Loading...
HomeMy WebLinkAboutLUA-02-008 Large FormatSYM \G- CO V-: CA ------ --- ---------- ---�-`--- po Q r--t" ON 5107 svoo _ --- ----"' s3nnanr sue+"""► N''° '"oImo svo n svo_-- 20 in sv svo svo 20 in -3 poc �ON A - 2Z poS�TTO—N' 00 REVISION BY APPROVED DATE SYM REVISION GUARD 1 HOUSED-50 SiCUR" c- 0 30'-6" BY o 0 1 APPROVED DATE Concrete Slab Conc 180' , \ t , 1 1 , , Gat\\ \ 5--03 Ga ACCEPTABILITY DR N THIS DESIGN AND/OR CHECKED SPECIFICATION IS APPROVED — ENGINEER APPROVED BY DEPT. I DATE PROJECT: -i'I=1 r— D----50 (GUARD HOUSE) INSTALLATION PROJECT. LOCATION: THE PROJECT IS LOCATED ON THE RENTON AIRFIELD PROPERTY THAT BOEING LEASES FROM THE CITY OF RENTON. THE GUARD HOUSE WILL. BE 18OFT EAST OF THE HIGH WATER MARK OF THE CEDAR RIVER, NORTH OF THE 5-50 BUILDING, AND WEST OF APRON A. DESCRIPTION: BUILDING/GUARD HOUSE D--50 IS A 1—STORY APPROXIMATELY 382 SCE FT. WOOD STRUCTURE. BOEING IS INSTALLING A GUARD HOUSE AS PART OF EFFORTS TO INCREASE SECURITY ON RENTON FIELD. THE GUARD HOUSE WILL MONITOR VEHICLE ACCESS TO RENTON FIELD. SCOPE: INSTALL/MODIFY 30.5'x12.5' WOOD STRUCTURE, TRENCH APPROX. 60' FOR UTILITIES, AND MODIFY INSIDE WALLS. 17/02 I SUBTITLE TITLE SECURE RENTON AIRPORT GUARDHOUSE D-50 SECURITY MASTER COL. SCALE I " - 20� JOB NO. 31177702 RENTON, WA DWG NO. `'sv'EL � /7yOFRFN O�f�',fv� N 2002 ICROFILMEL s SYM 5-14 5-60 5-63 5-65- 5-403 COMMERCIAL AIRPLANE INSTALL GUARD HOUSE 5409 L i �,_�. FLAN VIEW )��, �G�w�;j� ;� "' � VICINITY/ SITE MAP REVISION I BY I APPROVED I DATE I SYM REVISION BY I APPROVED I DATE L AM" E/NG' ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED APPROVED BY I DEPT. I DATE SUBTITLE TITLE NEIGHBORHOOD DETAIL MAP CURRENT r;OFIL INSTALL GUARD HOUSE JOB NO. COMP NO. 31177702 SECURITY MASTER COL. RENTON, WA DWG NO. GUARD HOUSE SME-Oa -Go8 0 O 0 I 0 Z m 0 w w W IL W x O O c U m >G /cn V 1 I n n O �z Q n W Q � z� Q O = J c) ~ Ln J Ln W n r W L� U �O CO CrJ C 00 00 N IL 0c)00 � V _Z 0 O H a J w Z w O �m Z EQ �z O �_ J N z Nio p Uy p p 3 Q Z ID LL U rl N M M m 0 0 0 N N LL. LL LLL zz 0 0 0 Q m 0 m m w ~ z 2 oz oz CD 3 U 0 d U o O U 6 0 M n M i w � < o W o Q N 0 w J Q m a Q 3 q CD 0 w U cli X w CD 0 0 0 x u w z W J 0 z \\ ♦ 1 1 ♦ 20' 0 20' 1 1 SCALE.- 1 " = 20' NO TE.• ALL LOT DIMENSIONS sR�. ARE APPROXIMA TE. moo. % 1 � ♦♦ ®i 3 i I i 3 ! 25.75' - 3 NEW N THICKENED COMPACT STALLS AC EDGE NEW ASPHALT PAVEMENT 1 h I MIN. (4,268 SF) 45' O � , l(j EXIST BLDG. — -- -- PROPOSED (10,815 SF) FIRE TURN EXIST. CONC. WALK r TO 3E REMOVED �� AROUND AND LANDSCAPED _ s. R-_ 4 i I' i.� �. p NEW CONC. j I WALK i 21 " Ln EXIST. BLDG. 1 L (680 SF) t I R EXIST. WALKWAY Z ; (373 SF) . RELOCATED FLAG- POLE - ---- �- o ot� T EXIST. PA VEMENT I (7,809 SF) I FLAG POLE TO I� BE RELOCATED , I I I I 1 I I I J i � J o e 20' MIN. 3 ~ ,o I � I FIRE ACCESS --� -t0 EASEMENT ; 1 I Z EXIST. STORM -I W �-- I � I DRAIN �, I I k I a 3 I I ! I I I EXIST. WA TER ' 12'r8' TRASH I — ENXOSUREI 1 � 1 I —i- " ®� I— — -- — o EXIST. FIRE I ! r HYDRANT— VK N88'23'47"W 169.52''EA p 1+NEW PA VEMEN T (203 