Loading...
HomeMy WebLinkAboutEx07_TIACivTech12720 East Nora Avenue, Suite D • Spokane Valley, Washington 99216 • 509.236.0800 RE N T O N M A R K E T Tr a f f i c I m p a c t A n a l y s i s October 2024 CivTech Project No. 24-0640 North of 3rd Street and East of Logan Avenue in Renton, Washington Prepared for: City of Renton 1055 South Grady Way Renton, Washington 98057 For Submittal to: City of Renton Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 RENTON MARKET TRAFFIC IMPACT ANALYSIS NORTH OF 3RD STREET AND EAST OF LOGAN AVENUE IN RENTON, WASHINGTON Prepared for: City of Renton 1055 South Grady Way Renton, Washington 98057 For Submittal to: City of Renton CivTech Inc. 12720 East Nora Avenue Suite D Spokane Valley, Washington 99216 Office: 602-290-3016 info@civtech.com OCTOBER 2024 CIVTECH PROJECT NO. 24-0640 Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 Renton Market – Renton, Washington Traffic Impact Analysis i October 2024 TABLE OF CONTENTS EXECUTIVE SUMMARY ....................................................................................................... 1  INTRODUCTION ................................................................................................................. 3  Study Requirements ............................................................................................................. 3  Study Area ........................................................................................................................... 3  Horizon Years ....................................................................................................................... 4  EXISTING CONDITIONS .................................................................................................... 6  Land Use ............................................................................................................................. 6  Surrounding Land Use .......................................................................................................... 6  Roadway Network ................................................................................................................ 6  Intersection Configuration ..................................................................................................... 7  Traffic Volumes .................................................................................................................... 8  Capacity Analysis ................................................................................................................ 11  Crash History ..................................................................................................................... 13  Future Roadway Improvements ........................................................................................... 13  PROPOSED DEVELOPMENT .............................................................................................. 14  Site Location ...................................................................................................................... 14  Site Density/Intensity ......................................................................................................... 14  Site Access ......................................................................................................................... 14  Trip Generation .................................................................................................................. 16  Vehicle Trip Distribution and Assignment ............................................................................. 17  Future Background Traffic ................................................................................................... 20  Total Traffic ....................................................................................................................... 20  TRAFFIC AND IMPROVEMENT ANALYSIS ........................................................................ 25  Turn Lane Warranting Analysis ............................................................................................ 25  Projected Capacity Analysis ................................................................................................. 26  Queue Length Analysis ....................................................................................................... 27  Sight Distance Analysis ....................................................................................................... 30  CONCLUSIONS ................................................................................................................. 31  LIST OF REFERENCES TECHNICAL APPENDICES Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 Renton Market – Renton, Washington Traffic Impact Analysis ii October 2024 LIST OF TABLES Table 1 – Intersection Level of Service Criteria .............................................................. 11  Table 2 – Existing Peak Hour Levels of Service ............................................................... 12  Table 3 – Intersection Crash Data Summary .................................................................. 13  Table 4 – Trip Generation ................................................................................................ 16  Table 5 – Site Trip Distribution ........................................................................................ 17  Table 6 – Right-turn Deceleration Lane Warranting Criteria .......................................... 25  Table 7 – Left-turn Deceleration Lane Warranting Criteria ............................................ 25  Table 8 – Peak Hour Levels of Service ............................................................................. 26  Table 9 – Queue Storage Lengths ................................................................................... 28  Table 10 – AASHTO Sight Distance Requirements .......................................................... 30  LIST OF FIGURES Figure 1 – Vicinity Map ...................................................................................................... 5  Figure 2 – Existing Lane Configurations and Stop Controls .............................................. 9  Figure 3 – Existing Peak Hour Traffic Volumes ............................................................... 10  Figure 4 – Site Plan and Access ....................................................................................... 15  Figure 5 – Trip Distribution ............................................................................................. 18  Figure 6 – Site Generated Traffic Volumes ...................................................................... 19  Figure 7 – 2026 Background Traffic Volumes ................................................................. 21  Figure 8 – 2031 Background Traffic Volumes ................................................................. 22  Figure 9 – 2026 Total Traffic Volumes ............................................................................ 23  Figure 10 – 2031 Total Traffic Volumes .......................................................................... 24  Figure 11 – Proposed Lane Configurations and Traffic Control ...................................... 29  Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 Renton Market – Renton, Washington Traffic Impact Analysis 1 October 2024 EXECUTIVE SUMMARY The City of Renton proposes the renovation of the Renton Market located north of 3rd Street and east of Logan. Renton Market will be renovated to include 12 new vendor stalls and one new tenant on the east side of the building utilized as a sit-down restaurant. Access to the site will be from two (2) access points in a parking garage along 2nd street, one (1) access point along Logan Avenue and parking will be provided along the streets of 3rd Street and Burnett Avenue. CivTech, Inc. has been retained by the City of Renton to perform the traffic impact study for the proposed development. The purpose of this assessment is to address the traffic and transportation impacts of the proposed development on the surrounding streets and intersections. The following conclusions and recommendations have been documented in this study: GENERAL  The proposed development is anticipated to generate 628 weekday daily trips, 35 (19 in/16 out) trips during the AM peak hour, and 105 (60 in/ 58 out) trips during the PM peak hour.  The distribution for LUC 926 Food Cart Pods as assumed to be equal to LUC 930 Fast Casual Restaurant since they share similar traits and are within the same facility. The 12 new vendor stalls are anticipated to generate more trips than the two tenants on the east and west since there will be more vendors to go to that serve different items/goods therefore, more people will likely be going to the Renton Marketplace for the one of the 12 vendors rather than the two tenants on the east and west. EXISTING  The results of the existing conditions analysis summarized in Table 2 indicate that all study intersections operate with acceptable levels of service (LOS D or better). OPENING YEAR (2026)  The results of the Synchro analysis summarized in Table 8 indicate that all study intersections operate with overall acceptable levels of service (LOS D or better). 2031 HORIZON YEAR  The results of the Synchro analysis summarized in Table 8 indicate that all study intersections operate with overall acceptable levels of service (LOS D or better). RIGHT-TURN DECELERATION LANES  According to WSDOT standards, due to the low current and expected future traffic volumes and the low-speed limit on Logan Avenue, the right-turn lane warrant criteria is not met for the intersection. Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 Renton Market – Renton, Washington Traffic Impact Analysis 2 October 2024 LEFT-TURN DECELERATION LANES  According to WSDOT standards, due to the low current and expected future traffic volumes and low-speed limit on Logan Avenue, the right-turn lane warrant criteria is not met for the intersection. QUEUE STORAGE  The recommended storage lengths are provided for study horizon year 2031 using the total traffic projections. SIGHT DISTANCE  Sight visibility should be provided at all driveways according to the distances shown in Table 10. All vegetation and trees should be maintained to allow unobstructed sight distance. Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 Renton Market – Renton, Washington Traffic Impact Analysis 3 October 2024 INTRODUCTION The City of Renton proposes the renovation of the Renton Market located north of 3rd Street and east of Logan Avenue. The Pavilion Center will be renovated to include 12 new vendor stalls and one new tenant on the east side of the building utilized as a sit restaurant. Access to the site will be from two (2) access points in a parking garage along 2nd street, one (1) access point along Logan Avenue and parking will be provided along the streets of 3rd Street and Burnett Avenue. The vicinity of the site is provided in Figure 1. CivTech, Inc. has been retained by the City of Renton the traffic impact analysis (TIA) for the proposed development. The purpose of this assessment is to address the traffic and transportation impacts of the proposed development on the surrounding streets and intersections. A TIA is an investigation of existing and projected future traffic conditions in a predetermined local area relative to a specific proposed development, an area typically defined by the jurisdiction(s) responsible for roadways that provide access to the site. STUDY REQUIREMENTS This study analyzes the traffic impact due to the proposed renovation on the Renton Market on the surrounding street network. The study has been prepared in conformance with the City of Renton Permit Services Policy Guidelines for Traffic Impact Analysis for New Development. The proposed development is anticipated to generate less than 500 trips during the highest peak hour; therefore, a Category I TIA was prepared herein. The specific objectives of the study are:  To determine whether the planned street system in the vicinity of the site is adequate to accommodate the increased traffic that results from the proposed development.  To recommend additional street improvements or traffic control devices, where necessary, to mitigate the additional site-generated traffic; and,  Evaluate the internal site circulation and provide recommendations if necessary. STUDY AREA The study area has been defined as including the following intersections:  City Center Parking Egress and 2nd Street  City Center Parking Ingress and 2nd Street  Logan Avenue and 2nd Street  Logan Avenue and Renton Market Driveway  Logan Avenue and Driveway of 3rd Street  Logan Avenue/Smithers Avenue/3rd Street  Burnett Avenue and 2nd Street  Burnett Avenue and 3rd Street Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 Renton Market – Renton, Washington Traffic Impact Analysis 4 October 2024 HORIZON YEARS The Renton Market renovation is expected to open during 2026. The study years will include the existing year 2024, the Phase 1 opening year assumed to be 2026 and a horizon year 5-years after buildout 2031. The study intersections and the site accesses will be analyzed for the AM and PM peak hours to determine the recommended intersection lane configuration, intersection stop control, turn lane storage requirements, and roadway typical sections for the development. Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 WASHINGTON KING COUNTY Figure 1: Vicinity Map CivTechRenton Market - Trac Impact Analysis NORTHNTS B u r n e t t P l . SITE 2nd St. 3rd St. Lo g a n A v e . Ci t y C e n t e r Pa r k i n g E g r e e s Ci t y C e n t e r Pa r k i n g I n g r e e s Sm i t h e r s A v e . Bu r n e t t A v e . Pavilion Drwy. Driveway City ofRenton Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 Renton Market – Renton, Washington Traffic Impact Analysis 6 October 2024 EXISTING CONDITIONS LAND USE The existing land is currently used as the Renton Pavilion Events Center where vendors will come and provide goods and services to other pedestrians. SURROUNDING LAND USE Directly surrounding the site are apartment complexes and retail uses. Northwest of the site across 2nd Street is the Renton High School. South of the site across 3rd Street is the Renton Civic Theatre. West of the site across Logan Avenue is the Revo 225 Apartments. East of the site across Burnette Avenue is the Metropolitan Place Apartments. Freeways surrounding the site within two and a half miles include the Interstate 405 (I-405) and the Valley Freeway (SR 167). ROADWAY NETWORK The existing roadway network within the study area includes, 2nd Street, Logan Avenue, Smithers Avenue, 3rd Street, and Burnett Avenue. 2nd Street is a west three (3) lane roadway with three lanes of travel westbound. The roadway begins to the east at Mill Avenue and continues west until it terminates at Rainer Avenue. The posted speed limit is 25 miles-per-hour (mph) within the vicinity of the site. Logan Avenue is a north-south two (2) lane roadway with one lane of travel in each direction. The roadway begins to the north where it converts from Southport Drive and continues south until it terminates at 3rd Street. The posted speed limit is 25 mph within the vicinity of the site. Smithers Avenue is a north-south two (2) lane roadway with one (1) lane of travel one each direction. The roadway begins to the south at 4th street and continues north until it terminates at 3rd Street. There is no posted speed limit within the vicinity of the site. 3rd Street is an east two (2) lane roadway with two lanes of travel eastbound. The roadway begins to the west where it converts from SW Sunset Boulevard and continues east until it converts to the WA-900. The posted speed limit is 25 mph within the vicinity of the site. Burnett Avenue is a north-south two (2) lane roadway with one (1) lane of travel one each direction. The roadway begins to the south at 7th Street and continues north until it terminates at Tillicum Street. The posted speed limit is 25 mph within the vicinity of the site. Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 Renton Market – Renton, Washington Traffic Impact Analysis 7 October 2024 INTERSECTION CONFIGURATION The unsignalized intersection of City Center Parking Egress and 2nd Street operates as a 3- legged intersection with stop control in the northbound approach. The northbound approach consists of one (1) exclusive left-turn lane. The westbound approach consists of four (4) through lanes. The unsignalized intersection of City Center Parking Ingress and 2nd Street operates as a 3- legged intersection. The westbound approach consists of three (3) through lanes and a shared through/left-turn lanes. The signalized intersection of Logan Avenue and 2nd Street operates as a 4-legged intersection. The northbound approach consists of a shared left/through turn lane. The southbound approach consists of one (1) through lane and one (1) dedicated right-turn lane. The intersection of Logan Avenue and Pavilion Driveway operates as a 3-legged intersection with stop control on the eastbound approach. The northbound approach consists of a shared through/right-turn lane. The southbound approach consists of a shared left/through turn lane. The eastbound approach consists of a shared left/right-turn lane. The intersection of Logan Avenue and Driveway of 3rd Street operates as a 3-legged intersection with stop control on the westbound approach. The northbound approach consists of one (1) through lane. The southbound approach consists of a shared through/right-turn lane. The westbound approach consists of a dedicated right-turn lane. The signalized intersection of Logan Avenue/Smithers Avenue/3rd Street operates as a 4-legged intersection. The northbound approach consists of a dedicated right-turn lane. The southbound approach consists of an exclusive left-turn lane. The eastbound approach on Smithers Avenue consists of one (1) through lane and a shared through/right-turn lane. The eastbound approach on Logan Avenue consists of one (1) through lane and a shared left/through turn lane. The signalized intersection of Burnett Avenue and 2nd Street operates as a 4-legged intersection. The northbound approach consists of one (1) through lane and one (1) exclusive left-turn lane. The southbound approach consists of one (1) through lane and one (1) dedicated right-turn lane. The westbound approach consists of two (2) through lanes, one shared left/through turn lane and a shared through/right-turn lane. The signalized intersection of Burnett Avenue and 3rd Street as a 4-legged intersection. The northbound approach consists of one (1) through lane and one (1) dedicated right-turn lane. The southbound approach consists of a shared left/through turn lane. The eastbound approach consists of two (2) through lanes, one shared left/through turn lane and one (1) dedicated right-turn lane. The existing intersection lane configurations and traffic control is illustrated in Figure 2. Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 Renton Market – Renton, Washington Traffic Impact Analysis 8 October 2024 TRAFFIC VOLUMES CivTech engaged All Traffic Data Services. to record traffic volumes at eight (8) study intersections within the project vicinity. Peak hour volume turning movement counts were performed from 7:00- 9:00 AM and 4:00-6:00 PM on Tuesday, August 20, 2024. Peak hour turning movement counts were conducted at the following study intersections:  City Center Parking Egress and 2nd Street  City Center Parking Ingress and 2nd Street  Logan Avenue and 2nd Street  Logan Avenue and Pavilion Driveway  Logan Avenue and Driveway of 3rd Street  Logan Avenue/Smithers Avenue/3rd Street  Burnett Avenue and 2nd Street  Burnett Avenue and 3rd Street The existing traffic volumes observed for this study are presented in Figure 3 for the weekday AM and PM peak hours. Traffic volume data obtained for this study have been included in Appendix B. Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 Cit y C e n t e r Pa r k i n g E g r e e s Cit y C e n t e r Pa r k i n g I n g r e e s SITE 2nd St. 3rd St. Lo g a n A v e . Sm i t h e r s A v e . Bu r n e t t A v e . B u r n e t t P l . Pavilion Drwy. Driveway 11123 4 15 16 18 7 Figure 2: Existing Lane Configuration and Traffic Control Renton Market - Trac Impact Analysis CivTech Prepared for:City of Renton 1055 South Grady Way Renton, Washington 98057 For Submittal to:City of Renton SP E E D LIM I T 20 SP E E D LI M I T 25 SPE E D LIM I T 25 SPEEDLIMIT25 SPEEDLIMIT25 SPEEDLIMIT25 SPEEDLIMIT25 SPEEDLIMIT25 SPE E D LIM I T 25 PARK PARK 1 2 4 5 6 3 7 8 City Center Parking Egress & 2nd St City Center Parking Ingress & 2nd St Logan Ave & 2nd St Logan Ave & Pavilion Driveway Logan Ave & Driveway of 3rd St Logan Ave/Smithers Ave/3rd St Burnett Ave & 2nd St Burnett Ave & 3rd St NORTHLEGEND Thru or Turning Movement Stop Sign Speed Limit Traffic Signal SPEEDLIMIT40 Two-Way Left Turn-Lane Raised Median Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 !"#$%#&'()*+(),-,."+$" 0( 0 ) 0( 0 ) 0( 0 ) !"#$% 0( 0 ) 0( 0 ) 0( 0 ) !"#$% 40 ( 2 2 5 ) 29 ( 2 7 ) 0( 0 ) !"#$% 0( 0 ) 56 ( 0 ) 4( 1 1 ) !"#$% 0(0)0(0)0(0)0(0)0(0)129(117)0(0)5(9)0(0)435(654)0(0)416(683)0(0)278(485)0(0)0(0)0(0)1(0)0(0)16(57)0(0)16(29)0(0)2(0) 2(8 8 ) 0(0 ) 0(1 ) 0(0 ) 0(0 ) 0(0 ) 21 ( 2 9 ) 59 ( 2 1 ) 0(0 ) 0(0 ) 66 ( 1 ) 2(0 ) City Center Parking Egress & 2nd St City Center Parking Ingress & 2nd St Logan Ave & 2nd St Logan Ave & Pavilion Driveway 6( 0 ) 60 ( 0 ) 0( 0 ) !"#$% 0( 0 ) 0( 0 ) 66 ( 0 ) !"#$% 2( 1 1 ) 0( 0 ) 0( 0 ) !"#$% 21 ( 1 7 ) 6( 1 6 ) 0( 0 ) !"#$% 1(0)0(0)58(0)0(0)0(0)5(12)0(0)16(14)0(0)0(0)207(827)0(0)0(0)359(474)0(0)359(474)5(0)0(0)2(29)0(0)0(0)0(0)0(0)33(52) 0(0 ) 63 ( 0 ) 0(0 ) 0(0 ) 5(0 ) 9(1 7 ) 0(0 ) 0(0 ) 0(0 ) 58 ( 1 6 4 ) 16 ( 3 2 ) 0(0 ) Logan Ave & Driveway of 3rd St Logan Ave/Smithers Ave/3rd St Burnett Pl & 2nd Street Burnett Ave & 2nd St 0( 0 ) 16 ( 4 4 ) 23 ( 3 6 ) !"#$% 41(112)0(0)203(606)0(0)36(127)0(0) 0(0 ) 40 ( 6 8 ) 26 ( 8 1 ) Burnett Ave & 3rd St B u r n e t t P l . SITE 2nd St. 3rd St. Lo g a n A v e . Cit y C e n t e r Pa r k i n g E g r e e s Cit y C e n t e r Pa r k i n g I n g r e e s Sm i t h e r s A v e . Bu r n e t t A v e . Pavilion Drwy. Driveway 123 4 15 16 18 7 Figure 3: Existing Traffic Volumes Renton Market - Trac Impact Analysis CivTech!"#$%#&'()*+(),-,."+$" 0( 0 ) 0( 0 ) 0( 0 ) !"#$% 0( 0 ) 0( 0 ) 0( 0 ) !"#$% 40 ( 2 2 5 ) 29 ( 2 7 ) 0( 0 ) !"#$% 0( 0 ) 56 ( 0 ) 4( 1 1 ) !"#$% 0(0)0(0)0(0)0(0)0(0)129(117)0(0)5(9)0(0)435(654)0(0)416(683)0(0)278(485)0(0)0(0)0(0)1(0)0(0)16(57)0(0)16(29)0(0)2(0) 2(8 8 ) 0(0 ) 0(1 ) 0(0 ) 0(0 ) 0(0 ) 21 ( 2 9 ) 59 ( 2 1 ) 0(0 ) 0(0 ) 66 ( 1 ) 2(0 ) City Center Parking Egress & 2nd St City Center Parking Ingress & 2nd St Logan Ave & 2nd St Logan Ave & Pavilion Driveway 6( 0 ) 60 ( 0 ) 0( 0 ) !"#$% 0( 0 ) 0( 0 ) 66 ( 0 ) !"#$% 2( 1 1 ) 0( 0 ) 0( 0 ) !"#$% 21 ( 1 7 ) 6( 1 6 ) 0( 0 ) !"#$% 1(0)0(0)58(0)0(0)0(0)5(12)0(0)16(14)0(0)0(0)207(827)0(0)0(0)359(474)0(0)359(474)5(0)0(0)2(29)0(0)0(0)0(0)0(0)33(52) 0(0 ) 63 ( 0 ) 0(0 ) 0(0 ) 5(0 ) 9(1 7 ) 0(0 ) 0(0 ) 0(0 ) 58 ( 1 6 4 ) 16 ( 3 2 ) 0(0 ) Logan Ave & Driveway of 3rd St Logan Ave/Smithers Ave/3rd St Burnett Pl & 2nd Street Burnett Ave & 2nd St 0( 0 ) 16 ( 4 4 ) 23 ( 3 6 ) !"#$% 41(112)0(0)203(606)0(0)36(127)0(0) 0(0 ) 40 ( 6 8 ) 26 ( 8 1 ) Burnett Ave & 3rd St 1 2 4 5 6 7 3 8 Legend XX(XX) - AM(PM) Peak Hour Traffic Volumes NORTH Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 Renton Market – Renton, Washington Traffic Impact Analysis 11 October 2024 CAPACITY ANALYSIS Peak hour capacity analyses have been conducted for the study intersections based on existing intersection configurations and traffic volumes. All intersections have been analyzed using the methodologies presented in the Highway Capacity Manual (HCM), Special Report 209, and using Synchro software, version 12.0 under the HCM 7th edition methodology. The concept of level of service (LOS) uses qualitative measures that characterize operational conditions within the traffic stream. The individual levels of service are described by factors that include speed, travel time, freedom to maneuver, traffic interruptions, and comfort and convenience. Six levels of service are defined for each type of facility for which analysis procedures are available. They are given letter designations A through F, with LOS A representing the best operating conditions and LOS F the worst. Each level of service represents a range of operating conditions. Levels of service for intersections are defined within ranges of average control delay per vehicle, the number of seconds a vehicle can expect to wait due to the presence of a traffic control device. Table 1 lists the level of service criteria for signalized and unsignalized intersections, respectively. Synchro 12.0 software calculates the LOS per the HCM 7th edition methodology. The 7th edition HCM documents the signalized LOS calculation methodology which takes into account lane geometry, traffic volumes and cycle length/phasing to compute LOS. Synchro analysis worksheets report individual movement delay/LOS and overall delay/LOS for signalized intersections; unsignalized intersection worksheets report the worst-case delay/LOS and the average overall intersection delay. Results of the existing level of service analyses are shown in Table 2 for both AM and PM peak hours. The existing conditions analysis worksheets have been included in Appendix C. TABLE 1 – INTERSECTION LEVEL OF SERVICE CRITERIA Level of Service Control Delay (sec/veh) Signalized Unsignalized A ≤ 10 ≤ 10 B > 10-20 > 10-15 C > 20-35 > 15-25 D > 35-55 > 25-35 E > 55-80 > 35-50 F > 80 (or v/c>1) > 50 (or v/c>1) Source: Exhibits 19-8, 20-2, 21-8, and 22-8, Highway Capacity Manual, 7th Edition Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 Renton Market – Renton, Washington Traffic Impact Analysis 12 October 2024 TABLE 2 – EXISTING PEAK HOUR LEVELS OF SERVICE ID Intersection Intersection Control Approach/ Movement Existing LOS AM (PM) 1 City Center Parking Egress and 2nd Street 1-way stop (NB) NB Right A (B) 2 City Center Parking Ingress and 2nd Street 1-way stop (NB) WB Shared A (A) 3 Logan Avenue and 2nd Street Signal NB SB WB B (B) B (B) A (B) Overall A (B) 4 Logan Avenue and Pavilion Driveway 1-way stop (WB) SB Shared WB Shared A (A) A (A) 5 Logan Avenue and Driveway of 3rd Street 1-way stop (EB) EB Right A (A) 6 Logan Avenue/Smithers Avenue and 3rd Street Signal NB SB EB C (C) B (A) B (B) Overall B (B) 7 Burnett Avenue and 2nd Street Signal NB SB WB C (C) A (B) C (C) Overall C (C) 7.1 Burnett Place and 2nd Street 1-way stop (SB) SB Right A (A) 8 Burnett Avenue and 3rd Street Signal NB SB EB B (B) B (B) B (B) Overall B (B) The results of the existing conditions analysis summarized in Table 2 indicate that all study intersections operate with acceptable levels of service (LOS D or better). Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 Renton Market – Renton, Washington Traffic Impact Analysis 13 October 2024 CRASH HISTORY Crash data for the study area was obtained from the WSDOT website for the past three (3) years and the portion of the current year that has happened already. In total, there have been 14 incidents within the study area since the beginning of 2021. A majority of these crashes occurred at intersections of Burnett Avenue and 2nd Street within the vicinity of the site. The summary of intersection crash data is presented in Table 3. TABLE 3 – INTERSECTION CRASH DATA SUMMARY Intersection T o t a l I n c i d e n t s Incidents in each Category 2 0 2 4 2 0 2 3 2 0 2 2 2 0 2 1 Fa t a l Su s p e c t e d Se r i o u s I n j u r y S u s p e c t e d Mi n o r I n j u r y P o s s i b l e In j u r y N o A p p a r e n t In j u r y City Center Parking Egress and 2nd Street 2 0 0 1 1 0 1 0 1 0 City Center Parking Ingress and 2nd Street 1 0 1 0 0 0 0 0 1 0 Logan Avenue and 2nd Street 2 1 0 1 0 0 0 0 1 1 Logan Avenue and Pavilion Driveway 0 0 0 0 0 0 0 0 0 0 Logan Avenue and Driveway of 3rd Street 0 0 0 0 0 0 0 0 0 0 Logan Avenue/Smithers Avenue/3rd Street 3 1 1 0 1 0 0 1 1 1 Burnett Avenue and 2nd Street 3 1 1 1 0 0 0 0 0 3 Burnett Avenue and 3rd Street 2 0 1 1 0 0 0 1 0 1 Upon reviewing the City of Renton crash data there were no fatalities within the vicinity of the site. There was one suspected minor injury at the intersection of Logan Avenue/Smithers Avenue & 3rd Street and Burnett Avenue & 3rd Street. The highest number of crashes over the four-year period occurred at the intersection of Burnett Avenue & 2nd Street with a total of 3 crashes, less than 1 crash per year. Crash analysis worksheets are included in Appendix D. FUTURE ROADWAY IMPROVEMENTS Upon review of the 2024 – 2029 six-year transportation improvement program from the City of Renton, there are additional improvements proposed by the city within study area. The City of Renton plans to convert the existing 4-lane one way roadway 2nd Street to a roadway with one through lane in each direction between Main Avenue and Rainier Avenue. The conversion is currently partially funded. Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 Renton Market – Renton, Washington Traffic Impact Analysis 14 October 2024 The City of Renton plans to convert the existing 3-lane one way roadway 3rd Street to a roadway with one through lane in each direction between Main Avenue and Rainier Avenue. This conversion currently does not have any funding. PROPOSED DEVELOPMENT SITE LOCATION The City of Renton proposes the renovation of the Renton Market located north of 3rd Street and east of Logan Avenue. The Pavilion Center will be renovated to include 12 new vendor stalls and one new tenant on the east side of the building utilized as a sit-down restaurant. SITE DENSITY/INTENSITY Renton Market will consist of 12 new vendor stalls and approximately 3,210 KSF of sit-down restaurant. SITE ACCESS There are a total of three (3) existing access points.  City Center Parking Egress – is the 2nd Street access into the site. Vehicles will only be allowed to make a left out from the parking garage on to 2nd Street located approximately 80 feet east of Burnett Avenue along 2nd Street.  City Center Parking Ingress – is the 2nd Street access into the site. Vehicles will only be allowed to make a right into the parking garage located approximately 200 feet east of Burnett Avenue along 2nd Street.  Renton Market Driveway – is a restricted right-in/left in access located approximately 285-feet south of 2nd Street of Riggs Road along Logan Avenue. The proposed development site plans is provided in Figure 4 . Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 Figure 4: Site Plan and Access Renton Market - Trac Impact Analysis CivTech                                                                                                                                                                                                                                                                                                                                                                                                                                      11 19 12 4 NORTHNTS Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 Renton Market – Renton, Washington Traffic Impact Analysis 16 October 2024 TRIP GENERATION The anticipated trip generation is summarized in Table 4. Detailed trip generation calculations are provided in Appendix E. TABLE 4 – TRIP GENERATION Land Use Quantity Units+ ITE ITE Land Use Name AM Distribution PM Distribution Code In Out In Out Renton Market Food Cart Pod 12 Food Carts 926 Food Cart Pod 50% 50% 55% 45% Sit Down Restaurant 3.21 KSF 932 Sit Down Restaurant 55% 45% 61% 39% Land Use ADT AM Peak Hour PM Peak Hour Avg. Rate* Total Avg. Rate* In Out Total Avg. Rate* In Out Total Food Cart Pod 23.7 284 0.35 2 2 4 6.35 42 34 76 Sit Down Restaurant 107.2 344 9.57 17 14 31 9.05 18 11 29 Totals 628 19 16 35 60 45 105 Notes: *Average rate was calculated by dividing total trips generated using regression equation by the number of units. (See below.) + KSF = 1,000 square feet; DUs = Dwelling Units CALCULATIONS (Equations shown only where applicable) Land Use [Units] Daily AM Peak Hour PM Peak Hour Food Cart Pods [12 Food Carts] FC: X*23.7 FC: T = X*0.35 FC: T = 6.98*X - 7.59 Sit Down Restaurant [3.21 KSF] FC: T = X*107.2 FC: T = X*9.57 FC: T = X*9.05 The proposed development is anticipated to generate 628 weekday daily trips, 35 (19 in/16 out) trips during the AM peak hour, and 105 (60 in/ 58 out) trips during the PM peak hour. The distribution for LUC 926 Food Cart Pods as assumed to be equal to LUC 930 Fast Casual Restaurant since they share similar traits and are within the same facility. The 12 new vendor stalls are anticipated to generate more trips than the two tenants on the east and west since there will be more vendors to go to that serve different items/goods therefore, more people will likely be going to the Renton Marketplace for the one of the 12 vendors rather than the two tenants on the east and west. Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 Renton Market – Renton, Washington Traffic Impact Analysis 17 October 2024 VEHICLE TRIP DISTRIBUTION AND ASSIGNMENT A directional distribution pattern was assumed for the Renton Market development. The eight (8) traffic counts that were taken, were used for determining the proposed trip distribution. The resulting trip distribution percentages for the study area are shown in Table 5. TABLE 5 – SITE TRIP DISTRIBUTION Direction (To/From) IN Percentage OUT Percentage North on Burnett Avenue (north of 2nd Street) 2% 2% South on Burnett Avenue (south of 3rd Street) 4% 4% North on Smithers Avenue (north of 4th Street) 2% 2% South on Logan Avenue (south of Tobin Street) 7% 7% East on 3rd Street (east of Burnett Avenue) 0% 44% East on 3rd Street (east of 7th Smithers Avenue) 46% 0% West on 2nd Street (west Burnett Avenue) 39% 0% West of 2nd Street (west of Logan Avenue) 0% 41% Total 100% 100% Figure 5 illustrates the trip distribution percentages noted in Table 5 on the roadway network within the study area. The percentages presented in Figure 5 were applied to the site trips generated to determine the AM and PM peak hour site traffic at the intersections within the study area. Figure 6 presents the resulting site generated traffic for the proposed development. Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942                                                                                                                                                                         Figure 5: Trip Distribution CivTechRenton Market - Trac Impact Analysis B u r n e t t P l . SITE 2nd St. 3rd St. Lo g a n A v e . Ci t y C e n t e r Pa r k i n g E g r e e s Ci t y C e n t e r Pa r k i n g I n g r e e s Sm i t h e r s A v e . Bu r n e t t A v e . Pavilion Drwy. Driveway In-Bound Trip Distribution Out-Bound Trip Distribution LEGEND NORTH 39% 0% 0% 44% 4%4% 2%2% 0% 46% 41% 0% 7%7% 2%2% XX% XX% Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 !"#$%$&$'"()$*+,$*-./01,21 0(0) 0(0) 0(0) !"#$% 0(0) 0(0) 0(0) !"#$% 0(0) 0(0) 0(0) !"#$% 0(0) 1(2) 1(3) !"#$% 0(0)0(0)0(0)0(0)0(0)1(3)0(0)0(0)0(0)18(56)0(0)9(26)0(0)7(18)0(0)0(0)0(0)0(0)0(0)17(54)0(0)2(4)0(0)0(0) 8(24 ) 0(0) 0(0) 0(0) 0(0) 0(0) 0(0) 0(0) 0(0) 0(0) 0(0) 1(3) City Center Parking Egress & 2nd St City Center Parking Ingress & 2nd St Logan Ave & 2nd St Logan Ave & Pavilion Driveway 0(0) 1(2) 0(0) !"#$% 0(0) 0(0) 1(2) !"#$% 0(0) 0(0) 0(0) !"#$% 0(1) 0(0) 0(0) !"#$% 0(0)0(0)1(3)0(0)0(0)0(0)0(0)0(0)0(0)0(0)8(25)0(0)0(0)0(0)0(0)9(27)0(0)0(0)0(0)0(0)0(0)0(0)0(0)0(0) 0(0) 1(3) 0(0) 0(0) 0(0) 0(1) 0(0) 0(0) 0(0) 9(28 ) 0(0) 0(0) Logan Ave & Driveway of 3rd St Logan Ave/Smithers Ave/3rd St Burnett Pl & 2nd St Burnett Ave & 2nd St 0(0) 1(3) 6(18 ) !"#$% 8(26)0(0)1(2)0(0)0(0)0(0) 0(0) 1(2) 0(0) Burnett Ave & 3rd St 0(0) 0(0) 0(0) !"#$% 0(0)0(0)0(0)0(0)7(20)0(0) 0(0) 9(28 ) 0(0) Renton Market Driveway & Burnett Ave !"#$%$&$'"()$*+,$*-./01,21 0(0) 0(0) 0(0) !"#$% 0(0) 0(0) 0(0) !"#$% 0(0) 0(0) 0(0) !"#$% 0(0) 1(2) 1(3) !"#$% 0(0)0(0)0(0)0(0)0(0)1(3)0(0)0(0)0(0)18(56)0(0)9(26)0(0)7(18)0(0)0(0)0(0)0(0)0(0)17(54)0(0)2(4)0(0)0(0) 8(24 ) 0(0) 0(0) 0(0) 0(0) 0(0) 0(0) 0(0) 0(0) 0(0) 0(0) 1(3) City Center Parking Egress & 2nd St City Center Parking Ingress & 2nd St Logan Ave & 2nd St Logan Ave & Pavilion Driveway 0(0) 1(2) 0(0) !"#$% 0(0) 0(0) 1(2) !"#$% 0(0) 0(0) 0(0) !"#$% 0(1) 0(0) 0(0) !"#$% 0(0)0(0)1(3)0(0)0(0)0(0)0(0)0(0)0(0)0(0)8(25)0(0)0(0)0(0)0(0)9(27)0(0)0(0)0(0)0(0)0(0)0(0)0(0)0(0) 0(0) 1(3) 0(0) 0(0) 0(0) 0(1) 0(0) 0(0) 0(0) 9(28 ) 0(0) 0(0) Logan Ave & Driveway of 3rd St Logan Ave/Smithers Ave/3rd St Burnett Pl & 2nd St Burnett Ave & 2nd St 0(0) 1(3) 6(18 ) !"#$% 8(26)0(0)1(2)0(0)0(0)0(0) 0(0) 1(2) 0(0) Burnett Ave & 3rd St 0(0) 0(0) 0(0) !"#$% 0(0)0(0)0(0)0(0)7(20)0(0) 0(0) 9(28 ) 0(0) Renton Market Driveway & Burnett Ave !"#$%$&$'(')$*+,-#./012$3/4$356(78498 B u r n e t t P l . SITE 2nd St. 3rd St. Lo g a n A v e . Cit y C e n t e r Pa r k i n g E g r e e s Cit y C e n t e r Pa r k i n g I n g r e e s Sm i t h e r s A v e . Bu r n e t t A v e . Pavilion Drwy. Driveway 123 4 15 16 18 19 7 Figure 6: Site Generated Traffic Volumes Renton Market - Trac Impact Analysis CivTech 1 2 4 5 6 3 8 9 Legend XX(XX) - AM(PM) Peak Hour Traffic Volumes NORTH 7 Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 Renton Market – Renton, Washington Traffic Impact Analysis 20 October 2024 FUTURE BACKGROUND TRAFFIC The City of Renton Traffic Impact Guidelines states that all roadways and intersections should experience a 5% increase in peak hour traffic volumes as a result of a proposed development. CivTech consulted with the client and deemed it was acceptable to use 2% for the Renton Market development since the area around is already built out and the area is not expecting any other major developments. Therefore, a 2% annual growth rate (1.04 annual expansion factor for 2026, 1.149 for 2031) was applied to the volumes at the study intersections to obtain the future background traffic volumes. The background volumes for the opening year of 2026 are presented in Figure 7. The background volumes for the opening year of 2031 are presented in Figure 8. Background traffic calculations are located within Appendix F. TOTAL TRAFFIC Total traffic was determined by adding the site generated traffic to the estimated projected background traffic. Total peak hour traffic volumes for the opening year of 2026 are shown in Figure 9. Total peak hour traffic volumes for the horizon year of 2031 are shown in Figure 10. Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 !"#$%$&$'(')$*+,-#./012$3/4$356(78498 0( 0 ) 0( 0 ) 0( 0 ) !"#$% 0( 0 ) 0( 0 ) 0( 0 ) !"#$% 42 (23 4 ) 30 (28 ) 0( 0 ) !"#$% 0( 0 ) 58 (0 ) 4( 11 ) !"#$% 0(0) 0(0)0(0) 0(0)0(0)134(122)0(0)0(0)452(680)0(0)433(710)0(0)289(504)0(0)0(0) 1(0)0(0)17(59)0(0)17(30)0(0) 2( 92 ) 0( 0 ) 0( 1 ) 0( 0 ) 0( 0 ) 0( 0 ) 22 (30 ) 61 (22 ) 0( 0 ) 0( 0 ) 69 (1 ) 2( 0 ) City Center Parking Egress & 2nd St City Center Parking Ingress & 2nd St Logan Ave & 2nd St Logan Ave & Renton Market Driveway] 6( 0 ) 62 (0 ) 0( 0 ) !"#$% 0( 0 ) 0( 0 ) 69 (0 ) !"#$% 2( 11 ) 0( 0 ) 0( 0 ) !"#$% 22 (18 ) 6( 17 ) 0( 0 ) !"#$% 1(0) 0(0)60(0)0(0)0(0)5(12)0(0)17(15)0(0) 0(0)215(860)0(0)0(0)373(493)0(0)373(493)5(0)0(0)2(30)0(0)0(0) 0(0)0(0)34(54) 66 (0 ) 0( 0 ) 0( 0 ) 0( 0 ) 5( 0 ) 14 (1 8) 0( 0 ) 0( 0 ) 0( 0 ) 60 (17 1 ) 17 (33 ) 0( 0 ) Logan Ave & Driveway of 3rd St Logan Ave/Smithers Ave/3rd St Burnett Pl & 2nd St Burnett Ave & 2nd St 0( 0 ) 17 (46 ) 24 (37 ) !"#$% 43(116)0(0)211(630)0(0)37(132)0(0) 0(0 ) 42 (71 ) 27 (84 ) Burnett Ave & 3rd St 0( 0 ) 40 (71 ) 0( 0 ) !"#$% 0(0) 0(0)0(0) 0(0)6(11)0(0) 0(0 ) 85 (18 7 ) 0(0 ) Renton Market Driveway & Burnett Ave !"#$%$&$'(')$*+,-#./012$3/4$356(78498 0( 0 ) 0( 0 ) 0( 0 ) !"#$% 0( 0 ) 0( 0 ) 0( 0 ) !"#$% 42 (23 4 ) 30 (28 ) 0( 0 ) !"#$% 0( 0 ) 58 (0 ) 4( 11 ) !"#$% 0(0)0(0)0(0)0(0)0(0)134(122)0(0)5(9)0(0)452(680)0(0)433(710)0(0)289(504)0(0)0(0)0(0)1(0)0(0)17(59)0(0)17(30)0(0)2(0) 2( 92 ) 0( 0 ) 0( 1 ) 0( 0 ) 0( 0 ) 0( 0 ) 22 (30 ) 61 (22 ) 0( 0 ) 0( 0 ) 69 (1 ) 2( 0 ) City Center ParkingEgress&2nd St City Center Parking Ingress&2nd St LoganAve &2ndSt Logan Ave & Renton Market Driveway] 6( 0 ) 62 (0 ) 0( 0 ) !"#$% 0( 0 ) 0( 0 ) 69 (0 ) !"#$% 2( 11 ) 0( 0 ) 0( 0 ) !"#$% 22 (18 ) 6( 17 ) 0( 0 ) !"#$% 1(0)0(0)60(0)0(0)0(0)5(12)0(0)17(15)0(0)0(0)215(860)0(0)0(0)373(493)0(0)373(493)5(0)0(0)2(30)0(0)0(0)0(0)0(0)34(54) 66 (0 ) 0( 0 ) 0( 0 ) 0( 0 ) 5( 0 ) 9( 18 ) 0( 0 ) 0( 0 ) 0( 0 ) 60 (17 1 ) 17 (33 ) 0( 0 ) Logan Ave & Driveway of 3rd St Logan Ave/Smithers Ave/3rd St Burnett Pl&2ndSt Burnett Ave & 2nd St 0( 0 ) 17 (46 ) 24 (37 ) !"#$% 43(116)0(0)211(630)0(0)37(132)0(0) 0(0 ) 42 (71 ) 27 (84 ) Burnett Ave & 3rd St 0( 0 ) 40 (71 ) 0( 0 ) !"#$% 0(0)0(0)0(0)0(0)6(11)0(0) 0(0 ) 85 (18 7 ) 0(0 ) RentonMarket Driveway & Burnett Ave B u r n e t t P l . SITE 2nd St. 3rd St. Lo g a n A v e . Cit y C e n t e r Pa r k i n g E g r e e s Cit y C e n t e r Pa r k i n g I n g r e e s Sm i t h e r s A v e . Bu r n e t t A v e . Pavilion Drwy. Driveway 123 4 15 16 18 19 7 Figure 7: 2026 Background Traffic Volumes Renton Market - Trac Impact Analysis CivTech 1 2 4 5 6 7 3 8 9 Legend XX(XX) - AM(PM) Peak Hour Traffic Volumes NORTH Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 !"#$%$&$'()*$+,-.#/0123$405$4*6(78598 0( 0 ) 0( 0 ) 0( 0 ) !"#$% 0( 0 ) 0( 0 ) 0( 0 ) !"#$% 46 ( 2 5 9 ) 33 ( 3 1 ) 0( 0 ) !"#$% 0( 0 ) 64 ( 0 ) 5( 1 3 ) !"#$% 0(0) 0(0)0(0) 0(0)0(0)148(134)0(0)0(0)500(751)0(0)478(785)0(0)319(557)0(0)0(0) 1(0)0(0)18(65)0(0)18(33)0(0) 2( 1 0 1 ) 0(0 ) 0(1 ) 0(0 ) 0(0 ) 0(0 ) 24 ( 3 3 ) 68 ( 2 4 ) 0(0 ) 0(0 ) 76 ( 1 ) 2(0 ) City Center Parking Egress & 2nd St City Center Parking Ingress & 2nd St Logan Ave & 2nd St Logan Ave & Pavilion Driveway 7( 0 ) 69 ( 0 ) 0( 0 ) !"#$% 0( 0 ) 0( 0 ) 76 ( 0 ) !"#$% 2( 1 3 ) 0( 0 ) 0( 0 ) !"#$% 24 ( 2 0 ) 7( 1 8 ) 0( 0 ) !"#$% 1(0) 0(0)67(0)0(0)0(0)6(14)0(0)18(16)0(0) 0(0)238(950)0(0)0(0)412(545)0(0)412(545)6(0)0(0)2(33)0(0)0(0) 0(0)0(0)38(60) 72 ( 0 ) 0(0 ) 0(0 ) 0(0 ) 6(0 ) 16(2 0 ) 0(0 ) 0(0 ) 0(0 ) 67 ( 1 8 8 ) 18 ( 3 7 ) 0(0 ) Logan Ave & Driveway of 3rd St Logan Ave/Smithers Ave/3rd St Burnett Pl & 2nd Street Burnett Ave & 2nd St 0( 0 ) 18 ( 5 1 ) 26 ( 4 1 ) !"#$% 47(129)0(0)233(696)0(0)41(146)0(0) 0(0 ) 46 ( 7 8 ) 30 ( 9 3 ) Burnett Ave & 3rd St 0(0 ) 45 ( 7 8 ) 0(0 ) !"#$% 0(0) 0(0)0(0) 0(0)7(13)0(0) 0(0 ) 93 ( 2 0 7 ) 0(0 ) Renton Market Driveway & Burnett Ave !"#$%$&$'(')$*+,-#./012$3/4$356(78498 B u r n e t t P l . SITE 2nd St. 3rd St. Lo g a n A v e . Cit y C e n t e r Pa r k i n g E g r e e s Cit y C e n t e r Pa r k i n g I n g r e e s Sm i t h e r s A v e . Bu r n e t t A v e . Pavilion Drwy. Driveway 123 4 15 16 18 19 7 Figure 8: 2031 Background Traffic Volumes Renton Market - Trac Impact Analysis CivTech 1 2 4 5 6 3 8 9 Legend XX(XX) - AM(PM) Peak Hour Traffic Volumes NORTH !"#$%$&$'()*$+,-.#/0123$405$4*6(78598 0(0 ) 0(0 ) 0(0 ) !"#$% 0(0 ) 0(0 ) 0(0 ) !"#$% 46 ( 2 5 9 ) 33 ( 3 1 ) 0(0 ) !"#$% 0(0 ) 64 ( 0 ) 5(1 3 ) !"#$% 0(0)0(0)0(0)0(0)0(0)148(134)0(0)6(10)0(0)500(751)0(0)478(785)0(0)319(557)0(0)0(0)0(0)1(0)0(0)18(65)0(0)18(33)0(0)2(0) 2(1 0 1 ) 0(0 ) 0(1 ) 0(0 ) 0(0 ) 0(0 ) 24 ( 3 3 ) 68 ( 2 4 ) 0(0 ) 0(0 ) 76 ( 1 ) 2(0 ) City Center Parking Egress & 2nd St City Center Parking Ingress & 2nd St Logan Ave & 2nd St Logan Ave & Pavilion Driveway 7(0 ) 69 ( 0 ) 0(0 ) !"#$% 0(0 ) 0(0 ) 76 ( 0 ) !"#$% 2(1 3 ) 0(0 ) 0(0 ) !"#$% 24 ( 2 0 ) 7(1 8 ) 0(0 ) !"#$% 1(0)0(0)67(0)0(0)0(0)6(14)0(0)18(16)0(0)0(0)238(950)0(0)0(0)412(545)0(0)412(545)6(0)0(0)2(33)0(0)0(0)0(0)0(0)38(60) 72 ( 0 ) 0(0 ) 0(0 ) 0(0 ) 6(0 ) 10 ( 2 0 ) 0(0 ) 0(0 ) 0(0 ) 67 ( 1 8 8 ) 18 ( 3 7 ) 0(0 ) Logan Ave & Driveway of 3rd St Logan Ave/Smithers Ave/3rd St Burnett Pl & 2nd Street Burnett Ave & 2nd St 0(0 ) 18 ( 5 1 ) 26 ( 4 1 ) !"#$% 47(129)0(0)233(696)0(0)41(146)0(0) 0( 0 ) 46 ( 7 8 ) 30 ( 9 3 ) Burnett Ave & 3rd St 0(0 ) 45 ( 7 8 ) 0(0 ) !"#$% 0(0)0(0)0(0)0(0)7(13)0(0) 0( 0 ) 93 ( 2 0 7 ) 0( 0 ) Renton Market Driveway & Burnett Ave 7 Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 !"#$%$&$'(')$*+,-.$$/+.$/01(23.43 0( 0 ) 0( 0 ) 0( 0 ) !"#$% 0( 0 ) 0( 0 ) 0( 0 ) !"#$% 42 (23 4 ) 30 (28 ) 0( 0 ) !"#$% 0( 0 ) 59 (2 ) 5( 14 ) !"#$% 0(0) 0(0)0(0) 0(0)0(0)135(125)0(0)0(0)470(736)0(0)442(736)0(0)296(522)0(0)0(0) 1(0)0(0)34(113)0(0)19(34)0(0) 10 (11 6 ) 0( 0 ) 0( 1 ) 0( 0 ) 0( 0 ) 0( 0 ) 22 (30 ) 61 (22 ) 0( 0 ) 0( 0 ) 69 (1 ) 3( 3 ) City Center Parking Egress & 2nd St City Center Parking Ingress & 2nd St Logan Ave & 2nd St Logan Ave & Renton Market Driveway] 6( 0 ) 63 (2 ) 0( 0 ) !"#$% 0( 0 ) 0( 0 ) 70 (2 ) !"#$% 2( 11 ) 0( 0 ) 0( 0 ) !"#$% 22 (19 ) 6( 17 ) 0( 0 ) !"#$% 1(0) 0(0)61(3)0(0)0(0)5(12)0(0)17(15)0(0) 0(0)223(885)0(0)0(0)373(493)0(0)382(520)5(0)0(0)2(30)0(0)0(0) 0(0)0(0)34(54) 66 (0 ) 1( 3 ) 0( 0 ) 0( 0 ) 5( 0 ) 14 (1 9) 0( 0 ) 0( 0 ) 0( 0 ) 69 (19 9 ) 17 (33 ) 0( 0 ) Logan Ave & Driveway of 3rd St Logan Ave/Smithers Ave/3rd St Burnett Pl & 2nd St Burnett Ave & 2nd St 0( 0 ) 18 (49 ) 30 (55 ) !"#$% 51(142)0(0)212(632)0(0)37(132)0(0) 0(0 ) 43 (73 ) 27 (84 ) Burnett Ave & 3rd St 0( 0 ) 40 (71 ) 0( 0 ) !"#$% 0(0) 0(0)0(0) 0(0)13(31)0(0) 0(0 ) 94 (21 5 ) 0(0 ) Renton Market Driveway & Burnett Ave B u r n e t t P l . SITE 2nd St. 3rd St. Lo g a n A v e . Cit y C e n t e r Pa r k i n g E g r e e s Cit y C e n t e r Pa r k i n g I n g r e e s Sm i t h e r s A v e . Bu r n e t t A v e . Pavilion Drwy. Driveway 123 4 15 16 18 19 7 Figure 9: 2026 Total Traffic Volumes Renton Market - Trac Impact Analysis CivTech 1 2 4 5 6 7 3 8 0 Legend XX(XX) - AM(PM) Peak Hour Traffic Volumes NORTH !"#$%$&$'(')$*+,-.$$/+.$/01(23.43 0( 0 ) 0( 0 ) 0( 0 ) !"#$% 0( 0 ) 0( 0 ) 0( 0 ) !"#$% 42 (23 4 ) 30 (28 ) 0( 0 ) !"#$% 0( 0 ) 59 (2 ) 5( 14 ) !"#$% 0(0)0(0)0(0)0(0)0(0)135(125)0(0)5(9)0(0)470(736)0(0)442(736)0(0)296(522)0(0)0(0)0(0)1(0)0(0)34(113)0(0)19(34)0(0)2(0) 10 (11 6 ) 0( 0 ) 0( 1 ) 0( 0 ) 0( 0 ) 0( 0 ) 22 (30 ) 61 (22 ) 0( 0 ) 0( 0 ) 69 (1 ) 3( 3 ) City Center ParkingEgress&2nd St City Center Parking Ingress&2nd St Logan Ave &2ndSt Logan Ave & Renton Market Driveway] 6( 0 ) 63 (2 ) 0( 0 ) !"#$% 0( 0 ) 0( 0 ) 70 (2 ) !"#$% 2( 11 ) 0( 0 ) 0( 0 ) !"#$% 22 (19 ) 6( 17 ) 0( 0 ) !"#$% 1(0)0(0)61(3)0(0)0(0)5(12)0(0)17(15)0(0)0(0)223(885)0(0)0(0)373(493)0(0)382(520)5(0)0(0)2(30)0(0)0(0)0(0)0(0)34(54) 66 (0 ) 1( 3 ) 0( 0 ) 0( 0 ) 5( 0 ) 9( 19 ) 0( 0 ) 0( 0 ) 0( 0 ) 69 (19 9 ) 17 (33 ) 0( 0 ) Logan Ave & Driveway of 3rd St Logan Ave/Smithers Ave/3rd St Burnett Pl&2ndSt Burnett Ave & 2nd St 0( 0 ) 18 (49 ) 30 (55 ) !"#$% 51(142)0(0)212(632)0(0)37(132)0(0) 0(0 ) 43 (73 ) 27 (84 ) Burnett Ave & 3rd St 0( 0 ) 40 (71 ) 0( 0 ) !"#$% 0(0)0(0)0(0)0(0)13(31)0(0) 0(0 ) 94 (21 5 ) 0(0 ) RentonMarket Driveway & Burnett Ave Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 !"#$%$&$'()*$+,-./$$0,/$0*1(23/43 0( 0 ) 0( 0 ) 0( 0 ) !"#$% 0( 0 ) 0( 0 ) 0( 0 ) !"#$% 46 ( 2 5 9 ) 33 ( 3 1 ) 0( 0 ) !"#$% 0( 0 ) 65 ( 2 ) 6( 1 6 ) !"#$% 0(0) 0(0)0(0) 0(0)0(0)149(137)0(0)0(0)518(807)0(0)487(811)0(0)326(575)0(0)0(0) 1(0)0(0)35(119)0(0)20(37)0(0) 10 ( 1 2 5 ) 0(0 ) 0(1 ) 0(0 ) 0(0 ) 0(0 ) 24 ( 3 3 ) 68 ( 2 4 ) 0(0 ) 0(0 ) 76 ( 1 ) 3(3 ) City Center Parking Egress & 2nd St City Center Parking Ingress & 2nd St Logan Ave & 2nd St Logan Ave & Renton Market Driveway] 7( 0 ) 70 ( 2 ) 0( 0 ) !"#$% 0( 0 ) 0( 0 ) 77 ( 2 ) !"#$% 2( 1 3 ) 0( 0 ) 0( 0 ) !"#$% 24 ( 2 1 ) 7( 1 8 ) 0( 0 ) !"#$% 1(0) 0(0)68(3)0(0)0(0)6(14)0(0)18(16)0(0) 0(0)246(975)0(0)0(0)412(545)0(0)421(572)6(0)0(0)2(33)0(0)0(0) 0(0)0(0)38(60) 72 ( 0 ) 1(3 ) 0(0 ) 0(0 ) 6(0 ) 16(2 1 ) 0(0 ) 0(0 ) 0(0 ) 76 ( 2 1 6 ) 18 ( 3 7 ) 0(0 ) Logan Ave & Driveway of 3rd St Logan Ave/Smithers Ave/3rd St Burnett Pl & 2nd St Burnett Ave & 2nd St 0(0 ) 19 ( 5 4 ) 32 ( 5 9 ) !"#$% 55(155)0(0)234(698)0(0)41(146)0(0) 0(0 ) 47 ( 8 0 ) 30 ( 9 3 ) Burnett Ave & 3rd St 0(0 ) 45 ( 7 8 ) 0(0 ) !"#$% 0(0) 0(0)0(0) 0(0)14(33)0(0) 0( 0 ) 10 2 ( 2 3 5 ) 0( 0 ) Renton Market Driveway & Burnett Ave !"#$%$&$'()*$+,-./$$0,/$0*1(23/43 0( 0 ) 0( 0 ) 0( 0 ) !"#$% 0( 0 ) 0( 0 ) 0( 0 ) !"#$% 46 ( 2 5 9 ) 33 ( 3 1 ) 0( 0 ) !"#$% 0( 0 ) 65 ( 2 ) 6( 1 6 ) !"#$% 0(0)0(0)0(0)0(0)0(0)149(137)0(0)6(10)0(0)518(807)0(0)487(811)0(0)326(575)0(0)0(0)0(0)1(0)0(0)35(119)0(0)20(37)0(0)2(0) 10 ( 1 2 5 ) 0(0 ) 0(1 ) 0(0 ) 0(0 ) 0(0 ) 24 ( 3 3 ) 68 ( 2 4 ) 0(0 ) 0(0 ) 76 ( 1 ) 3(3 ) City Center Parking Egress & 2nd St City Center Parking Ingress & 2nd St Logan Ave & 2nd St Logan Ave & Renton Market Driveway] 7( 0 ) 70 ( 2 ) 0( 0 ) !"#$% 0( 0 ) 0( 0 ) 77 ( 2 ) !"#$% 2( 1 3 ) 0( 0 ) 0( 0 ) !"#$% 24 ( 2 1 ) 7( 1 8 ) 0( 0 ) !"#$% 1(0)0(0)68(3)0(0)0(0)6(14)0(0)18(16)0(0)0(0)246(975)0(0)0(0)412(545)0(0)421(572)6(0)0(0)2(33)0(0)0(0)0(0)0(0)38(60) 72 ( 0 ) 1(3 ) 0(0 ) 0(0 ) 6(0 ) 10 ( 2 1 ) 0(0 ) 0(0 ) 0(0 ) 76 ( 2 1 6 ) 18 ( 3 7 ) 0(0 ) Logan Ave & Driveway of 3rd St Logan Ave/Smithers Ave/3rd St Burnett Pl & 2nd St Burnett Ave & 2nd St 0(0 ) 19 ( 5 4 ) 32 ( 5 9 ) !"#$% 55(155)0(0)234(698)0(0)41(146)0(0) 0(0 ) 47 ( 8 0 ) 30 ( 9 3 ) Burnett Ave & 3rd St 0(0 ) 45 ( 7 8 ) 0(0 ) !"#$% 0(0)0(0)0(0)0(0)14(33)0(0) 0( 0 ) 10 2 ( 2 3 5 ) 0( 0 ) Renton Market Driveway & Burnett Ave !"#$%$&$'(')$*+,-#./012$3/4$356(78498 B u r n e t t P l . SITE 2nd St. 3rd St. Lo g a n A v e . Cit y C e n t e r Pa r k i n g E g r e e s Cit y C e n t e r Pa r k i n g I n g r e e s Sm i t h e r s A v e . Bu r n e t t A v e . Pavilion Drwy. Driveway 123 4 15 16 18 19 7 Figure 10: 2031 Total Traffic Volumes Renton Market - Trac Impact Analysis CivTech 1 2 4 5 6 3 8 9 Legend XX(XX) - AM(PM) Peak Hour Traffic Volumes NORTH 7 Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 Renton Market – Renton, Washington Traffic Impact Analysis 25 October 2024 TRAFFIC AND IMPROVEMENT ANALYSIS Future projected background (No Build) and total (Build) scenarios are analyzed using the background and total traffic volumes calculated for each horizon year 2026, 2031. TURN LANE WARRANTING ANALYSIS RIGHT-TURN DECELERATION LANES The City of Renton does not have specific warrants for the installation of dedicated right-turns lanes. CivTech deferred to Chapter 1310 of the Washington State Department of Transportation (WSDOT) Design Manual, which requires a driveway right-turn deceleration lane to be provided when peak hour right-turn volumes meet or exceed the ranges given in the exhibit 1310-24. Table 6 is a summary of the 2031 peak hour right-turn volumes from the adjacent street onto the proposed driveways: TABLE 6 – RIGHT-TURN DECELERATION LANE WARRANTING CRITERIA Access Advancing Volumes Right-Turn Volume Warrant Met? Logan Avenue & Renton Market Driveway 76 3 No According to WSDOT standards, due to the low current and expected future traffic volumes and the low-speed limit on Logan Avenue, the right-turn lane warrant criteria is not met for the intersection. LEFT-TURN DECELERATION LANES The City of Renton does not have specific warrants for the installation of dedicated right-turns lanes. CivTech deferred to Chapter 1310 of the WSDOT Design Manual, which requires a driveway right- turn deceleration lane to be provided when peak hour right-turn volumes meet or exceed the ranges given in the exhibit 1310-09. Table 7 is a summary of the 2031 peak hour left-turn volumes from the adjacent street onto the proposed driveways: TABLE 7 – LEFT-TURN DECELERATION LANE WARRANTING CRITERIA Access Advancing Volumes Left-Turn Volume Warrant Met? Logan Avenue & Renton Market Driveway 65 6 No According to WSDOT standards, due to the low current and expected future traffic volumes and the low-speed limit on Logan Avenue, the right-turn lane warrant criteria is not met for the intersection. Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 Renton Market – Renton, Washington Traffic Impact Analysis 26 October 2024 PROJECTED CAPACITY ANALYSIS The overall intersection and approach levels of service are summarized in Table 8 for the 2026 background and total traffic conditions. Detailed analysis worksheets for the 2026 background analysis can be found in Appendix H, worksheets for the 2031 background analysis can be found in Appendix I, worksheets for the 2026 total traffic analysis can be found in Appendix J, worksheets for the 2031 total traffic analysis can be found in Appendix K. TABLE 8 – PEAK HOUR LEVELS OF SERVICE ID Intersection Intersection Control Approach/ Movement 2026 2031 No Build Build No Build Build AM (PM) AM(PM) AM (PM) AM(PM) 1 City Center Parking Egress and 2nd Street 1-way stop (NB) NB Left A (B) A (B) A (B) A (B) 2 City Center Parking Ingress and 2nd Street 1-way stop (NB) WB Shared A (A) A (A) A (A) A (A) 3 Logan Avenue and 2nd Street Signal NB SB WB B (B) B (B) A (B) B (B) B (B) A (B) B (B) B (B) C (C) B (B) B (B) C (C) Overall A (B) A (B) B (B) B (B) 4 Logan Avenue and Pavilion Driveway 1-way stop (WB) SB Shared WB Shared A (A) A (A) A (A) A (A) A (A) A (A) A (A) A (A) 5 Logan Avenue and Driveway of 3rd Street 1-way stop (EB) EB Right A (A) A (A) A (A) A (A) 6 Logan Avenue/Smithers Avenue and 3rd Street Signal NB SB EB C (C) B (A) B (C) C (C) A (B) B (C) C (C) A (B) C (B) C (C) B (B) B (C) Overall B (C) B (C) C (B) B (C) 7 Burnett Avenue and 2nd Street Signal NB SB WB B (C) C (C) C (C) B (C) C (C) C (C) C (B) C (C) C (C) B (C) C (C) C (C) Overall C (C) C (C) C (C) C (C) 7.1 Burnett Place and 2nd Street 1-way stop (SB) SB Right A (A) A (A) A (A A (A) 8 Burnett Avenue and 3rd Street Signal NB SB EB B (B) B (B) A (B) B (B) B (B) A (B) B (B) B (B) A (B B (B) B (B) A (B) Overall B (B) B (B) B (A) B (B) 9 Renton Market Egress & Burnett Avenue 1-way stop (EB) EB Right A (A) A (A) A (A) A (A) The results of the Synchro analysis summarized in Table 8 indicate that all study intersections operate with overall acceptable levels of service (LOS D or better). Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 Renton Market – Renton, Washington Traffic Impact Analysis 27 October 2024 QUEUE LENGTH ANALYSIS Adequate turn storage should be provided on any approach where turn lanes are permitted and/or warranted. A queuing analysis was performed for all warranted/recommended and existing intersection turn lanes where site traffic is expected as well as left-turn lanes adjacent to the site using the methodology documented on pages 9-96 through 9-99 of the latest (7th) edition of the American Association of Highway and Transportation Officials’ (AASHTO) A Policy on Geometric Design of Highways and Streets (the AASHTO “Green Book”). The Green Book indicates that, “A deceleration lane should be sufficiently long to store the number of vehicles likely to accumulate in a queue during a critical period.” For a right turn lane at an unsignalized driveway or intersection, the critical period has typically been two minutes and the storage length estimated as the length required to hold the average number of arriving vehicles per a two-minute period, of which there are 30 per hour. Thus, for unsignalized driveways and intersections, the storage length for a right-turn lane can be calculated by use of the following formula: Storage Length = ቄ ሺ௩௘௛/௛௥ሻ ሺଷ଴ ௣௘௥௜௢ௗ௦/௛௥ሻቅ ൈ 𝑉𝐿, where VL is an assumed average Vehicle Length of 25 feet. For unsignalized intersections, the storage length for a left-turn lane is determined by the use of Equations 9-3 and 9-4 of the Green Book. Storage Length = ൜୪୬ሾ௉ሺ௡வேሻሿ ୪୬ೡ ೎ െ1ൠ ൈ 𝑉𝐿 [9-4], where 𝑐ൌ௏బ௘షೇబ೟೎ యలబబ⁄ ଵି௘షೇబ೟೎ యలబబ⁄ [9-3] and VL is 25 feet. Where signalized, the critical period per the Green Book is one-and-a-half to two signal cycles.1 The equation used to calculate the queue storage for a right- or left-turn lane using AASHTO methodology is thus: Storage Length = ቄଵ.ହ ௫ ሺ௩௘௛/௛௥ሻ ሺ௖௬௖௟௘௦/௛௥ሻ ቅ ൈ 𝑉𝐿, where VL is, again, 25 feet. The turn lane storage requirements for the study intersections are summarized in Table 9. Detailed queue storage calculation worksheets using the AASHTO method are included in Appendix L. 1 AASHTO, under Section 9.7.2.2 (page 9-96) of the Green Book, indicates that storage length for a turn lane, exclusive of taper, “should usually be based on 1.5 to 2 times the average number of vehicles that would need to be stored per signal cycle” at a signalized intersection. Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 Renton Market – Renton, Washington Traffic Impact Analysis 28 October 2024 TABLE 9 – QUEUE STORAGE LENGTHS ID Intersection Intersection Control Movement Queue Storage Existing (1) AASHTO HCM (2) Recommended 3 Logan Avenue and 2nd Street Signal SB Right 60’ 275' 80’ No Change 6 Logan Avenue/Smithers Avenue and 3rd Street Signal SB Left 70’ 75’ 45’ No Change 7/A Burnett Place and 2nd Street 1-way stop (SB) SB Left 75’ 25’ <25’ No Change 8 Burnett Avenue and 3rd Street Signal EB Right NB Right 125’ 50’ 100’ 125’ 20’ <25’ No Change (1) Measured from beginning of stop bar to the end of the stripe. (2) HCM 95th percentile queue reported in vehicles/lane, assuming 1 vehicle ~ 25 feet. The recommended storage lengths in Table 9 are provided for study horizon year 2031 using the total traffic projections. Proposed lane configurations are shown in Figure 11. Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 Burnett Ave & 3rd St Cit y C e n t e r Pa r k i n g E g r e e s Cit y C e n t e r Pa r k i n g I n g r e e s SITE 2nd St. 3rd St. Lo g a n A v e . Sm i t h e r s A v e . Bu r n e t t A v e . B u r n e t t P l . Pavilion Drwy. Driveway 11 19 123 4 15 16 18 7 Renton Market - Trac Impact Analysis Figure 11: Proposed Lane Configuration and Traffic Control SP E E D LIM I T 20 SP E E D LI M I T 25 SPE E D LIM I T 25 SPEEDLIMIT25 SPEEDLIMIT25 SPEEDLIMIT25 SPEEDLIMIT25 SPEEDLIMIT25 SPE E D LIM I T 25 PARK PARK 1 2 4 5 6 3 7 8 City Center Parking Egress & 2nd St City Center Parking Ingress & 2nd St Logan Ave & 2nd St Logan Ave & Pavilion Driveway Logan Ave & Driveway of 3rd St 9 Logan Ave & Driveway of 3rd St Logan Ave/Smithers Ave/3rd St Burnett Ave & 2nd St Burnett Ave & 3rd St NORTHLEGEND Thru or Turning Movement Recommended Improvements Stop Sign Speed Limit Traffic Signal SPEEDLIMIT40 Two-Way Left Turn-Lane Raised Median CivTech Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 Renton Market – Renton, Washington Traffic Impact Analysis 30 October 2024 SIGHT DISTANCE ANALYSIS Adequate sight distance must be provided at intersections and site access driveways to allow safe turning movements. There must be sufficient unobstructed sight distance along both approaches of a street/driveway intersection and across their included corners to allow operators of vehicles to see each other in time to prevent a collision. Sight distance worksheets according to AASHTO guidelines have been included within Appendix M. Sight distance calculations are summarized in Table 10. TABLE 10 – AASHTO SIGHT DISTANCE REQUIREMENTS Roadway Posted Speed Limit/ Design Speed (mph) Sight Distance Along Roadway Left of Driveway (Case B2/B3) Right of Driveway (Case B1) On Major Road (Case F) Logan Avenue 25/35 335’ 390’ Restricted 2nd Street 25/35 490’ 415’ Restricted 2nd Street 25/35 415’ Restricted 365’ Burnett Avenue 25/35 335’ Restricted Restricted Sight visibility should be provided at all driveways according to the distances shown in Table 10. All vegetation and trees should be maintained to allow unobstructed sight distance. Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 Renton Market – Renton, Washington Traffic Impact Analysis 31 October 2024 CONCLUSIONS The following conclusions and recommendations have been documented in this study: GENERAL  The proposed development is anticipated to generate 628 weekday daily trips, 35 (19 in/16 out) trips during the AM peak hour, and 105 (60 in/ 58 out) trips during the PM peak hour.  The distribution for LUC 926 Food Cart Pods as assumed to be equal to LUC 930 Fast Casual Restaurant since they share similar traits and are within the same facility. The 12 new vendor stalls are anticipated to generate more trips than the two tenants on the east and west since there will be more vendors to go to that serve different items/goods therefore, more people will likely be going to the Renton Marketplace for the one of the 12 vendors rather than the two tenants on the east and west. EXISTING  The results of the existing conditions analysis summarized in Table 2 indicate that all study intersections operate with acceptable levels of service (LOS D or better). OPENING YEAR (2026)  The results of the Synchro analysis summarized in Table 8 indicate that all study intersections operate with overall acceptable levels of service (LOS D or better). 2031 HORIZON YEAR  The results of the Synchro analysis summarized in Table 8 indicate that all study intersections operate with overall acceptable levels of service (LOS D or better). RIGHT-TURN DECELERATION LANES  According to WSDOT standards, due to the low current and expected future traffic volumes and the low-speed limit on Logan Avenue, the right-turn lane warrant criteria is not met for the intersection. LEFT-TURN DECELERATION LANES  According to WSDOT standards, due to the low current and expected future traffic volumes and low-speed limit on Logan Avenue, the right-turn lane warrant criteria is not met for the intersection. QUEUE STORAGE  The recommended storage lengths are provided for study horizon year 2031 using the total traffic projections. SIGHT DISTANCE  Sight visibility should be provided at all driveways according to the distances shown in Table 10. All vegetation and trees should be maintained to allow unobstructed sight distance. Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 Renton Market – Renton, Washington Traffic Impact Analysis 32 LIST OF REFERENCES Highway Capacity Manual, Sixth Edition: A Guide for Multimodal Mobility Analysis. Transportation Research Board, Washington, D.C., 2018. Manual on Uniform Traffic Control Devices. U.S. Department of Transportation, Federal Highways Administration, Washington, D.C., 2009. Trip Generation Manual, 11th Edition, Institute of Transportation Engineers, Washington, D.C., 2017. Trip Generation Handbook, 3rd Edition, Institute of Transportation Engineers, Washington, D.C., 2014. Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 Renton Market – Renton, Washington Traffic Impact Analysis 33 TECHNICAL APPENDICES APPENDIX A:  APPENDIX B:  APPENDIX C:  APPENDIX D:  APPENDIX E:  APPENDIX F:  APPENDIX G:  APPENDIX H:  APPENDIX I:  APPENDIX J:  APPENDIX K:  APPENDIX L:  APPENDIX M:  REVIEW COMMENTS AND RESPONSES (RESERVED)  EXISTING TRAFFIC COUNTS  EXISTING PEAK HOUR ANALYSIS  CRASH ANALYSIS WORKSHEETS  TRIP GENERATION CALCULATIONS  BACKGROUND GROWTH CALCULATIONS  TURN LANE WARRANTS  2026 NO BUILD PEAK HOUR ANALYSIS  2031 NO BUILD PEAK HOUR ANALYSIS  2026 BUILD PEAK HOUR ANALYSIS  2031 BUILD PEAK HOUR ANALYSIS  QUEUE STORAGE ANALYSIS  SIGHT DISTANCE ANALYSIS  Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 Renton Market – Renton, Washington Traffic Impact Analysis 34 APPENDIX A: REVIEW COMMENTS AND RESPONSES (Reserved) Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 CivTech, Inc. Review Comments & Responses Renton Market 1 Submittal Disposition Codes: (1) Will Comply (2) Will Evaluate (3) Delete Comment (4) Defer to Consultant/Owner Reviewer Name, Agency:Susan Tillack Item Review Comment (Code) & Response 1.I noticed the first paragraph in the Executive Summary mis-states the anticipated program - it notes 14 vendor stalls and one new fast casual restaurant, but the program has 12 vendor stalls and two anchor tenants on the east and west sides of the building ( anticipated to be full service, not fast casual, restaurant and/or bar and, possibly, a bakery) (1) The TIA has been updated to reflect 12 vendor stalls instead of 14 and we have changed from LUC code 930 to LUC 932 Sit- Down Restaurant for the two anchor tenants on the east and west side. Appendix A Page 1 of 1 Reviewed Date CivTech Received Date CivTech Entered Date CivTech Response Date Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 Renton Market – Renton, Washington Traffic Impact Analysis 35 APPENDIX B: EXISTING TRAFFIC COUNTS Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 CC PAKRING EGRESS CC PAKRING EGRESS2ND ST 2ND ST (303) 216-2439www.alltrafficdata.net Location:1 CC PAKRING EGRESS & 2ND ST AM Tuesday, August 20, 2024Date: Traffic Counts - Motorized Vehicles Note: Total study counts contained in parentheses. Motorized Vehicles Pedestrians/Bicycles in CrosswalkHeavy VehiclesPeak Hour Peak Hour:07:30 AM - 08:30 AM Peak 15-Minutes:07:45 AM - 08:00 AM Traffic Counts - Heavy Vehicles, Bicycles on Road, and Pedestrians/Bicycles in Crosswalk 00 436 0 21 0 437 0.87 N S EW 0.00 0.87 0.38 0.00 ()() (810) () (815) () (6)(1) 0 00 0 435 1 0 0 0 0 0 0 2 0 00 2ND ST 2ND ST CC PAKRING EGRESS CC PAKRING EGRESS 1 7 7 0 N S EW 2 5 52 1 0 0 0 0 00 0 3 0 0 0 0 00 3 0 00 0 3 N S EW 0 0 0 0 0 00 IntervalStart Time RightLeft Thru Total Eastbound Westbound Northbound Southbound U-Turn RollingHourRightLeft ThruU-Turn RightLeft ThruU-Turn RightLeft ThruU-Turn 7:00 AM 426000 0084 010 000 850000 7:15 AM 426000 00100 010 000 1010000 7:30 AM 438000 01112 010 000 1140000 7:45 AM 434000 00126 000 000 1260000 8:00 AM 390000 0085 000 000 850000 8:15 AM 000 00112 010 000 1130000 8:30 AM 000 00108 020 000 1100000 8:45 AM 000 0082 000 000 820000 Count Total 000 01809 060 000 8160000 Peak Hour 000 01435 020 000 4380000 HV% PHF 0.00 0.87 0.38 0.00 0.0% 0.7% 0.0% 0.0% 0.7% 0.87 EB WB NB SB All Heavy VehiclesIntervalStart Time EB NB TotalWB SB 7:00 AM 00000 7:15 AM 00000 7:30 AM 00101 7:45 AM 00101 8:00 AM 00101 8:15 AM 00000 8:30 AM 00101 8:45 AM 00000 Count Total 00404 Peak Hour 00303 Bicycles on RoadwayIntervalStart Time EB NB TotalWB SB 7:00 AM 00000 7:15 AM 00000 7:30 AM 00000 7:45 AM 00000 8:00 AM 00000 8:15 AM 00000 8:30 AM 00000 8:45 AM 00000 Count Total 00000 Peak Hour 00000 Pedestrians/Bicycles on CrosswalkIntervalStart Time EB NB TotalWB SB 7:00 AM 03205 7:15 AM 01124 7:30 AM 04105 7:45 AM 00011 8:00 AM 02406 8:15 AM 01203 8:30 AM 01102 8:45 AM 00033 Count Total 01211 629 Peak Hour 077115 CC PAKRING EGRESS CC PAKRING EGRESS2ND ST 2ND ST (303) 216-2439www.alltrafficdata.net Location:1 CC PAKRING EGRESS & 2ND ST PM Tuesday, August 20, 2024Date: Traffic Counts - Motorized Vehicles Note: Total study counts contained in parentheses. Motorized Vehicles Pedestrians/Bicycles in CrosswalkHeavy VehiclesPeak Hour Peak Hour:04:15 PM - 05:15 PM Peak 15-Minutes:04:15 PM - 04:30 PM Traffic Counts - Heavy Vehicles, Bicycles on Road, and Pedestrians/Bicycles in Crosswalk 00 654 1 890 0 742 0.94 N S EW 0.00 0.96 0.78 0.00 ()() (1,224) (1) (1,385) () (163)(1) 0 00 0 654 0 0 0 0 0 0 0 88 0 10 2ND ST 2ND ST CC PAKRING EGRESS CC PAKRING EGRESS 14 28 23 2 N S EW 15 13 1211 11 3 2 0 0 00 0 0 0 0 0 0 00 0 0 00 0 0 N S EW 0 0 0 0 0 00 IntervalStart Time RightLeft Thru Total Eastbound Westbound Northbound Southbound U-Turn RollingHourRightLeft ThruU-Turn RightLeft ThruU-Turn RightLeft ThruU-Turn 4:00 PM 733000 00145 0250 000 1700000 4:15 PM 743000 00168 0300 000 1980000 4:30 PM 698000 00170 0200 000 1900000 4:45 PM 677000 00156 0190 000 1750000 5:00 PM 654000 00160 0190 000 1800010 5:15 PM 0 0 0 0 0 140 0 13 0 0 0 0 1530000 5:30 PM 0 0 0 0 0 151 0 18 0 0 0 0 1690000 5:45 PM 0 0 0 0 1 133 0 18 0 0 0 0 1520000 Count Total 000 011,223 01620 000 1,3870010 Peak Hour 000 00654 0880 000 7430010 HV% PHF 0.00 0.96 0.78 0.00 0.0% 0.0% 0.0% 0.0% 0.0% 0.94 EB WB NB SB All Heavy VehiclesIntervalStart Time EB NB TotalWB SB 4:00 PM 0 0 0 0 0 4:15 PM 0 0 0 0 0 4:30 PM 0 0 0 0 0 4:45 PM 0 0 0 0 0 5:00 PM 0 0 0 0 0 5:15 PM 0 0 0 0 0 5:30 PM 0 0 0 0 0 5:45 PM 0 0 0 0 0 Count Total 00000 Peak Hour 00000 Bicycles on RoadwayIntervalStart Time EB NB TotalWB SB 4:00 PM 0 0 0 0 0 4:15 PM 1 0 1 0 2 4:30 PM 0 0 3 0 3 4:45 PM 1 0 0 0 1 5:00 PM 1 0 0 0 1 5:15 PM 0 0 1 0 1 5:30 PM 0 0 1 0 1 5:45 PM 0 0 1 0 1 Count Total 307010 Peak Hour 30407 Pedestrians/Bicycles on CrosswalkIntervalStart Time EB NB TotalWB SB 4:00 PM 7 6 5 3 21 4:15 PM 0 5 5 2 12 4:30 PM 1 9 9 10 29 4:45 PM 1 7 4 2 14 5:00 PM 0 2 10 0 12 5:15 PM 0 2 4 1 7 5:30 PM 0 11 3 2 16 5:45 PM 0 7 0 0 7 Count Total 9494020118 Peak Hour 223281467 Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 CC PARKING INGRESS CC PARKING INGRESS2ND ST 2ND ST (303) 216-2439www.alltrafficdata.net Location:2 CC PARKING INGRESS & 2ND ST AM Tuesday, August 20, 2024Date: Traffic Counts - Motorized Vehicles Note: Total study counts contained in parentheses. Motorized Vehicles Pedestrians/Bicycles in CrosswalkHeavy VehiclesPeak Hour Peak Hour:07:00 AM - 08:00 AM Peak 15-Minutes:07:30 AM - 07:45 AM Traffic Counts - Heavy Vehicles, Bicycles on Road, and Pedestrians/Bicycles in Crosswalk 00 432 0 016 0 416 0.88 N S EW 0.00 0.88 0.00 0.00 ()() (806) () (773) () ()(33) 0 00 0 416 16 0 0 0 0 0 0 0 0 00 2ND ST 2ND ST CC PARKING INGRESS CC PARKING INGRESS 2 0 8 1 N S EW 0 0 53 2 0 1 0 0 00 0 2 0 0 0 0 00 2 0 00 0 2 N S EW 0 0 0 0 0 00 IntervalStart Time RightLeft Thru Total Eastbound Westbound Northbound Southbound U-Turn RollingHourRightLeft ThruU-Turn RightLeft ThruU-Turn RightLeft ThruU-Turn 7:00 AM 432000 0798 000 000 1050000 7:15 AM 428000 02104 000 000 1060000 7:30 AM 428000 07116 000 000 1230000 7:45 AM 388000 0098 000 000 980000 8:00 AM 374000 0398 000 000 1010000 8:15 AM 000 06100 000 000 1060000 8:30 AM 000 0380 000 000 830000 8:45 AM 000 0579 000 000 840000 Count Total 000 033773 000 000 8060000 Peak Hour 000 016416 000 000 4320000 HV% PHF 0.00 0.88 0.00 0.00 0.0% 0.5% 0.0% 0.0% 0.5% 0.88 EB WB NB SB All Heavy VehiclesIntervalStart Time EB NB TotalWB SB 7:00 AM 00000 7:15 AM 00000 7:30 AM 00202 7:45 AM 00000 8:00 AM 00101 8:15 AM 00101 8:30 AM 00000 8:45 AM 00000 Count Total 00404 Peak Hour 00202 Bicycles on RoadwayIntervalStart Time EB NB TotalWB SB 7:00 AM 00000 7:15 AM 00000 7:30 AM 00000 7:45 AM 00000 8:00 AM 00000 8:15 AM 10001 8:30 AM 00000 8:45 AM 00000 Count Total 10001 Peak Hour 00000 Pedestrians/Bicycles on CrosswalkIntervalStart Time EB NB TotalWB SB 7:00 AM 03014 7:15 AM 12003 7:30 AM 01012 7:45 AM 02002 8:00 AM 11002 8:15 AM 32027 8:30 AM 20046 8:45 AM 02002 Count Total 7130828 Peak Hour 180211 CC PARKING INGRESS CC PARKING INGRESS2ND ST 2ND ST (303) 216-2439www.alltrafficdata.net Location:2 CC PARKING INGRESS & 2ND ST PM Tuesday, August 20, 2024Date: Traffic Counts - Motorized Vehicles Note: Total study counts contained in parentheses. Motorized Vehicles Pedestrians/Bicycles in CrosswalkHeavy VehiclesPeak Hour Peak Hour:04:00 PM - 05:00 PM Peak 15-Minutes:04:45 PM - 05:00 PM Traffic Counts - Heavy Vehicles, Bicycles on Road, and Pedestrians/Bicycles in Crosswalk 00 740 0 057 0 683 0.93 N S EW 0.00 0.93 0.00 0.25 ()() (1,377) () (1,270) (1) ()(108) 0 00 0 683 57 0 0 0 0 0 0 0 0 00 2ND ST 2ND ST CC PARKING INGRESS CC PARKING INGRESS 26 2 17 31 N S EW 0 2 98 17 9 16 15 0 00 0 0 0 0 0 0 00 0 0 00 0 0 N S EW 0 0 0 0 0 00 IntervalStart Time RightLeft Thru Total Eastbound Westbound Northbound Southbound U-Turn RollingHourRightLeft ThruU-Turn RightLeft ThruU-Turn RightLeft ThruU-Turn 4:00 PM 740000 015177 000 000 1920000 4:15 PM 701000 020154 000 000 1740000 4:30 PM 690000 08166 000 000 1740000 4:45 PM 665000 014186 000 000 2000000 5:00 PM 638000 014139 000 000 1530000 5:15 PM 000 018145 000 000 1630000 5:30 PM 000 08141 000 000 1490000 5:45 PM 000 010162 000 000 1731000 Count Total 000 01071,270 000 000 1,3781000 Peak Hour 000 057683 000 000 7400000 HV% PHF 0.25 0.93 0.00 0.00 0.0% 0.0% 0.0% 0.0% 0.0% 0.93 EB WB NB SB All Heavy VehiclesIntervalStart Time EB NB TotalWB SB 4:00 PM 0 0 0 0 0 4:15 PM 0 0 0 0 0 4:30 PM 0 0 0 0 0 4:45 PM 0 0 0 0 0 5:00 PM 0 0 0 0 0 5:15 PM 0 0 0 0 0 5:30 PM 0 0 0 0 0 5:45 PM 0 0 0 0 0 Count Total 00000 Peak Hour 00000 Bicycles on RoadwayIntervalStart Time EB NB TotalWB SB 4:00 PM 0 0 2 0 2 4:15 PM 0 0 1 0 1 4:30 PM 0 0 1 0 1 4:45 PM 1 0 0 0 1 5:00 PM 0 0 1 0 1 5:15 PM 0 0 2 0 2 5:30 PM 0 0 1 0 1 5:45 PM 0 0 0 0 0 Count Total 10809 Peak Hour 10405 Pedestrians/Bicycles on CrosswalkIntervalStart Time EB NB TotalWB SB 4:00 PM 15 1 0 5 21 4:15 PM 7 7 0 13 27 4:30 PM 5 1 2 7 15 4:45 PM 4 8 0 1 13 5:00 PM 3 1 0 1 5 5:15 PM 9 6 0 2 17 5:30 PM 2 9 0 1 12 5:45 PM 6 8 1 0 15 Count Total 51 41 3 30 125 Peak Hour 31 17 2 26 76 Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 LOGAN AVE LOGAN AVE2ND ST 2ND ST (303) 216-2439www.alltrafficdata.net Location:3 LOGAN AVE & 2ND ST AM Tuesday, August 20, 2024Date: Traffic Counts - Motorized Vehicles Note: Total study counts contained in parentheses. Motorized Vehicles Pedestrians/Bicycles in CrosswalkHeavy VehiclesPeak Hour Peak Hour:07:30 AM - 08:30 AM Peak 15-Minutes:07:45 AM - 08:00 AM Traffic Counts - Heavy Vehicles, Bicycles on Road, and Pedestrians/Bicycles in Crosswalk 69 188 423 0 8045 0 339 0.95 N S EW 0.66 0.90 0.82 0.00 (335)(173) (775) () (628) () (142)(127) 40 00 129 278 16 0 0 0 0 0 29 21 59 00 2ND ST 2ND ST LOGAN AVE LOGAN AVE 0 3 7 1 N S EW 1 2 43 0 0 1 0 0 00 1 3 0 0 0 0 01 4 0 00 0 3 N S EW 0 0 0 0 0 00 IntervalStart Time RightLeft Thru Total Eastbound Westbound Northbound Southbound U-Turn RollingHourRightLeft ThruU-Turn RightLeft ThruU-Turn RightLeft ThruU-Turn 7:00 AM 547000 0359 0410 0016 121021 0 8 7:15 AM 547000 0454 038 0013 125036 0 7 7:30 AM 572000 0382 0411 007 150029 014 7:45 AM 569000 0468 0513 006 151046 0 9 8:00 AM 543000 0553 0318 007 121026 0 9 8:15 AM 000 0475 0917 009 150028 0 8 8:30 AM 000 0770 0317 0014 147025 011 8:45 AM 000 0451 0512 0021 125018 014 Count Total 0 0 0 0 34 512 0 36 106 0 0 93 1,0900229 0 80 Peak Hour 0 0 0 016278 02159 0 029 5720129 0 40 HV% PHF 0.00 0.90 0.82 0.66 0.0% 0.9% 0.0% 0.0% 0.7% 0.95 EB WB NB SB All Heavy VehiclesIntervalStart Time EB NB TotalWB SB 7:00 AM 00000 7:15 AM 00000 7:30 AM 00101 7:45 AM 00101 8:00 AM 00101 8:15 AM 00101 8:30 AM 00000 8:45 AM 00000 Count Total 00404 Peak Hour 00404 Bicycles on RoadwayIntervalStart Time EB NB TotalWB SB 7:00 AM 00000 7:15 AM 00000 7:30 AM 00000 7:45 AM 00011 8:00 AM 00000 8:15 AM 00000 8:30 AM 01001 8:45 AM 00000 Count Total 01012 Peak Hour 00011 Pedestrians/Bicycles on CrosswalkIntervalStart Time EB NB TotalWB SB 7:00 AM 03003 7:15 AM 11013 7:30 AM 03104 7:45 AM 12104 8:00 AM 02002 8:15 AM 00101 8:30 AM 52209 8:45 AM 702211 Count Total 14 13 7 3 37 Peak Hour 173011 LOGAN AVE LOGAN AVE2ND ST 2ND ST (303) 216-2439www.alltrafficdata.net Location:3 LOGAN AVE & 2ND ST PM Tuesday, August 20, 2024Date: Traffic Counts - Motorized Vehicles Note: Total study counts contained in parentheses. Motorized Vehicles Pedestrians/Bicycles in CrosswalkHeavy VehiclesPeak Hour Peak Hour:04:15 PM - 05:15 PM Peak 15-Minutes:04:15 PM - 04:30 PM Traffic Counts - Heavy Vehicles, Bicycles on Road, and Pedestrians/Bicycles in Crosswalk 252 198 691 0 5056 0 739 0.95 N S EW 0.93 0.95 0.62 0.25 (364)(480) (1,270) (1) (1,389) (1) (90)(87) 22 5 00 177 485 29 0 0 0 0 0 27 29 21 00 2ND ST 2ND ST LOGAN AVE LOGAN AVE 13 25 16 20 N S EW 14 11 97 9 4 14 6 0 00 0 0 0 0 0 0 00 0 0 00 0 0 N S EW 0 0 0 0 0 00 IntervalStart Time RightLeft Thru Total Eastbound Westbound Northbound Southbound U-Turn RollingHourRightLeft ThruU-Turn RightLeft ThruU-Turn RightLeft ThruU-Turn 4:00 PM 964000 05110 055 003 218039 051 4:15 PM 993000 09126 0147 009 262047 050 4:30 PM 934000 05122 044 008 237042 052 4:45 PM 910000 011113 076 008 247045 057 5:00 PM 877000 04124 044 002 247043 066 5:15 PM 000 08101 023 002 203028 059 5:30 PM 000 05100 078 003 213038 052 5:45 PM 000 01105 036 003 214139 155 Count Total 0 0 0 048901 04643 0 038 1,8411321 1442 Peak Hour 0 0 0 029485 02921 0 027 9930177 0225 HV% PHF 0.25 0.95 0.62 0.93 0.0% 0.0% 0.0% 0.0% 0.0% 0.95 EB WB NB SB All Heavy VehiclesIntervalStart Time EB NB TotalWB SB 4:00 PM 0 0 0 0 0 4:15 PM 0 0 0 0 0 4:30 PM 0 0 0 0 0 4:45 PM 0 0 0 0 0 5:00 PM 0 0 0 0 0 5:15 PM 0 0 0 0 0 5:30 PM 0 0 0 0 0 5:45 PM 0 0 0 0 0 Count Total 00000 Peak Hour 00000 Bicycles on RoadwayIntervalStart Time EB NB TotalWB SB 4:00 PM 0 0 0 0 0 4:15 PM 0 1 2 0 3 4:30 PM 0 0 2 0 2 4:45 PM 0 3 0 1 4 5:00 PM 0 0 0 1 1 5:15 PM 0 0 2 1 3 5:30 PM 0 0 1 1 2 5:45 PM 0 0 1 0 1 Count Total 048416 Peak Hour 044210 Pedestrians/Bicycles on CrosswalkIntervalStart Time EB NB TotalWB SB 4:00 PM 9 8 3 5 25 4:15 PM 2 6 14 2 24 4:30 PM 6 1 5 1 13 4:45 PM 9 3 4 9 25 5:00 PM 3 6 2 1 12 5:15 PM 4 1 3 1 9 5:30 PM 4 11 8 1 24 5:45 PM 12 5 3 2 22 Count Total 49 41 42 22 154 Peak Hour 20 16 25 13 74 Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 LOGAN AVE LOGAN AVEPAVILION DWY PAVILION DWY (303) 216-2439www.alltrafficdata.net Location:4 LOGAN AVE & PAVILION DWY AM Tuesday, August 20, 2024Date: Traffic Counts - Motorized Vehicles Note: Total study counts contained in parentheses. Motorized Vehicles Pedestrians/Bicycles in CrosswalkHeavy VehiclesPeak Hour Peak Hour:08:00 AM - 09:00 AM Peak 15-Minutes:08:45 AM - 09:00 AM Traffic Counts - Heavy Vehicles, Bicycles on Road, and Pedestrians/Bicycles in Crosswalk 60 73 7 4 6858 0 0 0.73 N S EW 0.60 0.35 0.71 0.00 (120)(107) (13) (11) () () (109)(98) 0 22 5 0 2 0 0 0 0 0 56 0 66 20 PAVILION DWY PAVILION DWY LOGAN AVE LOGAN AVE 20 16 4 1 N S EW 10 6 13 11 9 1 0 0 00 0 0 0 0 0 0 00 0 0 00 0 0 N S EW 0 0 0 0 0 00 IntervalStart Time RightLeft Thru Total Eastbound Westbound Northbound Southbound U-Turn RollingHourRightLeft ThruU-Turn RightLeft ThruU-Turn RightLeft ThruU-Turn 7:00 AM 94000 000 0010 0310 250200 7:15 AM 91000 000 007 0216 260100 7:30 AM 100000 000 009 106 200310 7:45 AM 112000 000 0014 018 230000 8:00 AM 135000 000 0014 107 220000 8:15 AM 000 000 0024 118 350100 8:30 AM 000 000 0013 0017 320110 8:45 AM 000 020 0015 0124 460310 Count Total 000 020 00106 3896 229011 3 0 Peak Hour 000 020 0066 2256 1350520 HV% PHF 0.00 0.35 0.71 0.60 0.0% 0.0% 0.0% 0.0% 0.0% 0.73 EB WB NB SB All Heavy VehiclesIntervalStart Time EB NB TotalWB SB 7:00 AM 00000 7:15 AM 00000 7:30 AM 00000 7:45 AM 00000 8:00 AM 00000 8:15 AM 00000 8:30 AM 00000 8:45 AM 00000 Count Total 00000 Peak Hour 00000 Bicycles on RoadwayIntervalStart Time EB NB TotalWB SB 7:00 AM 00000 7:15 AM 00000 7:30 AM 00000 7:45 AM 00011 8:00 AM 00000 8:15 AM 01001 8:30 AM 00000 8:45 AM 00000 Count Total 01012 Peak Hour 01001 Pedestrians/Bicycles on CrosswalkIntervalStart Time EB NB TotalWB SB 7:00 AM 00000 7:15 AM 00415 7:30 AM 00257 7:45 AM 01124 8:00 AM 01315 8:15 AM 014611 8:30 AM 00358 8:45 AM 126817 Count Total 1 5 23 28 57 Peak Hour 14162041 LOGAN AVE LOGAN AVEPAVILION DWY PAVILION DWY (303) 216-2439www.alltrafficdata.net Location:4 LOGAN AVE & PAVILION DWY PM Tuesday, August 20, 2024Date: Traffic Counts - Motorized Vehicles Note: Total study counts contained in parentheses. Motorized Vehicles Pedestrians/Bicycles in CrosswalkHeavy VehiclesPeak Hour Peak Hour:04:15 PM - 05:15 PM Peak 15-Minutes:04:45 PM - 05:00 PM Traffic Counts - Heavy Vehicles, Bicycles on Road, and Pedestrians/Bicycles in Crosswalk 11 12 9 9 10 0 0 0.75 N S EW 0.69 0.63 0.25 0.00 (18)(16) (14) (13) () () (1)() 0 29 9 0 0 0 0 0 0 0 0 0 1 00 PAVILION DWY PAVILION DWY LOGAN AVE LOGAN AVE 43 18 7 25 6 N S EW 99 88 1213 16 27 2 4 0 00 0 0 0 0 0 0 00 0 0 00 0 0 N S EW 0 0 0 0 0 00 IntervalStart Time RightLeft Thru Total Eastbound Westbound Northbound Southbound U-Turn RollingHourRightLeft ThruU-Turn RightLeft ThruU-Turn RightLeft ThruU-Turn 4:00 PM 19000 000 000 010 20100 4:15 PM 21000 000 001 040 60100 4:30 PM 19000 000 000 110 40200 4:45 PM 16000 000 000 120 70400 5:00 PM 12000 000 000 020 40200 5:15 PM 000 000 000 020 40200 5:30 PM 000 000 000 100 10000 5:45 PM 000 000 000 010 30200 Count Total 000 000 001 3130 31014 0 0 Peak Hour 000 000 001 290 210900 HV% PHF 0.00 0.63 0.25 0.69 0.0% 0.0% 0.0% 0.0% 0.0% 0.75 EB WB NB SB All Heavy VehiclesIntervalStart Time EB NB TotalWB SB 4:00 PM 0 0 0 0 0 4:15 PM 0 0 0 0 0 4:30 PM 0 0 0 0 0 4:45 PM 0 0 0 0 0 5:00 PM 0 0 0 0 0 5:15 PM 0 0 0 0 0 5:30 PM 0 0 0 0 0 5:45 PM 0 0 0 0 0 Count Total 00000 Peak Hour 00000 Bicycles on RoadwayIntervalStart Time EB NB TotalWB SB 4:00 PM 0 0 0 0 0 4:15 PM 0 0 0 0 0 4:30 PM 0 0 0 1 1 4:45 PM 0 0 0 1 1 5:00 PM 0 0 0 0 0 5:15 PM 0 0 0 0 0 5:30 PM 0 0 0 0 0 5:45 PM 0 0 0 0 0 Count Total 00022 Peak Hour 00022 Pedestrians/Bicycles on CrosswalkIntervalStart Time EB NB TotalWB SB 4:00 PM 0 4 86 44 134 4:15 PM 0 7 64 12 83 4:30 PM 1 7 57 10 75 4:45 PM 2 5 27 4 38 5:00 PM 3 6 39 17 65 5:15 PM 3 3 53 17 76 5:30 PM 3 5 56 7 71 5:45 PM 0 3 47 14 64 Count Total 12 40 429 125 606 Peak Hour 6 25 187 43 261 Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 LOGAN AVE LOGAN AVE225 LOGAN DWY 225 LOGAN DWY (303) 216-2439www.alltrafficdata.net Location:5 LOGAN AVE & 225 LOGAN DWY AM Tuesday, August 20, 2024Date: Traffic Counts - Motorized Vehicles Note: Total study counts contained in parentheses. Motorized Vehicles Pedestrians/Bicycles in CrosswalkHeavy VehiclesPeak Hour Peak Hour:08:00 AM - 09:00 AM Peak 15-Minutes:08:30 AM - 08:45 AM Traffic Counts - Heavy Vehicles, Bicycles on Road, and Pedestrians/Bicycles in Crosswalk 66 64 0 0 6365 6 6 0.84 N S EW 0.79 0.00 0.87 0.75 (108)(97) () () (10) (10) (106)(95) 6 00 0 0 0 5 0 1 0 0 60 0 63 00 225 LOGAN DWY 225 LOGAN DWY LOGAN AVE LOGAN AVE 4 0 4 13 N S EW 0 0 13 2 2 4 9 0 00 0 0 0 0 0 0 00 0 0 00 0 0 N S EW 0 0 0 0 0 00 IntervalStart Time RightLeft Thru Total Eastbound Westbound Northbound Southbound U-Turn RollingHourRightLeft ThruU-Turn RightLeft ThruU-Turn RightLeft ThruU-Turn 7:00 AM 78000 000 008 009 181000 7:15 AM 90000 000 0012 005 180001 7:30 AM 100010 000 006 005 141001 7:45 AM 126000 000 0017 008 281002 8:00 AM 135000 000 0017 0010 302001 8:15 AM 000 000 0013 0013 281001 8:30 AM 000 000 0019 0019 401001 8:45 AM 010 000 0014 0018 371003 Count Total 020 000 00106 0087 21380010 Peak Hour 010 000 0063 0060 1355006 HV% PHF 0.75 0.00 0.87 0.79 0.0% 0.0% 0.0% 0.0% 0.0% 0.84 EB WB NB SB All Heavy VehiclesIntervalStart Time EB NB TotalWB SB 7:00 AM 00000 7:15 AM 00000 7:30 AM 00000 7:45 AM 00000 8:00 AM 00000 8:15 AM 00000 8:30 AM 00000 8:45 AM 00000 Count Total 00000 Peak Hour 00000 Bicycles on RoadwayIntervalStart Time EB NB TotalWB SB 7:00 AM 00000 7:15 AM 00000 7:30 AM 00011 7:45 AM 00000 8:00 AM 00000 8:15 AM 00000 8:30 AM 00000 8:45 AM 00000 Count Total 00011 Peak Hour 00000 Pedestrians/Bicycles on CrosswalkIntervalStart Time EB NB TotalWB SB 7:00 AM 40004 7:15 AM 41005 7:30 AM 01001 7:45 AM 40015 8:00 AM 42006 8:15 AM 30014 8:30 AM 32016 8:45 AM 30025 Count Total 2560536 Peak Hour 13 4 0 4 21 LOGAN AVE LOGAN AVE225 LOGAN DWY 225 LOGAN DWY (303) 216-2439www.alltrafficdata.net Location:5 LOGAN AVE & 225 LOGAN DWY PM Tuesday, August 20, 2024Date: Traffic Counts - Motorized Vehicles Note: Total study counts contained in parentheses. Motorized Vehicles Pedestrians/Bicycles in CrosswalkHeavy VehiclesPeak Hour Peak Hour:04:00 PM - 05:00 PM Peak 15-Minutes:04:00 PM - 04:15 PM Traffic Counts - Heavy Vehicles, Bicycles on Road, and Pedestrians/Bicycles in Crosswalk 00 0 0 00 0 0 0.00 N S EW 0.00 0.00 0.00 0.00 ()() () () () () ()() 0 00 0 0 0 0 0 0 0 0 0 0 0 00 225 LOGAN DWY 225 LOGAN DWY LOGAN AVE LOGAN AVE 142 0 75 35 0 N S EW 0 0 2649 65 77 16 0 19 0 0 00 0 0 0 0 0 0 00 0 0 00 0 0 N S EW 0 0 0 0 0 00 IntervalStart Time RightLeft Thru Total Eastbound Westbound Northbound Southbound U-Turn RollingHourRightLeft ThruU-Turn RightLeft ThruU-Turn RightLeft ThruU-Turn 4:00 PM 0000 000 000 000 00000 4:15 PM 0000 000 000 000 00000 4:30 PM 0000 000 000 000 00000 4:45 PM 0000 000 000 000 00000 5:00 PM 0000 000 000 000 00000 5:15 PM 000 000 000 000 00000 5:30 PM 000 000 000 000 00000 5:45 PM 000 000 000 000 00000 Count Total 000 000 000 000 00000 Peak Hour 000 000 000 000 00000 HV% PHF 0.00 0.00 0.00 0.00 0.0% 0.0% 0.0% 0.0% 0.0% 0.00 EB WB NB SB All Heavy VehiclesIntervalStart Time EB NB TotalWB SB 4:00 PM 0 0 0 0 0 4:15 PM 0 0 0 0 0 4:30 PM 0 0 0 0 0 4:45 PM 0 0 0 0 0 5:00 PM 0 0 0 0 0 5:15 PM 0 0 0 0 0 5:30 PM 0 0 0 0 0 5:45 PM 0 0 0 0 0 Count Total 00000 Peak Hour 00000 Bicycles on RoadwayIntervalStart Time EB NB TotalWB SB 4:00 PM 0 0 0 0 0 4:15 PM 0 0 0 1 1 4:30 PM 0 0 0 0 0 4:45 PM 0 0 0 0 0 5:00 PM 0 0 0 0 0 5:15 PM 0 0 0 0 0 5:30 PM 0 0 0 0 0 5:45 PM 0 0 0 0 0 Count Total 00011 Peak Hour 00011 Pedestrians/Bicycles on CrosswalkIntervalStart Time EB NB TotalWB SB 4:00 PM 86 21 0 28 135 4:15 PM 71 12 0 19 102 4:30 PM 95 22 0 39 156 4:45 PM 98 20 0 56 174 5:00 PM 121 37 0 62 220 5:15 PM 70 14 0 41 125 5:30 PM 75 22 0 32 129 5:45 PM 69 20 0 38 127 Count Total 685168 03151,168 Peak Hour 350 75 0 142 567 Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 LOGAN AVE-SMITHERS AVE LOGAN AVE-SMITHERS AVE3RD ST 3RD ST (303) 216-2439www.alltrafficdata.net Location:6 LOGAN AVE-SMITHERS AVE & 3RD ST AM Tuesday, August 20, 2024Date: Traffic Counts - Motorized Vehicles Note: Total study counts contained in parentheses. Motorized Vehicles Pedestrians/Bicycles in CrosswalkHeavy VehiclesPeak Hour Peak Hour:08:00 AM - 09:00 AM Peak 15-Minutes:08:45 AM - 09:00 AM Traffic Counts - Heavy Vehicles, Bicycles on Road, and Pedestrians/Bicycles in Crosswalk 66 63 0 277 92 267 0 0.97 N S EW 0.83 0.00 0.75 0.94 (107)(96) () (486) () (485) (14)(2) 0 066 0 0 0 2 207 58 0 0 0 0 5 40 3RD ST 3RD ST LOGAN AVE-SMITHERS AVE LOGAN AVE-SMITHERS AVE 9 4 10 2 N S EW 3 1 64 4 5 1 1 0 00 0 0 0 0 2 0 00 0 2 00 2 0 N S EW 0 0 0 0 0 00 IntervalStart Time RightLeft Thru Total Eastbound Westbound Northbound Southbound U-Turn RollingHourRightLeft ThruU-Turn RightLeft ThruU-Turn RightLeft ThruU-Turn 7:00 AM 2530934 000 000 0100 540010 7:15 AM 28501141 000 000 050 580010 7:30 AM 3110556 000 001 060 690010 7:45 AM 32601745 000 001 090 720000 8:00 AM 34201556 000 001 0120 860020 8:15 AM 01453 000 000 0150 841010 8:30 AM 01645 000 002 0190 841010 8:45 AM 01353 000 002 0200 880000 Count Total 0100383 000 007 0960 5952070 Peak Hour 058207 000 005 0660 3422040 HV% PHF 0.94 0.00 0.75 0.83 0.7% 0.0% 0.0% 0.0% 0.6% 0.97 EB WB NB SB All Heavy VehiclesIntervalStart Time EB NB TotalWB SB 7:00 AM 00000 7:15 AM 00000 7:30 AM 00000 7:45 AM 00000 8:00 AM 10001 8:15 AM 00000 8:30 AM 00000 8:45 AM 10001 Count Total 20002 Peak Hour 20002 Bicycles on RoadwayIntervalStart Time EB NB TotalWB SB 7:00 AM 00000 7:15 AM 00011 7:30 AM 00000 7:45 AM 00000 8:00 AM 00000 8:15 AM 00000 8:30 AM 10001 8:45 AM 00000 Count Total 10012 Peak Hour 10001 Pedestrians/Bicycles on CrosswalkIntervalStart Time EB NB TotalWB SB 7:00 AM 01012 7:15 AM 11215 7:30 AM 00011 7:45 AM 00022 8:00 AM 12036 8:15 AM 02114 8:30 AM 12227 8:45 AM 04138 Count Total 3 12 6 14 35 Peak Hour 210 4 925 LOGAN AVE-SMITHERS AVE LOGAN AVE-SMITHERS AVE3RD ST 3RD ST (303) 216-2439www.alltrafficdata.net Location:6 LOGAN AVE-SMITHERS AVE & 3RD ST PM Tuesday, August 20, 2024Date: Traffic Counts - Motorized Vehicles Note: Total study counts contained in parentheses. Motorized Vehicles Pedestrians/Bicycles in CrosswalkHeavy VehiclesPeak Hour Peak Hour:04:00 PM - 05:00 PM Peak 15-Minutes:04:15 PM - 04:30 PM Traffic Counts - Heavy Vehicles, Bicycles on Road, and Pedestrians/Bicycles in Crosswalk 00 0 844 1830 856 0 0.91 N S EW 0.00 0.00 0.60 0.92 ()() () (1,558) () (1,561) (42)(45) 0 00 0 0 0 29 827 0 0 0 0 0 0 171 3RD ST 3RD ST LOGAN AVE-SMITHERS AVE LOGAN AVE-SMITHERS AVE 391 13 9 85 0 N S EW 74 65 5332 204 187 0 0 0 00 0 0 0 0 0 0 00 0 0 00 0 0 N S EW 0 0 0 0 0 00 IntervalStart Time RightLeft Thru Total Eastbound Westbound Northbound Southbound U-Turn RollingHourRightLeft ThruU-Turn RightLeft ThruU-Turn RightLeft ThruU-Turn 4:00 PM 87400203 000 000 000 2167060 4:15 PM 85800225 000 100 000 2408060 4:30 PM 80900201 000 000 000 2060050 4:45 PM 79200198 000 000 000 21214 0 0 0 5:00 PM 