37.5 kVA 120/240V (A)
SLAG7726
318167-165733
10 kVA 120/240V (A)
EOP
28'
318158-165725
SLAG7727
ROW
60'
318200-165734
25 kVA 120/240V (C)
SLAG7730
318154-165741
37.5 kVA 120/240V (B)
25T
SLAG7725
PCR
13
#
4
A
C
S
R
ABC
#
4
A
C
S
R
#
4
A
C
S
R
ABC
ABC
SITE PLAN
POWER GENERAL NOTES - RESIDENTIAL PROJECT
N
Vicinity Map
47.7893, -122.2213
Owner / Developer Contact Info
officeATTN:
PNW RESTORATION LLC
9805 NE 116 ST #7220
KIRKLAND WA, 98034
KEVIN HACKETT 425-248-0076
OVERHEAD CIRCUIT MAP
SCALE: 6" = 1 MILE
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
PCR-13
12/4/2024
343 353 286
1.1 --
344.1 353 286
HP Svc/MSA
Distribution
TEMP REMOVAL
Superior
ORDER#NOTIF#
PWR
PROJECT PHASE
N/AN/A
N/A
108161897
CABLE TV
PHONE
GAS
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
10.
7.
6.
5.
4.
3.
2.
1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing
work to get the underground facilities located.
STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.
SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
Roads shall be paved or have a compacted , crushed rock base in place.
CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard
posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,
storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them.
All work is to be done in accordance with local municipal and county permit requirements as applicable.
Inclement weather conditions may cause delays in construction times and dates.
EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer
will provide any and all shoring or they will side slope the trench to 1:1.
8.
9.
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
SCALE: 1" = 50'
10
1
1
8
3
0
5
8
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
Service Stubs
101183058
N/A
N/A
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
RUBY OTIS 253-243-4463 12/11/24
JAMES WORKMAN N/A 12/13/24
N/A N/A N/A
JAMES WORKMAN N/A 12/17/24
RW-136956 RENTON
DELPH FIRE DAMAGE
NEW OH BRIDLE SVC (200A)
457 MAPLE AVE NW, RENTON WA, 98057
N/A N/A
N/A 101183058
AS NOTED 1/1
KING N/A N/A CSPSKEPM
SW 7-23N-05E N/A N/A
2305E027 2305E028 2305E027 PCR-13
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
515765773
N/A
SERVICE BRACKET SERVICE DROP
NO. 6 COPPERWELD,
AIRCRAFT CABLE
OR EQUIVALENT
3/4" RIGID GALVANIZED
45˚
MIN
18" MIN
SEE
DETAIL 1
FLASHING
STRUCTURAL FRAMING
AND FINISH MATERIALS
5/16" U-BOLT
2" X 4" BACKING
BLOCKING BETWEEN
MAST AND BUILDING
RIGID STEEL
CONDUIT
STRUCTURAL
FRAMING
AND FINISH
MATERIALS
GROUND GROUND
5/16" U-BOLT
2" X 4" BACKING
RIGID STEEL
CONDUIT
CONDUIT OR EQUIVALENT ENDS
FLATTENED AND DRILLED
SHARP BEND; NO RADIUS
(SEE DETAIL 2)45˚
MIN
COLLARS,
CYCLONE
FENCE
CLAMP OR
EQUIVALENT
WITH 3/8" MIN
BOLT SIZE
WEATHERHEAD
DETAIL 1 DETAIL 2
GALVANIZED
THIMBLE AND CABLE
CLAMP
FLASHING OR MASTIC
METHOD OF GUYING
ATTACHMENT
SEE DETAIL 1
GALVANIZED BOLT;
EYE-BOLT OPTIONAL
PULL
60˚ - 90˚
GUY WIRES
60˚ - 90˚
APART
PULL
COLLARS, CYCLONE FENCE
CLAMP OR EQUAL WITH
3/8" MIN BOLT SIZE
GUYED SERVICE MAST DETAIL