SF)LA mLO Q 100-YR FLOOD LIMIT ELEV. 31.4 (FEMA) \\\`N \\\ \ EX. FIRE HYDRANT TO E REL OCA TED 34 ti6 AIX \. . RELOCATEDI FIRE H YDRANT At "- CURB (TYP.) \Ji \\\ IILO \\ \\ N, f�\ .: t.t \• \\ — � is � � � ' •V6a": � \°°\\\\ ° \\\ \ 4 \a\ ., \\ \ �\ \ � � \ �`. ':. ,• , . \ \ee\��\ �=:,��-, 13 ram J - SS L a 114 a SS--� ss-------•----- S$ Nx -_ I t -w----------w---- ------w----------w-----------w------- _ ti --_ j - SD — SS ss ss -�— — ss--____— t t SS ----------- SS -------_ SS SS ss N 5TH ST � m N4THST Q- e N Q 00 N 3RD ST v J � SITE S TOB/N ST BRONSON 40 WA Y 2 � LIBERTY S 2ND ST e e e PARK CEDAR R/ VER PARK o J c S e S4THST ~ 5 � e WPY Q H��SER z Q 1.. Noma VICINITY MAP; NOT TO SCALE GENERAL NO TES: 0WNER/DEVELOPER: ENGINEER: Cl TY OF REN TON HOUSING AUTHORI TY 970 HARRINGTON NE RENTON, WASHINGTON 98056 (425) 226-1850 PETERSON CONSULTING ENGINEERS 4030 LAKE WASHINGTON BLVD N.E. SUITE 200 KIRKLAND, WASHINGTON 980JJ (425) 827-5874 CONTACT- NICK BOSSOFF P.E. TOTAL SITE AREA: 50,143 SF EXISTING IMPERVIOUS AREA: 19,677 SF PROPOSED IMPERVIOUS AREA: 4, 471 SF TOTAL IMPERVIOUS AREA: 24,148 SF L 0 T CO VERA GE.' 487. EXISTING PARKING STALLS: 27 ADDITIONAL STALLS PROPOSED: STANDARD: 5 COMPACT' 3 TO TA L: 35 "'p,I BO`�,! � o� wasr,*I�•A� A� ,P 29631 9 �Or sl ONAL �1 1- I • t% x EXPIRES 07/02/03 PRELIM/NARY DRAWING NOT FOR CONSTRUCT/ON sm-od.-D1 l L�. L.!41'OUT AND PAVEMENT GINERA1. NOTES 1. PROTECTION OF SITE Locate all existing and new underground utility lines prior to any construction. Save and protect existing trees designated to remain. Repair any damage done to existing curbing, sidewalks, fences, and any other damage caused ae a result of this contract. 2. GRADING Landscape Contractor to be responsible for providing sub reds at all paved areas and directly adjacent landscape yp areas as indicated on plans, in tical details and cross -sections and as discussed during preconstruction meetings. Notify Owner's representative of 'any discrepancy or potential surface or subsurface drainage problems prior to starting work, 3. LAYOUT Do not scale drawings, use dimensions and layout notation. If compound radiuses and curves are shown without notation keep the radiusee smooth and evenly tapered between tan ante. Stake or paint locations of all pavement or masonry structures in the Field for acceptance by Owner or Landeca�e Architect. Failure to notify Owner or Landscape Architect of any discrepancies, and conflicts immediately shall result in contractor accepting any and all remedial measures, 4. SLEEVING Provide a minimum of (2) 4" PVC sleeves at all isolated landscape areas within pavement and walls and across driveways. 5. STRUCTURAL FILL Provide compactible structural fill as required at driveway and pedestrian pavement to insure minimal settlement of base materials. 6. PAVEMENT Provide pavement that is smooth, rseqqular, pitched for proper drainage, uniformly colored without soft spots, waves, fills, dips, or podkat6. Edge lines ehIll be uniform and smooth Asphalt pavement gas that do not abut concrete pavement shall have a hand -tamped edge angled at approximately 45'. Seal all a pFialt meet lines and butt joints and apply tads coat at feathered or shimmed edges. 