in this summary is subject to modification and/or concurrence by
official decision-makers (e.g., Hearing Examiner, Planning Director, Development Services
Director, Development Engineering Director, Department of Community & Economic
Development Administrator, Public Works Administrator and City Council).
DEPARTMENT OF COMMUNITY
& ECONOMIC DEVELOPMENT
M E M O R A N D U M
DATE: December 16, 2024
TO: Ashley Wragge, Associate Planner
FROM: Scott Warlick, Engineering Specialist III
SUBJECT: Utility and Transportation Comments
1824 Aberdeen Ave NE
PRE24-000370
NOTE: The applicant is cautioned that information contained in this summary is preliminary and
non-binding and may be subject to modification and/or concurrence by official City decision-
makers. Review comments may also need to be revised based on site planning and other design
changes required by City staff or made by the applicant.
I have completed a preliminary review for the above-referenced proposal located at parcel(s)
3343901606. The following comments are based on the pre-application submittal made to the
City of Renton by the applicant.
Water Comments
1. The new ADU is within the City of Renton’s water service area and in the Highlands 435
Pressure Zone.
2. The site is located in wellhead protection zone 1.
3. There is an existing 16-inch water main in Aberdeen Ave NE (Record Dwg: W-28250F). The
static water pressure is about 60 psi at ground elevation of 298-feet.
4. There is one existing hydrants located on Aberdeen Ave NE (Hydrant ID No. HYD-NE-00084)
that appears to be within 300-feet of the proposed ADU.
5. The development is subject to applicable water system development charges (SDC’s) fee and
meter installation fees based on the number and size of the meters for domestic and fire use.
The development is also subject fees for water connections and purity tests. Current fees can
be found in the 2025 Development Fees Document on the City’s website. Fees will be charged
based on the rate at the time of construction permit issuance.
a. The SDC fee for water is based on the size of the new domestic water to serve the
project. The current water fee for a single 1-inch meter is $5,025.00 per meter.
b. Water Service installation fee is $2,875.00 per 1-inch service line.
c. Drop-in meter fee is $460.00 per meter for a 1-inch meter.
d. Final determination of applicable fees will be made after the water meter size has
been determined. SDC fees are assessed and payable at construction permit
issuance. The full fee schedule can be found at:
https://edocs.rentonwa.gov/Documents/DocView.aspx?id=10593568&dbid=1&repo
=CityofRenton.
Error! Reference source not found. –Error! Reference source not found.
Page 2 of 4
Sewer Comments
1. Sewer service is provided by City of Renton.
2. There is an 8-inch PVC sewer main located in Aberdeen Ave NE west of the property (Record
Dwg: S-282510).
3. There is an existing 6” PVC sewer stub serving the property. At the property line there is a 4”
side sewer connection to the existing single-family residence from the sewer stub.
4. The developer will need to show how they propose to provide sewer to the ADU. ADU’s are
allowed to connect to the same 6” sewer stub as the single-family residence through a “Y”
connection.
5. This development is in the West Kennydale Sewer Interceptor. The SAD fee for the West
Kennydale Sewer Interceptor is $1,050.00.
6. The development is subject to a wastewater system development charge (SDC) fee. SDC fee
for sewer is based on the size of the domestic water meters to serve the project. Current
fees can be found in the 2025 Development Fees Document on the City’s website. Fees will
be charged based on the rate at the time of construction permit issuance.
a. The current sewer fee for a 1-inch meter is $4,025.00 per meter for the new single
family. The current sewer fee for a 1-inch meter is $2,875.00 per meter for the
new ADU.
b. SDC fees are payable at construction permit issuance.
c. The full fee schedule can be found at:
https://edocs.rentonwa.gov/Documents/Browse.aspx?id=8217302&dbid=1&re
po=CityofRenton.
Surface Water Comments
1. There is a City of Renton 18-inch stormwater main to the west of the property (record
drawing: D-28250D).
