Loading...
HomeMy WebLinkAboutPN_PROJECT_NARRATIVE_PSE_101174060_241118_V1PROJECT NARRATIVE Please respond to these criteria; use a separate sheet if needed. 1.Project Name. 101174060 604194 EAR17 CREW2 200 SW LANGS 2.The name, source, intensity, and location of the sound/project limits. Potelco line trucks, bucket trucks, flatbed trucks 3.Description of work. REPLACE TERM AND RISER ON POLE 317816-165761. REPLACE (3) J-BUS, (9) ELBOWS, (3) DUST CAPS IN VAULT 317817-165764. REPLACE EXISTING 3-PH PRI - REUSE EXISTING CONDUIT. 4.The equipment and vehicles used for the work (please provide a table of the equipment to be used with its appropriate decibels). Vehicles: LINE TRUCK 85db @ 50' 1 TON TRUCK 85db @ 50' BUCKET TRUCK 75db @ 50' 5.Proposed Noise Mitigating Measures the applicant will implement to minimize the sound level violations. Use hand tools when possible. Limit run time of gas-powered equipment. 6.Any additional information or studies regarding any aspect of the requested variance that is deemed necessary to complete the review of the variance request. No 7.The hours during the day and/or night the noise will occur. 10PM-6AM 8.The number of days and/or nights the noise will occur. 2 Nights 9.The ambient sound level during the time of day or night for which the variance is being sought. 84db-85db 10.The time period (include start date and end date) for which the variance is requested. We will need2 nights to complete work. The date will depend on when the noise variance is issued. 11.The reason for which the noise violation cannot be avoided, i.e. why work cannot be performed within allowed times. OUTAGE NEEDED FOR COMMERICAL CUSTOMERS. NO WAY TO SWITCH OUT OUTAGES. 12.Mitigating conditions that the applicant will implement to minimize the sound level violations. Use hand tools when possible. Limit run time of gas-powered equipment.