72900186 000 100 000 2004090 5:15 PM 00179 000 000 000 1916060 5:30 PM 00181 000 000 000 1892060 5:45 PM 00145 000 000 000 1492020 Count Total 001,518 000 200 000 1,60343 0 40 0 Peak Hour 00827 000 100 000 87429 0 17 0 HV% PHF 0.92 0.00 0.60 0.00 0.0% 0.0% 0.0% 0.0% 0.0% 0.91 EB WB NB SB All Heavy VehiclesIntervalStart Time EB NB TotalWB SB 4:00 PM 0 0 0 0 0 4:15 PM 0 0 0 0 0 4:30 PM 0 0 0 0 0 4:45 PM 0 0 0 0 0 5:00 PM 0 0 0 0 0 5:15 PM 1 0 0 0 1 5:30 PM 0 0 0 0 0 5:45 PM 0 0 0 0 0 Count Total 10001 Peak Hour 00000 Bicycles on RoadwayIntervalStart Time EB NB TotalWB SB 4:00 PM 0 0 0 0 0 4:15 PM 0 0 0 1 1 4:30 PM 0 0 0 0 0 4:45 PM 0 0 0 0 0 5:00 PM 0 0 0 0 0 5:15 PM 0 0 0 0 0 5:30 PM 0 0 1 0 1 5:45 PM 0 0 0 0 0 Count Total 00112 Peak Hour 00011 Pedestrians/Bicycles on CrosswalkIntervalStart Time EB NB TotalWB SB 4:00 PM 01625113154 4:15 PM 0142268104 4:30 PM 03045100175 4:45 PM 02547110182 5:00 PM 01650135201 5:15 PM 03661128225 5:30 PM 02845108181 5:45 PM 0 6 9 83 98 Count Total 01713048451,320 Peak Hour 085139391615 Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 (3 0 3 ) 2 1 6 - 2 4 3 9 ww w . a l l t r a f f i c d a t a . n e t Location: 7 B U R N E T T A V E & 2 N D S T A M Tu e s d a y , A u g u s t 2 0 , 2 0 2 4 Date: Peak Hour - All Vehicles No t e : T o t a l s t u d y c o u n t s c o n t a i n e d i n p a r e n t h e s e s . Peak Hour: 07 : 4 5 A M - 0 8 : 4 5 A M Peak 15-Minutes: 07 : 4 5 A M - 0 8 : 0 0 A M 0033035 9 5160 00000000 0 6 0 21 0 0 0 0 2 0 0 0 0 0 0 0 0 49 9 0 0 0 0 16 0.80 0.0 0 0.8 6 0 27 32 0.84 (58) (41) 043 1 (80 9 )() 413 (76 6 ) () 39 74 (141) (63) 0.5014 2 (21 ) (3) BU RN E T T A V E 2ND ST BURN E T T A V E BU RN E T T P L 2ND ST 0.8 6N S E W (3 0 3 ) 2 1 6 - 2 4 3 9 ww w . a l l t r a f f i c d a t a . n e t Location: 7 B U R N E T T A V E & 2 N D S T P M Tu e s d a y , A u g u s t 2 0 , 2 0 2 4 Date: Peak Hour - All Vehicles No t e : T o t a l s t u d y c o u n t s c o n t a i n e d i n p a r e n t h e s e s . Peak Hour: 04 : 1 5 P M - 0 5 : 1 5 P M Peak 15-Minutes: 04 : 3 0 P M - 0 4 : 4 5 P M 00520474 12140 00000010 0 16 0 17 0 0 0 0 11 0 0 0 0 0 0 0 0 149 15 0 0 0 0 32 0.89 0.2 5 0.9 8 0 33 46 0.82 (96) (71) 165 1 (1,2 2 4 ) (1) 55 2 (1,0 1 9 ) () 68 196 (399) (139) 0.4628 11 (51 ) (20 ) BU RN E T T A V E 2ND ST BURN E T T A V E BU RN E T T P L 2ND ST 0.9 6N S E W Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 Peak H our -- P edestrians Peak Hour - Bicycles 1 14 13 7 N S E W 77 4 910 43 0 0 0 0 0 0 0 0 0 2 2 0 00000000 00000000 0 0 0 0 0 0 0 0 0 0 00 0 0 0 0 0 0 0 0 0 0 0 0S E W N0 0 0 1 1 0 0 00 0 00 00 0 0 0 0 0 0 0 0 0 0 Peak H our - P edestrians Peak Hour - Bicycles 14 43 53 26 N S E W 19 24 20 3359 1412 0 0 0 0 0 0 0 0 0 13 7 6 00003000 01000100 0 1 0 1 0 0 0 0 0 0 00 0 0 0 0 0 0 0 0 0 0 0 0S E W N5 2 3 3 1 2 3 12 2 02 00 0 0 0 0 0 0 0 2 0 2 Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 Traffic Counts - Motorized Vehicles We s t b o u n d Int e r v a l Sta r t T i m e UH L L B L T B R R H R No r t h w e s t b o u n d UH L L B L T B R R H R No r t h b o u n d UH L L B L T B R R H R No r t h e a s t b o u n d UH L L B L T B R R H R 7:0 0 A M 00 1 2 2 4 0 0 0 00 3 0 7 0 1 1 0 7:1 5 A M 00 8 1 2 0 0 0 00 7 0 8 6 1 3 0 7:3 0 A M 00 9 0 5 0 0 0 00 6 0 1 0 1 0 2 0 7:4 5 A M 00 1 3 3 5 0 0 0 0 0 1 0 0 1 0 6 1 4 0 8:0 0 A M 00 1 2 3 5 0 0 0 00 6 0 6 8 2 4 0 8:1 5 A M 00 1 0 0 2 0 0 0 00 9 0 9 5 2 2 0 8:3 0 A M 00 1 4 3 4 0 0 0 00 8 0 9 0 0 6 0 8:4 5 A M 00 1 8 0 6 0 0 0 00 7 0 6 1 1 3 0 Co u n t T o t a l 0 0 9 6 1 2 3 3 0 0 0 00 5 6 0 6 7 7 8 2 5 0 00 4 9 9 1 6 0 0 0 Pe a k H o u r 0 0 3 3 0 3 5 9 5 1 6 0 To t a l Ea s t b o u n d Int e r v a l Sta r t T i m e Rol l i n g Ho u r UH L L B L T B R R H R So u t h e a s t b o u n d UH L L B L T B R R H R So u t h b o u n d UH L L B L T B R R H R So u t h w e s t b o u n d UH L L B L T B R R H R 7:0 0 A M 96 4 8 6 00 0 0 0 0 0 0 0 0 0 0 1 0 2 0 00 0 0 0 0 0 0 7:1 5 A M 11 4 4 9 8 00 0 0 0 0 0 1 0 0 0 0 0 0 5 0 00 0 0 0 0 0 0 7:3 0 A M 12 6 5 1 1 00 0 0 0 0 0 0 0 0 0 0 0 0 3 0 00 0 0 0 0 0 0 7:4 5 A M 15 0 5 1 6 00 0 0 0 0 0 1 0 0 0 0 1 0 6 0 00 0 0 0 0 0 0 8:0 0 A M 10 8 4 6 5 00 0 0 0 0 0 0 0 0 0 0 3 0 5 0 00 0 0 0 0 0 0 8:1 5 A M 12 7 00 0 0 0 0 0 1 0 0 0 0 0 0 6 0 00 0 0 0 0 0 0 8:3 0 A M 13 1 00 0 0 0 0 0 0 0 0 0 0 2 0 4 0 00 0 0 0 0 0 0 8:4 5 A M 99 00 0 0 0 0 0 0 0 0 0 0 0 0 2 1 00 0 0 0 0 0 0 Co u n t T o t a l 95 1 00 0 0 0 0 0 3 0 0 0 0 7 0 3 3 1 00 0 0 0 0 0 0 51 6 Pe a k H o u r 00 0 0 0 0 0 2 0 0 0 0 6 0 2 1 0 00 0 0 0 0 0 0 Traffic Counts - Motorized Vehicles We s t b o u n d Int e r v a l Sta r t T i m e UH L L B L T B R R H R No r t h w e s t b o u n d UH L L B L T B R R H R No r t h b o u n d UH L L B L T B R R H R No r t h e a s t b o u n d UH L L B L T B R R H R 4:0 0 P M 00 3 0 4 3 0 0 0 0 0 1 5 0 1 0 3 0 2 0 4:1 5 P M 00 3 8 4 8 0 0 0 00 9 0 1 1 7 4 4 0 4:3 0 P M 00 4 4 5 6 0 0 0 0 0 1 7 0 1 1 8 4 2 0 4:4 5 P M 00 3 8 2 8 0 0 0 0 0 1 6 0 1 1 2 3 5 0 5:0 0 P M 00 2 9 4 1 0 0 0 0 0 0 1 0 0 1 2 7 1 3 0 5:1 5 P M 00 3 8 3 1 1 0 0 0 00 1 3 0 9 5 0 2 0 5:3 0 P M 10 4 1 7 1 0 0 0 0 0 0 1 0 0 1 0 4 1 2 0 5:4 5 P M 10 3 1 7 1 6 0 0 0 00 2 0 0 9 5 1 4 0 Co u n t T o t a l 20 2 8 9 3 6 7 2 0 0 0 0 0 1 1 0 0 8 7 1 1 4 2 4 0 00 1 4 9 1 5 3 2 0 0 0 Pe a k H o u r 0 0 5 2 0 4 7 4 1 2 1 4 0 To t a l Ea s t b o u n d Int e r v a l Sta r t T i m e Rol l i n g Ho u r UH L L B L T B R R H R So u t h e a s t b o u n d UH L L B L T B R R H R So u t h b o u n d UH L L B L T B R R H R So u t h w e s t b o u n d UH L L B L T B R R H R 4:0 0 P M 16 9 7 6 7 00 0 0 0 0 0 1 0 0 0 0 0 0 1 1 0 00 0 0 0 0 0 0 4:1 5 P M 19 9 7 9 3 00 0 0 0 0 0 6 0 0 0 0 2 0 7 0 00 0 0 0 0 0 0 4:3 0 P M 20 7 7 7 0 00 0 0 0 0 0 1 0 0 0 0 5 0 5 0 00 0 0 0 0 0 0 4:4 5 P M 19 2 7 4 8 00 0 0 0 0 0 3 0 0 0 0 3 0 2 0 00 0 0 0 0 0 0 5:0 0 P M 19 5 7 4 3 00 0 0 0 0 0 1 0 0 0 0 6 0 3 0 01 0 0 0 0 0 0 5:1 5 P M 17 6 00 0 0 0 0 0 3 0 0 0 0 5 0 6 0 00 0 0 0 0 0 0 5:3 0 P M 18 5 00 0 0 0 0 0 3 0 0 0 0 3 0 3 0 00 0 0 0 0 0 0 5:4 5 P M 18 7 00 0 0 0 0 0 2 0 0 0 0 3 0 7 0 00 0 0 0 0 0 0 Co u n t T o t a l 1,5 1 0 00 0 0 0 0 0 2 0 0 0 0 0 2 7 0 4 4 0 01 0 0 0 0 0 0 79 3 Pe a k H o u r 00 0 0 0 0 0 1 1 0 0 0 0 1 6 0 1 7 0 01 0 0 0 0 0 0 Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 BURNETT AVE BURNETT AVE3RD ST 3RD ST (303) 216-2439www.alltrafficdata.net Location:8 BURNETT AVE & 3RD ST AM Tuesday, August 20, 2024Date: Traffic Counts - Motorized Vehicles Note: Total study counts contained in parentheses. Motorized Vehicles Pedestrians/Bicycles in CrosswalkHeavy VehiclesPeak Hour Peak Hour:08:00 AM - 09:00 AM Peak 15-Minutes:08:30 AM - 08:45 AM Traffic Counts - Heavy Vehicles, Bicycles on Road, and Pedestrians/Bicycles in Crosswalk 39 81 0 252 6652 280 0 0.84 N S EW 0.79 0.00 0.61 0.86 (164)(70) () (407) () (481) (121)(101) 0 023 0 0 0 36 203 41 0 0 16 0 40 260 3RD ST 3RD ST BURNETT AVE BURNETT AVE 22 12 8 6 N S EW 5 7 35 11 11 2 4 0 00 0 0 0 0 0 2 02 0 0 00 2 0 N S EW 0 0 0 0 0 00 IntervalStart Time RightLeft Thru Total Eastbound Westbound Northbound Southbound U-Turn RollingHourRightLeft ThruU-Turn RightLeft ThruU-Turn RightLeft ThruU-Turn 7:00 AM 28701520 000 005 032 567040 7:15 AM 32701230 000 009 055 7811 0 6 0 7:30 AM 31501432 000 006 031 729070 7:45 AM 3570734 000 0015 084 8110 0 3 0 8:00 AM 38501556 000 006 047 965030 8:15 AM 0539 000 008 061 664030 8:30 AM 01256 000 0011 077 11413 0 8 0 8:45 AM 0952 000 0015 061 10914 0 12 0 Count Total 089319 000 0075 04228 67273 0 46 0 Peak Hour 041203 000 0040 02316 38536 0 26 0 HV% PHF 0.86 0.00 0.61 0.79 0.7% 0.0% 0.0% 0.0% 0.5% 0.84 EB WB NB SB All Heavy VehiclesIntervalStart Time EB NB TotalWB SB 7:00 AM 01001 7:15 AM 00000 7:30 AM 00000 7:45 AM 00000 8:00 AM 10001 8:15 AM 00000 8:30 AM 10001 8:45 AM 00000 Count Total 21003 Peak Hour 20002 Bicycles on RoadwayIntervalStart Time EB NB TotalWB SB 7:00 AM 00000 7:15 AM 00000 7:30 AM 00000 7:45 AM 20013 8:00 AM 00000 8:15 AM 01001 8:30 AM 00000 8:45 AM 00000 Count Total 21014 Peak Hour 01001 Pedestrians/Bicycles on CrosswalkIntervalStart Time EB NB TotalWB SB 7:00 AM 30148 7:15 AM 124815 7:30 AM 014712 7:45 AM 00235 8:00 AM 11439 8:15 AM 222814 8:30 AM 02248 8:45 AM 334717 Count Total 10 11 23 44 88 Peak Hour 68122248 BURNETT AVE BURNETT AVE3RD ST 3RD ST (303) 216-2439www.alltrafficdata.net Location:8 BURNETT AVE & 3RD ST PM Tuesday, August 20, 2024Date: Traffic Counts - Motorized Vehicles Note: Total study counts contained in parentheses. Motorized Vehicles Pedestrians/Bicycles in CrosswalkHeavy VehiclesPeak Hour Peak Hour:04:00 PM - 05:00 PM Peak 15-Minutes:04:30 PM - 04:45 PM Traffic Counts - Heavy Vehicles, Bicycles on Road, and Pedestrians/Bicycles in Crosswalk 81 181 0 723 149171 845 0 0.96 N S EW 0.89 0.00 0.87 0.96 (372)(153) () (1,409) () (1,564) (362)(298) 0 136 0 0 0 127 606 112 0 0 44 0 68 810 3RD ST 3RD ST BURNETT AVE BURNETT AVE 268 50 76 19 7 N S EW 30 20 2947 139 129 98 99 0 00 0 0 0 0 0 0 00 0 0 00 0 0 N S EW 0 0 0 0 0 00 IntervalStart Time RightLeft Thru Total Eastbound Westbound Northbound Southbound U-Turn RollingHourRightLeft ThruU-Turn RightLeft ThruU-Turn RightLeft ThruU-Turn 4:00 PM 1,075024148 0 0 0 0 013 0 911 26536 0 24 0 4:15 PM 1,063032157 000 0018 168 26931 0 16 0 4:30 PM 1,0520 30 153 0 0 0 0 0 22 0 10 13 28032 0 20 0 4:45 PM 1,0220 26 148 0 0 0 0 0 15 0 11 12 26128 0 21 0 5:00 PM 1,004017138 000 0025 099 25326 0 29 0 5:15 PM 0 20 143 0 0 0 0 0 27 0 11 7 25816 0 34 0 5:30 PM 0 29 135 0 0 0 0 0 24 0 3 9 25022 0 28 0 5:45 PM 0 22 130 0 0 0 0 0 27 0 7 17 24321 0 19 0 Count Total 0 200 1,152 0 0 0 0 0 171 1 66 86 2,079212 0 191 0 Peak Hour 0 112 606 0 0 0 0 0 68 1 36 44 1,075127 0 81 0 HV% PHF 0.96 0.00 0.87 0.89 0.0% 0.0% 0.0% 0.0% 0.0% 0.96 EB WB NB SB All Heavy VehiclesIntervalStart Time EB NB TotalWB SB 4:00 PM 0 0 0 0 0 4:15 PM 0 0 0 0 0 4:30 PM 0 0 0 0 0 4:45 PM 0 0 0 0 0 5:00 PM 0 0 0 0 0 5:15 PM 0 0 0 0 0 5:30 PM 0 0 0 0 0 5:45 PM 1 0 0 0 1 Count Total 10001 Peak Hour 00000 Bicycles on RoadwayIntervalStart Time EB NB TotalWB SB 4:00 PM 0 0 0 0 0 4:15 PM 0 0 0 0 0 4:30 PM 0 0 0 0 0 4:45 PM 0 0 0 1 1 5:00 PM 1 1 0 1 3 5:15 PM 1 0 0 0 1 5:30 PM 0 0 0 0 0 5:45 PM 1 1 0 0 2 Count Total 32027 Peak Hour 00011 Pedestrians/Bicycles on CrosswalkIntervalStart Time EB NB TotalWB SB 4:00 PM 55 18 10 47 130 4:15 PM 40 24 18 74 156 4:30 PM 41 15 8 61 125 4:45 PM 61 19 14 86 180 5:00 PM 31 9 20 41 101 5:15 PM 45 19 19 64 147 5:30 PM 38 13 9 55 115 5:45 PM 52 21 12 70 155 Count Total 363 138 110 498 1,109 Peak Hour 197 76 50 268 591 Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 Renton Market – Renton, Washington Traffic Impact Analysis 36 APPENDIX C: EXISTING PEAK HOUR ANALYSIS Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 24-0640 Renton Market 1: City Center Parking Egress & 2nd Street Existing AM HCM Unsignalized Intersection Capacity Analysis Existing AM 24-0640 Renton Market 1:56 pm 08/12/2024 Existing AM Synchro 12 ReportCivTech Inc.Page 1 Movement EBT EBR WBL WBT NBL NBR Lane ConfigurationsTraffic Volume (veh/h) 0 0 1 435 2 0 Future Volume (Veh/h) 0 0 1 435 2 0Sign Control Free Free Stop Grade 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 0 0 1 473 2 0 Pedestrians Lane Width (ft)Walking Speed (ft/s) Percent BlockageRight turn flare (veh) Median type None None Median storage veh)Upstream signal (ft) 148 164 pX, platoon unblocked vC, conflicting volume 0 120 0vC1, stage 1 conf vol vC2, stage 2 conf volvCu, unblocked vol 0 120 0 tC, single (s) 4.1 6.8 6.9 tC, 2 stage (s)tF (s) 2.2 3.5 3.3 p0 queue free % 100 100 100 cM capacity (veh/h) 1622 862 1084 Direction, Lane # WB 1 WB 2 WB 3 WB 4 NB 1 Volume Total 69 135 135 135 2 Volume Left 10002 Volume Right 00000cSH 1622 1700 1700 1700 862 Volume to Capacity 0.00 0.08 0.08 0.08 0.00 Queue Length 95th (ft)00000Control Delay (s/veh) 0.1 0.0 0.0 0.0 9.2 Lane LOS A AApproach Delay (s/veh) 0.0 9.2 Approach LOS A Intersection Summary Average Delay 0.1Intersection Capacity Utilization 16.3% ICU Level of Service A Analysis Period (min) 15 24-0640 Renton Market 1: City Center Parking Egress & 2nd Street Existing PM HCM Unsignalized Intersection Capacity Analysis Existing PM 24-0640 Renton Market 10:23 am 09/06/2024 Existing PM Synchro 12 ReportCivTech Inc.Page 1 Movement EBT EBR WBL WBT NBL NBR Lane ConfigurationsTraffic Volume (veh/h) 0 0 0 654 88 1 Future Volume (Veh/h) 0 0 0 654 88 1Sign Control Free Free Stop Grade 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 0 0 0 711 96 1 Pedestrians Lane Width (ft)Walking Speed (ft/s) Percent BlockageRight turn flare (veh) Median type None None Median storage veh)Upstream signal (ft) 148 164 pX, platoon unblocked vC, conflicting volume 0 178 0vC1, stage 1 conf vol vC2, stage 2 conf volvCu, unblocked vol 0 178 0 tC, single (s) 4.1 6.8 6.9 tC, 2 stage (s)tF (s) 2.2 3.5 3.3 p0 queue free % 100 88 100 cM capacity (veh/h) 1622 795 1084 Direction, Lane # WB 1 WB 2 WB 3 WB 4 NB 1 Volume Total 178 178 178 178 97 Volume Left 000096 Volume Right 00001cSH 1700 1700 1700 1700 797 Volume to Capacity 0.10 0.10 0.10 0.10 0.12 Queue Length 95th (ft)000010Control Delay (s/veh) 0.0 0.0 0.0 0.0 10.1 Lane LOS BApproach Delay (s/veh) 0.0 10.1 Approach LOS B Intersection Summary Average Delay 1.2Intersection Capacity Utilization 21.1% ICU Level of Service A Analysis Period (min) 15 Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 24-0640 Renton Market 2: City Center Parking Ingress & 2nd Street Existing AM HCM Unsignalized Intersection Capacity Analysis Existing AM 24-0640 Renton Market 1:56 pm 08/12/2024 Existing AM Synchro 12 ReportCivTech Inc.Page 2 Movement EBT EBR WBL WBT NBL NBR Lane ConfigurationsTraffic Volume (veh/h) 0 0 16 416 0 0 Future Volume (Veh/h) 0 0 16 416 0 0Sign Control Free Free Stop Grade 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 0 0 17 452 0 0 Pedestrians Lane Width (ft)Walking Speed (ft/s) Percent BlockageRight turn flare (veh) Median type None None Median storage veh)Upstream signal (ft) 76 236 pX, platoon unblocked vC, conflicting volume 0 147 0vC1, stage 1 conf vol vC2, stage 2 conf volvCu, unblocked vol 0 147 0 tC, single (s) 4.1 6.8 6.9 tC, 2 stage (s)tF (s) 2.2 3.5 3.3 p0 queue free % 99 100 100 cM capacity (veh/h) 1622 822 1084 Direction, Lane # WB 1 WB 2 WB 3 WB 4 Volume Total 82 129 129 129 Volume Left 17000 Volume Right 0000cSH 1622 1700 1700 1700 Volume to Capacity 0.01 0.08 0.08 0.08 Queue Length 95th (ft)1000Control Delay (s/veh) 1.6 0.0 0.0 0.0 Lane LOS AApproach Delay (s/veh) 0.3 Approach LOS Intersection Summary Average Delay 0.3Intersection Capacity Utilization 9.6% ICU Level of Service A Analysis Period (min) 15 24-0640 Renton Market 2: City Center Parking Ingress & 2nd Street Existing PM HCM Unsignalized Intersection Capacity Analysis Existing PM 24-0640 Renton Market 10:23 am 09/06/2024 Existing PM Synchro 12 ReportCivTech Inc.Page 2 Movement EBT EBR WBL WBT NBL NBR Lane ConfigurationsTraffic Volume (veh/h) 0 0 57 683 0 0 Future Volume (Veh/h) 0 0 57 683 0 0Sign Control Free Free Stop Grade 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 0 0 62 742 0 0 Pedestrians Lane Width (ft)Walking Speed (ft/s) Percent BlockageRight turn flare (veh) Median type None None Median storage veh)Upstream signal (ft) 76 236 pX, platoon unblocked vC, conflicting volume 0 310 0vC1, stage 1 conf vol vC2, stage 2 conf volvCu, unblocked vol 0 310 0 tC, single (s) 4.1 6.8 6.9 tC, 2 stage (s)tF (s) 2.2 3.5 3.3 p0 queue free % 96 100 100 cM capacity (veh/h) 1622 633 1084 Direction, Lane # WB 1 WB 2 WB 3 WB 4 Volume Total 168 212 212 212 Volume Left 62000 Volume Right 0000cSH 1622 1700 1700 1700 Volume to Capacity 0.04 0.12 0.12 0.12 Queue Length 95th (ft)3000Control Delay (s/veh) 2.9 0.0 0.0 0.0 Lane LOS AApproach Delay (s/veh) 0.6 Approach LOS Intersection Summary Average Delay 0.6Intersection Capacity Utilization 14.1% ICU Level of Service A Analysis Period (min) 15 Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 24-0640 Renton Market 3: Logan Avenue & 2nd Street Existing AM Timings Existing AM 24-0640 Renton Market 1:56 pm 08/12/2024 Existing AM Synchro 12 ReportCivTech Inc.Page 3 Lane Group WBT NBL NBT SBT SBR Lane ConfigurationsTraffic Volume (vph) 278 21 59 29 40 Future Volume (vph) 278 21 59 29 40Turn Type NA Perm NA NA Perm Protected Phases 2 8 4 Permitted Phases 8 4Detector Phase 28844 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0Minimum Split (s) 22.5 22.5 22.5 22.5 22.5 Total Split (s) 38.0 37.0 37.0 37.0 37.0Total Split (%) 50.7% 49.3% 49.3% 49.3% 49.3% Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 All-Red Time (s) 1.0 1.0 1.0 1.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 Total Lost Time (s) 4.5 4.5 4.5 4.5 Lead/LagLead-Lag Optimize? Recall Mode C-Max None None Max MaxAct Effct Green (s) 33.5 32.5 32.5 32.5 Actuated g/C Ratio 0.45 0.43 0.43 0.43 v/c Ratio 0.16 0.11 0.03 0.06Control Delay (s/veh) 3.5 13.2 12.5 4.6 Queue Delay 0.0 0.0 0.0 0.0 Total Delay (s/veh) 3.5 13.2 12.5 4.6LOS A BBA Approach Delay (s/veh) 3.6 13.3 8.0Approach LOS A B A Intersection Summary Cycle Length: 75 Actuated Cycle Length: 75 Offset: 0 (0%), Referenced to phase 2:WBTL and 6:, Start of GreenNatural Cycle: 45 Control Type: Actuated-CoordinatedMaximum v/c Ratio: 0.16 Intersection Signal Delay (s/veh): 5.4 Intersection LOS: A Intersection Capacity Utilization 26.1% ICU Level of Service AAnalysis Period (min) 15 Splits and Phases: 3: Logan Avenue & 2nd Street 24-0640 Renton Market 3: Logan Avenue & 2nd Street Existing PM Timings Existing PM 24-0640 Renton Market 10:23 am 09/06/2024 Existing PM Synchro 12 ReportCivTech Inc.Page 3 Lane Group WBT NBL NBT SBT SBR Lane ConfigurationsTraffic Volume (vph) 485 29 21 27 225 Future Volume (vph) 485 29 21 27 225Turn Type NA Perm NA NA Perm Protected Phases 2 8 4 Permitted Phases 8 4Detector Phase 28844 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0Minimum Split (s) 22.5 22.5 22.5 22.5 22.5 Total Split (s) 38.0 37.0 37.0 37.0 37.0Total Split (%) 50.7% 49.3% 49.3% 49.3% 49.3% Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 All-Red Time (s) 1.0 1.0 1.0 1.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 Total Lost Time (s) 4.5 4.5 4.5 4.5 Lead/LagLead-Lag Optimize? Recall Mode C-Max None None Max MaxAct Effct Green (s) 33.5 32.5 32.5 32.5 Actuated g/C Ratio 0.45 0.43 0.43 0.43 v/c Ratio 0.24 0.07 0.03 0.29Control Delay (s/veh) 9.6 12.9 12.4 3.4 Queue Delay 0.0 0.0 0.0 0.0 Total Delay (s/veh) 9.6 12.9 12.4 3.4LOS A BBA Approach Delay (s/veh) 9.7 12.9 4.4Approach LOS A B A Intersection Summary Cycle Length: 75 Actuated Cycle Length: 75 Offset: 0 (0%), Referenced to phase 2:WBTL and 6:, Start of GreenNatural Cycle: 45 Control Type: Actuated-CoordinatedMaximum v/c Ratio: 0.30 Intersection Signal Delay (s/veh): 8.4 Intersection LOS: A Intersection Capacity Utilization 38.8% ICU Level of Service AAnalysis Period (min) 15 Splits and Phases: 3: Logan Avenue & 2nd Street Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 24-0640 Renton Market 3: Logan Avenue & 2nd Street Existing AM HCM Signalized Intersection Capacity Analysis Existing AM 24-0640 Renton Market 1:56 pm 08/12/2024 Existing AM Synchro 12 ReportCivTech Inc.Page 4 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane ConfigurationsTraffic Volume (vph) 0 0 0 16 278 129 21 59 0 0 29 40 Future Volume (vph) 0 0 0 16 278 129 21 59 0 0 29 40Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 4.5 4.5 4.5 4.5 Lane Util. Factor 0.86 1.00 1.00 1.00Frt 0.95 1.00 1.00 0.85 Flt Protected 0.99 0.98 1.00 1.00 Satd. Flow (prot) 6103 1838 1863 1583Flt Permitted 0.99 0.94 1.00 1.00 Satd. Flow (perm) 6103 1758 1863 1583 Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 0 0 0 17 302 140 23 64 0 0 32 43 RTOR Reduction (vph)00007700000024 Lane Group Flow (vph)00003820087003219 Turn Type Perm NA Perm NA NA Perm Protected Phases 2 8 4 Permitted Phases 2 8 4Actuated Green, G (s) 33.5 32.5 32.5 32.5 Effective Green, g (s) 33.5 32.5 32.5 32.5 Actuated g/C Ratio 0.45 0.43 0.43 0.43Clearance Time (s) 4.5 4.5 4.5 4.5 Vehicle Extension (s) 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 2726 761 807 685v/s Ratio Prot 0.02 v/s Ratio Perm 0.06 c0.05 0.01 v/c Ratio 0.13 0.11 0.03 0.02Uniform Delay, d1 12.2 12.6 12.2 12.1 Progression Factor 0.40 1.00 1.00 1.00Incremental Delay, d2 0.1 0.0 0.0 0.0 Delay (s) 5.0 12.7 12.3 12.2 Level of Service A B B BApproach Delay (s/veh) 0.0 5.0 12.7 12.2 Approach LOS AABB Intersection Summary HCM 2000 Control Delay (s/veh) 7.0 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.13 Actuated Cycle Length (s) 75.0 Sum of lost time (s) 9.0 Intersection Capacity Utilization 26.1% ICU Level of Service AAnalysis Period (min) 15 c Critical Lane Group 24-0640 Renton Market 3: Logan Avenue & 2nd Street Existing PM HCM Signalized Intersection Capacity Analysis Existing PM 24-0640 Renton Market 10:23 am 09/06/2024 Existing PM Synchro 12 ReportCivTech Inc.Page 4 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane ConfigurationsTraffic Volume (vph) 0 0 0 29 485 117 29 21 0 0 27 225 Future Volume (vph) 0 0 0 29 485 117 29 21 0 0 27 225Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 4.5 4.5 4.5 4.5 Lane Util. Factor 0.86 1.00 1.00 1.00Frt 0.97 1.00 1.00 0.85 Flt Protected 0.99 0.97 1.00 1.00 Satd. Flow (prot) 6215 1810 1863 1583Flt Permitted 0.99 0.87 1.00 1.00 Satd. Flow (perm) 6215 1635 1863 1583 Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 0 0 0 32 527 127 32 23 0 0 29 245 RTOR Reduction (vph)000055000000133 Lane Group Flow (vph)000063100550029112 Turn Type Perm NA Perm NA NA Perm Protected Phases 2 8 4 Permitted Phases 2 8 4Actuated Green, G (s) 33.5 32.5 32.5 32.5 Effective Green, g (s) 33.5 32.5 32.5 32.5 Actuated g/C Ratio 0.45 0.43 0.43 0.43Clearance Time (s) 4.5 4.5 4.5 4.5 Vehicle Extension (s) 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 2776 708 807 685v/s Ratio Prot 0.02 v/s Ratio Perm 0.10 0.03 c0.07 v/c Ratio 0.22 0.07 0.03 0.16Uniform Delay, d1 12.7 12.4 12.2 12.9 Progression Factor 0.86 1.00 1.00 1.00Incremental Delay, d2 0.1 0.0 0.0 0.5 Delay (s) 11.2 12.5 12.3 13.4 Level of Service B B B BApproach Delay (s/veh) 0.0 11.2 12.5 13.3 Approach LOS ABBB Intersection Summary HCM 2000 Control Delay (s/veh) 11.9 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.20 Actuated Cycle Length (s) 75.0 Sum of lost time (s) 9.0 Intersection Capacity Utilization 38.8% ICU Level of Service AAnalysis Period (min) 15 c Critical Lane Group Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 24-0640 Renton Market 4: Pavilion Center Driveway & Logan Avenue Existing AM HCM 7th TWSC Existing AM 24-0640 Renton Market 1:56 pm 08/12/2024 Existing AM Synchro 12 ReportCivTech Inc.Page 6 Intersection Int Delay, s/veh 0.7 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 2 5 66 2 4 56 Future Vol, veh/h 2 5 66 2 4 56Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free FreeRT Channelized - None - None - None Storage Length 0 - - - - - Veh in Median Storage, # 0 - 0 - - 0Grade, % 0 - 0 - - 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2Mvmt Flow 25722461 Major/Minor Minor1 Major1 Major2 Conflicting Flow All 142 73 0 0 74 0 Stage 1 73 - - - - - Stage 2 70 - - - - - Critical Hdwy 6.42 6.22 - - 4.12 -Critical Hdwy Stg 15.42----- Critical Hdwy Stg 25.42-----Follow-up Hdwy 3.518 3.318 - - 2.218 - Pot Cap-1 Maneuver 850 989 - - 1526 - Stage 1 950 - - - - - Stage 2 953 - - - - - Platoon blocked, % - - - Mov Cap-1 Maneuver 848 989 - - 1526 -Mov Cap-2 Maneuver 848 - - - - - Stage 1 950 - - - - - Stage 2 950 - - - - - Approach WB NB SB HCM Control Delay, s/v 8.84 0 0.49HCM LOS A Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT Capacity (veh/h) - - 944 120 - HCM Lane V/C Ratio - - 0.008 0.003 -HCM Control Delay (s/veh) - - 8.8 7.4 0 HCM Lane LOS - - A A AHCM 95th %tile Q(veh) - - 0 0 - 24-0640 Renton Market 4: Pavilion Center Driveway & Logan Avenue Existing PM HCM 7th TWSC Existing PM 24-0640 Renton Market 10:23 am 09/06/2024 Existing PM Synchro 12 ReportCivTech Inc.Page 6 Intersection Int Delay, s/veh 7.4 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 0 9 1 0 11 0 Future Vol, veh/h 0 9 1 0 11 0Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free FreeRT Channelized - None - None - None Storage Length 0 ----- Veh in Median Storage, # 0 - 0 - - 0Grade, % 0 - 0 - - 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2Mvmt Flow 01010120 Major/Minor Minor1 Major1 Major2 Conflicting Flow All 25 1 0 0 1 0 Stage 1 1 ----- Stage 2 24 ----- Critical Hdwy 6.42 6.22 - - 4.12 -Critical Hdwy Stg 15.42----- Critical Hdwy Stg 25.42-----Follow-up Hdwy 3.518 3.318 - - 2.218 - Pot Cap-1 Maneuver 991 1083 - - 1622 - Stage 1 1022 ----- Stage 2 999 ----- Platoon blocked, % - - - Mov Cap-1 Maneuver 983 1083 - - 1622 -Mov Cap-2 Maneuver 983 ----- Stage 1 1022 ----- Stage 2 991 ----- Approach WB NB SB HCM Control Delay, s/v 8.35 0 7.24HCM LOS A Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT Capacity (veh/h) - - 1083 1622 - HCM Lane V/C Ratio - - 0.009 0.007 -HCM Control Delay (s/veh) - - 8.4 7.2 0 HCM Lane LOS - - A A AHCM 95th %tile Q(veh) - - 0 0 - Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 24-0640 Renton Market 5: Logan Avenue & Driveway n/of 3rd Street Existing AM HCM 7th TWSC Existing AM 24-0640 Renton Market 1:56 pm 08/12/2024 Existing AM Synchro 12 ReportCivTech Inc.Page 8 Intersection Int Delay, s/veh 0.4 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 1 5 0 63 60 6 Future Vol, veh/h 1 5 0 63 60 6Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free FreeRT Channelized - None - None - None Storage Length - 0 - - - - Veh in Median Storage, # 0 - - 0 0 -Grade, % 0 - - 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2Mvmt Flow 1 5 06865 7 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 137 68 - 0 - 0 Stage 1 68 - - - - - Stage 2 68 - - - - - Critical Hdwy 6.42 6.22 - - - -Critical Hdwy Stg 15.42----- Critical Hdwy Stg 25.42-----Follow-up Hdwy 3.518 3.318 - - - - Pot Cap-1 Maneuver 856 995 0 - - - Stage 1 954 - 0 - - - Stage 2 954 - 0 - - - Platoon blocked, % - - - Mov Cap-1 Maneuver 856 995 - - - -Mov Cap-2 Maneuver 856 - - - - - Stage 1 954 - - - - - Stage 2 954 - - - - - Approach EB NB SB HCM Control Delay, s/v 8.64 0 0HCM LOS A Minor Lane/Major Mvmt NBTEBLn1 SBT SBR Capacity (veh/h) - 995 - - HCM Lane V/C Ratio - 0.005 - -HCM Control Delay (s/veh) - 8.6 - - HCM Lane LOS - A - -HCM 95th %tile Q(veh) - 0 - - 24-0640 Renton Market 5: Logan Avenue & Driveway n/of 3rd Street Existing PM HCM 7th TWSC Existing PM 24-0640 Renton Market 10:23 am 09/06/2024 Existing PM Synchro 12 ReportCivTech Inc.Page 8 Intersection Int Delay, s/veh 0 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 0 0 0 0 0 0 Future Vol, veh/h 0 0 0 0 0 0Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free FreeRT Channelized - None - None - None Storage Length - 0 ---- Veh in Median Storage, # 0 - - 0 0 -Grade, % 0 - - 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2Mvmt Flow 0 0 0 0 0 0 Major/Minor Minor2 Major1 Major2 Conflicting Flow All - 1 - 0 - 0 Stage 1 ------ Stage 2 ------ Critical Hdwy - 6.22 - - - -Critical Hdwy Stg 1 ------ Critical Hdwy Stg 2 ------Follow-up Hdwy -3.318---- Pot Cap-1 Maneuver 0 1083 0 - - - Stage 1 0 - 0 - - - Stage 2 0 - 0 - - - Platoon blocked, % - - - Mov Cap-1 Maneuver - 1083 ----Mov Cap-2 Maneuver ------ Stage 1 ------ Stage 2 ------ Approach EB NB SB HCM Control Delay, s/v 0 0 0HCM LOS A Minor Lane/Major Mvmt NBTEBLn1 SBT SBR Capacity (veh/h)---- HCM Lane V/C Ratio ----HCM Control Delay (s/veh) - 0 - - HCM Lane LOS - A - -HCM 95th %tile Q(veh) ---- Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 24-0640 Renton Market 6: 3rd Street & Logan Avenue Existing AM Timings Existing AM 24-0640 Renton Market 1:56 pm 08/12/2024 Existing AM Synchro 12 ReportCivTech Inc.Page 9 Lane Group EBT NBR SBL Lane ConfigurationsTraffic Volume (vph) 207 9 66 Future Volume (vph) 207 9 66Turn Type NA Perm Prot Protected Phases 2 4 Permitted Phases 3Detector Phase 2 3 4 Switch Phase Minimum Initial (s) 5.0 5.0 5.0Minimum Split (s) 22.5 22.5 23.0 Total Split (s) 25.0 10.0 15.0Total Split (%) 50.0% 20.0% 30.0% Yellow Time (s) 3.5 3.5 4.0 All-Red Time (s) 1.0 1.