2. The site is located in Zone 2 of the City’s Aquifer Protection Area (APA). In this zone,
stormwater open conveyance systems, such as ditches and channels, and water quality
facilities may require a liner per sections 6.2.4 and 1.2.4.3 of the 2022 RSWDM.
3. Drainage plans and a drainage report complying with the adopted 2022 Renton Surface Water
Design Manual will be required. Refer to Figure 1.1.2.A – Flow Chart of the 2022 Renton
Surface Water Design Manual (RSWDM) to determine what type of drainage review is
required for this site. The site falls within the City’s Flow Control (matching forested
conditions) Standard. The site falls within the Cedar River drainage basin.
4. The current Surface Water Standard Plans shall be used in all drainage plan submittals. The
current City of Renton Standard Details are available online in the City of Renton website
https://edocs.rentonwa.gov/Documents/Browse.aspx?id=990403&dbid=0&repo=CityofRent
on
5. If the new plus replaced pollution generating impervious surface exceeds 5,000 SF, the
applicant will be required to provide basic water quality treatment. Any proposed detention
and/or water quality vault shall be designed in accordance with the RSWDM that is current at
the time of civil construction permit application. Separate structural plans will be required to
be submitted for review and approval under a separate building permit for the detention
and/or water quality vault.
Error! Reference source not found. –Error! Reference source not found.
Page 3 of 4
6. Appropriate on-site BMPs satisfying Core Requirement #9 will be required to help mitigate
the new runoff created by this development to the maximum extent feasible. On-site BMPs
shall be evaluated in order of preference by feasibility as described in Section C.1.3 of the
2017 RSWDM. A preliminary drainage plan, including the application of on-site BMPs, shall be
included with the land use application, as applicable to the project. The final drainage plan
and drainage report must be submitted with the utility construction permit application.
7. A geotechnical soils report for the site is required per the 2017 Renton Surface Water Design
Manual Section C.1.3. Information on the water table and soil permeability (measured
infiltration rates), with recommendations of appropriate on-site BMPs per Core Requirement
#9 and Appendix C shall be included in the report. The report should also include information
concerning the soils, geology, drainage patterns and vegetation present shall be presented in
order to evaluate the drainage, erosion control and slope stability for site development of the
proposed plat. The applicant must demonstrate the development will not result in soil erosion
and sedimentation, landslide, slippage, or excess surface water runoff.
8. Erosion control measures to meet the City requirements shall be provided.
9. The development falls within the R-8 zone which has a maximum impervious surface area of
65% per lot.
10. The development is subject to a surface water system development charge (SDC) fee. Fees
will be charged based on the rate at the time of construction permit issuance.
a. The 2025 Surface water system development fee is $2,350 per one Accessory
Dwelling Unit.
b. The full schedule can be found at:
https://edocs.rentonwa.gov/Documents/DocView.aspx?id=10593568&dbid=1&repo
=CityofRenton.
Transportation Comments
1. Per City code 4-6-060 frontage improvements are required for new construction or addition
in excess of $175,000. The proposed project fronts Aberdeen Ave NE to the west.
a. Aberdeen Ave NE is classified as a collector street, with an existing right-of-way (ROW)
width of approximately 60-feet with an existing paved width of approximately 42-
feet. To meet the City’s complete street standards for a collector street, a minimum
ROW width of 83-feet is required. Per RMC 4-6-060 half of street improvements as
taken from the ROW centerline and include a 23-foot paved road, a 0.5-foot curb, an
8-foot planting strip, and a 8-foot sidewalk. However, in accordance with the city’s
current trails and bicycle master plan, the city will support a street modification for a
paved road width of 32-feet(16-feet from ROW centerline), .5-foot curb, an 8-foot
planting strip, a 5-foot sidewalk, street trees storm drainage improvements. No ROW
dedication will be required.