8. DRAINAGE Slope all pavement to drain at 2% Min. Contractor is responsible for providing adequate drainage on all paved surfaces and directly adjacent landscape grades. S. FINISHES The Owner or Landscape Architect shall approve all pavement and masonry finishes prior to construction. Provide samples, photographs or cut sheets of firi'is'hes for review. 10. COORDINATION WITH 55WILLIAMS CONSTRUCTION DOCUMENT SET See Civil/Architectural plane for typical details of curbing and pavement work 11. CLEAN UP Contractor to remove from site all excess pavement material and provide clean eubgrade in all planting areas free from slag, aggregate or other waste products generated LANDSCAPE CXENERAi . NOTES 1. PROTECTION OF SITE Locate all existing and new underground utility lines prior to any construction. Save and protect existing trees designated to remain. Repair any damage done to curbing, sidewalks, fences, and any other damae caused as a result of this contract. 2. SUBGRADE PREPARATION Remove from site all invaeive weeds (i e. grasses, blackberry, scotch broom) and rocks/dabns lar er than a i" size from planting areas prior to placenn�g topsoil and as uncovered during tilling and planting. ill all plating areas to a depth of 6" prior to placement of topsoil unless otherwise noted on p an(s). 3. TOPSOIL Imported topsoil shall be a prepared 2 way or winter mix topsoil from an approved commercial supplier. Provide 3' minimum depth in all lawn areas. Provide 10" minimum depth in all shrub beds, 6" minimum depth in groundcove• areas. Provide imported topsoil to depth only in planting areas outside of any existingtrees aesignated to remain. Pocket plant shrubs and groundcovar with topsoil badkfill in planting areas th3t occur within dripines of existing trees. 4. MULCH Provide 2" depth medium d. fir bark mulch in all new shrub and groundcover areas. 5. GRAD ING Landscape Contractor to be responsible for maintaining finish ggrading in all planting areas as indicated on plans, in typical details and croee-eactions and as discussed caring precon6truction meetings. verify provision of rough grade by general contractor or Owner to pius/minus one tenth foot. Notify Owner's representative of any discrap-dncy or potential drainage problems in eubgrade prior to starting work 6. PLANT MATERIALS All plant materials are relocated from existing site areas. Ball in burlap as regiurad and transpllant with root ball in tact. 1. FERTILIZER Fertilize all plant material with 119 'Agriform' tablets. Provide (4) tablets par tree, (2) per shrub, and (1) per groundcover. Place tablete around rootball after backfilling by 5M for tree, shrub, and groundcover planting. 8. SOIL POLYMER Provide 'Soil Moist' or approved alternate. Provide (3) ounces per caliper inch of tree trunk diameter. Provide (1) ounce per shrub and I/2' ounce per groundcover. Add soil polymer to badkrill mix of trans, shrubs and groundcover. 