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 Total Lost Time (s) 4.5 4.5 5.0 Lead/Lag Lead LagLead-Lag Optimize? Yes Yes Recall Mode C-Max None MaxAct Effct Green (s) 20.5 5.5 18.0 Actuated g/C Ratio 0.41 0.11 0.36 v/c Ratio 0.20 0.01 0.11Control Delay (s/veh) 9.9 0.0 13.3 Queue Delay 0.0 0.0 0.0 Total Delay (s/veh) 9.9 0.0 13.3LOS AAB Approach Delay (s/veh) 9.9Approach LOS A Intersection Summary Cycle Length: 50 Actuated Cycle Length: 50 Offset: 0 (0%), Referenced to phase 2:EBTL and 6:, Start of GreenNatural Cycle: 70 Control Type: Actuated-CoordinatedMaximum v/c Ratio: 0.20 Intersection Signal Delay (s/veh): 10.3 Intersection LOS: B Intersection Capacity Utilization 26.1% ICU Level of Service AAnalysis Period (min) 15 Splits and Phases: 6: 3rd Street & Logan Avenue 24-0640 Renton Market 6: 3rd Street & Logan Avenue Existing PM Timings Existing PM 24-0640 Renton Market 10:23 am 09/06/2024 Existing PM Synchro 12 ReportCivTech Inc.Page 9 Lane Group EBT NBR Ø4 Lane ConfigurationsTraffic Volume (vph) 827 17 Future Volume (vph) 827 17Turn Type NA Perm Protected Phases 2 4 Permitted Phases 3Detector Phase 2 3 Switch Phase Minimum Initial (s) 5.0 5.0 5.0Minimum Split (s) 22.5 22.5 23.0 Total Split (s) 25.0 10.0 15.0Total Split (%) 50.0% 20.0% 30% Yellow Time (s) 3.5 3.5 4.0 All-Red Time (s) 1.0 1.0 1.0Lost Time Adjust (s) 0.0 0.0 Total Lost Time (s) 4.5 4.5 Lead/Lag Lead LagLead-Lag Optimize? Yes Yes Recall Mode C-Max None MaxAct Effct Green (s) 20.5 5.5 Actuated g/C Ratio 0.41 0.11 v/c Ratio 0.64 0.03Control Delay (s/veh) 14.2 0.1 Queue Delay 0.0 0.0 Total Delay (s/veh) 14.2 0.1LOS B A Approach Delay (s/veh) 14.2Approach LOS B Intersection Summary Cycle Length: 50 Actuated Cycle Length: 50 Offset: 0 (0%), Referenced to phase 2:EBTL and 6:, Start of GreenNatural Cycle: 70 Control Type: Actuated-CoordinatedMaximum v/c Ratio: 0.64 Intersection Signal Delay (s/veh): 14.0 Intersection LOS: B Intersection Capacity Utilization 35.4% ICU Level of Service AAnalysis Period (min) 15 Splits and Phases: 6: 3rd Street & Logan Avenue Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 24-0640 Renton Market 6: 3rd Street & Logan Avenue Existing AM HCM Signalized Intersection Capacity Analysis Existing AM 24-0640 Renton Market 1:56 pm 08/12/2024 Existing AM Synchro 12 ReportCivTech Inc.Page 10 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane ConfigurationsTraffic Volume (vph) 5820720000096600 Future Volume (vph) 5820720000096600Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 4.5 4.5 5.0 Lane Util. Factor 0.95 1.00 1.00Frt 0.99 0.86 1.00 Flt Protected 0.98 1.00 0.95 Satd. Flow (prot) 3498 1611 1770Flt Permitted 0.98 1.00 0.95 Satd. Flow (perm) 3498 1611 1770 Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 63225200000107200 RTOR Reduction (vph)0100000010000 Lane Group Flow (vph) 0 28900000007200 Turn Type Perm NA Perm Prot Protected Phases 2 4 Permitted Phases 2 3Actuated Green, G (s) 16.9 1.1 18.0 Effective Green, g (s) 16.9 1.1 18.0 Actuated g/C Ratio 0.34 0.02 0.36Clearance Time (s) 4.5 4.5 5.0 Vehicle Extension (s) 3.0 3.0 3.0 Lane Grp Cap (vph) 1182 35 637v/s Ratio Prot c0.04 v/s Ratio Perm 0.08 c0.00 v/c Ratio 0.24 0.00 0.11Uniform Delay, d1 11.9 23.9 10.6 Progression Factor 1.00 1.00 1.00Incremental Delay, d2 0.4 0.0 0.3 Delay (s) 12.4 23.9 11.0 Level of Service B C BApproach Delay (s/veh) 12.4 0.0 23.9 11.0 Approach LOS B A C B Intersection Summary HCM 2000 Control Delay (s/veh) 12.5 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.17 Actuated Cycle Length (s) 50.0 Sum of lost time (s) 14.0 Intersection Capacity Utilization 26.1% ICU Level of Service AAnalysis Period (min) 15 c Critical Lane Group 24-0640 Renton Market 6: 3rd Street & Logan Avenue Existing PM HCM Signalized Intersection Capacity Analysis Existing PM 24-0640 Renton Market 10:23 am 09/06/2024 Existing PM Synchro 12 ReportCivTech Inc.Page 10 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane ConfigurationsTraffic Volume (vph) 0827290000017000 Future Volume (vph) 0827290000017000Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 4.5 4.5 Lane Util. Factor 0.95 1.00Frt 0.99 0.86 Flt Protected 1.00 1.00 Satd. Flow (prot) 3521 1611Flt Permitted 1.00 1.00 Satd. Flow (perm) 3521 1611 Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 0899320000018000 RTOR Reduction (vph)0600000018000 Lane Group Flow (vph) 0 9250000000000 Turn Type NA Perm Prot Protected Phases 2 4 Permitted Phases 2 3Actuated Green, G (s) 16.9 1.1 Effective Green, g (s) 16.9 1.1 Actuated g/C Ratio 0.34 0.02Clearance Time (s) 4.5 4.5 Vehicle Extension (s) 3.0 3.0 Lane Grp Cap (vph) 1190 35v/s Ratio Prot c0.26 v/s Ratio Perm c0.00 v/c Ratio 0.77 0.01Uniform Delay, d1 14.8 23.9 Progression Factor 1.00 1.00Incremental Delay, d2 5.0 0.1 Delay (s) 19.8 24.0 Level of Service B CApproach Delay (s/veh) 19.8 0.0 24.0 0.0 Approach LOS B A C A Intersection Summary HCM 2000 Control Delay (s/veh) 20.0 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.37 Actuated Cycle Length (s) 50.0 Sum of lost time (s) 14.0 Intersection Capacity Utilization 35.4% ICU Level of Service AAnalysis Period (min) 15 c Critical Lane Group Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 24-0640 Renton Market 7: Burnett Avenue & 2nd Street Existing AM Timings Existing AM 24-0640 Renton Market 1:56 pm 08/12/2024 Existing AM Synchro 12 ReportCivTech Inc.Page 11 Lane Group WBT NBL NBT SBT SBR Lane ConfigurationsTraffic Volume (vph) 359 58 16 6 21 Future Volume (vph) 359 58 16 6 21Turn Type NA Prot NA NA Perm Protected Phases 2384 Permitted Phases 4Detector Phase 23844 Switch Phase Minimum Initial (s) 5.0 5.0 4.0 5.0 5.0Minimum Split (s) 23.0 9.5 23.0 23.0 23.0 Total Split (s) 25.0 25.0 50.0 25.0 25.0Total Split (%) 33.3% 33.3% 66.7% 33.3% 33.3% Yellow Time (s) 4.0 3.5 4.0 4.0 4.0 All-Red Time (s) 1.0 1.0 1.0 1.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 5.0 4.5 5.0 5.0 5.0 Lead/Lag Lead Lag LagLead-Lag Optimize? Yes Yes Yes Recall Mode C-Max None Max Max MaxAct Effct Green (s) 20.0 8.1 45.0 36.7 36.7 Actuated g/C Ratio 0.27 0.11 0.60 0.49 0.49 v/c Ratio 0.32 0.33 0.01 0.00 0.02Control Delay (s/veh) 22.5 34.9 6.1 13.3 0.0 Queue Delay 0.0 0.0 0.0 0.0 0.0 Total Delay (s/veh) 22.5 34.9 6.1 13.3 0.0LOS CCABA Approach Delay (s/veh) 22.5 28.8 3.1Approach LOS C C A Intersection Summary Cycle Length: 75 Actuated Cycle Length: 75 Offset: 0 (0%), Referenced to phase 2:WBTL, Start of GreenNatural Cycle: 60 Control Type: Actuated-CoordinatedMaximum v/c Ratio: 0.33 Intersection Signal Delay (s/veh): 22.4 Intersection LOS: C Intersection Capacity Utilization 28.0% ICU Level of Service AAnalysis Period (min) 15 Splits and Phases: 7: Burnett Avenue & 2nd Street 24-0640 Renton Market 7: Burnett Avenue & 2nd Street Existing PM Timings Existing PM 24-0640 Renton Market 10:23 am 09/06/2024 Existing PM Synchro 12 ReportCivTech Inc.Page 11 Lane Group WBT NBL NBT SBT SBR Lane ConfigurationsTraffic Volume (vph) 474 164 32 16 17 Future Volume (vph) 474 164 32 16 17Turn Type NA Prot NA NA Perm Protected Phases 2384 Permitted Phases 4Detector Phase 23844 Switch Phase Minimum Initial (s) 5.0 5.0 4.0 5.0 5.0Minimum Split (s) 23.0 9.5 23.0 23.0 23.0 Total Split (s) 25.0 25.0 50.0 25.0 25.0Total Split (%) 33.3% 33.3% 66.7% 33.3% 33.3% Yellow Time (s) 4.0 3.5 4.0 4.0 4.0 All-Red Time (s) 1.0 1.0 1.0 1.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 5.0 4.5 5.0 5.0 5.0 Lead/Lag Lead Lag LagLead-Lag Optimize? Yes Yes Yes Recall Mode C-Max None Max Max MaxAct Effct Green (s) 20.0 12.8 45.0 27.7 27.7 Actuated g/C Ratio 0.27 0.17 0.60 0.37 0.37 v/c Ratio 0.43 0.58 0.03 0.02 0.02Control Delay (s/veh) 23.8 36.1 6.2 17.3 0.0 Queue Delay 0.0 0.0 0.0 0.0 0.0 Total Delay (s/veh) 23.8 36.1 6.2 17.3 0.0LOS CDABA Approach Delay (s/veh) 23.8 31.2 8.5Approach LOS C C A Intersection Summary Cycle Length: 75 Actuated Cycle Length: 75 Offset: 0 (0%), Referenced to phase 2:WBTL, Start of GreenNatural Cycle: 60 Control Type: Actuated-CoordinatedMaximum v/c Ratio: 0.59 Intersection Signal Delay (s/veh): 25.1 Intersection LOS: C Intersection Capacity Utilization 35.9% ICU Level of Service AAnalysis Period (min) 15 Splits and Phases: 7: Burnett Avenue & 2nd Street Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 24-0640 Renton Market 7: Burnett Avenue & 2nd Street Existing AM HCM Signalized Intersection Capacity Analysis Existing AM 24-0640 Renton Market 1:56 pm 08/12/2024 Existing AM Synchro 12 ReportCivTech Inc.Page 12 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane ConfigurationsTraffic Volume (vph) 0003335916581600621 Future Volume (vph) 0003335916581600621Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 5.0 4.5 5.0 5.0 5.0 Lane Util. Factor 0.91 1.00 1.00 1.00 1.00Frt 0.99 1.00 1.00 1.00 0.85 Flt Protected 0.99 0.95 1.00 1.00 1.00 Satd. Flow (prot) 5036 1770 1863 1863 1583Flt Permitted 0.99 0.95 1.00 1.00 1.00 Satd. Flow (perm) 5036 1770 1863 1863 1583 Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 0003639017631700723 RTOR Reduction (vph)0000600000012 Lane Group Flow (vph)00004370631700711 Turn Type Perm NA Prot NA NA Perm Protected Phases 2 3 8 4 Permitted Phases 2 4Actuated Green, G (s) 18.2 5.6 46.8 36.7 36.7 Effective Green, g (s) 18.2 5.6 46.8 36.7 36.7 Actuated g/C Ratio 0.24 0.07 0.62 0.49 0.49Clearance Time (s) 5.0 4.5 5.0 5.0 5.0 Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 1222 132 1162 911 774v/s Ratio Prot c0.04 c0.01 0.00 v/s Ratio Perm 0.09 0.01 v/c Ratio 0.35 0.47 0.01 0.00 0.01Uniform Delay, d1 23.5 33.2 5.3 9.8 9.8 Progression Factor 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.8 2.7 0.0 0.0 0.0 Delay (s) 24.3 36.0 5.3 9.8 9.8 Level of Service C D A A AApproach Delay (s/veh) 0.0 24.3 29.4 9.8 Approach LOS A C C A Intersection Summary HCM 2000 Control Delay (s/veh) 24.3 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.16 Actuated Cycle Length (s) 75.0 Sum of lost time (s) 14.5 Intersection Capacity Utilization 28.0% ICU Level of Service AAnalysis Period (min) 15 c Critical Lane Group 24-0640 Renton Market 7: Burnett Avenue & 2nd Street Existing PM HCM Signalized Intersection Capacity Analysis Existing PM 24-0640 Renton Market 10:23 am 09/06/2024 Existing PM Synchro 12 ReportCivTech Inc.Page 12 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane ConfigurationsTraffic Volume (vph) 0 0 0 52 474 14 164 32 0 0 16 17 Future Volume (vph) 0 0 0 52 474 14 164 32 0 0 16 17Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 5.0 4.5 5.0 5.0 5.0 Lane Util. Factor 0.91 1.00 1.00 1.00 1.00Frt 0.99 1.00 1.00 1.00 0.85 Flt Protected 0.99 0.95 1.00 1.00 1.00 Satd. Flow (prot) 5041 1770 1863 1863 1583Flt Permitted 0.99 0.95 1.00 1.00 1.00 Satd. Flow (perm) 5041 1770 1863 1863 1583 Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 0 0 0 57 515 15 178 35 0 0 17 18 RTOR Reduction (vph)0000400000011 Lane Group Flow (vph)000058301783500177 Turn Type Perm NA Prot NA NA Perm Protected Phases 2 3 8 4 Permitted Phases 2 4Actuated Green, G (s) 20.0 12.8 45.0 27.7 27.7 Effective Green, g (s) 20.0 12.8 45.0 27.7 27.7 Actuated g/C Ratio 0.27 0.17 0.60 0.37 0.37Clearance Time (s) 5.0 4.5 5.0 5.0 5.0 Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 1344 302 1117 688 584v/s Ratio Prot c0.10 c0.02 0.01 v/s Ratio Perm 0.12 0.00 v/c Ratio 0.43 0.58 0.03 0.02 0.01Uniform Delay, d1 22.8 28.6 6.1 15.0 14.9 Progression Factor 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 1.0 2.9 0.0 0.0 0.0 Delay (s) 23.8 31.6 6.1 15.1 15.0 Level of Service C C A B BApproach Delay (s/veh) 0.0 23.8 27.4 15.0 Approach LOS A C C B Intersection Summary HCM 2000 Control Delay (s/veh) 24.4 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.28 Actuated Cycle Length (s) 75.0 Sum of lost time (s) 14.5 Intersection Capacity Utilization 35.9% ICU Level of Service AAnalysis Period (min) 15 c Critical Lane Group Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 24-0640 Renton Market 8: 3rd Street & Burnett Avenue Existing AM Timings Existing AM 24-0640 Renton Market 1:56 pm 08/12/2024 Existing AM Synchro 12 ReportCivTech Inc.Page 13 Lane Group EBT EBR NBT NBR SBL SBT Lane ConfigurationsTraffic Volume (vph) 203 36 40 26 23 16 Future Volume (vph) 203 36 40 26 23 16Turn Type NA Perm NA Perm Perm NA Protected Phases 6 8 4 Permitted Phases 6 8 4Detector Phase 668844 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 4.0 4.0Minimum Split (s) 29.0 29.0 29.0 29.0 20.0 20.0 Total Split (s) 34.0 34.0 31.0 31.0 31.0 31.0Total Split (%) 52.3% 52.3% 47.7% 47.7% 47.7% 47.7% Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 All-Red Time (s) 1.0 1.0 10.0 10.0 1.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 5.0 5.0 14.0 14.0 5.0 Lead/LagLead-Lag Optimize? Recall Mode C-Max C-Max Max Max Max MaxAct Effct Green (s) 29.0 29.0 17.0 17.0 26.0 Actuated g/C Ratio 0.45 0.45 0.26 0.26 0.40 v/c Ratio 0.16 0.04 0.08 0.06 0.06Control Delay (s/veh) 11.1 0.1 18.8 6.8 12.4 Queue Delay 0.0 0.0 0.0 0.0 0.0 Total Delay (s/veh) 11.1 0.1 18.8 6.8 12.4LOS BABA B Approach Delay (s/veh) 9.8 14.1 12.4Approach LOS A B B Intersection Summary Cycle Length: 65 Actuated Cycle Length: 65 Offset: 0 (0%), Referenced to phase 2: and 6:EBTL, Start of GreenNatural Cycle: 60 Control Type: Actuated-CoordinatedMaximum v/c Ratio: 0.17 Intersection Signal Delay (s/veh): 10.8 Intersection LOS: B Intersection Capacity Utilization 34.3% ICU Level of Service AAnalysis Period (min) 15 Splits and Phases: 8: 3rd Street & Burnett Avenue 24-0640 Renton Market 8: 3rd Street & Burnett Avenue Existing PM Timings Existing PM 24-0640 Renton Market 10:23 am 09/06/2024 Existing PM Synchro 12 ReportCivTech Inc.Page 13 Lane Group EBT EBR NBT NBR SBL SBT Lane ConfigurationsTraffic Volume (vph) 606 127 68 81 36 44 Future Volume (vph) 606 127 68 81 36 44Turn Type NA Perm NA Perm Perm NA Protected Phases 6 8 4 Permitted Phases 6 8 4Detector Phase 668844 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 4.0 4.0Minimum Split (s) 29.0 29.0 29.0 29.0 20.0 20.0 Total Split (s) 34.0 34.0 31.0 31.0 31.0 31.0Total Split (%) 52.3% 52.3% 47.7% 47.7% 47.7% 47.7% Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 All-Red Time (s) 1.0 1.0 10.0 10.0 1.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 5.0 5.0 14.0 14.0 5.0 Lead/LagLead-Lag Optimize? Recall Mode C-Max C-Max Max Max Max MaxAct Effct Green (s) 29.0 29.0 17.0 17.0 26.0 Actuated g/C Ratio 0.45 0.45 0.26 0.26 0.40 v/c Ratio 0.49 0.17 0.15 0.18 0.13Control Delay (s/veh) 14.2 1.4 19.5 6.1 13.1 Queue Delay 1.0 0.0 0.0 0.0 0.0 Total Delay (s/veh) 15.3 1.4 19.5 6.1 13.1LOS BABA B Approach Delay (s/veh) 13.2 12.3 13.1Approach LOS B B B Intersection Summary Cycle Length: 65 Actuated Cycle Length: 65 Offset: 0 (0%), Referenced to phase 2: and 6:EBTL, Start of GreenNatural Cycle: 60 Control Type: Actuated-CoordinatedMaximum v/c Ratio: 0.50 Intersection Signal Delay (s/veh): 13.1 Intersection LOS: B Intersection Capacity Utilization 49.3% ICU Level of Service AAnalysis Period (min) 15 Splits and Phases: 8: 3rd Street & Burnett Avenue Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 24-0640 Renton Market 8: 3rd Street & Burnett Avenue Existing AM HCM Signalized Intersection Capacity Analysis Existing AM 24-0640 Renton Market 1:56 pm 08/12/2024 Existing AM Synchro 12 ReportCivTech Inc.Page 14 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane ConfigurationsTraffic Volume (vph) 41203360000402623160 Future Volume (vph) 41203360000402623160Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 5.0 5.0 14.0 14.0 5.0 Lane Util. Factor 0.95 1.00 1.00 1.00 1.00Frt 1.00 0.85 1.00 0.85 1.00 Flt Protected 0.99 1.00 1.00 1.00 0.97 Satd. Flow (prot) 3510 1583 1863 1583 1809Flt Permitted 0.99 1.00 1.00 1.00 0.87 Satd. Flow (perm) 3510 1583 1863 1583 1631 Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 45221390000432825170 RTOR Reduction (vph) 0 0 220000021000 Lane Group Flow (vph) 0 266 1700004370420 Turn Type Perm NA Perm NA Perm Perm NA Protected Phases 6 8 4 Permitted Phases 6 6 8 4Actuated Green, G (s) 29.0 29.0 17.0 17.0 26.0 Effective Green, g (s) 29.0 29.0 17.0 17.0 26.0 Actuated g/C Ratio 0.45 0.45 0.26 0.26 0.40Clearance Time (s) 5.0 5.0 14.0 14.0 5.0 Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 1566 706 487 414 652v/s Ratio Prot 0.02 v/s Ratio Perm 0.08 0.01 0.00 c0.03 v/c Ratio 0.16 0.02 0.08 0.01 0.06Uniform Delay, d1 10.7 10.0 18.1 17.8 12.0 Progression Factor 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.2 0.0 0.3 0.0 0.1 Delay (s) 11.0 10.1 18.4 17.8 12.1 Level of Service B B B B BApproach Delay (s/veh) 10.9 0.0 18.2 12.1 Approach LOS BABB Intersection Summary HCM 2000 Control Delay (s/veh) 12.3 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.14 Actuated Cycle Length (s) 65.0 Sum of lost time (s) 19.0 Intersection Capacity Utilization 34.3% ICU Level of Service AAnalysis Period (min) 15 c Critical Lane Group 24-0640 Renton Market 8: 3rd Street & Burnett Avenue Existing PM HCM Signalized Intersection Capacity Analysis Existing PM 24-0640 Renton Market 10:23 am 09/06/2024 Existing PM Synchro 12 ReportCivTech Inc.Page 14 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane ConfigurationsTraffic Volume (vph) 1126061270000688136440 Future Volume (vph) 1126061270000688136440Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 5.0 5.0 14.0 14.0 5.0 Lane Util. Factor 0.95 1.00 1.00 1.00 1.00Frt 1.00 0.85 1.00 0.85 1.00 Flt Protected 0.99 1.00 1.00 1.00 0.97 Satd. Flow (prot) 3512 1583 1863 1583 1822Flt Permitted 0.99 1.00 1.00 1.00 0.87 Satd. Flow (perm) 3512 1583 1863 1583 1632 Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 1226591380000748839480 RTOR Reduction (vph) 0 0 760000065000 Lane Group Flow (vph) 0 781 62000074230870 Turn Type Perm NA Perm NA Perm Perm NA Protected Phases 6 8 4 Permitted Phases 6 6 8 4Actuated Green, G (s) 29.0 29.0 17.0 17.0 26.0 Effective Green, g (s) 29.0 29.0 17.0 17.0 26.0 Actuated g/C Ratio 0.45 0.45 0.26 0.26 0.40Clearance Time (s) 5.0 5.0 14.0 14.0 5.0 Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 1566 706 487 414 652v/s Ratio Prot 0.04 v/s Ratio Perm 0.22 0.04 0.01 c0.05 v/c Ratio 0.49 0.08 0.15 0.05 0.13Uniform Delay, d1 12.8 10.3 18.4 17.9 12.3 Progression Factor 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 1.1 0.2 0.6 0.2 0.4 Delay (s) 13.9 10.6 19.1 18.2 12.7 Level of Service B B B B BApproach Delay (s/veh) 13.4 0.0 18.6 12.7 Approach LOS BABB Intersection Summary HCM 2000 Control Delay (s/veh) 14.1 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.39 Actuated Cycle Length (s) 65.0 Sum of lost time (s) 19.0 Intersection Capacity Utilization 49.3% ICU Level of Service AAnalysis Period (min) 15 c Critical Lane Group Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 24-0640 Renton Market 22: 2nd Street & Burnett Place Existing AM HCM Unsignalized Intersection Capacity Analysis Existing AM 24-0640 Renton Market 1:56 pm 08/12/2024 Existing AM Synchro 12 ReportCivTech Inc.Page 15 Movement EBL EBT WBT WBR SBL SBR Lane ConfigurationsTraffic Volume (veh/h) 00359502 Future Volume (Veh/h) 00359502Sign Control Free Free Stop Grade 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 00390502 Pedestrians Lane Width (ft)Walking Speed (ft/s) Percent BlockageRight turn flare (veh) Median type None None Median storage veh)Upstream signal (ft) 258 54 pX, platoon unblocked vC, conflicting volume 395 393 100vC1, stage 1 conf vol vC2, stage 2 conf volvCu, unblocked vol 395 393 100 tC, single (s) 4.1 6.8 6.9 tC, 2 stage (s)tF (s) 2.2 3.5 3.3 p0 queue free % 100 100 100 cM capacity (veh/h) 1160 584 936 Direction, Lane # WB 1 WB 2 WB 3 WB 4 SB 1 Volume Total 111 111 111 61 2 Volume Left 00000 Volume Right 00052cSH 1700 1700 1700 1700 936 Volume to Capacity 0.07 0.07 0.07 0.04 0.00 Queue Length 95th (ft)00000Control Delay (s/veh) 0.0 0.0 0.0 0.0 8.9 Lane LOS AApproach Delay (s/veh) 0.0 8.9 Approach LOS A Intersection Summary Average Delay 0.0Intersection Capacity Utilization 15.3% ICU Level of Service A Analysis Period (min) 15 24-0640 Renton Market 22: 2nd Street & Burnett Place Existing PM HCM Unsignalized Intersection Capacity Analysis Existing PM 24-0640 Renton Market 10:23 am 09/06/2024 Existing PM Synchro 12 ReportCivTech Inc.Page 15 Movement EBL EBT WBT WBR SBL SBR Lane ConfigurationsTraffic Volume (veh/h) 00359502 Future Volume (Veh/h) 00359502Sign Control Free Free Stop Grade 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 00390502 Pedestrians Lane Width (ft)Walking Speed (ft/s) Percent BlockageRight turn flare (veh) Median type None None Median storage veh)Upstream signal (ft) 258 54 pX, platoon unblocked vC, conflicting volume 395 393 100vC1, stage 1 conf vol vC2, stage 2 conf volvCu, unblocked vol 395 393 100 tC, single (s) 4.1 6.8 6.9 tC, 2 stage (s)tF (s) 2.2 3.5 3.3 p0 queue free % 100 100 100 cM capacity (veh/h) 1160 584 936 Direction, Lane # WB 1 WB 2 WB 3 WB 4 SB 1 Volume Total 111 111 111 61 2 Volume Left 00000 Volume Right 00052cSH 1700 1700 1700 1700 936 Volume to Capacity 0.07 0.07 0.07 0.04 0.00 Queue Length 95th (ft)00000Control Delay (s/veh) 0.0 0.0 0.0 0.0 8.9 Lane LOS AApproach Delay (s/veh) 0.0 8.9 Approach LOS A Intersection Summary Average Delay 0.0Intersection Capacity Utilization 15.3% ICU Level of Service A Analysis Period (min) 15 Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 Renton Market – Renton, Washington Traffic Impact Analysis 37 APPENDIX D: CRASH ANALYSIS WORKSHEETS Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 Renton Market – Renton, Washington Traffic Impact Analysis 38 APPENDIX E: TRIP GENERATION CALCULATIONS Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 Renton Market Trip Generation Proposed Methodology Overview Box 1 - Define Study Site Land Use Type&Site Characteristics,| Box 2 - Define Site Context | Box 3 - Define Analysis Objectives Trip Types&Time Period Land Use Types and Size Proposed Use Amount Units ITE LUC ITE Land Use Name Food Cart Pod 12 Food Carts 926 Food Cart Pod Sit Down Restaurant 3.210 1,000 square feet 932 High Turnover(Sit Down) Restaurant Box 4 - Is Study Site Multimodal? Box 5/Box 9 - Estimate Baseline Trips/Estimate Vehicular Trips (Determine Equation) Equation Type: Equation Used [Equated Rate] (Type Abbreviations: Weighted Average Rate ("WA"), Fitted Curve (Type: Equation Used [Equated Rate] Proposed Use ADT AM Peak Hour PM Peak Hour (not used) Food Cart Pod C: T=X*23.7 [23.70]C: T=X*0.35 [0.35] FC: T=6.98*X-7.59 [6.35]N/A: [] Sit Down Restaurant WA: T=X*107.2 [107.20] WA: T=X*9.57 [9.57] WA: T=X*9.05 [9.05]N/A: [] October 2024 This form facilitates trip generation estimation using data within the Institute of Transportation Engineer's (ITE) Trip Generation Manual, 11th Edition and methodology described within ITE's Trip Generation Handbook, 3rd Edition. These references will be referred to as Manual and Handbook, respectively. The Manual contains data collected by various transportation professionals for a wide range of different land uses, with each land use category represented by a land use code (LUC). Average rates and equations have been established that correlate the relationship between an independent variable that describes the development size and generated trips for each categorized LUC in various settings and time periods. The Handbook indicates an established methodology for how to use data contained within the Manual when to use the fitted curve instead of the average rate and when to adjustments to the volume of trips are appropriate and how to do so. The methodology steps are represented visually in boxes in Figure 3.1. This worksheet applies calculations for each box if applicable. The analyst is to pick an appropriate LUC(s) based on the subject's zoning/land use(s)/future land use(s). The size of the land use(s) is described in reference to an independent variable(s) specific to (each) the land use (example: 1,000 square feet of building area is relatively common). Context assessment is to "simply determine whether the study sites is in a multimodal setting" and "could have persons accessing the site by walking, bicycling, or riding transit." This assessment is used in Box 4. The Manual separates data into 4 setting categories - Rural, General Urban/Suburban, Dense Multi-Urban Use and Center City Core. This worksheet uses the following abbreviations, respectively: R, G, D, and C. The Manual does not have data for all settings of all land use codes. The "General Urban/Suburban" setting is used by default. This tool will focus on vehicular trips for a 24-hour period on a typical weekday as well as its AM peak hour and PM peak hour. Other time period(s) may be of interest. Vehicle trips are estimated using rates/equations applicable to each LUC. When the appropriate graph has a fitted curve, the Handbook has a process (Figure 4.2) to determine when to use it versus using the weighted average rate or collecting local data. The methodology requires for engineering judgement in some circumstances and permits engineering judgement to override or make adjustments when appropriate to best project (example 1: study site is expected to operate differently than data in the applicable land use code - such as restaurant that is closed in the morning or in the evening; example 2: LUC data in a localized area fails to be represented by the typically selected fitted curve/weighted average rate - a small shop/LUC 820, AM peak hour is skewed by the high y-intercept). Per the Handbook, "if the objective is to establish a local trip generation rate for a particular land use or study site, the simplified approach (Box 9) may be acceptable but the Box 5 through 8 approach is required if the study site is located in an infill setting, contains a mix of uses on-site, or is near significant transit service." Page 1 of 4 Appendix E September 2024 Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 Renton Market Trip Generation Proposed October 2024 Box 5/Box 9 - Estimate Baseline Trips/Estimate Vehicular Trips (Apply Equations and in/out Distributions) Baseline Vehicular Trips ADT AM Peak Hour PM Peak Hour (not used) Proposed Use % In In Out Total % In In Out Total % In In Out Total % In In Out Total Food Cart Pod 50% 142 142 284 50% 2 2 4 55% 42 34 76 0% 000 Sit Down Restaurant 50% 172 172 344 55% 17 14 31 61% 18 11 29 0% 000 Totals 314 314 628 19 16 35 60 45 105 Box 6 - Convert Baseline Vehicle Trips to Person Trips If no vehicle trip reductions are to be applied, this portion may be ignored. The Handbook states "There are not enough samples to derive precise percentages by mode...however, for all but one,...the motor vehicle percentage of total person trips is at least 96 percent." and "[vehicle occupancy for] many of the most commonly analyzed land use codes are not [available]." This form assumes that the total baseline vehicle trips for all land use codes accounts for 90% of total person trips. Unless otherwise specified, this form later reverses the conversion in Box 8. If vehicle trip reductions are not applied for internal capture and alternative mode, vehicle trips may be separtated into vehicle trip subsets (pass-by trips, diverted trips, truck trips, new passenger vehicle trips) as part of Box 10. If vehicle trip reductions are to be applied, continue to Box 6. Page 2 of 4 Appendix E September 2024 Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 Renton Market Trip Generation Proposed October 2024 External Vehicular Trips ADT AM Peak Hour PM Peak Hour (not used) Proposed Use In Out Total In Out Total In Out Total In Out Total Food Cart Pod 142 142 284 2 2 4 42 34 76 000 Sit Down Restaurant 172 172 344 17 14 31 18 11 29 000 Totals 314 314 628 19 16 35 60 45 105 000 The vehicle occupancy and baseline alternate mode are now factored out from the external trips in vehicles, after any adjustments for internal capture and additional alternate mode from Box 7. In B 6 hi l i id d f 90% f l i Al d i i ddi i h b li if d f i B I i i d h hi l i Page 3 of 4 Appendix E September 2024 Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 Renton Market Trip Generation Proposed October 2024 Net New [Non-Truck] Trips ADT AM Peak Hour PM Peak Hour (not used) Proposed Use In Out Total In Out Total In Out Total In Out Total Food Cart Pod 142 142 284 2 2 4 42 34 76 000 Sit Down Restaurant 172 172 344 17 14 31 12 5 17 000 Totals 314 314 628 19 16 35 54 39 93 000 Net New Trips. Pass-by trips and truck trips may be subtracted from the total external vehicle trips, if applicable/data available. Diverted link trips may also be separated, but are often (conservatively) grouped with primary trips. Page 4 of 4 Appendix E September 2024 Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 Renton Market – Renton, Washington Traffic Impact Analysis 39 APPENDIX F: BACKGROUND GROWTH CALCULATIONS Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 Renton Market Background Traffic Calculations Location of counts:Confirmed with the city that 2% was acceptableSource(s): Year Volume Start 99 99 End 99 99 AAGR #DIV/0! Exp Factor 1.000 Growth Rate Used 2.0% Per-Year Multiplier 1.020 Expansion Year Factor(s) 2024 1.000 2025 1.020 2026 1.040 Opening 2027 1.061 2028 1.082 2029 1.104 2030 1.126 2031 1.149 5-Year Horizon 2032 1.172 2033 1.195 2034 1.219 2035 1.243 2036 1.268 2037 1.294 2038 1.319 2039 1.346 2040 1.373 2041 1.400 2042 1.428 2043 1.457 2044 1.486 2045 1.516 2046 1.546 2047 1.577 2048 1.608 2049 1.641 2050 1.673 2051 1.707 2052 1.741 2053 1.776 2054 1.811 2055 1.848 2056 1.885 Appendix F Page 1 September 2024 Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 Renton Market – Renton, Washington Traffic Impact Analysis 40 APPENDIX G: TURN LANE WARRANTS Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 Renton Market – Renton, Washington Traffic Impact Analysis 41 APPENDIX H: 2026 NO BUILD PEAK HOUR ANALYSIS Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 5HQWRQ0DUNHW &LW\&HQWHU3DUNLQJ(JUHVV QG6WUHHW %DFNJURXQG$0 HCM Unsignalized Intersection Capacity Analysis 2026 Background AM 24-0640 Renton Market 1:56 pm 08/12/2024 2026 Background AM Synchro 12 ReportCivTech Inc.Page 1 Movement EBT EBR WBL WBT NBL NBR Lane ConfigurationsTraffic Volume (veh/h) 0 0 1 470 10 0 Future Volume (Veh/h) 0 0 1 470 10 0Sign Control Free Free Stop Grade 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 0 0 1 511 11 0 Pedestrians Lane