2. Undergrounding of all existing utilities is required on all frontages per RMC 4-6-090.
3. Refer to City code 4-4-080 regarding driveway regulations.
a. A minimum separation of 5-feet is required between driveway and the property line.
b. Maximum driveway slopes shall not exceed 15%. Driveways exceeding 8% shall
provide slotted drains.
c. The maximum width of single loaded garage driveway shall not exceed nine feet (9')
and double-loaded garage driveway shall not exceed sixteen feet (16').
Error! Reference source not found. –Error! Reference source not found.
Page 4 of 4
4. Paving and trench restoration within the City of Renton right of way shall comply with the
City’s Trench Restoration and Street Overlay Requirements.
General Comments
1. If frontage improvements are required, all existing and proposed utility lines (i.e. electrical,
phone, and cable services, etc.) along property frontage or within the site must be
underground as outlined in RMC 4-6-090 – UTILITY LINES - UNDERGROUND INSTALLATION.
The construction of these franchise utilities must be inspected and approved by a City of
Renton inspector.
2. Maximum exposed retaining wall height is 6-ft and shall be setback a minimum of 3-ft from
the right-of-way as outlined in RMC 4-4-040 – Fences, Hedges and Retaining Walls.
3. Adequate separation between utilities as well as other features shall be provided in
accordance with code requirements.
a. 7-ft minimum horizontal and 1-ft vertical separation between storm and other
utilities is required with the exception of water lines which require 10-ft horizontal
and 1.5-ft vertical.
b. The stormwater line should be minimum 5 feet away from any other structure or wall
or building.
c. Trench of any utility should not be in the zone of influence of the retaining wall or of
the building.
4. All construction utility permits for utility and street improvements will require separate plan
submittals. All utility plans shall confirm to the Renton Drafting Standards. A licensed Civil
Engineer shall prepare the civil plans. Please visit the Development Engineering Forms page
for the most up-to-date plan submittal requirements:
https://rentonwa.gov/cms/one.aspx?portalId=7922741&pageId=9687014
5. A landscaping plan shall be included with the civil plan submittal. Each plan shall be on
separate sheets.
6. Fees quoted in this document reflect the fees applicable in the year 2025 only and will be
assessed based on the fee that is current at the time of the permit application or issuance, as
applicable to the permit type. Please visit www.rentonwa.gov for the current development
fee schedule.
PRE24-000370
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
M E M O R A N D U M
DATE: January 2, 2024
TO: Pre-Application File No. PRE24-000370
FROM: Ashley Wragge, Assistant Planner
SUBJECT: Lam and Yan's DADU 1824 Aberdeen Ave NE (APN 3343901606)
General: We have completed a preliminary review of the pre-application for the above-
referenced development proposal. The following comments on development and permitting
issues are based on the pre-application submittals made to the City of Renton by the applicant
and the codes in effect on the date of review. The applicant is cautioned that information
contained in this summary may be subject to modification and/or concurrence by official decision-
makers (e.g., Hearing Examiner, Community & Economic Development Administrator, Public
Works Administrator, Planning Director, Development Services Director, Development
Engineering Director, and City Council). Review comments may also need to be revised based on
site planning and other design changes required by City staff or made by the applicant. The
applicant is encouraged to review all applicable sections of the Renton Municipal Code. The
Development Regulations are available online at https://www.codepublishing.com/WA/Renton.
Project Proposal: The subject property at 1824 Aberdeen Ave NE (APN 3343901606) is located on
the east side of Aberdeen Ave NE approximately mid-block. The project site is 16,128 square feet
(0.37 acres) and is located within the Residential Medium Density land use designation and within
the Residential-8 (R-8) zone. A single-family home and two (2) associated accessory structures are
located on the site, of which the applicant has proposed the retention of the home and the
workshop. The other associated accessory structure is 716 square feet and is proposed to be
converted into a detached accessory dwelling unit (DADU). The applicant proposes to remove the
chimney, replace the roof, keep the exterior walls, and remodel the inside into a two-bedroom,
one-bathroom accessory dwelling unit. The applicant does not indicate any tree removal on site.