9. HYDROSEED Provide one application the designated area(s) of the Landscape Plan at the following rates of slurry- - Seed, 3 wa4 bland, IW% perennial r s at 12 Ibs. per 1000 SF - Fertilizer, 10-10-20 with urea form FTFE at 400 Ibe. per acre. - Hydromulch, 'Silva -Fibre' by Weyerhaeuser (or equal) at 1,600 Ibs, per acre. - Lima, to achieve a pH beetwaen 5 and 1 - Water, 50M allon6 per acre. -Tadufier, at 40 tbs. per acre on slopes greater than 4096. 10. IRRIGATION Restoration of automatic irrigation system at new and restored planting areas snail be per bidder design. Irrigation system shall include verification of double check per urisdiction requirements and inspection, 6ch 40 man Ines and class 200 laterals trenched to a 12" min, 4th Provide Rain Bird IWO series heads and nozzles and Rain Bird DVF or PGA series automatic remote control valves. Provide 12" pop-up heads in shrub/ggroundcover areas and 4" pop -ups in lawn areas. verify worhung order of existing controller. and restored Irrigation zones shall have complete head to head coverage with separate zones For north, south, east and west exposure, as well as lawn and shrub/groundcover areas. Nozzele shall be adjusted to provide optimal coverage with minimum overapray. Irrigation system bid shalt include first year winterization bg compressed air blow-out and sprinnclq start-( Irrigation contractor to provide ae-bult drawing showing locations of all main lines, laterals, vlaves and indication of zones. Irrgation contractor to provide a one year warranty against defects in materials and workmanship in new ana restored areas. 11. MAINTENANCE Landscape Contractor to maintain site until final acceptance of the job by the Owner. Site shall be maintained during landscape construction to keep site clean of excess soil or excavation on paved areas. Landscape contr ctor to coodnate with Bast Management Practices of the jurisdiction of the site. 12 CLEAN UP Prior to final acceptace and payment, the Landscape Contractor shall remove from site all trash and debris caused as a result of this contract and shall pressure wash or wet broom all soil from pavement. I J J Liar■�n�u�n■�� �. .. 41 01 DETAIL 7h&I EXISTING SITE INFORMATION DERIVED FROM FIELD MEASUREMENTS. PLAN PROVIDED FOR CONCEPTUAL USE ONLY. CONTRACTOR TO FIELD VERIFY ALL AREAS AND DIMENSIONS ON SITE 0 5 y 10 20 30 SCALE 1"=10' N.T.S. iF REDUCED _ _ a+. , ti • Ciro "tdY";r-+t^a•ro'•i+d•' k `,.. `", ti.. . RESTORE EX., ` �, ''`\ ` , -°`°,- •`' LAIUN As i�EQ1?. . iN PUBLIC EX. •GONG lUA1�K . •TOP • OF BERM, , i. +(37.50)• VERIFY + EXISTING I EX. PLANTING." a EXISTING SCULPTUi?E y' �•� RESTORE LAWN* uJ/ 1 PRECAST CONIC. NYDROSEED A5.G7D; . fE \ `` WHEEL STOPS t3) CC' MPACT ( EE) ' PARKING SPACES.:. - 1 • k TOP .off kky - ;• '• 1 \ +f37,50) VERIFY lk F`> tmr= d. RGENC \ Y TURN -AR OUNI� ' ,4PPR0 X1M,4TE' LOCATOIN•. . _ .• . . .. , :. 01= FIRE HYDRANT RELOCATED, V RIB' fE PER r. - k 37.00 + APRROX PROVIDE 'THICKENED EDGE 1-2� IVRiFY� - AT ASPHALT` WHERE NO CURB IS -INDICATED :` \ O } , PROVIDE ASPHALT FLUSH TO • , 5go 0 � �..:: � :•��••.,..' .