SCALE: NONE
SERVICE LINE
(UTILITY OWNED)
SERVICE MAST
CONNECTION POINT
26'
17-1/2'
12'13'
STATE HIGHWAYS STREETS, ALLEYS, COUNTY ROADS,
DRIVEWAYS, AND PARKING AREAS
RESIDENTIAL PROPERTY
OVERHEAD SERVICE CLEARANCE DETAIL
SCALE: NONE
TOP VIEW 18" MIN
3' MIN WORKING
SPACE
18" MIN
3' MIN 4' MIN
6' MAX
5' PREFERRED
3' MIN
3' MIN
Neares
t
S
i
d
e
W
a
l
l
or Obs
t
r
u
c
t
i
o
n
A
n
y
O
b
s
t
r
u
c
t
i
o
n
A
b
o
v
e
M
e
t
e
r
Working Space
Meter Clearances
SCALE: NONE
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
1771 SQ FT
200 AMPS
GAS
7.7
80 A
1.5%
2.9%
00 1"2"
00 50'100'
CIRCUIT FEET ADDED: 0'
WIRE STRINGING SECONDARY
Location
Usage Wire Size & Type
Quantity
of wires
Length
(per wire)TotalFromTo
P01 P02 SPAN GUY 3/8" STEEL WIRE 1 120'120'
P01 BRIDLE SVC 1/0 OH TPX 1 25'25'
BRIDLE M01 SVC 1/0 OH TPX 1 100'100'
SITE SPECIFIC NOTES
AT P01: 318179-165727
-EXISTING 45'' CL UNK 1985 DISTRIBUTION POLE TO REMAIN
-EXISTING 37.5kVA 120/240V OH TRF TO REMAIN
-INSTALL 120' 3/8" SPAN GUY TO P02
-INSTALL (1) BRIDLE SVC #1/0 TRIPLEX FROM P01 TO M01 6024.1000 (BSTPX)
-INSTALL (1) 4" RIGID CLEVIS, NEUTRAL IN COMMON POSITION 6015.1000 (INDNRC)
-INSTALL ZIP TIES AS NEEDED TO PREVENT SAGGING
AT P02: 318167-165733
-EXISTING 40' CL UNK 1969 DISTRIBUTION POLE TO REMAIN
-EXISTING 10kVA 120/240V OH TRF TO REMAIN
AT M01: NEW METER BASE
-INSTALL 200A METER
SPAN SPECIFIC NOTES
-SEE SITE PLAN, ONE-LINE DRAWING AND TABLES FOR NEW INSTALLS
(3)3-5
3-6
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:RUBY OTIS
(253) 243-4463
RUBY.OTIS@PSE.COM
JOBSITE
JOBSITE
CUSTOMER DEVELOPMENT NOTES:
A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO STARTING ANY SITE
WORK.
CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET
SOUND ENERGY STANDARDS & LOCAL MUNICIPALITY.
**DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL**
CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING:
CROSSING/BORING.
-OPEN TRENCH OR BORING FOR CROSSINGS ARE ALLOWED PER LOCAL MUNICIPALITY PERMIT
REQUIREMENTS.
-CROSSINGS IN RIGHT OF WAY MUST BE SCHEDULED WITH PROJECT MANAGER PRIOR TO
CONSTRUCTION.
-PROJECT MANAGER OR DESIGNATED REPRESENTATIVE MUST BE ON SITE DURING CONSTRUCTION
WORK IN RIGHT OF WAY.
-EXCAVATION CONTRACTOR MUST BE LICENSED AND BONDED TO PERFORM WORK IN RIGHT OF WAY.
JOB SITE READINESS.
-JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO
CONSTRUCTION DATE.
-ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER AND LOCAL
MUNICIPALITY.
-ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS MUST BE
COMPLETED 5 BUSINESS DAYS PRIOR TO SCHEDULED CONSTRUCTION DATE.
-REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS, VAULTS &
TRENCH AT ALL TIMES.
-REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE DAY OF CONSTRUCTION TO COMPLETE
BACKFILLING.
-IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED.
-PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT.
-IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP AND
SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS.