Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutAddendum - 1Docusign Envelope ID: 30983147-83F5-427A-82E9-176236756FBF
AMENDMENT NO. 1 TO AGREEMENT FOR MAPLEWOOD PARK
SURVEY
THIS AMENDMENT, dated for reference purposes only as January 10, 2025, is by and between
the City of Renton (the "City"), a Washington municipal corporation, and PACE Engineers, Inc.
("Consultant"), a profit Corporation. The City and the Consultant are referred to collectively in
this Amendment as the "Parties." Once fully executed by the Parties, this Amendment is
effective as of the last date signed by both parties.
Whereas, the City engaged the services of the Consultant under Agreement CAG-24-281, dated
October 9, 2024, to provide necessary services for the surveying of Maplewood Park referred to
herein as the "Agreement");
Whereas, the Parties wish to amend the Agreement to change the scope of work, change the
time for performance, and change the compensation in order to provide utility locate services to
complete the surveying project.
NOW THEREFORE, It is mutually agreed upon that CAG-24-281 is amended as follows:
1.Scope of Work: Section 1, Scope of Work, is amended to add work as specified in Exhibit
A-1, which is attached and incorporated herein.
2.Time of Performance: Section 3, Time of Performance, is amended. All Work shall be
performed by no later than February 14, 2025.
3.Compensation: Section 4, Compensation, is amended so that the maximum amount of
compensation payable to Consultant is increased by $396.75 from $6,500.00 to
$6,896.75, plus any applicable state and local sales taxes. The additional compensation
shall be paid based upon Work actually performed according to the rate(s) or amounts
specified in Exhibit A-1, which is attached and incorporated herein.
4.All terms of the Agreement not explicitly modified herein shall remain in full force and
effect and such terms shall apply to Work performed according to this Amendment as if
fully set forth herein.
IN WITNESS WHEREOF, the Parties have voluntarily entered into this Amendment as of the date
last signed by the Parties below.
CAG-24-281, ADDEN #1-25
Docusign Envelope ID: 30983147-83F5-427A-82E9-176236756FBF
CITY OF RENTON
� DocuSigned by:
By: !1::!:::c�� �t Maryjane Van Cleave Parks and Recreation Administrator 1/10/2025 I 11:54 AM PST
Date
Approved as to Legal Form
By:-----------Shane Moloney City Attorney
Contract Template Updated 06/17/2021
PAGE20F2
CONSULTANT
By: __ 2i_�_.o_. _a_,_:folll:_:1_5�_8'_00_' __ William R. Hawkins Senior Principal Surveyor
1/9/25 Date
Approved by Cheryl Beyer via email 12/30/2024
Docusign Envelope ID: 30983147-83F5-427A-82E9-176236756FBF
J, APACE
PACE Engineers, Inc.
11255 Kirkland Way, Suite 300
Kirkland, WA 98033
425.827.2014
Betsy Severtsen
City of Renton
Attn: Tax & Licensing Division
1055 S Grady Way, 5th Floor
Renton 98057
PACE Project
CAG-24-281
24605 Maplewood Park
Professional Services for the Period: November 1, 2024 to November 30, 2024
Attachment A-1
December 20, 2024
--------------------------------------------------
Billing Group
Total Fee
Percent Complete
Consultants
Reimb Outside Consulting
Topo Survey
6,500.00
94.00 Total Earned
Previous Fee Billing
Total Fee
11/11/2024 Applied Professional Services, Utility Locate by APS
Inc.
Total Consultants
6,110.00
3,250.00
Bill Group Total
396.75
396.75
2,860.00
396.75
$3,256.75 To receive invoices/statements by email, set up electronic pmts or questions regarding your account please contact: paceaccounting@paceengrs.com