} V �, } � d I . EX. CONC. PAVEMENT. SLOPE' + �. TO DRAiN TOWARD EX. 36.00 APPROX 9 PARIKiNG LOT. ` '' . • �� � \ s i' PROVIDE STRUCTURAL FILL. LANDSCAPE PLAAiTIW_%6`WITHIN 2' PROVIDE 2" DEPTH CLASS B ' I R 6" DE - OF .EMERGENCY VE LE TURN .. ''� �„ " �`�� ; �� + 35.00 . , Q ASPHALT OVER DEPTH 3e•60 AROUND SHALL BEM TAINER' _.may ApPRox COMPACTED; UNIFORM APPROX + AT A MAXIMUM 24" HEiG +i3s�oo) _ CRUSHED'ROCK BASE. ' .. VERIFY �' SLOPE 2qo TOWARD ALLOW FOR VEHICLE OVE _. EXISTING PARKING LOT \, c i \ PLANTING BED FOR < EX. BBQ RELOCATED ROSE$ \� :. AND -SHRUBS EX. CONIC. RELOCATED 'at FIRE HYDRANT PLANTING 13ED FOR ` PATIO k" RELOCATED ROSES ,{�,, AND SHRUBS. PROVIDE "..' .. t.F 0 • _D A' I G. SHALL GROUNDCOVER AT 24" OC. TO DRIPLINE ° SAW CUT' AND REMOVE OF SHRUBS. . Ip EXISTING CONC. PAVEMENT. HYDROSEED \ I. > PROVIDE NEW BROOM FIN. LAWN SEE LANDSCAPE PLAN o CONC. WALK AS SHOWN. BY ROPER COMPANY + (4" SLAB ON 4" CR. BASE, FOR SIDE YARD w` TOOLED EDGES AND �OINTv - LANDSCAPING AS ,�'�� PART OF 55 WILLIAM `` s 22't ACC AiSLE 18'-0" PARKING PROJECT EXISTING BUILDING (CEDAR RIVER TERRACE z APARTMENTS) 5 EX. CONC. WALK TO REMAIN - PROPOSED BROOOM FIN. CONC. VERTICAL f; CURB W. TOOLED EDGES, TYP. (6"x 18", W/ +'4 x BAR CONT-) (TC EL. TO SE FLUSH W/ EX. } ` GONG PAVEMENT, b" HT. ABV. FIN. GRADE OF w ; : {_ LANDSCAPE PLAN 1 EX, CONC: WALK- TO BYEROPER COMPANY ., ,,_, s.+. is e.sk-<..v..: ;.,.6.h+. „t.+Rw:xc s ' a `5. `` ",-f''. -•'€,..` .,�=,,i'' }- w' "`,:.:: �f � y •, �5E REMOVED.FOR ADJACENT LOT LANDSCAPING EX. PLANTING c35.0o) VERIFY BED lTl'PJ RELOCATED i FLAG POLE ,i EX. CONC. I ENTRY PLAZA EX, PLANTING BED (TYP.) • ` r 4 ` 4.60) VERIFY «<_ O i +� EXISTING FLAG POLE LOCATION t ~ • . 1 i ' 1I 1 3 rf PROVIDE 2 DEPTH CLASS B ASPHALT COMPACTED CRUSHED ROCK BASE EX. CONC. CURB TO BE REMOVED (TYP.) -- EXISTING ASPHALT PARKING LOT �l (PAVEMENT TO REMAIN, TYR.) - _0�<7 SEE LANDSCAPE PLAN BY ROPER COMPANY FOR SIDE YARD LANDSCAPING I Ex CONIC. WALK EX. CONC. CURB TO 4 REMAIN (TYP-) EX. 8 CAL. MAPLE TREES TO BE .) - EX. PLANTING BED (TYP-) sl 1� SEE CIVIL/ARCHITECTURAL. PLANS ' OF 55 WILLIAMS PROJECT FOR REVISION OF SITE IN THIS AREA i 12'x8' TRASH ENCLOSURE Ii ON CONC PAD (VERIFY '( ATION DOES NOT CONFLICT I WITH SITE CONDITIONS) ?{ PROVIDE 2" DEPTH CLASS B Z r, h. a_. d. Ls� . . },••. ASPHALT OVER 6" DEPTH COMPACTED CRUSHED ROCK BASE EX. CONC. CUR5 TO a BE REMOVED (TYP.) a- • ,II ► PROPOSED BROOM FIN. CONIC. VERTI APPROXIMATE a . ' ' CURB W. TOOLED EDGES TYP- (6 "x iv, 04 LOCATION OF fE a I' BAR CONT-) (TC EL. TO BE FLUSH W/ X. (VERIFY); CONC PAVEMENT, 6" HT. ABV. FIN. GIR _JE'i ASPHJ - - W - a U PROPOSED BUILDING (55 WILLIAMS CONDOMINIUMS) SEE ARCHITECTURAL PLANS STATE \\ I ILV Jf TODDW\\� t�l I CA`TE No. J66 NOT VALID UNLESS S' N D D DATED 7 -1 Ar 5to j(7 Landscape Architecture LnvironmentaL .services WWW.SrrE•STUDIO.COM PROJECT@S RE-S' • U D I O. CO M P(425) 788 8326 F(425) 671-0647 PO BOX 1542 