Width (ft)Walking Speed (ft/s) Percent BlockageRight turn flare (veh) Median type None None Median storage veh)Upstream signal (ft) 148 164 pX, platoon unblocked vC, conflicting volume 0 130 0vC1, stage 1 conf vol vC2, stage 2 conf volvCu, unblocked vol 0 130 0 tC, single (s) 4.1 6.8 6.9 tC, 2 stage (s)tF (s) 2.2 3.5 3.3 p0 queue free % 100 99 100 cM capacity (veh/h) 1622 851 1084 Direction, Lane # WB 1 WB 2 WB 3 WB 4 NB 1 Volume Total 74 146 146 146 11 Volume Left 100011 Volume Right 00000cSH 1622 1700 1700 1700 851 Volume to Capacity 0.00 0.09 0.09 0.09 0.01 Queue Length 95th (ft)00001Control Delay (s/veh) 0.1 0.0 0.0 0.0 9.3 Lane LOS A AApproach Delay (s/veh) 0.0 9.3 Approach LOS A Intersection Summary Average Delay 0.2Intersection Capacity Utilization 16.8% ICU Level of Service A Analysis Period (min) 15 5HQWRQ0DUNHW &LW\&HQWHU3DUNLQJ(JUHVV QG6WUHHW %DFNJURXQG30 HCM Unsignalized Intersection Capacity Analysis 2026 Background PM 24-0640 Renton Market 12:49 am 09/09/2024 2026 Background PM Synchro 12 ReportCivTech Inc.Page 1 Movement EBT EBR WBL WBT NBL NBR Lane ConfigurationsTraffic Volume (veh/h) 0 0 0 680 92 1 Future Volume (Veh/h) 0 0 0 680 92 1Sign Control Free Free Stop Grade 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 0 0 0 739 100 1 Pedestrians Lane Width (ft)Walking Speed (ft/s) Percent BlockageRight turn flare (veh) Median type None None Median storage veh)Upstream signal (ft) 148 164 pX, platoon unblocked vC, conflicting volume 0 185 0vC1, stage 1 conf vol vC2, stage 2 conf volvCu, unblocked vol 0 185 0 tC, single (s) 4.1 6.8 6.9 tC, 2 stage (s)tF (s) 2.2 3.5 3.3 p0 queue free % 100 87 100 cM capacity (veh/h) 1622 787 1084 Direction, Lane # WB 1 WB 2 WB 3 WB 4 NB 1 Volume Total 185 185 185 185 101 Volume Left 0000100 Volume Right 00001cSH 1700 1700 1700 1700 789 Volume to Capacity 0.11 0.11 0.11 0.11 0.13 Queue Length 95th (ft)000011Control Delay (s/veh) 0.0 0.0 0.0 0.0 10.2 Lane LOS BApproach Delay (s/veh) 0.0 10.2 Approach LOS B Intersection Summary Average Delay 1.2Intersection Capacity Utilization 21.7% ICU Level of Service A Analysis Period (min) 15 Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 5HQWRQ0DUNHW &LW\&HQWHU3DUNLQJ,QJUHVV QG6WUHHW %DFNJURXQG$0 HCM Unsignalized Intersection Capacity Analysis 2026 Background AM 24-0640 Renton Market 1:56 pm 08/12/2024 2026 Background AM Synchro 12 ReportCivTech Inc.Page 2 Movement EBT EBR WBL WBT NBL NBR Lane ConfigurationsTraffic Volume (veh/h) 0 0 34 442 0 0 Future Volume (Veh/h) 0 0 34 442 0 0Sign Control Free Free Stop Grade 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 0 0 37 480 0 0 Pedestrians Lane Width (ft)Walking Speed (ft/s) Percent BlockageRight turn flare (veh) Median type None None Median storage veh)Upstream signal (ft) 76 236 pX, platoon unblocked vC, conflicting volume 0 194 0vC1, stage 1 conf vol vC2, stage 2 conf volvCu, unblocked vol 0 194 0 tC, single (s) 4.1 6.8 6.9 tC, 2 stage (s)tF (s) 2.2 3.5 3.3 p0 queue free % 98 100 100 cM capacity (veh/h) 1622 759 1084 Direction, Lane # WB 1 WB 2 WB 3 WB 4 Volume Total 106 137 137 137 Volume Left 37000 Volume Right 0000cSH 1622 1700 1700 1700 Volume to Capacity 0.02 0.08 0.08 0.08 Queue Length 95th (ft)2000Control Delay (s/veh) 2.7 0.0 0.0 0.0 Lane LOS AApproach Delay (s/veh) 0.5 Approach LOS Intersection Summary Average Delay 0.5Intersection Capacity Utilization 10.3% ICU Level of Service A Analysis Period (min) 15 5HQWRQ0DUNHW &LW\&HQWHU3DUNLQJ,QJUHVV QG6WUHHW %DFNJURXQG30 HCM Unsignalized Intersection Capacity Analysis 2026 Background PM 24-0640 Renton Market 12:49 am 09/09/2024 2026 Background PM Synchro 12 ReportCivTech Inc.Page 2 Movement EBT EBR WBL WBT NBL NBR Lane ConfigurationsTraffic Volume (veh/h) 0 0 59 710 0 0 Future Volume (Veh/h) 0 0 59 710 0 0Sign Control Free Free Stop Grade 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 0 0 64 772 0 0 Pedestrians Lane Width (ft)Walking Speed (ft/s) Percent BlockageRight turn flare (veh) Median type None None Median storage veh)Upstream signal (ft) 76 236 pX, platoon unblocked vC, conflicting volume 0 321 0vC1, stage 1 conf vol vC2, stage 2 conf volvCu, unblocked vol 0 321 0 tC, single (s) 4.1 6.8 6.9 tC, 2 stage (s)tF (s) 2.2 3.5 3.3 p0 queue free % 96 100 100 cM capacity (veh/h) 1622 622 1084 Direction, Lane # WB 1 WB 2 WB 3 WB 4 Volume Total 174 221 221 221 Volume Left 64000 Volume Right 0000cSH 1622 1700 1700 1700 Volume to Capacity 0.04 0.13 0.13 0.13 Queue Length 95th (ft)3000Control Delay (s/veh) 2.9 0.0 0.0 0.0 Lane LOS AApproach Delay (s/veh) 0.6 Approach LOS Intersection Summary Average Delay 0.6Intersection Capacity Utilization 14.5% ICU Level of Service A Analysis Period (min) 15 Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 5HQWRQ0DUNHW /RJDQ$YHQXH QG6WUHHW %DFNJURXQG$0 Timings 2026 Background AM 24-0640 Renton Market 1:56 pm 08/12/2024 2026 Background AM Synchro 12 ReportCivTech Inc.Page 3 Lane Group WBT NBL NBT SBT SBR Lane ConfigurationsTraffic Volume (vph) 296 22 61 30 42 Future Volume (vph) 296 22 61 30 42Turn Type NA Perm NA NA Perm Protected Phases 2 8 4 Permitted Phases 8 4Detector Phase 28844 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0Minimum Split (s) 22.5 22.5 22.5 22.5 22.5 Total Split (s) 38.0 37.0 37.0 37.0 37.0Total Split (%) 50.7% 49.3% 49.3% 49.3% 49.3% Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 All-Red Time (s) 1.0 1.0 1.0 1.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 Total Lost Time (s) 4.5 4.5 4.5 4.5 Lead/LagLead-Lag Optimize? Recall Mode C-Max None None Max MaxAct Effct Green (s) 33.5 32.5 32.5 32.5 Actuated g/C Ratio 0.45 0.43 0.43 0.43 v/c Ratio 0.17 0.11 0.04 0.06Control Delay (s/veh) 4.1 13.2 12.5 4.5 Queue Delay 0.0 0.0 0.0 0.0 Total Delay (s/veh) 4.1 13.2 12.5 4.5LOS A BBA Approach Delay (s/veh) 4.1 13.3 7.9Approach LOS A B A Intersection Summary Cycle Length: 75 Actuated Cycle Length: 75 Offset: 0 (0%), Referenced to phase 2:WBTL and 6:, Start of GreenNatural Cycle: 45 Control Type: Actuated-CoordinatedMaximum v/c Ratio: 0.17 Intersection Signal Delay (s/veh): 5.8 Intersection LOS: A Intersection Capacity Utilization 26.7% ICU Level of Service AAnalysis Period (min) 15 Splits and Phases: 3: Logan Avenue & 2nd Street 5HQWRQ0DUNHW /RJDQ$YHQXH QG6WUHHW %DFNJURXQG30 Timings 2026 Background PM 24-0640 Renton Market 12:49 am 09/09/2024 2026 Background PM Synchro 12 ReportCivTech Inc.Page 3 Lane Group WBT NBL NBT SBT SBR Lane ConfigurationsTraffic Volume (vph) 504 30 22 28 234 Future Volume (vph) 504 30 22 28 234Turn Type NA Perm NA NA Perm Protected Phases 2 8 4 Permitted Phases 8 4Detector Phase 28844 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0Minimum Split (s) 22.5 22.5 22.5 22.5 22.5 Total Split (s) 38.0 37.0 37.0 37.0 37.0Total Split (%) 50.7% 49.3% 49.3% 49.3% 49.3% Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 All-Red Time (s) 1.0 1.0 1.0 1.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 Total Lost Time (s) 4.5 4.5 4.5 4.5 Lead/LagLead-Lag Optimize? Recall Mode C-Max None None Max MaxAct Effct Green (s) 33.5 32.5 32.5 32.5 Actuated g/C Ratio 0.45 0.43 0.43 0.43 v/c Ratio 0.25 0.08 0.03 0.31Control Delay (s/veh) 9.7 12.9 12.5 4.1 Queue Delay 0.0 0.0 0.0 0.0 Total Delay (s/veh) 9.7 12.9 12.5 4.1LOS A BBA Approach Delay (s/veh) 9.8 13.0 5.1Approach LOS A B A Intersection Summary Cycle Length: 75 Actuated Cycle Length: 75 Offset: 0 (0%), Referenced to phase 2:WBTL and 6:, Start of GreenNatural Cycle: 45 Control Type: Actuated-CoordinatedMaximum v/c Ratio: 0.31 Intersection Signal Delay (s/veh): 8.7 Intersection LOS: A Intersection Capacity Utilization 39.7% ICU Level of Service AAnalysis Period (min) 15 Splits and Phases: 3: Logan Avenue & 2nd Street Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 5HQWRQ0DUNHW /RJDQ$YHQXH QG6WUHHW %DFNJURXQG$0 HCM Signalized Intersection Capacity Analysis 2026 Background AM 24-0640 Renton Market 1:56 pm 08/12/2024 2026 Background AM Synchro 12 ReportCivTech Inc.Page 4 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane ConfigurationsTraffic Volume (vph) 0 0 0 19 296 135 22 61 0 0 30 42 Future Volume (vph) 0 0 0 19 296 135 22 61 0 0 30 42Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 4.5 4.5 4.5 4.5 Lane Util. Factor 0.86 1.00 1.00 1.00Frt 0.95 1.00 1.00 0.85 Flt Protected 0.99 0.98 1.00 1.00 Satd. Flow (prot) 6106 1838 1863 1583Flt Permitted 0.99 0.94 1.00 1.00 Satd. Flow (perm) 6106 1756 1863 1583 Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 0 0 0 21 322 147 24 66 0 0 33 46 RTOR Reduction (vph)00008100000026 Lane Group Flow (vph)00004090090003320 Turn Type Perm NA Perm NA NA Perm Protected Phases 2 8 4 Permitted Phases 2 8 4Actuated Green, G (s) 33.5 32.5 32.5 32.5 Effective Green, g (s) 33.5 32.5 32.5 32.5 Actuated g/C Ratio 0.45 0.43 0.43 0.43Clearance Time (s) 4.5 4.5 4.5 4.5 Vehicle Extension (s) 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 2727 760 807 685v/s Ratio Prot 0.02 v/s Ratio Perm 0.07 c0.05 0.01 v/c Ratio 0.14 0.11 0.04 0.02Uniform Delay, d1 12.3 12.6 12.2 12.1 Progression Factor 0.46 1.00 1.00 1.00Incremental Delay, d2 0.1 0.0 0.0 0.0 Delay (s) 5.8 12.7 12.3 12.2 Level of Service A B B BApproach Delay (s/veh) 0.0 5.8 12.7 12.3 Approach LOS AABB Intersection Summary HCM 2000 Control Delay (s/veh) 7.6 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.13 Actuated Cycle Length (s) 75.0 Sum of lost time (s) 9.0 Intersection Capacity Utilization 26.7% ICU Level of Service AAnalysis Period (min) 15 c Critical Lane Group 5HQWRQ0DUNHW /RJDQ$YHQXH QG6WUHHW %DFNJURXQG30 HCM Signalized Intersection Capacity Analysis 2026 Background PM 24-0640 Renton Market 12:49 am 09/09/2024 2026 Background PM Synchro 12 ReportCivTech Inc.Page 4 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane ConfigurationsTraffic Volume (vph) 0 0 0 30 504 122 30 22 0 0 28 234 Future Volume (vph) 0 0 0 30 504 122 30 22 0 0 28 234Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 4.5 4.5 4.5 4.5 Lane Util. Factor 0.86 1.00 1.00 1.00Frt 0.97 1.00 1.00 0.85 Flt Protected 0.99 0.97 1.00 1.00 Satd. Flow (prot) 6214 1810 1863 1583Flt Permitted 0.99 0.87 1.00 1.00 Satd. Flow (perm) 6214 1633 1863 1583 Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 0 0 0 33 548 133 33 24 0 0 30 254 RTOR Reduction (vph)000055000000125 Lane Group Flow (vph)000065900570030129 Turn Type Perm NA Perm NA NA Perm Protected Phases 2 8 4 Permitted Phases 2 8 4Actuated Green, G (s) 33.5 32.5 32.5 32.5 Effective Green, g (s) 33.5 32.5 32.5 32.5 Actuated g/C Ratio 0.45 0.43 0.43 0.43Clearance Time (s) 4.5 4.5 4.5 4.5 Vehicle Extension (s) 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 2775 707 807 685v/s Ratio Prot 0.02 v/s Ratio Perm 0.11 0.03 c0.08 v/c Ratio 0.23 0.08 0.03 0.18Uniform Delay, d1 12.8 12.4 12.2 13.1 Progression Factor 0.86 1.00 1.00 1.00Incremental Delay, d2 0.1 0.0 0.0 0.6 Delay (s) 11.2 12.5 12.3 13.7 Level of Service B B B BApproach Delay (s/veh) 0.0 11.2 12.5 13.5 Approach LOS ABBB Intersection Summary HCM 2000 Control Delay (s/veh) 11.9 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.21 Actuated Cycle Length (s) 75.0 Sum of lost time (s) 9.0 Intersection Capacity Utilization 39.7% ICU Level of Service AAnalysis Period (min) 15 c Critical Lane Group Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 5HQWRQ0DUNHW 5HQWRQ0DUNHW'ULYHZD\ /RJDQ$YHQXH %DFNJURXQG$0 HCM Unsignalized Intersection Capacity Analysis 2026 Background AM 24-0640 Renton Market 1:56 pm 08/12/2024 2026 Background AM Synchro 12 ReportCivTech Inc.Page 5 Movement WBL WBR NBT NBR SBL SBT Lane ConfigurationsTraffic Volume (veh/h) 0 0 69 3 5 59 Future Volume (Veh/h) 0 0 69 3 5 59Sign Control Stop Free Free Grade 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 0 0 75 3 5 64 Pedestrians Lane Width (ft)Walking Speed (ft/s) Percent BlockageRight turn flare (veh) Median type None None Median storage veh)Upstream signal (ft) 259 302 pX, platoon unblocked vC, conflicting volume 151 77 78vC1, stage 1 conf vol vC2, stage 2 conf volvCu, unblocked vol 151 77 78 tC, single (s) 6.4 6.2 4.1 tC, 2 stage (s)tF (s) 3.5 3.3 2.2 p0 queue free % 100 100 100 cM capacity (veh/h) 839 985 1520 Direction, Lane # NB 1 SB 1 Volume Total 78 69 Volume Left 0 5 Volume Right 3 0cSH 1700 1520 Volume to Capacity 0.05 0.00 Queue Length 95th (ft) 0 0Control Delay (s/veh) 0.0 0.6 Lane LOS AApproach Delay (s/veh) 0.0 0.6 Approach LOS Intersection Summary Average Delay 0.3Intersection Capacity Utilization 10.6% ICU Level of Service A Analysis Period (min) 15 5HQWRQ0DUNHW 5HQWRQ0DUNHW'ULYHZD\ /RJDQ$YHQXH %DFNJURXQG30 HCM Unsignalized Intersection Capacity Analysis 2026 Background PM 24-0640 Renton Market 12:49 am 09/09/2024 2026 Background PM Synchro 12 ReportCivTech Inc.Page 5 Movement WBL WBR NBT NBR SBL SBT Lane ConfigurationsTraffic Volume (veh/h) 0010110 Future Volume (Veh/h) 0010110Sign Control Stop Free Free Grade 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 0010120 Pedestrians Lane Width (ft)Walking Speed (ft/s) Percent BlockageRight turn flare (veh) Median type None None Median storage veh)Upstream signal (ft) 259 302 pX, platoon unblocked vC, conflicting volume 25 1 1vC1, stage 1 conf vol vC2, stage 2 conf volvCu, unblocked vol 25 1 1 tC, single (s) 6.4 6.2 4.1 tC, 2 stage (s)tF (s) 3.5 3.3 2.2 p0 queue free % 100 100 99 cM capacity (veh/h) 983 1084 1622 Direction, Lane # NB 1 SB 1 Volume Total 1 12 Volume Left 0 12 Volume Right 0 0cSH 1700 1622 Volume to Capacity 0.00 0.01 Queue Length 95th (ft) 0 1Control Delay (s/veh) 0.0 7.2 Lane LOS AApproach Delay (s/veh) 0.0 7.2 Approach LOS Intersection Summary Average Delay 6.7Intersection Capacity Utilization 10.6% ICU Level of Service A Analysis Period (min) 15 Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 5HQWRQ0DUNHW /RJDQ$YHQXH 'ULYHZD\QRIUG6WUHHW %DFNJURXQG$0 HCM 7th TWSC 2026 Background AM 24-0640 Renton Market 1:56 pm 08/12/2024 2026 Background AM Synchro 12 ReportCivTech Inc.Page 7 Intersection Int Delay, s/veh 0.4 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 1 5 0 67 63 6 Future Vol, veh/h 1 5 0 67 63 6Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free FreeRT Channelized - None - None - None Storage Length - 0 - - - - Veh in Median Storage, # 0 - - 0 0 -Grade, % 0 - - 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2Mvmt Flow 1 5 07368 7 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 145 72 - 0 - 0 Stage 1 72 - - - - - Stage 2 73 - - - - - Critical Hdwy 6.42 6.22 - - - -Critical Hdwy Stg 15.42----- Critical Hdwy Stg 25.42-----Follow-up Hdwy 3.518 3.318 - - - - Pot Cap-1 Maneuver 848 991 0 - - - Stage 1 951 - 0 - - - Stage 2 950 - 0 - - - Platoon blocked, % - - - Mov Cap-1 Maneuver 848 991 - - - -Mov Cap-2 Maneuver 848 - - - - - Stage 1 951 - - - - - Stage 2 950 - - - - - Approach EB NB SB HCM Control Delay, s/v 8.65 0 0HCM LOS A Minor Lane/Major Mvmt NBTEBLn1 SBT SBR Capacity (veh/h) - 991 - - HCM Lane V/C Ratio - 0.005 - -HCM Control Delay (s/veh) - 8.7 - - HCM Lane LOS - A - -HCM 95th %tile Q(veh) - 0 - - 5HQWRQ0DUNHW /RJDQ$YHQXH 'ULYHZD\QRIUG6WUHHW %DFNJURXQG30 HCM 7th TWSC 2026 Background PM 24-0640 Renton Market 12:49 am 09/09/2024 2026 Background PM Synchro 12 ReportCivTech Inc.Page 7 Intersection Int Delay, s/veh 0 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 0 0 0 0 0 0 Future Vol, veh/h 0 0 0 0 0 0Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free FreeRT Channelized - None - None - None Storage Length - 0 ---- Veh in Median Storage, # 0 - - 0 0 -Grade, % 0 - - 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2Mvmt Flow 0 0 0 0 0 0 Major/Minor Minor2 Major1 Major2 Conflicting Flow All - 1 - 0 - 0 Stage 1 ------ Stage 2 ------ Critical Hdwy - 6.22 - - - -Critical Hdwy Stg 1 ------ Critical Hdwy Stg 2 ------Follow-up Hdwy -3.318---- Pot Cap-1 Maneuver 0 1083 0 - - - Stage 1 0 - 0 - - - Stage 2 0 - 0 - - - Platoon blocked, % - - - Mov Cap-1 Maneuver - 1083 ----Mov Cap-2 Maneuver ------ Stage 1 ------ Stage 2 ------ Approach EB NB SB HCM Control Delay, s/v 0 0 0HCM LOS A Minor Lane/Major Mvmt NBTEBLn1 SBT SBR Capacity (veh/h)---- HCM Lane V/C Ratio ----HCM Control Delay (s/veh) - 0 - - HCM Lane LOS - A - -HCM 95th %tile Q(veh) ---- Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 5HQWRQ0DUNHW UG6WUHHW /RJDQ$YHQXH %DFNJURXQG$0 Timings 2026 Background AM 24-0640 Renton Market 1:56 pm 08/12/2024 2026 Background AM Synchro 12 ReportCivTech Inc.Page 8 Lane Group EBT NBR SBL Lane ConfigurationsTraffic Volume (vph) 223 14 70 Future Volume (vph) 223 14 70Turn Type NA Perm Prot Protected Phases 2 4 Permitted Phases 3Detector Phase 2 3 4 Switch Phase Minimum Initial (s) 5.0 5.0 5.0Minimum Split (s) 22.5 22.5 23.0 Total Split (s) 25.0 10.0 15.0Total Split (%) 50.0% 20.0% 30.0% Yellow Time (s) 3.5 3.5 4.0 All-Red Time (s) 1.0 1.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 Total Lost Time (s) 4.5 4.5 5.0 Lead/Lag Lead LagLead-Lag Optimize? Yes Yes Recall Mode C-Max None MaxAct Effct Green (s) 20.5 5.5 18.0 Actuated g/C Ratio 0.41 0.11 0.36 v/c Ratio 0.21 0.02 0.11Control Delay (s/veh) 9.9 0.0 13.3 Queue Delay 0.0 0.0 0.0 Total Delay (s/veh) 9.9 0.0 13.3LOS AAB Approach Delay (s/veh) 10.0Approach LOS A Intersection Summary Cycle Length: 50 Actuated Cycle Length: 50 Offset: 0 (0%), Referenced to phase 2:EBTL and 6:, Start of GreenNatural Cycle: 70 Control Type: Actuated-CoordinatedMaximum v/c Ratio: 0.22 Intersection Signal Delay (s/veh): 10.3 Intersection LOS: B Intersection Capacity Utilization 26.9% ICU Level of Service AAnalysis Period (min) 15 Splits and Phases: 6: 3rd Street & Logan Avenue 5HQWRQ0DUNHW UG6WUHHW /RJDQ$YHQXH %DFNJURXQG30 Timings 2026 Background PM 24-0640 Renton Market 12:49 am 09/09/2024 2026 Background PM Synchro 12 ReportCivTech Inc.Page 8 Lane Group EBT NBR Ø4 Lane ConfigurationsTraffic Volume (vph) 860 18 Future Volume (vph) 860 18Turn Type NA Perm Protected Phases 2 4 Permitted Phases 3Detector Phase 2 3 Switch Phase Minimum Initial (s) 5.0 5.0 5.0Minimum Split (s) 22.5 22.5 23.0 Total Split (s) 25.0 10.0 15.0Total Split (%) 50.0% 20.0% 30% Yellow Time (s) 3.5 3.5 4.0 All-Red Time (s) 1.0 1.0 1.0Lost Time Adjust (s) 0.0 0.0 Total Lost Time (s) 4.5 4.5 Lead/Lag Lead LagLead-Lag Optimize? Yes Yes Recall Mode C-Max None MaxAct Effct Green (s) 20.5 5.5 Actuated g/C Ratio 0.41 0.11 v/c Ratio 0.66 0.03Control Delay (s/veh) 14.6 0.1 Queue Delay 0.0 0.0 Total Delay (s/veh) 14.6 0.1LOS B A Approach Delay (s/veh) 14.7Approach LOS B Intersection Summary Cycle Length: 50 Actuated Cycle Length: 50 Offset: 0 (0%), Referenced to phase 2:EBTL and 6:, Start of GreenNatural Cycle: 70 Control Type: Actuated-CoordinatedMaximum v/c Ratio: 0.67 Intersection Signal Delay (s/veh): 14.4 Intersection LOS: B Intersection Capacity Utilization 36.4% ICU Level of Service AAnalysis Period (min) 15 Splits and Phases: 6: 3rd Street & Logan Avenue Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 5HQWRQ0DUNHW UG6WUHHW /RJDQ$YHQXH %DFNJURXQG$0 HCM Signalized Intersection Capacity Analysis 2026 Background AM 24-0640 Renton Market 1:56 pm 08/12/2024 2026 Background AM Synchro 12 ReportCivTech Inc.Page 9 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane ConfigurationsTraffic Volume (vph) 61223200000147000 Future Volume (vph) 61223200000147000Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 4.5 4.5 5.0 Lane Util. Factor 0.95 1.00 1.00Frt 0.99 0.86 1.00 Flt Protected 0.98 1.00 0.95 Satd. Flow (prot) 3499 1611 1770Flt Permitted 0.98 1.00 0.95 Satd. Flow (perm) 3499 1611 1770 Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 66242200000157600 RTOR Reduction (vph)0100000015000 Lane Group Flow (vph) 0 30900000007600 Turn Type Perm NA Perm Prot Protected Phases 2 4 Permitted Phases 2 3Actuated Green, G (s) 16.9 1.1 18.0 Effective Green, g (s) 16.9 1.1 18.0 Actuated g/C Ratio 0.34 0.02 0.36Clearance Time (s) 4.5 4.5 5.0 Vehicle Extension (s) 3.0 3.0 3.0 Lane Grp Cap (vph) 1182 35 637v/s Ratio Prot c0.04 v/s Ratio Perm 0.09 c0.00 v/c Ratio 0.26 0.00 0.11Uniform Delay, d1 12.0 23.9 10.6 Progression Factor 1.00 1.00 1.00Incremental Delay, d2 0.5 0.1 0.3 Delay (s) 12.5 24.0 11.0 Level of Service B C BApproach Delay (s/veh) 12.5 0.0 24.0 11.0 Approach LOS B A C B Intersection Summary HCM 2000 Control Delay (s/veh) 12.7 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.18 Actuated Cycle Length (s) 50.0 Sum of lost time (s) 14.0 Intersection Capacity Utilization 26.9% ICU Level of Service AAnalysis Period (min) 15 c Critical Lane Group 5HQWRQ0DUNHW UG6WUHHW /RJDQ$YHQXH %DFNJURXQG30 HCM Signalized Intersection Capacity Analysis 2026 Background PM 24-0640 Renton Market 12:49 am 09/09/2024 2026 Background PM Synchro 12 ReportCivTech Inc.Page 9 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane ConfigurationsTraffic Volume (vph) 0860300000018000 Future Volume (vph) 0860300000018000Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 4.5 4.5 Lane Util. Factor 0.95 1.00Frt 0.99 0.86 Flt Protected 1.00 1.00 Satd. Flow (prot) 3521 1611Flt Permitted 1.00 1.00 Satd. Flow (perm) 3521 1611 Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 0935330000020000 RTOR Reduction (vph)0500000020000 Lane Group Flow (vph) 0 9630000000000 Turn Type NA Perm Prot Protected Phases 2 4 Permitted Phases 2 3Actuated Green, G (s) 16.9 1.1 Effective Green, g (s) 16.9 1.1 Actuated g/C Ratio 0.34 0.02Clearance Time (s) 4.5 4.5 Vehicle Extension (s) 3.0 3.0 Lane Grp Cap (vph) 1190 35v/s Ratio Prot c0.27 v/s Ratio Perm c0.00 v/c Ratio 0.80 0.01Uniform Delay, d1 15.0 23.9 Progression Factor 1.00 1.00Incremental Delay, d2 5.9 0.1 Delay (s) 21.0 24.0 Level of Service C CApproach Delay (s/veh) 21.0 0.0 24.0 0.0 Approach LOS C A C A Intersection Summary HCM 2000 Control Delay (s/veh) 21.1 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.38 Actuated Cycle Length (s) 50.0 Sum of lost time (s) 14.0 Intersection Capacity Utilization 36.4% ICU Level of Service AAnalysis Period (min) 15 c Critical Lane Group Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 5HQWRQ0DUNHW %XUQHWW$YHQXH QG6WUHHW %DFNJURXQG$0 Timings 2026 Background AM 24-0640 Renton Market 1:56 pm 08/12/2024 2026 Background AM Synchro 12 ReportCivTech Inc.Page 10 Lane Group WBT NBL NBT SBT SBR Lane ConfigurationsTraffic Volume (vph) 382 69 17 6 22 Future Volume (vph) 382 69 17 6 22Turn Type NA Prot NA NA Perm Protected Phases 2384 Permitted Phases 4Detector Phase 23844 Switch Phase Minimum Initial (s) 5.0 5.0 4.0 5.0 5.0Minimum Split (s) 23.0 23.0 23.0 23.0 23.0 Total Split (s) 25.0 25.0 50.0 25.0 25.0Total Split (%) 33.3% 33.3% 66.7% 33.3% 33.3% Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 All-Red Time (s) 1.0 1.0 1.0 1.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 Lead/Lag Lead Lag LagLead-Lag Optimize? Yes Yes Yes Recall Mode C-Max Max Max Max MaxAct Effct Green (s) 20.0 20.0 45.0 20.0 20.0 Actuated g/C Ratio 0.27 0.27 0.60 0.27 0.27 v/c Ratio 0.34 0.15 0.01 0.01 0.04Control Delay (s/veh) 22.7 22.2 6.1 20.5 0.1 Queue Delay 0.0 0.0 0.0 0.0 0.0 Total Delay (s/veh) 22.7 22.2 6.1 20.5 0.1LOS CCACA Approach Delay (s/veh) 22.7 19.1 4.8Approach LOS C B A Intersection Summary Cycle Length: 75 Actuated Cycle Length: 75 Offset: 0 (0%), Referenced to phase 2:WBTL, Start of GreenNatural Cycle: 70 Control Type: Actuated-CoordinatedMaximum v/c Ratio: 0.35 Intersection Signal Delay (s/veh): 21.2 Intersection LOS: C Intersection Capacity Utilization 29.2% ICU Level of Service AAnalysis Period (min) 15 Splits and Phases: 7: Burnett Avenue & 2nd Street 5HQWRQ0DUNHW %XUQHWW$YHQXH QG6WUHHW %DFNJURXQG30 Timings 2026 Background PM 24-0640 Renton Market 12:49 am 09/09/2024 2026 Background PM Synchro 12 ReportCivTech Inc.Page 10 Lane Group WBT NBL NBT SBT SBR Lane ConfigurationsTraffic Volume (vph) 493 171 33 17 18 Future Volume (vph) 493 171 33 17 18Turn Type NA Prot NA NA Perm Protected Phases 2384 Permitted Phases 4Detector Phase 23844 Switch Phase Minimum Initial (s) 5.0 5.0 4.0 5.0 5.0Minimum Split (s) 23.0 23.0 23.0 23.0 23.0 Total Split (s) 25.0 25.0 50.0 25.0 25.0Total Split (%) 33.3% 33.3% 66.7% 33.3% 33.3% Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 All-Red Time (s) 1.0 1.0 1.0 1.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 Lead/Lag Lead Lag LagLead-Lag Optimize? Yes Yes Yes Recall Mode C-Max Max Max Max MaxAct Effct Green (s) 20.0 20.0 45.0 20.0 20.0 Actuated g/C Ratio 0.27 0.27 0.60 0.27 0.27 v/c Ratio 0.45 0.39 0.03 0.03 0.04Control Delay (s/veh) 24.0 25.5 6.2 20.7 0.1 Queue Delay 0.0 0.0 0.0 0.0 0.0 Total Delay (s/veh) 24.0 25.5 6.2 20.7 0.1LOS CCACA Approach Delay (s/veh) 24.0 22.4 9.9Approach LOS C C A Intersection Summary Cycle Length: 75 Actuated Cycle Length: 75 Offset: 0 (0%), Referenced to phase 2:WBTL, Start of GreenNatural Cycle: 70 Control Type: Actuated-CoordinatedMaximum v/c Ratio: 0.45 Intersection Signal Delay (s/veh): 23.0 Intersection LOS: C Intersection Capacity Utilization 36.6% ICU Level of Service AAnalysis Period (min) 15 Splits and Phases: 7: Burnett Avenue & 2nd Street Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 5HQWRQ0DUNHW %XUQHWW$YHQXH QG6WUHHW %DFNJURXQG$0 HCM Signalized Intersection Capacity Analysis 2026 Background AM 24-0640 Renton Market 1:56 pm 08/12/2024 2026 Background AM Synchro 12 ReportCivTech Inc.Page 11 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane ConfigurationsTraffic Volume (vph) 0003438217691700622 Future Volume (vph) 0003438217691700622Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 5.0 5.0 5.0 5.0 5.0 Lane Util. Factor 0.91 1.00 1.00 1.00 1.00Frt 0.99 1.00 1.00 1.00 0.85 Flt Protected 0.99 0.95 1.00 1.00 1.00 Satd. Flow (prot) 5036 1770 1863 1863 1583Flt Permitted 0.99 0.95 1.00 1.00 1.00 Satd. Flow (perm) 5036 1770 1863 1863 1583 Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 0003741518751800724 RTOR Reduction (vph)0000600000018 Lane Group Flow (vph)0000464075180076 Turn Type Perm NA Prot NA NA Perm Protected Phases 2 3 8 4 Permitted Phases 2 4Actuated Green, G (s) 20.0 20.0 45.0 20.0 20.0 Effective Green, g (s) 20.0 20.0 45.0 20.0 20.0 Actuated g/C Ratio 0.27 0.27 0.60 0.27 0.27Clearance Time (s) 5.0 5.0 5.0 5.0 5.0 Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 1342 472 1117 496 422v/s Ratio Prot c0.04 c0.01 0.00 v/s Ratio Perm 0.09 0.00 v/c Ratio 0.34 0.15 0.01 0.01 0.01Uniform Delay, d1 22.2 21.0 6.0 20.2 20.2 Progression Factor 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.7 0.7 0.0 0.0 0.0 Delay (s) 22.9 21.7 6.0 20.2 20.3 Level of Service C C A C CApproach Delay (s/veh) 0.0 22.9 18.7 20.3 Approach LOS A C B C Intersection Summary HCM 2000 Control Delay (s/veh) 22.1 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.17 Actuated Cycle Length (s) 75.0 Sum of lost time (s) 15.0 Intersection Capacity Utilization 29.2% ICU Level of Service AAnalysis Period (min) 15 c Critical Lane Group 5HQWRQ0DUNHW %XUQHWW$YHQXH QG6WUHHW %DFNJURXQG30 HCM Signalized Intersection Capacity Analysis 2026 Background PM 24-0640 Renton Market 12:49 am 09/09/2024 2026 Background PM Synchro 12 ReportCivTech Inc.Page 11 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane ConfigurationsTraffic Volume (vph) 0 0 0 54 493 15 171 33 0 0 17 18 Future Volume (vph) 0 0 0 54 493 15 171 33 0 0 17 18Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 5.0 5.0 5.0 5.0 5.0 Lane Util. Factor 0.91 1.00 1.00 1.00 1.00Frt 0.99 1.00 1.00 1.00 0.85 Flt Protected 0.99 0.95 1.00 1.00 1.00 Satd. Flow (prot) 5041 1770 1863 1863 1583Flt Permitted 0.99 0.95 1.00 1.00 1.00 Satd. Flow (perm) 5041 1770 1863 1863 1583 Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 0 0 0 59 536 16 186 36 0 0 18 20 RTOR Reduction (vph)0000400000015 Lane Group Flow (vph)000060701863600185 Turn Type Perm NA Prot NA NA Perm Protected Phases 2 3 8 4 Permitted Phases 2 4Actuated Green, G (s) 20.0 20.0 45.0 20.0 20.0 Effective Green, g (s) 20.0 20.0 45.0 20.0 20.0 Actuated g/C Ratio 0.27 0.27 0.60 0.27 0.27Clearance Time (s) 5.0 5.0 5.0 5.0 5.0 Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 1344 472 1117 496 422v/s Ratio Prot c0.11 c0.02 0.01 v/s Ratio Perm 0.12 0.00 v/c Ratio 0.45 0.39 0.03 0.03 0.01Uniform Delay, d1 22.9 22.5 6.1 20.3 20.2 Progression Factor 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 1.0 2.4 0.0 0.1 0.0 Delay (s) 24.0 24.9 6.1 20.5 20.2 Level of Service C C A C CApproach Delay (s/veh) 0.0 24.0 21.9 20.3 Approach LOS A C C C Intersection Summary HCM 2000 Control Delay (s/veh) 23.3 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.29 Actuated Cycle Length (s) 75.0 Sum of lost time (s) 15.0 Intersection Capacity Utilization 36.6% ICU Level of Service AAnalysis Period (min) 15 c Critical Lane Group Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 5HQWRQ0DUNHW UG6WUHHW %XUQHWW$YHQXH %DFNJURXQG$0 Timings 2026 Background AM 24-0640 Renton Market 1:56 pm 08/12/2024 2026 Background AM Synchro 12 ReportCivTech Inc.Page 12 Lane Group EBT EBR NBT NBR SBL SBT Lane ConfigurationsTraffic Volume (vph) 212 37 43 27 30 18 Future Volume (vph) 212 37 43 27 30 18Turn Type NA Perm NA Perm Perm NA Protected Phases 6 8 4 Permitted Phases 6 8 4Detector Phase 668844 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 4.0 4.0Minimum Split (s) 29.0 29.0 23.0 23.0 23.0 23.0 Total Split (s) 37.0 37.0 28.0 28.0 28.0 28.0Total Split (%) 56.9% 56.9% 43.1% 43.1% 43.1% 