The City’s mapping system, COR Maps, indicates that this property is located within the wellfield
called Well 5A protection area zone.
Current Use: A single-family home with associated accessory structures located on the site.
1. Zoning /Land Use Designation, and Overlays: The subject property is located within the
Residential Medium Density land use designation and is within the Residential 8 (R-8) zoning
classification. The property is not part of any overlay districts. The R-8 Zone is intended to
create opportunities for new single family residential neighborhoods and to facilitate high-
quality infill development that promotes reinvestment in existing single-family
neighborhoods. It is intended to accommodate uses that are compatible with and support a
high-quality residential environment and add to a sense of community.
Accessory dwelling units (ADUs) may be allowed as an accessory use to a detached single-
family dwelling, or a principal building actively operated with a non-residential use by a
Lam and Yan’ DADU
Page 2 of 6
January 2, 2025
CityofRenton\Department Folders\Community and Economic Development (CED)\Current Planning\Pre-
Applications\2024\PRE24-000370\Working Files
religious institution or social service organization. ADUs shall be consistent with the
architectural character of the primary residential structure.
Unless owner occupancy is not required as a result of the Conditional Use Permit process (see
RMC 4-9-030H), prior to the issuance of building permits the property owner shall (a) file an
affidavit with the City affirming that the owner will live on site, occupying the primary dwelling
or ADU; and (b) record a notice on the property title that the owner will occupy the site, and
bearing the notarized signature of all property owners listed on the property title and which
includes at a minimum: the legal description of the property, a copy of the approved site/floor
plan, and the applicability of the restrictions and limitations regarding ADUs in RMC Title IV.
The City will be updating its ADU regulations to comply with recently adopted state
legislation (HB1337).
2. Development Standards: The property is subject to RMC 4-2-110C, “Development Standards
for Residential Development (Accessory Dwelling Units).”
Minimum Lot Size, Width and Depth – The minimum lot size in the R-8 zone is 5,000 square
feet. The minimum lot width is fifty feet (50’) and the minimum lot depth is eighty feet (80’).
The existing lot appears to comply with the minimum lot size, width, and depth standard
for the R-8 zone.
Building Standards – The R-8 standards permit a maximum building coverage to be 50%,
excluding an ADU. Conformance with building standards would be determined at the time
of permit review.
The maximum size of an ADU on this lot is 1000 square feet or 75% of the primary residence,
whichever is smaller. The square foot calculation shall not include porches, exterior stairs, or
garages. The total floor area of all accessory buildings shall not be greater than the floor area
of the primary residential uses. According to the lot size and size of the existing primary
structure, the maximum size of an ADU for this lot is 885 square feet. The applicant would
need to demonstrate that the proposed ADU complies with the size requirements at the time
of formal land use application.
Setbacks – Setbacks are the minimum required distance between the building footprint and
the property line. The required setbacks for the Accessory Dwelling Units in the R-8 zone are:
minimum front yard and secondary front yard, 5 additional feet parallel to the primary
dwelling unit façade; minimum side yard, 5 feet; minimum rear yard, 5 feet and when located
in the rear yard and at least 25% of the lineal length of the rear yard shall remain unoccupied.
In no case shall a structure over 42 inches (42”) in height intrude into the 20-foot (20’) clear
vision area defined in RMC 4-11-030.
Building Height and Impervious Surface Coverage – In the R-8 zone the maximum wall plate
height is 24 feet. ADUs are subject to the associated conditions and shall not be taller than
the primary structure. Additional ADU height allowances may be permitted upon application
and approval of a modification pursuant to RMC 4-9-250. The maximum impervious surface
area for the R-8 zone is 65%. The building height and coverage requirements would be
verified at the time of formal application.