DWALL, WA 98019 Z U) Z [L w i..L.i D � a rronn vl w O 0 X z w z LL1 a r W W a V w � (.) ,> Ul /\> \ \- W � �\ / \ \ 00 NEWL �L%A1 T�1 6# D \ eoofk / ^ \ \ X /v REVISION i \7< ll) M/I1/01 (3) 11/28/01 s SEE LANDSCAPE PLAN FORR DER COMPANY � X ARD LANDSCAPING AS PART OF 55 WILLIAMS PROJECT DESIGN J'A( DRAWN J'JV CHECKED J'N DATE C8/08/2009 SHEET JG T W s✓ W i O , O z 2 . U N = NZo II W � O _ Q P, o aN M N CU o oLL LL LL 0 0 0 m a W ' 2 oZ O pZ Z oZ Y O d Z 3 w a v) o aK 0 2 o (L a M 1y n cq M n Q c 0 +ou Q N z mW Q Q Q n co M o� Rl (lJ o Z z 0 Liry U I 20' 0 20' po SCALE: I" = 20' NOTE.• ALL LOT DIMENSIONS s'R�• ARE APPROXIMATE. gyp, II I I I 25.75' - 3 NEW N � I I COMPACT STALLS i t F 29' MIN. N 45' i EXIST. BLDG. L-- ----- A (10,815 SF) EXIST. CONC. WALK TO BE REMO VED AMD LANDSCAPED e f L J L NEW CONC. WALK i EXIST. BLDG. + (680 SF) EXIST. WALKWAY __ (373 SF) -_ ..1 — RELOCATED FLAG . 1.� POLE---� o I EXIST .PAVEMENT I (7,809 SF) I � I I � 2 FIRE e f EA I EXIST. STORM I DRAIN— — F W r EXIST. 12 x3' TRASH ENCLOSURE' — — -- EXIST FIRE ..- _ —HYDRANT--- EN ' f \ FLAG POLE TO-f, \ BE RELOCATED /^ II � f � � �hI111 � �_- i 1 ` L 1 3 ,I 4 I I I 1 — ' Ji o l N. 3� O LESS _ rt T Ik _ IIII i \ I t ( i F � 4 o ' r - o fly a Qal as e ,— _-1—.__..Nj4--.--1---- N11 ', `e 011 e ne x�\9�S� 100-YR FLOOD LIMIT ELEV. 3 1. 4 (FEMA) max\ X THICKENED ee \ \ \\\ AC EDGE FIRE HYDRANT T E RELOCATED I \ NEW ASPHALT ~ \ \ \ \\ e\ \\ PAVEMENT (4,268 SF) MIN. 34 N.,z� -\ \ \ �; ', ;; , '•wee` \\\ \\e\e\\ \ PROPOSED FIRE TURN- AROUND \ \ RELO TED FIRE +`��,\�` e \\ e I 2 Q� MIN 6" CONC. \ \ \ \. ` �`,•\ \fie` \\\ \ •.. - ,�. -'--�k'�L CURB (TYP.) •i \ , \ `e\ \ \ \ + ;� ^ •i ;�' r. +' % \ \.\ \ . �-` i. � � •�.`w\ \\\fie\t �\ \eNN e<\\\ \\ \ \Ilk 0' Ml AC SEM WA T i R=25' N a N88 23 47 W 169.52 IN !. o x NEW PAVEMENT o(203 SF) I 1 - 0 0 II �fi X W U J \\\ e \\ > l� \. \\\\\`e e \\\ \\ \N\`N \`e NN tee\\\\ \°we NN \\ \ F<F < �... CT I --------- -w-- _ w----------- w----- --- --w--- — — P p -___-_-w-----------w--- SS ._ / C�a ` �� 'St3" 5'f3'� ---- -grr-�.__._—_..r - �.__.,.� ---�•_��_—..�.._ �. � � _ _ T _ _-- - SS .— --- Ss Z.SD ss —'— ss ss -{�- ss ss ss --- - _ -- ss - -- ss ss ' I \ N 5TH ST � m 0 � Z �+ N 47H ST Q Q N Q 00 N 3RD ST SI TE S TOBIN ST BRONSON 40 WA Y LIBERTY S 2ND ST Q Q �[ PARK CEDAR RIVER PARK Q O � - Q Y S4THST Q �' WAYS � SER NFU W W VICINITY MAP. - NOT TO SCALE GENERAL NO TES: OWNER/DEVELOPER: ENGINEER: CITY OF RENTON HOUSING AUTHORITY 970 HARRINGTON NE RENTON, WASHINGTON 98056 (425) 226-1850 PETERSON CONSULTING ENGINEERS 40JO LAKE WASHINGTON BLVD N.E. SUITE 200 KIRKLAND, WASHINGTON 980JJ (425) 827-5874 CONTACT- NICK BOSSOFF, P.E. TOTAL SITE AREA: 50,143 SF EXISTING IMPERVIOUS AREA: 19, 677 SF PROPOSED IMPERVIOUS AREA: 4, 471 SF TOTAL IMPERVIOUS AREA: 24,148 SF L 0 T CO VERA GE.- 48Z EXISTING PARKING STALLS. 27 ADDITIONAL STALLS PROPOSED: STANDARD: 5 COMPA C T• 3 TO TA L: 35 1 B '�� •� Og wAs o4,�. 02 29631 Q �gslONAL�1-�t-n� EXPIRES 07/02/03 PRELIM/NARY DRAWING NOT FOR CONSTRUCT/ON -SA -oa—oi