43.1% Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 Lead/LagLead-Lag Optimize? Recall Mode C-Max C-Max Max Max Max MaxAct Effct Green (s) 32.0 32.0 23.0 23.0 23.0 Actuated g/C Ratio 0.49 0.49 0.35 0.35 0.35 v/c Ratio 0.16 0.05 0.07 0.04 0.09Control Delay (s/veh) 9.4 3.4 14.3 5.3 14.6 Queue Delay 0.0 0.0 0.0 0.0 0.0 Total Delay (s/veh) 9.4 3.4 14.3 5.3 14.6LOS AABA B Approach Delay (s/veh) 8.7 10.9 14.7Approach LOS A B B Intersection Summary Cycle Length: 65 Actuated Cycle Length: 65 Offset: 0 (0%), Referenced to phase 2: and 6:EBTL, Start of GreenNatural Cycle: 55 Control Type: Actuated-CoordinatedMaximum v/c Ratio: 0.17 Intersection Signal Delay (s/veh): 9.8 Intersection LOS: A Intersection Capacity Utilization 27.3% ICU Level of Service AAnalysis Period (min) 15 Splits and Phases: 8: 3rd Street & Burnett Avenue 5HQWRQ0DUNHW UG6WUHHW %XUQHWW$YHQXH %DFNJURXQG30 Timings 2026 Background PM 24-0640 Renton Market 12:49 am 09/09/2024 2026 Background PM Synchro 12 ReportCivTech Inc.Page 12 Lane Group EBT EBR NBT NBR SBL SBT Lane ConfigurationsTraffic Volume (vph) 630 132 71 84 37 46 Future Volume (vph) 630 132 71 84 37 46Turn Type NA Perm NA Perm Perm NA Protected Phases 6 8 4 Permitted Phases 6 8 4Detector Phase 668844 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 4.0 4.0Minimum Split (s) 29.0 29.0 23.0 23.0 23.0 23.0 Total Split (s) 37.0 37.0 28.0 28.0 28.0 28.0Total Split (%) 56.9% 56.9% 43.1% 43.1% 43.1% 43.1% Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 Lead/LagLead-Lag Optimize? Recall Mode C-Max C-Max Max Max Max MaxAct Effct Green (s) 32.0 32.0 23.0 23.0 23.0 Actuated g/C Ratio 0.49 0.49 0.35 0.35 0.35 v/c Ratio 0.46 0.16 0.11 0.14 0.15Control Delay (s/veh) 12.0 2.4 14.8 4.5 15.3 Queue Delay 1.0 0.0 0.0 0.0 0.0 Total Delay (s/veh) 13.1 2.4 14.8 4.5 15.3LOS BABA B Approach Delay (s/veh) 11.5 9.2 15.3Approach LOS B A B Intersection Summary Cycle Length: 65 Actuated Cycle Length: 65 Offset: 0 (0%), Referenced to phase 2: and 6:EBTL, Start of GreenNatural Cycle: 55 Control Type: Actuated-CoordinatedMaximum v/c Ratio: 0.47 Intersection Signal Delay (s/veh): 11.5 Intersection LOS: B Intersection Capacity Utilization 43.0% ICU Level of Service AAnalysis Period (min) 15 Splits and Phases: 8: 3rd Street & Burnett Avenue Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 5HQWRQ0DUNHW UG6WUHHW %XUQHWW$YHQXH %DFNJURXQG$0 HCM Signalized Intersection Capacity Analysis 2026 Background AM 24-0640 Renton Market 1:56 pm 08/12/2024 2026 Background AM Synchro 12 ReportCivTech Inc.Page 13 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane ConfigurationsTraffic Volume (vph) 51212370000432730180 Future Volume (vph) 51212370000432730180Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 5.0 5.0 5.0 5.0 5.0 Lane Util. Factor 0.95 1.00 1.00 1.00 1.00Frt 1.00 0.85 1.00 0.85 1.00 Flt Protected 0.99 1.00 1.00 1.00 0.96 Satd. Flow (prot) 3505 1583 1863 1583 1807Flt Permitted 0.99 1.00 1.00 1.00 0.85 Satd. Flow (perm) 3505 1583 1863 1583 1587 Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 55230400000472933200 RTOR Reduction (vph) 0 0 200000019000 Lane Group Flow (vph) 0 285 20000047100530 Turn Type Perm NA Perm NA Perm Perm NA Protected Phases 6 8 4 Permitted Phases 6 6 8 4Actuated Green, G (s) 32.0 32.0 23.0 23.0 23.0 Effective Green, g (s) 32.0 32.0 23.0 23.0 23.0 Actuated g/C Ratio 0.49 0.49 0.35 0.35 0.35Clearance Time (s) 5.0 5.0 5.0 5.0 5.0 Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 1725 779 659 560 561v/s Ratio Prot 0.03 v/s Ratio Perm 0.08 0.01 0.01 c0.03 v/c Ratio 0.16 0.02 0.07 0.01 0.09Uniform Delay, d1 9.1 8.4 13.9 13.6 14.0 Progression Factor 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.2 0.0 0.2 0.0 0.3 Delay (s) 9.3 8.5 14.1 13.7 14.3 Level of Service A A B B BApproach Delay (s/veh) 9.2 0.0 13.9 14.3 Approach LOS AABB Intersection Summary HCM 2000 Control Delay (s/veh) 10.6 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.14 Actuated Cycle Length (s) 65.0 Sum of lost time (s) 10.0 Intersection Capacity Utilization 27.3% ICU Level of Service AAnalysis Period (min) 15 c Critical Lane Group 5HQWRQ0DUNHW UG6WUHHW %XUQHWW$YHQXH %DFNJURXQG30 HCM Signalized Intersection Capacity Analysis 2026 Background PM 24-0640 Renton Market 12:49 am 09/09/2024 2026 Background PM Synchro 12 ReportCivTech Inc.Page 13 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane ConfigurationsTraffic Volume (vph) 1166301320000718437460 Future Volume (vph) 1166301320000718437460Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 5.0 5.0 5.0 5.0 5.0 Lane Util. Factor 0.95 1.00 1.00 1.00 1.00Frt 1.00 0.85 1.00 0.85 1.00 Flt Protected 0.99 1.00 1.00 1.00 0.97 Satd. Flow (prot) 3512 1583 1863 1583 1822Flt Permitted 0.99 1.00 1.00 1.00 0.87 Satd. Flow (perm) 3512 1583 1863 1583 1621 Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 1266851430000779140500 RTOR Reduction (vph) 0 0 730000059000 Lane Group Flow (vph) 0 811 70000077320900 Turn Type Perm NA Perm NA Perm Perm NA Protected Phases 6 8 4 Permitted Phases 6 6 8 4Actuated Green, G (s) 32.0 32.0 23.0 23.0 23.0 Effective Green, g (s) 32.0 32.0 23.0 23.0 23.0 Actuated g/C Ratio 0.49 0.49 0.35 0.35 0.35Clearance Time (s) 5.0 5.0 5.0 5.0 5.0 Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 1728 779 659 560 573v/s Ratio Prot 0.04 v/s Ratio Perm 0.23 0.04 0.02 c0.06 v/c Ratio 0.46 0.09 0.11 0.05 0.15Uniform Delay, d1 10.8 8.7 14.1 13.8 14.3 Progression Factor 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.9 0.2 0.3 0.1 0.5 Delay (s) 11.8 8.9 14.5 14.0 14.9 Level of Service B A B B BApproach Delay (s/veh) 11.3 0.0 14.2 14.9 Approach LOS BABB Intersection Summary HCM 2000 Control Delay (s/veh) 12.1 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.34 Actuated Cycle Length (s) 65.0 Sum of lost time (s) 10.0 Intersection Capacity Utilization 43.0% ICU Level of Service AAnalysis Period (min) 15 c Critical Lane Group Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 5HQWRQ0DUNHW %XUQHWW$YHQXH 5HQWRQ0DUNHW'ULYHZD\ %DFNJURXQG$0 HCM 7th TWSC 2026 Background AM 24-0640 Renton Market 1:56 pm 08/12/2024 2026 Background AM Synchro 12 ReportCivTech Inc.Page 15 Intersection Int Delay, s/veh 0.8 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 0 13 0 94 40 0 Future Vol, veh/h 0 13 0 94 40 0Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free FreeRT Channelized - None - None - None Storage Length - - - - - - Veh in Median Storage, # 0 - - 0 0 -Grade, % 0 - - 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2Mvmt Flow 0140102430 Major/Minor Minor2 Major1 Major2 Conflicting Flow All - 43 - 0 - 0 Stage 1 - - - - - - Stage 2 - - - - - - Critical Hdwy -6.22----Critical Hdwy Stg 1 ------ Critical Hdwy Stg 2 ------Follow-up Hdwy - 3.318 - - - - Pot Cap-1 Maneuver 0 1027 0 - - 0 Stage 1 0 - 0 - - 0 Stage 2 0 - 0 - - 0 Platoon blocked, % - - Mov Cap-1 Maneuver - 1027 - - - -Mov Cap-2 Maneuver - - - - - - Stage 1 - - - - - - Stage 2 - - - - - - Approach EB NB SB HCM Control Delay, s/v 8.56 0 0HCM LOS A Minor Lane/Major Mvmt NBTEBLn1 SBT Capacity (veh/h) - 1027 - HCM Lane V/C Ratio - 0.014 -HCM Control Delay (s/veh) - 8.6 - HCM Lane LOS - A -HCM 95th %tile Q(veh) - 0 - 5HQWRQ0DUNHW %XUQHWW$YHQXH 5HQWRQ0DUNHW'ULYHZD\ %DFNJURXQG30 HCM 7th TWSC 2026 Background PM 24-0640 Renton Market 12:49 am 09/09/2024 2026 Background PM Synchro 12 ReportCivTech Inc.Page 15 Intersection Int Delay, s/veh 0.4 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 0 11 0 187 71 0 Future Vol, veh/h 0 11 0 187 71 0Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free FreeRT Channelized - None - None - None Storage Length ------ Veh in Median Storage, # 0 - - 0 0 -Grade, % 0 - - 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2Mvmt Flow 0120203770 Major/Minor Minor2 Major1 Major2 Conflicting Flow All - 77 - 0 - 0 Stage 1 ------ Stage 2 ------ Critical Hdwy - 6.22 - - - -Critical Hdwy Stg 1 ------ Critical Hdwy Stg 2 ------Follow-up Hdwy -3.318---- Pot Cap-1 Maneuver 0 984 0 - - 0 Stage 1 0 - 0 - - 0 Stage 2 0 - 0 - - 0 Platoon blocked, % - - Mov Cap-1 Maneuver - 984 ----Mov Cap-2 Maneuver ------ Stage 1 ------ Stage 2 ------ Approach EB NB SB HCM Control Delay, s/v 8.7 0 0HCM LOS A Minor Lane/Major Mvmt NBTEBLn1 SBT Capacity (veh/h) - 984 - HCM Lane V/C Ratio - 0.012 -HCM Control Delay (s/veh) - 8.7 - HCM Lane LOS - A -HCM 95th %tile Q(veh) - 0 - Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 5HQWRQ0DUNHW QG6WUHHW %XUQHWW3ODFH %DFNJURXQG$0 HCM Unsignalized Intersection Capacity Analysis 2026 Background AM 24-0640 Renton Market 1:56 pm 08/12/2024 2026 Background AM Synchro 12 ReportCivTech Inc.Page 16 Movement EBL EBT WBT WBR SBL SBR Lane ConfigurationsTraffic Volume (veh/h) 00359502 Future Volume (Veh/h) 00359502Sign Control Free Free Stop Grade 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 00390502 Pedestrians Lane Width (ft)Walking Speed (ft/s) Percent BlockageRight turn flare (veh) Median type None None Median storage veh)Upstream signal (ft) 258 54 pX, platoon unblocked vC, conflicting volume 395 393 100vC1, stage 1 conf vol vC2, stage 2 conf volvCu, unblocked vol 395 393 100 tC, single (s) 4.1 6.8 6.9 tC, 2 stage (s)tF (s) 2.2 3.5 3.3 p0 queue free % 100 100 100 cM capacity (veh/h) 1160 584 936 Direction, Lane # WB 1 WB 2 WB 3 WB 4 SB 1 Volume Total 111 111 111 61 2 Volume Left 00000 Volume Right 00052cSH 1700 1700 1700 1700 936 Volume to Capacity 0.07 0.07 0.07 0.04 0.00 Queue Length 95th (ft)00000Control Delay (s/veh) 0.0 0.0 0.0 0.0 8.9 Lane LOS AApproach Delay (s/veh) 0.0 8.9 Approach LOS A Intersection Summary Average Delay 0.0Intersection Capacity Utilization 15.3% ICU Level of Service A Analysis Period (min) 15 5HQWRQ0DUNHW QG6WUHHW %XUQHWW3ODFH %DFNJURXQG30 HCM Unsignalized Intersection Capacity Analysis 2026 Background PM 24-0640 Renton Market 12:49 am 09/09/2024 2026 Background PM Synchro 12 ReportCivTech Inc.Page 16 Movement EBL EBT WBT WBR SBL SBR Lane ConfigurationsTraffic Volume (veh/h) 00359502 Future Volume (Veh/h) 00359502Sign Control Free Free Stop Grade 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 00390502 Pedestrians Lane Width (ft)Walking Speed (ft/s) Percent BlockageRight turn flare (veh) Median type None None Median storage veh)Upstream signal (ft) 258 54 pX, platoon unblocked vC, conflicting volume 395 393 100vC1, stage 1 conf vol vC2, stage 2 conf volvCu, unblocked vol 395 393 100 tC, single (s) 4.1 6.8 6.9 tC, 2 stage (s)tF (s) 2.2 3.5 3.3 p0 queue free % 100 100 100 cM capacity (veh/h) 1160 584 936 Direction, Lane # WB 1 WB 2 WB 3 WB 4 SB 1 Volume Total 111 111 111 61 2 Volume Left 00000 Volume Right 00052cSH 1700 1700 1700 1700 936 Volume to Capacity 0.07 0.07 0.07 0.04 0.00 Queue Length 95th (ft)00000Control Delay (s/veh) 0.0 0.0 0.0 0.0 8.9 Lane LOS AApproach Delay (s/veh) 0.0 8.9 Approach LOS A Intersection Summary Average Delay 0.0Intersection Capacity Utilization 15.3% ICU Level of Service A Analysis Period (min) 15 Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 Renton Market – Renton, Washington Traffic Impact Analysis 42 APPENDIX I: 2031 NO BUILD PEAK HOUR ANALYSIS Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 5HQWRQ0DUNHW &LW\&HQWHU3DUNLQJ(JUHVV QG6WUHHW %DFNJURXQG$0HCM Unsignalized Intersection Capacity Analysis 2031 Background AM 24-0640 Renton Market 3:04 pm 10/03/2024 2031 Background AM Synchro 12 ReportCivTech Inc.Page 1 Movement EBT EBR WBL WBT NBL NBR Lane ConfigurationsTraffic Volume (veh/h) 0 0 0 751 101 1 Future Volume (Veh/h) 0 0 0 751 101 1Sign Control Free Free Stop Grade 0% 0% 0% Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90Hourly flow rate (vph) 0 0 0 834 112 1 Pedestrians Lane Width (ft)Walking Speed (ft/s) Percent BlockageRight turn flare (veh) Median type None None Median storage veh)Upstream signal (ft) 148 164 pX, platoon unblocked vC, conflicting volume 0 209 0vC1, stage 1 conf vol vC2, stage 2 conf volvCu, unblocked vol 0 209 0 tC, single (s) 4.1 6.8 6.9 tC, 2 stage (s)tF (s) 2.2 3.5 3.3 p0 queue free % 100 85 100 cM capacity (veh/h) 1622 761 1084 Direction, Lane # WB 1 WB 2 WB 3 WB 4 NB 1 Volume Total 209 209 209 209 113 Volume Left 0000112 Volume Right 00001cSH 1700 1700 1700 1700 763 Volume to Capacity 0.12 0.12 0.12 0.12 0.15 Queue Length 95th (ft)000013Control Delay (s/veh) 0.0 0.0 0.0 0.0 10.5 Lane LOS BApproach Delay (s/veh) 0.0 10.5 Approach LOS B Intersection Summary Average Delay 1.3Intersection Capacity Utilization 23.2% ICU Level of Service A Analysis Period (min) 15 5HQWRQ0DUNHW &LW\&HQWHU3DUNLQJ(JUHVV QG6WUHHW %DFNJURXQG30HCM Unsignalized Intersection Capacity Analysis 2031 Background PM 24-0640 Renton Market 3:05 pm 10/03/2024 2031 Background PM Synchro 12 ReportCivTech Inc.Page 1 Movement EBT EBR WBL WBT NBL NBR Lane ConfigurationsTraffic Volume (veh/h) 0 0 1 500 2 0 Future Volume (Veh/h) 0 0 1 500 2 0Sign Control Free Free Stop Grade 0% 0% 0% Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90Hourly flow rate (vph) 0 0 1 556 2 0 Pedestrians Lane Width (ft)Walking Speed (ft/s) Percent BlockageRight turn flare (veh) Median type None None Median storage veh)Upstream signal (ft) 148 164 pX, platoon unblocked vC, conflicting volume 0 141 0vC1, stage 1 conf vol vC2, stage 2 conf volvCu, unblocked vol 0 141 0 tC, single (s) 4.1 6.8 6.9 tC, 2 stage (s)tF (s) 2.2 3.5 3.3 p0 queue free % 100 100 100 cM capacity (veh/h) 1622 837 1084 Direction, Lane # WB 1 WB 2 WB 3 WB 4 NB 1 Volume Total 80 159 159 159 2 Volume Left 10002 Volume Right 00000cSH 1622 1700 1700 1700 837 Volume to Capacity 0.00 0.09 0.09 0.09 0.00 Queue Length 95th (ft)00000Control Delay (s/veh) 0.1 0.0 0.0 0.0 9.3 Lane LOS A AApproach Delay (s/veh) 0.0 9.3 Approach LOS A Intersection Summary Average Delay 0.0Intersection Capacity Utilization 17.3% ICU Level of Service A Analysis Period (min) 15 Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 5HQWRQ0DUNHW &LW\&HQWHU3DUNLQJ,QJUHVV QG6WUHHW %DFNJURXQG$0HCM Unsignalized Intersection Capacity Analysis 2031 Background AM 24-0640 Renton Market 3:04 pm 10/03/2024 2031 Background AM Synchro 12 ReportCivTech Inc.Page 2 Movement EBT EBR WBL WBT NBL NBR Lane ConfigurationsTraffic Volume (veh/h) 0 0 65 785 0 0 Future Volume (Veh/h) 0 0 65 785 0 0Sign Control Free Free Stop Grade 0% 0% 0% Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90Hourly flow rate (vph) 0 0 72 872 0 0 Pedestrians Lane Width (ft)Walking Speed (ft/s) Percent BlockageRight turn flare (veh) Median type None None Median storage veh)Upstream signal (ft) 76 236 pX, platoon unblocked vC, conflicting volume 0 362 0vC1, stage 1 conf vol vC2, stage 2 conf volvCu, unblocked vol 0 362 0 tC, single (s) 4.1 6.8 6.9 tC, 2 stage (s)tF (s) 2.2 3.5 3.3 p0 queue free % 96 100 100 cM capacity (veh/h) 1622 583 1084 Direction, Lane # WB 1 WB 2 WB 3 WB 4 Volume Total 197 249 249 249 Volume Left 72000 Volume Right 0000cSH 1622 1700 1700 1700 Volume to Capacity 0.04 0.15 0.15 0.15 Queue Length 95th (ft)3000Control Delay (s/veh) 2.9 0.0 0.0 0.0 Lane LOS AApproach Delay (s/veh) 0.6 Approach LOS Intersection Summary Average Delay 0.6Intersection Capacity Utilization 15.7% ICU Level of Service A Analysis Period (min) 15 5HQWRQ0DUNHW &LW\&HQWHU3DUNLQJ,QJUHVV QG6WUHHW %DFNJURXQG30HCM Unsignalized Intersection Capacity Analysis 2031 Background PM 24-0640 Renton Market 3:05 pm 10/03/2024 2031 Background PM Synchro 12 ReportCivTech Inc.Page 2 Movement EBT EBR WBL WBT NBL NBR Lane ConfigurationsTraffic Volume (veh/h) 0 0 18 478 0 0 Future Volume (Veh/h) 0 0 18 478 0 0Sign Control Free Free Stop Grade 0% 0% 0% Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90Hourly flow rate (vph) 0 0 20 531 0 0 Pedestrians Lane Width (ft)Walking Speed (ft/s) Percent BlockageRight turn flare (veh) Median type None None Median storage veh)Upstream signal (ft) 76 236 pX, platoon unblocked vC, conflicting volume 0 173 0vC1, stage 1 conf vol vC2, stage 2 conf volvCu, unblocked vol 0 173 0 tC, single (s) 4.1 6.8 6.9 tC, 2 stage (s)tF (s) 2.2 3.5 3.3 p0 queue free % 99 100 100 cM capacity (veh/h) 1622 791 1084 Direction, Lane # WB 1 WB 2 WB 3 WB 4 Volume Total 96 152 152 152 Volume Left 20000 Volume Right 0000cSH 1622 1700 1700 1700 Volume to Capacity 0.01 0.09 0.09 0.09 Queue Length 95th (ft)1000Control Delay (s/veh) 1.6 0.0 0.0 0.0 Lane LOS AApproach Delay (s/veh) 0.3 Approach LOS Intersection Summary Average Delay 0.3Intersection Capacity Utilization 10.5% ICU Level of Service A Analysis Period (min) 15 Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 5HQWRQ0DUNHW /RJDQ$YHQXH QG6WUHHW %DFNJURXQG$0Timings 2031 Background AM 24-0640 Renton Market 3:04 pm 10/03/2024 2031 Background AM Synchro 12 ReportCivTech Inc.Page 3 Lane Group WBT NBL NBT SBT SBR Lane ConfigurationsTraffic Volume (vph) 557 33 24 31 259 Future Volume (vph) 557 33 24 31 259Turn Type NA Perm NA NA Perm Protected Phases 2 8 4 Permitted Phases 8 4Detector Phase 28844 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0Minimum Split (s) 22.5 22.5 22.5 22.5 22.5 Total Split (s) 38.0 37.0 37.0 37.0 37.0Total Split (%) 50.7% 49.3% 49.3% 49.3% 49.3% Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 All-Red Time (s) 1.0 1.0 1.0 1.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 Total Lost Time (s) 4.5 4.5 4.5 4.5 Lead/LagLead-Lag Optimize? Recall Mode C-Max None None Max MaxAct Effct Green (s) 33.5 32.5 32.5 32.5 Actuated g/C Ratio 0.45 0.43 0.43 0.43 v/c Ratio 0.28 0.09 0.04 0.36Control Delay (s/veh) 9.9 13.0 12.5 7.0 Queue Delay 0.0 0.0 0.0 0.0 Total Delay (s/veh) 9.9 13.0 12.5 7.0LOS A BBA Approach Delay (s/veh) 9.9 13.1 7.7Approach LOS A B A Intersection Summary Cycle Length: 75 Actuated Cycle Length: 75 Offset: 0 (0%), Referenced to phase 2:WBTL and 6:, Start of GreenNatural Cycle: 45 Control Type: Actuated-CoordinatedMaximum v/c Ratio: 0.37 Intersection Signal Delay (s/veh): 9.5 Intersection LOS: A Intersection Capacity Utilization 42.3% ICU Level of Service AAnalysis Period (min) 15 Splits and Phases: 3: Logan Avenue & 2nd Street 5HQWRQ0DUNHW /RJDQ$YHQXH QG6WUHHW %DFNJURXQG30Timings 2031 Background PM 24-0640 Renton Market 3:05 pm 10/03/2024 2031 Background PM Synchro 12 ReportCivTech Inc.Page 3 Lane Group WBT NBL NBT SBT SBR Lane ConfigurationsTraffic Volume (vph) 319 24 68 33 46 Future Volume (vph) 319 24 68 33 46Turn Type NA Perm NA NA Perm Protected Phases 2 8 4 Permitted Phases 8 4Detector Phase 28844 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0Minimum Split (s) 22.5 22.5 22.5 22.5 22.5 Total Split (s) 38.0 37.0 37.0 37.0 37.0Total Split (%) 50.7% 49.3% 49.3% 49.3% 49.3% Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 All-Red Time (s) 1.0 1.0 1.0 1.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 Total Lost Time (s) 4.5 4.5 4.5 4.5 Lead/LagLead-Lag Optimize? Recall Mode C-Max None None Max MaxAct Effct Green (s) 33.5 32.5 32.5 32.5 Actuated g/C Ratio 0.45 0.43 0.43 0.43 v/c Ratio 0.19 0.13 0.04 0.07Control Delay (s/veh) 3.7 13.4 12.5 4.3 Queue Delay 0.0 0.0 0.0 0.0 Total Delay (s/veh) 3.7 13.4 12.5 4.3LOS A BBA Approach Delay (s/veh) 3.7 13.5 7.8Approach LOS A B A Intersection Summary Cycle Length: 75 Actuated Cycle Length: 75 Offset: 0 (0%), Referenced to phase 2:WBTL and 6:, Start of GreenNatural Cycle: 45 Control Type: Actuated-CoordinatedMaximum v/c Ratio: 0.19 Intersection Signal Delay (s/veh): 5.6 Intersection LOS: A Intersection Capacity Utilization 27.7% ICU Level of Service AAnalysis Period (min) 15 Splits and Phases: 3: Logan Avenue & 2nd Street Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 5HQWRQ0DUNHW /RJDQ$YHQXH QG6WUHHW %DFNJURXQG$0HCM 7th Signalized Intersection Summary 2031 Background AM 24-0640 Renton Market 3:04 pm 10/03/2024 2031 Background AM Synchro 12 ReportCivTech Inc.Page 5 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane ConfigurationsTraffic Volume (veh/h) 0 0 0 33 557 134 33 24 0 0 31 259 Future Volume (veh/h) 0 0 0 33 557 134 33 24 0 0 31 259Initial Q (Qb), veh 000000000 Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 0 0 1870 1870Adj Flow Rate, veh/h 37 619 149 37 27 0 0 34 288 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90Percent Heavy Veh, % 222220022 Cap, veh/h 139 2325 540 386 263 0 0 810 687 Arrive On Green 0.15 0.15 0.15 0.43 0.43 0.00 0.00 0.43 0.43Sat Flow, veh/h 312 5205 1208 715 606 0 0 1870 1585 Grp Volume(v), veh/h 220 381 204 64 0 0 0 34 288 Grp Sat Flow(s),veh/h/ln 1855 1609 1653 1321 0 0 0 1870 1585Q Serve(g_s), s 7.9 7.9 8.2 0.1 0.0 0.0 0.0 0.8 9.4 Cycle Q Clear(g_c), s 7.9 7.9 8.2 1.5 0.0 0.0 0.0 0.8 9.4 Prop In Lane 0.17 0.73 0.58 0.00 0.00 1.00Lane Grp Cap(c), veh/h 828 1437 738 648 0 0 0 810 687 V/C Ratio(X) 0.27 0.27 0.28 0.10 0.00 0.00 0.00 0.04 0.42 Avail Cap(c_a), veh/h 828 1437 738 648 0 0 0 810 687HCM Platoon Ratio 0.33 0.33 0.33 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 0.00 0.00 0.00 1.00 1.00Uniform Delay (d), s/veh 21.1 21.1 21.2 12.5 0.0 0.0 0.0 12.3 14.7 Incr Delay (d2), s/veh 0.8 0.5 0.9 0.1 0.0 0.0 0.0 0.1 1.9 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0%ile BackOfQ(95%),veh/ln 6.8 5.7 6.4 1.1 0.0 0.0 0.0 0.6 6.3 Unsig. Movement Delay, s/veh LnGrp Delay(d), s/veh 21.8 21.5 22.1 12.5 0.0 0.0 0.0 12.4 16.6LnGrp LOS C C C B B B Approach Vol, veh/h 805 64 322 Approach Delay, s/veh 21.8 12.5 16.1Approach LOS C B B Timer - Assigned Phs 2 4 8 Phs Duration (G+Y+Rc), s 38.0 37.0 37.0 Change Period (Y+Rc), s 4.5 4.5 4.5Max Green Setting (Gmax), s 33.5 32.5 32.5 Max Q Clear Time (g_c+I1), s 10.2 11.4 3.5 Green Ext Time (p_c), s 5.4 1.1 0.3 Intersection Summary HCM 7th Control Delay, s/veh 19.7HCM 7th LOS B 5HQWRQ0DUNHW /RJDQ$YHQXH QG6WUHHW %DFNJURXQG30HCM 7th Signalized Intersection Summary 2031 Background PM 24-0640 Renton Market 3:05 pm 10/03/2024 2031 Background PM Synchro 12 ReportCivTech Inc.Page 5 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane ConfigurationsTraffic Volume (veh/h) 0 0 0 18 319 148 24 68 0 0 33 46 Future Volume (veh/h) 0 0 0 18 319 148 24 68 0 0 33 46Initial Q (Qb), veh 000000000 Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 0 0 1870 1870Adj Flow Rate, veh/h 20 354 164 27 76 0 0 37 51 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90Percent Heavy Veh, % 222220022 Cap, veh/h 121 2145 708 219 585 0 0 810 687 Arrive On Green 0.15 0.15 0.15 0.43 0.43 0.00 0.00 0.43 0.43Sat Flow, veh/h 271 4803 1585 365 1349 0 0 1870 1585 Grp Volume(v), veh/h 137 237 164 103 0 0 0 37 51 Grp Sat Flow(s),veh/h/ln 1857 1609 1585 1714 0 0 0 1870 1585Q Serve(g_s), s 4.8 4.8 6.9 0.0 0.0 0.0 0.0 0.9 1.4 Cycle Q Clear(g_c), s 4.8 4.8 6.9 2.5 0.0 0.0 0.0 0.9 1.4 Prop In Lane 0.15 1.00 0.26 0.00 0.00 1.00Lane Grp Cap(c), veh/h 829 1437 708 803 0 0 0 810 687 V/C Ratio(X) 0.17 0.16 0.23 0.13 0.00 0.00 0.00 0.05 0.07 Avail Cap(c_a), veh/h 829 1437 708 803 0 0 0 810 687HCM Platoon Ratio 0.33 0.33 0.33 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 0.00 0.00 0.00 1.00 1.00Uniform Delay (d), s/veh 19.8 19.7 20.6 12.7 0.0 0.0 0.0 12.3 12.4 Incr Delay (d2), s/veh 0.4 0.2 0.8 0.1 0.0 0.0 0.0 0.1 0.2 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0%ile BackOfQ(95%),veh/ln 3.9 3.3 4.9 1.8 0.0 0.0 0.0 0.6 0.9 Unsig. Movement Delay, s/veh LnGrp Delay(d), s/veh 20.2 20.0 21.4 12.8 0.0 0.0 0.0 12.4 12.7LnGrp LOS C B C B B B Approach Vol, veh/h 538 103 88 Approach Delay, s/veh 20.5 12.8 12.5Approach LOS C B B Timer - Assigned Phs 2 4 8 Phs Duration (G+Y+Rc), s 38.0 37.0 37.0 Change Period (Y+Rc), s 4.5 4.5 4.5Max Green Setting (Gmax), s 33.5 32.5 32.5 Max Q Clear Time (g_c+I1), s 8.9 3.4 4.5 Green Ext Time (p_c), s 3.5 0.3 0.5 Intersection Summary HCM 7th Control Delay, s/veh 18.4HCM 7th LOS B Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 5HQWRQ0DUNHW 5HQWRQ0DUNHW'ULYHZD\ /RJDQ$YHQXH %DFNJURXQG$0HCM Unsignalized Intersection Capacity Analysis 2031 Background AM 24-0640 Renton Market 3:04 pm 10/03/2024 2031 Background AM Synchro 12 ReportCivTech Inc.Page 6 Movement WBL WBR NBT NBR SBL SBT Lane ConfigurationsTraffic Volume (veh/h) 0010130 Future Volume (Veh/h) 0010130Sign Control Stop Free Free Grade 0% 0% 0% Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90Hourly flow rate (vph) 0010140 Pedestrians Lane Width (ft)Walking Speed (ft/s) Percent BlockageRight turn flare (veh) Median type None None Median storage veh)Upstream signal (ft) 259 302 pX, platoon unblocked vC, conflicting volume 29 1 1vC1, stage 1 conf vol vC2, stage 2 conf volvCu, unblocked vol 29 1 1 tC, single (s) 6.4 6.2 4.1 tC, 2 stage (s)tF (s) 3.5 3.3 2.2 p0 queue free % 100 100 99 cM capacity (veh/h) 977 1084 1622 Direction, Lane # NB 1 SB 1 Volume Total 1 14 Volume Left 0 14 Volume Right 0 0cSH 1700 1622 Volume to Capacity 0.00 0.01 Queue Length 95th (ft) 0 1Control Delay (s/veh) 0.0 7.2 Lane LOS AApproach Delay (s/veh) 0.0 7.2 Approach LOS Intersection Summary Average Delay 6.8Intersection Capacity Utilization 10.7% ICU Level of Service A Analysis Period (min) 15 5HQWRQ0DUNHW 5HQWRQ0DUNHW'ULYHZD\ /RJDQ$YHQXH %DFNJURXQG30HCM Unsignalized Intersection Capacity Analysis 2031 Background PM 24-0640 Renton Market 3:05 pm 10/03/2024 2031 Background PM Synchro 12 ReportCivTech Inc.Page 6 Movement WBL WBR NBT NBR SBL SBT Lane ConfigurationsTraffic Volume (veh/h) 0 0 76 2 5 64 Future Volume (Veh/h) 0 0 76 2 5 64Sign Control Stop Free Free Grade 0% 0% 0% Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90Hourly flow rate (vph) 0 0 84 2 6 71 Pedestrians Lane Width (ft)Walking Speed (ft/s) Percent BlockageRight turn flare (veh) Median type None None Median storage veh)Upstream signal (ft) 259 302 pX, platoon unblocked vC, conflicting volume 168 85 86vC1, stage 1 conf vol vC2, stage 2 conf volvCu, unblocked vol 168 85 86 tC, single (s) 6.4 6.2 4.1 tC, 2 stage (s)tF (s) 3.5 3.3 2.2 p0 queue free % 100 100 100 cM capacity (veh/h) 819 974 1510 Direction, Lane # NB 1 SB 1 Volume Total 86 77 Volume Left 0 6 Volume Right 2 0cSH 1700 1510 Volume to Capacity 0.05 0.00 Queue Length 95th (ft) 0 0Control Delay (s/veh) 0.0 0.6 Lane LOS AApproach Delay (s/veh) 0.0 0.6 Approach LOS Intersection Summary Average Delay 0.3Intersection Capacity Utilization 10.8% ICU Level of Service A Analysis Period (min) 15 Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 5HQWRQ0DUNHW /RJDQ$YHQXH 'ULYHZD\QRIUG6WUHHW %DFNJURXQG$0HCM Unsignalized Intersection Capacity Analysis 2031 Background AM 24-0640 Renton Market 3:04 pm 10/03/2024 2031 Background AM Synchro 12 ReportCivTech Inc.Page 7 Movement EBL EBR NBL NBT SBT SBR Lane ConfigurationsTraffic Volume (veh/h) 000000 Future Volume (Veh/h) 000000Sign Control Stop Free Free Grade 0% 0% 0% Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90Hourly flow rate (vph) 000000 Pedestrians Lane Width (ft)Walking Speed (ft/s) Percent BlockageRight turn flare (veh) Median type None None Median storage veh)Upstream signal (ft) 133 428 pX, platoon unblocked vC, conflicting volume 0 0 0vC1, stage 1 conf vol vC2, stage 2 conf volvCu, unblocked vol 0 0 0 tC, single (s) 6.4 6.2 4.1 tC, 2 stage (s)tF (s) 3.5 3.3 2.2 p0 queue free % 100 100 100 cM capacity (veh/h) 1023 1085 1623 Direction, Lane # EB 1 NB 1 SB 1 Volume Total 0 0 0 Volume Left 0 0 0 Volume Right 0 0 0cSH 1700 1700 1700 Volume to Capacity 0.01 0.00 0.05 Queue Length 95th (ft) 0 0 0Control Delay (s/veh) 0.0 0.0 0.0 Lane LOS AApproach Delay (s/veh) 0.0 0.0 0.0 Approach LOS A Intersection Summary Average Delay 0.0Intersection Capacity Utilization 0.0% ICU Level of Service A Analysis Period (min) 15 5HQWRQ0DUNHW /RJDQ$YHQXH 'ULYHZD\QRIUG6WUHHW %DFNJURXQG30HCM Unsignalized Intersection Capacity Analysis 2031 Background PM 24-0640 Renton Market 3:05 pm 10/03/2024 2031 Background PM Synchro 12 ReportCivTech Inc.Page 7 Movement EBL EBR NBL NBT SBT SBR Lane ConfigurationsTraffic Volume (veh/h) 1 6 0 72 69 7 Future Volume (Veh/h) 1 6 0 72 69 7Sign Control Stop Free Free Grade 0% 0% 0% Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90Hourly flow rate (vph) 1 7 0 80 77 8 Pedestrians Lane Width (ft)Walking Speed (ft/s) Percent BlockageRight turn flare (veh) Median type None None Median storage veh)Upstream signal (ft) 133 428 pX, platoon unblocked vC, conflicting volume 161 81 85vC1, stage 1 conf vol vC2, stage 2 conf volvCu, unblocked vol 161 81 85 tC, single (s) 6.4 6.2 4.1 tC, 2 stage (s)tF (s) 3.5 3.3 2.2 p0 queue free % 100 99 100 cM capacity (veh/h) 830 979 1512 Direction, Lane # EB 1 NB 1 SB 1 Volume Total 8 80 85 Volume Left 1 0 0 Volume Right 7 0 8cSH 957 1700 1700 Volume to Capacity 0.01 0.05 0.05 Queue Length 95th (ft) 1 0 0Control Delay (s/veh) 8.8 0.0 0.0 Lane LOS AApproach Delay (s/veh) 8.8 0.0 0.0 Approach LOS A Intersection Summary Average Delay 0.4Intersection Capacity Utilization Err% ICU Level of Service H Analysis Period (min) 15 Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 5HQWRQ0DUNHW /RJDQ$YHQXH 'ULYHZD\QRIUG6WUHHW %DFNJURXQG$0HCM 7th TWSC 2031 Background AM 24-0640 Renton Market 3:04 pm 10/03/2024 2031 Background AM Synchro 12 ReportCivTech Inc.Page 8 Intersection Int Delay, s/veh 0 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 0 0 0 0 0 0 Future Vol, veh/h 0 0 0 0 0 0Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free FreeRT Channelized - None - None - None Storage Length - 0 - - - - Veh in Median Storage, # 0 - - 0 0 -Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2Mvmt Flow 0 0 0 0 0 0 Major/Minor Minor2 Major1 Major2 Conflicting Flow All - 1 - 0 - 0 Stage 1 - - - - - - Stage 2 - - - - - - Critical Hdwy -6.22----Critical Hdwy Stg 1 ------ Critical Hdwy Stg 2 ------Follow-up Hdwy - 3.318 - - - - Pot Cap-1 Maneuver 0 1083 0 - - - Stage 1 0 - 0 - - - Stage 2 0 - 0 - - - Platoon blocked, % - - - Mov Cap-1 Maneuver - 1083 - - - -Mov Cap-2 Maneuver - - - - - - Stage 1 - - - - - - Stage 2 - - - - - - Approach EB NB SB HCM Control Delay, s/v 0 0 0HCM LOS A Minor Lane/Major Mvmt NBTEBLn1 SBT SBR Capacity (veh/h) - - - - HCM Lane V/C Ratio - - - -HCM Control Delay (s/veh) - 0 - - HCM Lane LOS - A - -HCM 95th %tile Q(veh) ---- 5HQWRQ0DUNHW /RJDQ$YHQXH 'ULYHZD\QRIUG6WUHHW %DFNJURXQG30HCM 7th TWSC 2031 Background PM 24-0640 Renton Market 3:05 pm 10/03/2024 2031 Background PM Synchro 12 ReportCivTech Inc.Page 8 Intersection Int Delay, s/veh 0.4 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 1 6 0 72 69 7 Future Vol, veh/h 1 6 0 72 69 7Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free FreeRT Channelized - None - None - None Storage Length - 0 ---- Veh in Median Storage, # 0 - - 0 0 -Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2Mvmt Flow 1 7 0 80 77 8 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 161 81 - 0 - 0 Stage 1 81 ----- Stage 2 80 ----- Critical Hdwy 6.426.22----Critical Hdwy Stg 15.42----- Critical Hdwy Stg 25.42-----Follow-up Hdwy 3.5183.318---- Pot Cap-1 Maneuver 830 979 0 - - - Stage 1 943 - 0 - - - Stage 2 943 - 0 - - - Platoon blocked, % - - - Mov Cap-1 Maneuver 830 979 ----Mov Cap-2 Maneuver 830 ----- Stage 1 943 ----- Stage 2 943 ----- Approach EB NB SB HCM Control Delay, s/v 8.7 0 0HCM LOS A Minor Lane/Major Mvmt NBTEBLn1 SBT SBR Capacity (veh/h) - 979 - - HCM Lane V/C Ratio - 0.007 - -HCM Control Delay (s/veh) - 8.7 - - HCM Lane LOS - A - -HCM 95th %tile Q(veh) - 0 - - Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 5HQWRQ0DUNHW UG6WUHHW /RJDQ$YHQXH %DFNJURXQG$0Timings 2031 Background AM 24-0640 Renton Market 3:04 pm 10/03/2024 2031 Background AM Synchro 12 ReportCivTech Inc.Page 9 Lane Group EBT NBR Ø4 Lane ConfigurationsTraffic Volume (vph) 950 20 Future Volume (vph) 950 20Turn Type NA Perm Protected Phases 2 4 Permitted Phases 3Detector Phase 2 3 Switch Phase Minimum Initial (s) 5.0 5.0 5.0Minimum Split (s) 22.5 22.5 23.0 Total Split (s) 25.0 10.0 15.0Total Split (%) 50.0% 20.0% 30% Yellow Time (s) 3.5 3.5 4.0 All-Red Time (s) 1.0 1.0 1.0Lost Time Adjust (s) 0.0 0.0 Total Lost Time (s) 4.5 4.5 Lead/Lag Lead LagLead-Lag Optimize? Yes Yes Recall Mode C-Max None MaxAct Effct Green (s) 20.5 5.5 Actuated g/C Ratio 0.41 0.11 v/c Ratio 0.75 0.04Control Delay (s/veh) 16.6 0.1 Queue Delay 0.0 0.0 Total Delay (s/veh) 16.6 0.1LOS B A Approach Delay (s/veh) 16.6Approach LOS B Intersection Summary Cycle Length: 50 Actuated Cycle Length: 50 Offset: 0 (0%), Referenced to phase 2:EBTL and 6:, Start of GreenNatural Cycle: 75 Control Type: Actuated-CoordinatedMaximum v/c Ratio: 0.75 Intersection Signal Delay (s/veh): 16.3 Intersection LOS: B Intersection Capacity Utilization 39.0% ICU Level of Service AAnalysis Period (min) 15 Splits and Phases: 6: 3rd Street & Logan Avenue 5HQWRQ0DUNHW UG6WUHHW /RJDQ$YHQXH %DFNJURXQG30Timings 2031 Background PM 24-0640 Renton Market 3:05 pm 10/03/2024 2031 Background PM Synchro 12 ReportCivTech Inc.Page 9 Lane Group EBT NBR SBL Lane ConfigurationsTraffic Volume (vph) 238 16 76 Future Volume (vph) 238 16 76Turn Type NA Perm Prot Protected Phases 2 4 Permitted Phases 3Detector Phase 2 3 4 Switch Phase Minimum Initial (s) 5.0 5.0 5.0Minimum Split (s) 22.5 22.5 23.0 Total Split (s) 25.0 10.0 15.0Total Split (%) 50.0% 20.0% 30.0% Yellow Time (s) 3.5 3.5 4.0 All-Red Time (s) 1.0 1.