3. Residential Design and Open Space Standards: All new ADUs in the R-8 zone are subject to
the Accessory Dwelling Unit Residential Design Standards outlined in RMC 4-2-116. The
proposed ADU must be architecturally compatible with the primary structure. Plans
Lam and Yan’ DADU
Page 3 of 6
January 2, 2025
CityofRenton\Department Folders\Community and Economic Development (CED)\Current Planning\Pre-
Applications\2024\PRE24-000370\Working Files
submitted with a formal application should indicate such compatibility. Design requirements
for an ADU in the R-8 zone include regulations regarding: windows and doors; scale, bulk, and
character; eaves; architectural detailing; materials and colors; and garages. If the primary
structure where the ADU is proposed does not comply with the adopted architectural
detailing standards adopted in the residential design standards (RMC 4-2-115E3), the primary
structure shall be brought to proportional compliance prior to the issuance of ADU building
permits
a. The amount invested in physical improvements to reduce or eliminate the
nonconformity related to the architectural detailing shall be determined by multiplying
the valuation of the ADU, as determined by the City, by ten percent (10%).
b. The Department shall evaluate and approve the allocation of the required investment
in bringing the primary structure into compliance based on the above formula and RMC
4-2-115E3.
Residential Design Review occurs as part of the Building Permit Review.
4. Landscaping: Except for maintenance of street trees, single family residential building permits
are exempt from landscaping requirements.
5. Significant Tree Retention: When significant trees (greater than 6-inch caliper or 8-caliper
inches for alders and cottonwoods) are proposed to be removed, a tree inventory and a tree
retention plan along with an arborist report, tree retention plan and tree retention worksheet
shall be provided with the formal land use application as defined in RMC 4-8-120. The tree
retention plan must show preservation of at least 30% of significant trees. Please refer to RMC
4-4-130 for further general and specific tree retention and land clearing requirements.
In addition to retaining a minimum of 30% of existing significant trees, each new lot would
be required to provide a minimum tree density of 30 tree credits per net acre. Tree credits
encourage retention of existing significant trees with larger trees being worth more tree
credits.
TREE SIZE TREE CREDITS
New small species tree 0.25
New medium species tree 1
New large species tree 2
Preserved tree 6 – 9 caliper inches 4
Preserved tree 10 – 12 caliper inches 5
Preserved tree 12 – 15 caliper inches 6
Preserved tree 16 – 18 caliper inches 7
Preserved tree 19 – 21 caliper inches 8
Lam and Yan’ DADU
Page 4 of 6
January 2, 2025
CityofRenton\Department Folders\Community and Economic Development (CED)\Current Planning\Pre-
Applications\2024\PRE24-000370\Working Files
TREE SIZE TREE CREDITS
Preserved tree 22 – 24 caliper inches 9
Preserved tree 25 – 28 caliper inches 10
Preserved tree 29 – 32 caliper inches 11
Preserved tree 33 – 36 caliper inches 12
Preserved tree 37 caliper inches and greater 13
Significant trees shall be retained in the following priority order:
Priority One: Landmark trees; significant trees that form a continuous canopy; significant
trees on slopes greater than twenty percent (20%); significant trees adjacent to critical
areas and their associated buffers; significant trees over sixty feet (60') in height or
greater than eighteen inches (18") caliper; and trees that shelter interior trees or trees on
abutting properties from strong winds, which could otherwise allow such sheltered trees
to be blown down if removed.
Priority Two: Healthy tree groupings whose associated undergrowth can be preserved;
other significant native evergreen or deciduous trees; and other significant non-native
trees.
Priority Three: Alders and cottonwoods shall be retained when all other trees have been
evaluated for retention and are not able to be retained, unless the alders and/ or
cottonwoods are used as part of an approved enhancement project within a critical area
or its buffer.
The Administrator may require independent review of any land use application that
involves tree removal and land clearing at the City's discretion.
The Administrator may authorize the planting of replacement trees on the site if it can be
demonstrated to the Administrator's satisfaction that replacement requirements in RMC
4-4-130H1e can be met.
Tree retention standards shall be applied to the developable area, as defined in RMC 4-
11-040, Definitions D, of a property. A formal tree retention plan and tree credit
worksheet would be required at the time of application.
6. Fences/Retaining Walls: In any residential zone, the maximum height of any fence, hedge or
retaining wall shall be seventy-two inches (72”) with limitations in the setbacks. Fences in the
front or secondary front yard shall not exceed forty-eight inches (48”) and shall not exceed
forty-two inches (42”) in any part of the clear vision area as defined by RMC 4-11-030. Fences
in the rear or side yard shall not exceed seventy-two inches (72”) except when the rear yard
abuts a public or private street, in those cases the maximum height is forty-eight inches (48”).
Lam and Yan’ DADU
Page 5 of 6
January 2, 2025
CityofRenton\Department Folders\Community and Economic Development (CED)\Current Planning\Pre-
Applications\2024\PRE24-000370\Working Files
Retaining walls shall be composed of brick, rock, textured or patterned concrete, or other
masonry product that complements the proposed building and site development. There shall
be a minimum three-foot (3') landscaped setback at the base of retaining walls abutting public
rights-of-way. Please refer to fences, hedges, and retaining wall standards in RMC 4-4-040 for
additional information.
7. Parking: For an ADU one (1) parking spot per unit is require with a maximum of two (2) per
unit is allowed. Demonstration of compliance with parking availability will be required at
time of permit submittal.
8. Access/Driveways: Access is proposed via one driveway from Aberdeen Ave NE. The
maximum width of single loaded garage driveways shall not exceed nine feet (9') and double
loaded garage driveways shall not exceed sixteen feet (16'). If a garage is not present on the
subject property, the maximum width of a driveway shall be sixteen feet (16'). New
driveways shall not be closer than 5-feet to any property line. Driveway widths and quantity
are limited by the driveway standards, in RMC 4-4-080I.
9. Critical Areas: The City of Renton (COR) mapping database identifies this property to be part
of the Wellhead Protection Area, Zone 2, Well 5A. A fill source statement shall be submitted
by the applicant if any fill is brought on the site. The statement shall be submitted prior to the
start of any construction on the site.
10. Environmental Review: In accordance with WAC 197-11-800, minor new construction is a
categorical exemption.
11. Permit Requirements: The proposed project would require a building permit. All fees are
subject to change. Any modifications requested would require an additional $299.00 fee.
Detailed information regarding the land use application submittal can be found on the City’s
new website by clicking “Land Use Applications” on the Community & Economic
Development page, then “All Forms (A to Z).” The City now requires electronic plan
submittal for all applications. The City’s Electronic File Standards can also be found on the
City’s website at
https://edocs.rentonwa.gov/Documents/Browse.aspx?startid=867190&dbid=0.
Lam and Yan’ DADU
Page 6 of 6
January 2, 2025
CityofRenton\Department Folders\Community and Economic Development (CED)\Current Planning\Pre-
Applications\2024\PRE24-000370\Working Files
12. Impact Fees: In addition to the applicable building and construction fees, impact fees would
be required. Fees change periodically and the fees in effect at the time of building permit
issuance would apply. For informational purposes, the 2025 impact fees are as follows:
· A Fire impact fee $579.41;
· A transportation impact fee $6,184.59 ;
· Renton School District Impact Fee $3,268 (+5% administrative fee) unless an exemption
can be made under RMC 4-1-190.I.1.a; and
· Parks Impact Fee currently assessed at $2,659.70.
A handout listing all of the City’s Development related fees is available for your review at
https://edocs.rentonwa.gov/Documents/Browse.aspx?id=8217302&dbid=0&repo=CityofRe
nton
Next Steps: When the formal application materials are complete, the applicant shall have the
materials pre-screened with the Building Division prior to submitting the complete application
package. Please contact the Building Division at permittech@rentonwa.gov for all permit
requirements and submittal questions.
Expiration: Building permits are valid for one year from the date of issuance. It is the
applicant’s responsibility to monitor the expiration dates.