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 Total Lost Time (s) 4.5 4.5 5.0 Lead/Lag Lead LagLead-Lag Optimize? Yes Yes Recall Mode C-Max None MaxAct Effct Green (s) 20.5 5.5 18.0 Actuated g/C Ratio 0.41 0.11 0.36 v/c Ratio 0.23 0.02 0.13Control Delay (s/veh) 10.1 0.0 13.4 Queue Delay 0.0 0.0 0.0 Total Delay (s/veh) 10.1 0.0 13.4LOS BAB Approach Delay (s/veh) 10.2Approach LOS B Intersection Summary Cycle Length: 50 Actuated Cycle Length: 50 Offset: 0 (0%), Referenced to phase 2:EBTL and 6:, Start of GreenNatural Cycle: 70 Control Type: Actuated-CoordinatedMaximum v/c Ratio: 0.24 Intersection Signal Delay (s/veh): 10.4 Intersection LOS: B Intersection Capacity Utilization 27.8% ICU Level of Service AAnalysis Period (min) 15 Splits and Phases: 6: 3rd Street & Logan Avenue Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 5HQWRQ0DUNHW UG6WUHHW /RJDQ$YHQXH %DFNJURXQG$0HCM Signalized Intersection Capacity Analysis 2031 Background AM 24-0640 Renton Market 3:04 pm 10/03/2024 2031 Background AM Synchro 12 ReportCivTech Inc.Page 10 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane ConfigurationsTraffic Volume (vph) 0950330000020000 Future Volume (vph) 0950330000020000Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 4.5 4.5 Lane Util. Factor 0.95 1.00Frt 0.99 0.86 Flt Protected 1.00 1.00 Satd. Flow (prot) 3521 1611Flt Permitted 1.00 1.00 Satd. Flow (perm) 3521 1611 Peak-hour factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90Adj. Flow (vph) 0 1056 370000022000 RTOR Reduction (vph)0500000022000 Lane Group Flow (vph) 0 10880000000000 Turn Type NA Perm Prot Protected Phases 2 4 Permitted Phases 2 3Actuated Green, G (s) 16.9 1.1 Effective Green, g (s) 16.9 1.1 Actuated g/C Ratio 0.34 0.02Clearance Time (s) 4.5 4.5 Vehicle Extension (s) 3.0 3.0 Lane Grp Cap (vph) 1190 35v/s Ratio Prot c0.31 v/s Ratio Perm c0.00 v/c Ratio 0.91 0.01Uniform Delay, d1 15.8 23.9 Progression Factor 1.00 1.00Incremental Delay, d2 12.2 0.1 Delay (s) 28.0 24.0 Level of Service C CApproach Delay (s/veh) 28.0 0.0 24.0 0.0 Approach LOS C A C A Intersection Summary HCM 2000 Control Delay (s/veh) 28.0 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.43 Actuated Cycle Length (s) 50.0 Sum of lost time (s) 14.0 Intersection Capacity Utilization 39.0% ICU Level of Service AAnalysis Period (min) 15 c Critical Lane Group 5HQWRQ0DUNHW UG6WUHHW /RJDQ$YHQXH %DFNJURXQG30HCM Signalized Intersection Capacity Analysis 2031 Background PM 24-0640 Renton Market 3:05 pm 10/03/2024 2031 Background PM Synchro 12 ReportCivTech Inc.Page 10 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane ConfigurationsTraffic Volume (vph) 67238200000167600 Future Volume (vph) 67238200000167600Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 4.5 4.5 5.0 Lane Util. Factor 0.95 1.00 1.00Frt 0.99 0.86 1.00 Flt Protected 0.98 1.00 0.95 Satd. Flow (prot) 3498 1611 1770Flt Permitted 0.98 1.00 0.95 Satd. Flow (perm) 3498 1611 1770 Peak-hour factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90Adj. Flow (vph) 74264200000188400 RTOR Reduction (vph)0100000018000 Lane Group Flow (vph) 0 33900000008400 Turn Type Perm NA Perm Prot Protected Phases 2 4 Permitted Phases 2 3Actuated Green, G (s) 16.9 1.1 18.0 Effective Green, g (s) 16.9 1.1 18.0 Actuated g/C Ratio 0.34 0.02 0.36Clearance Time (s) 4.5 4.5 5.0 Vehicle Extension (s) 3.0 3.0 3.0 Lane Grp Cap (vph) 1182 35 637v/s Ratio Prot c0.05 v/s Ratio Perm 0.10 c0.00 v/c Ratio 0.28 0.01 0.13Uniform Delay, d1 12.1 23.9 10.7 Progression Factor 1.00 1.00 1.00Incremental Delay, d2 0.6 0.1 0.4 Delay (s) 12.7 24.0 11.1 Level of Service B C BApproach Delay (s/veh) 12.7 0.0 24.0 11.1 Approach LOS B A C B Intersection Summary HCM 2000 Control Delay (s/veh) 12.9 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.20 Actuated Cycle Length (s) 50.0 Sum of lost time (s) 14.0 Intersection Capacity Utilization 27.8% ICU Level of Service AAnalysis Period (min) 15 c Critical Lane Group Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 5HQWRQ0DUNHW %XUQHWW$YHQXH QG6WUHHW %DFNJURXQG$0Timings 2031 Background AM 24-0640 Renton Market 3:04 pm 10/03/2024 2031 Background AM Synchro 12 ReportCivTech Inc.Page 12 Lane Group WBT NBL NBT SBT SBR Lane ConfigurationsTraffic Volume (vph) 545 188 37 18 20 Future Volume (vph) 545 188 37 18 20Turn Type NA Prot NA NA Perm Protected Phases 2384 Permitted Phases 4Detector Phase 23844 Switch Phase Minimum Initial (s) 5.0 5.0 4.0 5.0 5.0Minimum Split (s) 23.0 23.0 23.0 23.0 23.0 Total Split (s) 27.0 25.0 48.0 23.0 23.0Total Split (%) 36.0% 33.3% 64.0% 30.7% 30.7% Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 All-Red Time (s) 1.0 1.0 1.0 1.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 Lead/Lag Lead Lag LagLead-Lag Optimize? Yes Yes Yes Recall Mode C-Max Max Max Max MaxAct Effct Green (s) 22.0 20.0 43.0 18.0 18.0 Actuated g/C Ratio 0.29 0.27 0.57 0.24 0.24 v/c Ratio 0.46 0.44 0.03 0.04 0.04Control Delay (s/veh) 22.7 26.4 7.1 22.3 0.2 Queue Delay 0.0 0.0 0.0 0.0 0.0 Total Delay (s/veh) 22.7 26.4 7.1 22.3 0.2LOS CCACA Approach Delay (s/veh) 22.8 23.3 10.8Approach LOS C C B Intersection Summary Cycle Length: 75 Actuated Cycle Length: 75 Offset: 0 (0%), Referenced to phase 2:WBTL, Start of GreenNatural Cycle: 70 Control Type: Actuated-CoordinatedMaximum v/c Ratio: 0.47 Intersection Signal Delay (s/veh): 22.4 Intersection LOS: C Intersection Capacity Utilization 38.8% ICU Level of Service AAnalysis Period (min) 15 Splits and Phases: 7: Burnett Avenue & 2nd Street 5HQWRQ0DUNHW %XUQHWW$YHQXH QG6WUHHW %DFNJURXQG30Timings 2031 Background PM 24-0640 Renton Market 3:05 pm 10/03/2024 2031 Background PM Synchro 12 ReportCivTech Inc.Page 12 Lane Group WBT NBL NBT SBT SBR Lane ConfigurationsTraffic Volume (vph) 412 67 18 7 24 Future Volume (vph) 412 67 18 7 24Turn Type NA Prot NA NA Perm Protected Phases 2384 Permitted Phases 4Detector Phase 23844 Switch Phase Minimum Initial (s) 5.0 5.0 4.0 5.0 5.0Minimum Split (s) 23.0 23.0 23.0 23.0 23.0 Total Split (s) 27.0 25.0 48.0 23.0 23.0Total Split (%) 36.0% 33.3% 64.0% 30.7% 30.7% Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 All-Red Time (s) 1.0 1.0 1.0 1.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 Lead/Lag Lead Lag LagLead-Lag Optimize? Yes Yes Yes Recall Mode C-Max Max Max Max MaxAct Effct Green (s) 22.0 20.0 43.0 18.0 18.0 Actuated g/C Ratio 0.29 0.27 0.57 0.24 0.24 v/c Ratio 0.35 0.15 0.01 0.01 0.05Control Delay (s/veh) 21.3 22.1 7.0 22.0 0.2 Queue Delay 0.0 0.0 0.0 0.0 0.0 Total Delay (s/veh) 21.3 22.1 7.0 22.0 0.2LOS CCACA Approach Delay (s/veh) 21.4 19.0 5.2Approach LOS C B A Intersection Summary Cycle Length: 75 Actuated Cycle Length: 75 Offset: 0 (0%), Referenced to phase 2:WBTL, Start of GreenNatural Cycle: 70 Control Type: Actuated-CoordinatedMaximum v/c Ratio: 0.35 Intersection Signal Delay (s/veh): 20.1 Intersection LOS: C Intersection Capacity Utilization 29.9% ICU Level of Service AAnalysis Period (min) 15 Splits and Phases: 7: Burnett Avenue & 2nd Street Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 5HQWRQ0DUNHW %XUQHWW$YHQXH QG6WUHHW %DFNJURXQG$0HCM 7th Signalized Intersection Summary 2031 Background AM 24-0640 Renton Market 3:04 pm 10/03/2024 2031 Background AM Synchro 12 ReportCivTech Inc.Page 14 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane ConfigurationsTraffic Volume (veh/h) 0 0 0 60 545 16 188 37 0 0 18 20 Future Volume (veh/h) 0 0 0 60 545 16 188 37 0 0 18 20Initial Q (Qb), veh 000000000 Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 0 0 1870 1870Adj Flow Rate, veh/h 67 606 18 209 41 0 0 20 22 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90Percent Heavy Veh, % 222220022 Cap, veh/h 153 1387 41 475 1072 0 0 449 380 Arrive On Green 0.29 0.29 0.29 0.27 0.57 0.00 0.00 0.24 0.24Sat Flow, veh/h 522 4729 140 1781 1870 0 0 1870 1585 Grp Volume(v), veh/h 237 218 237 209 41 0 0 20 22 Grp Sat Flow(s),veh/h/ln 1844 1702 1845 1781 1870 0 0 1870 1585Q Serve(g_s), s 7.8 7.8 7.8 7.3 0.7 0.0 0.0 0.6 0.8 Cycle Q Clear(g_c), s 7.8 7.8 7.8 7.3 0.7 0.0 0.0 0.6 0.8 Prop In Lane 0.28 0.08 1.00 0.00 0.00 1.00Lane Grp Cap(c), veh/h 541 499 541 475 1072 0 0 449 380 V/C Ratio(X) 0.44 0.44 0.44 0.44 0.04 0.00 0.00 0.04 0.06 Avail Cap(c_a), veh/h 541 499 541 475 1072 0 0 449 380HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 0.00 0.00 1.00 1.00Uniform Delay (d), s/veh 21.5 21.5 21.5 22.8 7.0 0.0 0.0 21.9 22.0 Incr Delay (d2), s/veh 2.6 2.8 2.6 2.9 0.1 0.0 0.0 0.2 0.3 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0%ile BackOfQ(95%),veh/ln 6.5 6.0 6.5 6.0 0.5 0.0 0.0 0.5 0.6 Unsig. Movement Delay, s/veh LnGrp Delay(d), s/veh 24.0 24.2 24.0 25.8 7.0 0.0 0.0 22.1 22.3LnGrp LOS CCCCA CC Approach Vol, veh/h 691 250 42 Approach Delay, s/veh 24.1 22.7 22.2Approach LOS C C C Timer - Assigned Phs 2 3 4 8 Phs Duration (G+Y+Rc), s 27.0 25.0 23.0 48.0 Change Period (Y+Rc), s 5.0 5.0 5.0 5.0Max Green Setting (Gmax), s 22.0 20.0 18.0 43.0 Max Q Clear Time (g_c+I1), s 9.8 9.3 2.8 2.7 Green Ext Time (p_c), s 3.3 0.4 0.1 0.2 Intersection Summary HCM 7th Control Delay, s/veh 23.7HCM 7th LOS C 5HQWRQ0DUNHW %XUQHWW$YHQXH QG6WUHHW %DFNJURXQG30HCM 7th Signalized Intersection Summary 2031 Background PM 24-0640 Renton Market 3:05 pm 10/03/2024 2031 Background PM Synchro 12 ReportCivTech Inc.Page 14 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane ConfigurationsTraffic Volume (veh/h) 0003841218671800724 Future Volume (veh/h) 0003841218671800724Initial Q (Qb), veh 000000000 Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 0 0 1870 1870Adj Flow Rate, veh/h 4245820742000827 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90Percent Heavy Veh, % 222220022 Cap, veh/h 128 1391 61 475 1072 0 0 449 380 Arrive On Green 0.29 0.29 0.29 0.27 0.57 0.00 0.00 0.24 0.24Sat Flow, veh/h 435 4743 206 1781 1870 0 0 1870 1585 Grp Volume(v), veh/h 179164178742000827 Grp Sat Flow(s),veh/h/ln 1849 1702 1833 1781 1870 0 0 1870 1585Q Serve(g_s), s 5.7 5.6 5.7 2.4 0.3 0.0 0.0 0.2 1.0 Cycle Q Clear(g_c), s 5.7 5.6 5.7 2.4 0.3 0.0 0.0 0.2 1.0 Prop In Lane 0.24 0.11 1.00 0.00 0.00 1.00Lane Grp Cap(c), veh/h 542 499 538 475 1072 0 0 449 380 V/C Ratio(X) 0.33 0.33 0.33 0.16 0.02 0.00 0.00 0.02 0.07 Avail Cap(c_a), veh/h 542 499 538 475 1072 0 0 449 380HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 0.00 0.00 1.00 1.00Uniform Delay (d), s/veh 20.7 20.7 20.7 21.0 6.9 0.0 0.0 21.8 22.0 Incr Delay (d2), s/veh 1.6 1.7 1.6 0.7 0.0 0.0 0.0 0.1 0.4 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0%ile BackOfQ(95%),veh/ln 4.6 4.3 4.6 1.9 0.2 0.0 0.0 0.2 0.7 Unsig. Movement Delay, s/veh LnGrp Delay(d), s/veh 22.4 22.5 22.4 21.7 6.9 0.0 0.0 21.8 22.4LnGrp LOS CCCCA CC Approach Vol, veh/h 520 94 35 Approach Delay, s/veh 22.4 18.6 22.3Approach LOS C B C Timer - Assigned Phs 2 3 4 8 Phs Duration (G+Y+Rc), s 27.0 25.0 23.0 48.0 Change Period (Y+Rc), s 5.0 5.0 5.0 5.0Max Green Setting (Gmax), s 22.0 20.0 18.0 43.0 Max Q Clear Time (g_c+I1), s 7.7 4.4 3.0 2.3 Green Ext Time (p_c), s 2.6 0.1 0.1 0.1 Intersection Summary HCM 7th Control Delay, s/veh 21.8HCM 7th LOS C Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 5HQWRQ0DUNHW UG6WUHHW %XUQHWW$YHQXH %DFNJURXQG$0Timings 2031 Background AM 24-0640 Renton Market 3:04 pm 10/03/2024 2031 Background AM Synchro 12 ReportCivTech Inc.Page 15 Lane Group EBT EBR NBT NBR SBL SBT Lane ConfigurationsTraffic Volume (vph) 696 146 78 93 41 51 Future Volume (vph) 696 146 78 93 41 51Turn Type NA Perm NA Perm Perm NA Protected Phases 6 8 4 Permitted Phases 6 8 4Detector Phase 668844 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 4.0 4.0Minimum Split (s) 29.0 29.0 23.0 23.0 23.0 23.0 Total Split (s) 35.0 35.0 25.0 25.0 25.0 25.0Total Split (%) 58.3% 58.3% 41.7% 41.7% 41.7% 41.7% Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 Lead/LagLead-Lag Optimize? Recall Mode C-Max C-Max Max Max Max MaxAct Effct Green (s) 30.0 30.0 20.0 20.0 20.0 Actuated g/C Ratio 0.50 0.50 0.33 0.33 0.33 v/c Ratio 0.52 0.18 0.14 0.17 0.19Control Delay (s/veh) 11.4 2.2 14.8 4.5 15.5 Queue Delay 1.1 0.0 0.0 0.0 0.0 Total Delay (s/veh) 12.6 2.2 14.8 4.5 15.5LOS BABA B Approach Delay (s/veh) 11.1 9.2 15.5Approach LOS B A B Intersection Summary Cycle Length: 60 Actuated Cycle Length: 60 Offset: 0 (0%), Referenced to phase 2: and 6:EBTL, Start of GreenNatural Cycle: 55 Control Type: Actuated-CoordinatedMaximum v/c Ratio: 0.52 Intersection Signal Delay (s/veh): 11.2 Intersection LOS: B Intersection Capacity Utilization 46.2% ICU Level of Service AAnalysis Period (min) 15 Splits and Phases: 8: 3rd Street & Burnett Avenue 5HQWRQ0DUNHW UG6WUHHW %XUQHWW$YHQXH %DFNJURXQG30Timings 2031 Background PM 24-0640 Renton Market 3:05 pm 10/03/2024 2031 Background PM Synchro 12 ReportCivTech Inc.Page 15 Lane Group EBT EBR NBT NBR SBL SBT Lane ConfigurationsTraffic Volume (vph) 233 41 46 30 26 18 Future Volume (vph) 233 41 46 30 26 18Turn Type NA Perm NA Perm Perm NA Protected Phases 6 8 4 Permitted Phases 6 8 4Detector Phase 668844 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 4.0 4.0Minimum Split (s) 29.0 29.0 23.0 23.0 23.0 23.0 Total Split (s) 35.0 35.0 25.0 25.0 25.0 25.0Total Split (%) 58.3% 58.3% 41.7% 41.7% 41.7% 41.7% Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 Lead/LagLead-Lag Optimize? Recall Mode C-Max C-Max Max Max Max MaxAct Effct Green (s) 30.0 30.0 20.0 20.0 20.0 Actuated g/C Ratio 0.50 0.50 0.33 0.33 0.33 v/c Ratio 0.17 0.05 0.08 0.05 0.09Control Delay (s/veh) 8.5 3.0 14.2 5.5 14.4 Queue Delay 0.0 0.0 0.0 0.0 0.0 Total Delay (s/veh) 8.5 3.0 14.2 5.5 14.4LOS AABA B Approach Delay (s/veh) 7.9 10.8 14.4Approach LOS A B B Intersection Summary Cycle Length: 60 Actuated Cycle Length: 60 Offset: 0 (0%), Referenced to phase 2: and 6:EBTL, Start of GreenNatural Cycle: 55 Control Type: Actuated-CoordinatedMaximum v/c Ratio: 0.18 Intersection Signal Delay (s/veh): 9.0 Intersection LOS: A Intersection Capacity Utilization 27.8% ICU Level of Service AAnalysis Period (min) 15 Splits and Phases: 8: 3rd Street & Burnett Avenue Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 5HQWRQ0DUNHW UG6WUHHW %XUQHWW$YHQXH %DFNJURXQG$0HCM 7th Signalized Intersection Summary 2031 Background AM 24-0640 Renton Market 3:04 pm 10/03/2024 2031 Background AM Synchro 12 ReportCivTech Inc.Page 17 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane ConfigurationsTraffic Volume (veh/h) 1296961460000789341510 Future Volume (veh/h) 1296961460000789341510Initial Q (Qb), veh 000 000000 Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 0 1870 1870 1870 1870 0Adj Flow Rate, veh/h 143 773 162 0 87 103 46 57 0 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90Percent Heavy Veh, % 222 022220 Cap, veh/h 282 1527 793 0 623 528 281 318 0 Arrive On Green 0.50 0.50 0.50 0.00 0.33 0.33 0.33 0.33 0.00Sat Flow, veh/h 565 3054 1585 0 1870 1585 584 955 0 Grp Volume(v), veh/h 466 450 162 0 87 103 103 0 0 Grp Sat Flow(s),veh/h/ln 1842 1777 1585 0 1870 1585 1539 0 0Q Serve(g_s), s 10.2 10.2 3.4 0.0 2.0 2.8 0.0 0.0 0.0 Cycle Q Clear(g_c), s 10.2 10.2 3.4 0.0 2.0 2.8 2.3 0.0 0.0 Prop In Lane 0.31 1.00 0.00 1.00 0.45 0.00Lane Grp Cap(c), veh/h 921 888 793 0 623 528 600 0 0 V/C Ratio(X) 0.51 0.51 0.20 0.00 0.14 0.19 0.17 0.00 0.00 Avail Cap(c_a), veh/h 921 888 793 0 623 528 600 0 0HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.59 0.59 0.59 0.00 1.00 1.00 1.00 0.00 0.00Uniform Delay (d), s/veh 10.0 10.0 8.4 0.0 14.0 14.3 14.1 0.0 0.0 Incr Delay (d2), s/veh 1.2 1.2 0.3 0.0 0.5 0.8 0.6 0.0 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0%ile BackOfQ(95%),veh/ln 6.1 6.0 1.9 0.0 1.5 1.8 1.8 0.0 0.0 Unsig. Movement Delay, s/veh LnGrp Delay(d), s/veh 11.2 11.3 8.7 0.0 14.5 15.1 14.7 0.0 0.0LnGrp LOS BBA BBB Approach Vol, veh/h 1078 190 103 Approach Delay, s/veh 10.9 14.8 14.7Approach LOS B B B Timer - Assigned Phs 4 6 8 Phs Duration (G+Y+Rc), s 25.0 35.0 25.0 Change Period (Y+Rc), s 5.0 5.0 5.0Max Green Setting (Gmax), s 20.0 30.0 20.0 Max Q Clear Time (g_c+I1), s 4.3 12.2 4.8 Green Ext Time (p_c), s 0.4 6.3 0.6 Intersection Summary HCM 7th Control Delay, s/veh 11.7HCM 7th LOS B 5HQWRQ0DUNHW UG6WUHHW %XUQHWW$YHQXH %DFNJURXQG30HCM 7th Signalized Intersection Summary 2031 Background PM 24-0640 Renton Market 3:05 pm 10/03/2024 2031 Background PM Synchro 12 ReportCivTech Inc.Page 17 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane ConfigurationsTraffic Volume (veh/h) 47233410000463026180 Future Volume (veh/h) 47233410000463026180Initial Q (Qb), veh 000 000000 Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 0 1870 1870 1870 1870 0Adj Flow Rate, veh/h 52 259 46 0 51 33 29 20 0 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90Percent Heavy Veh, % 222 022220 Cap, veh/h 301 1507 793 0 623 528 370 232 0 Arrive On Green 0.50 0.50 0.50 0.00 0.33 0.33 0.33 0.33 0.00Sat Flow, veh/h 603 3014 1585 0 1870 1585 824 697 0 Grp Volume(v), veh/h 159 152 46 0 51 33 49 0 0 Grp Sat Flow(s),veh/h/ln 1840 1777 1585 0 1870 1585 1521 0 0Q Serve(g_s), s 2.8 2.8 0.9 0.0 1.1 0.9 0.0 0.0 0.0 Cycle Q Clear(g_c), s 2.8 2.8 0.9 0.0 1.1 0.9 1.1 0.0 0.0 Prop In Lane 0.33 1.00 0.00 1.00 0.59 0.00Lane Grp Cap(c), veh/h 920 888 793 0 623 528 603 0 0 V/C Ratio(X) 0.17 0.17 0.06 0.00 0.08 0.06 0.08 0.00 0.00 Avail Cap(c_a), veh/h 920 888 793 0 623 528 603 0 0HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.99 0.99 0.99 0.00 1.00 1.00 1.00 0.00 0.00Uniform Delay (d), s/veh 8.2 8.2 7.7 0.0 13.7 13.6 13.7 0.0 0.0 Incr Delay (d2), s/veh 0.4 0.4 0.1 0.0 0.3 0.2 0.3 0.0 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0%ile BackOfQ(95%),veh/ln 1.9 1.8 0.5 0.0 0.9 0.6 0.8 0.0 0.0 Unsig. Movement Delay, s/veh LnGrp Delay(d), s/veh 8.6 8.6 7.9 0.0 14.0 13.8 14.0 0.0 0.0LnGrp LOS AAA BBB Approach Vol, veh/h 357 84 49 Approach Delay, s/veh 8.5 13.9 14.0Approach LOS A B B Timer - Assigned Phs 4 6 8 Phs Duration (G+Y+Rc), s 25.0 35.0 25.0 Change Period (Y+Rc), s 5.0 5.0 5.0Max Green Setting (Gmax), s 20.0 30.0 20.0 Max Q Clear Time (g_c+I1), s 3.1 4.8 3.1 Green Ext Time (p_c), s 0.1 2.0 0.3 Intersection Summary HCM 7th Control Delay, s/veh 10.0HCM 7th LOS A Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 5HQWRQ0DUNHW %XUQHWW$YHQXH 5HQWRQ0DUNHW'ULYHZD\ %DFNJURXQG$0HCM 7th TWSC 2031 Background AM 24-0640 Renton Market 3:04 pm 10/03/2024 2031 Background AM Synchro 12 ReportCivTech Inc.Page 19 Intersection Int Delay, s/veh 0.4 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 0 13 0 207 78 0 Future Vol, veh/h 0 13 0 207 78 0Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free FreeRT Channelized - None - None - None Storage Length - - - - - - Veh in Median Storage, # 0 - - 0 0 -Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2Mvmt Flow 0140230870 Major/Minor Minor2 Major1 Major2 Conflicting Flow All - 87 - 0 - 0 Stage 1 - - - - - - Stage 2 - - - - - - Critical Hdwy -6.22----Critical Hdwy Stg 1 ------ Critical Hdwy Stg 2 ------Follow-up Hdwy - 3.318 - - - - Pot Cap-1 Maneuver 0 972 0 - - 0 Stage 1 0 - 0 - - 0 Stage 2 0 - 0 - - 0 Platoon blocked, % - - Mov Cap-1 Maneuver - 972 - - - -Mov Cap-2 Maneuver - - - - - - Stage 1 - - - - - - Stage 2 - - - - - - Approach EB NB SB HCM Control Delay, s/v 8.76 0 0HCM LOS A Minor Lane/Major Mvmt NBTEBLn1 SBT Capacity (veh/h) - 972 - HCM Lane V/C Ratio - 0.015 -HCM Control Delay (s/veh) - 8.8 - HCM Lane LOS - A -HCM 95th %tile Q(veh) - 0 - 5HQWRQ0DUNHW %XUQHWW$YHQXH 5HQWRQ0DUNHW'ULYHZD\ %DFNJURXQG30HCM 7th TWSC 2031 Background PM 24-0640 Renton Market 3:05 pm 10/03/2024 2031 Background PM Synchro 12 ReportCivTech Inc.Page 19 Intersection Int Delay, s/veh 0.4 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 0 7 0 93 45 0 Future Vol, veh/h 0 7 0 93 45 0Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free FreeRT Channelized - None - None - None Storage Length ------ Veh in Median Storage, # 0 - - 0 0 -Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2Mvmt Flow 0 8 0 103 50 0 Major/Minor Minor2 Major1 Major2 Conflicting Flow All - 50 - 0 - 0 Stage 1 ------ Stage 2 ------ Critical Hdwy - 6.22 - - - -Critical Hdwy Stg 1 ------ Critical Hdwy Stg 2 ------Follow-up Hdwy -3.318---- Pot Cap-1 Maneuver 0 1018 0 - - 0 Stage 1 0 - 0 - - 0 Stage 2 0 - 0 - - 0 Platoon blocked, % - - Mov Cap-1 Maneuver - 1018 ----Mov Cap-2 Maneuver ------ Stage 1 ------ Stage 2 ------ Approach EB NB SB HCM Control Delay, s/v 8.56 0 0HCM LOS A Minor Lane/Major Mvmt NBTEBLn1 SBT Capacity (veh/h) - 1018 - HCM Lane V/C Ratio - 0.008 -HCM Control Delay (s/veh) - 8.6 - HCM Lane LOS - A -HCM 95th %tile Q(veh) - 0 - Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 5HQWRQ0DUNHW QG6WUHHW %XUQHWW3ODFH %DFNJURXQG$0HCM Unsignalized Intersection Capacity Analysis 2031 Background AM 24-0640 Renton Market 3:04 pm 10/03/2024 2031 Background AM Synchro 12 ReportCivTech Inc.Page 20 Movement EBL EBT WBT WBR SBL SBR Lane ConfigurationsTraffic Volume (veh/h) 00359502 Future Volume (Veh/h) 00359502Sign Control Free Free Stop Grade 0% 0% 0% Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90Hourly flow rate (vph) 00399602 Pedestrians Lane Width (ft)Walking Speed (ft/s) Percent BlockageRight turn flare (veh) Median type None None Median storage veh)Upstream signal (ft) 258 54 pX, platoon unblocked vC, conflicting volume 405 402 103vC1, stage 1 conf vol vC2, stage 2 conf volvCu, unblocked vol 405 402 103 tC, single (s) 4.1 6.8 6.9 tC, 2 stage (s)tF (s) 2.2 3.5 3.3 p0 queue free % 100 100 100 cM capacity (veh/h) 1150 576 932 Direction, Lane # WB 1 WB 2 WB 3 WB 4 SB 1 Volume Total 114 114 114 63 2 Volume Left 00000 Volume Right 00062cSH 1700 1700 1700 1700 932 Volume to Capacity 0.07 0.07 0.07 0.04 0.00 Queue Length 95th (ft)00000Control Delay (s/veh) 0.0 0.0 0.0 0.0 8.9 Lane LOS AApproach Delay (s/veh) 0.0 8.9 Approach LOS A Intersection Summary Average Delay 0.0Intersection Capacity Utilization 15.3% ICU Level of Service A Analysis Period (min) 15 5HQWRQ0DUNHW QG6WUHHW %XUQHWW3ODFH %DFNJURXQG30HCM Unsignalized Intersection Capacity Analysis 2031 Background PM 24-0640 Renton Market 3:05 pm 10/03/2024 2031 Background PM Synchro 12 ReportCivTech Inc.Page 20 Movement EBL EBT WBT WBR SBL SBR Lane ConfigurationsTraffic Volume (veh/h) 00359502 Future Volume (Veh/h) 00359502Sign Control Free Free Stop Grade 0% 0% 0% Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90Hourly flow rate (vph) 00399602 Pedestrians Lane Width (ft)Walking Speed (ft/s) Percent BlockageRight turn flare (veh) Median type None None Median storage veh)Upstream signal (ft) 258 54 pX, platoon unblocked vC, conflicting volume 405 402 103vC1, stage 1 conf vol vC2, stage 2 conf volvCu, unblocked vol 405 402 103 tC, single (s) 4.1 6.8 6.9 tC, 2 stage (s)tF (s) 2.2 3.5 3.3 p0 queue free % 100 100 100 cM capacity (veh/h) 1150 576 932 Direction, Lane # WB 1 WB 2 WB 3 WB 4 SB 1 Volume Total 114 114 114 63 2 Volume Left 00000 Volume Right 00062cSH 1700 1700 1700 1700 932 Volume to Capacity 0.07 0.07 0.07 0.04 0.00 Queue Length 95th (ft)00000Control Delay (s/veh) 0.0 0.0 0.0 0.0 8.9 Lane LOS AApproach Delay (s/veh) 0.0 8.9 Approach LOS A Intersection Summary Average Delay 0.0Intersection Capacity Utilization 15.3% ICU Level of Service A Analysis Period (min) 15 Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 Renton Market – Renton, Washington Traffic Impact Analysis 43 APPENDIX J: 2026 BUILD PEAK HOUR ANALYSIS Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 5HQWRQ0DUNHW &LW\&HQWHU3DUNLQJ(JUHVV QG6WUHHW 7RWDO$0 HCM Unsignalized Intersection Capacity Analysis 2026 Total AM 24-0640 Renton Market 12:49 am 09/09/2024 2026 Total AM Synchro 12 ReportCivTech Inc.Page 1 Movement EBT EBR WBL WBT NBL NBR Lane ConfigurationsTraffic Volume (veh/h) 0 0 1 470 10 0 Future Volume (Veh/h) 0 0 1 470 10 0Sign Control Free Free Stop Grade 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 0 0 1 511 11 0 Pedestrians Lane Width (ft)Walking Speed (ft/s) Percent BlockageRight turn flare (veh) Median type None None Median storage veh)Upstream signal (ft) 148 164 pX, platoon unblocked vC, conflicting volume 0 130 0vC1, stage 1 conf vol vC2, stage 2 conf volvCu, unblocked vol 0 130 0 tC, single (s) 4.1 6.8 6.9 tC, 2 stage (s)tF (s) 2.2 3.5 3.3 p0 queue free % 100 99 100 cM capacity (veh/h) 1622 851 1084 Direction, Lane # WB 1 WB 2 WB 3 WB 4 NB 1 Volume Total 74 146 146 146 11 Volume Left 100011 Volume Right 00000cSH 1622 1700 1700 1700 851 Volume to Capacity 0.00 0.09 0.09 0.09 0.01 Queue Length 95th (ft)00001Control Delay (s/veh) 0.1 0.0 0.0 0.0 9.3 Lane LOS A AApproach Delay (s/veh) 0.0 9.3 Approach LOS A Intersection Summary Average Delay 0.2Intersection Capacity Utilization 16.8% ICU Level of Service A Analysis Period (min) 15 5HQWRQ0DUNHW &LW\&HQWHU3DUNLQJ(JUHVV QG6WUHHW 7RWDO30 HCM Unsignalized Intersection Capacity Analysis 2026 Total PM 24-0640 Renton Market 12:50 am 09/09/2024 2026 Total PM Synchro 12 ReportCivTech Inc.Page 1 Movement EBT EBR WBL WBT NBL NBR Lane ConfigurationsTraffic Volume (veh/h) 0 0 0 736 116 1 Future Volume (Veh/h) 0 0 0 736 116 1Sign Control Free Free Stop Grade 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 0 0 0 800 126 1 Pedestrians Lane Width (ft)Walking Speed (ft/s) Percent BlockageRight turn flare (veh) Median type None None Median storage veh)Upstream signal (ft) 148 164 pX, platoon unblocked vC, conflicting volume 0 200 0vC1, stage 1 conf vol vC2, stage 2 conf volvCu, unblocked vol 0 200 0 tC, single (s) 4.1 6.8 6.9 tC, 2 stage (s)tF (s) 2.2 3.5 3.3 p0 queue free % 100 84 100 cM capacity (veh/h) 1622 770 1084 Direction, Lane # WB 1 WB 2 WB 3 WB 4 NB 1 Volume Total 200 200 200 200 127 Volume Left 0000126 Volume Right 00001cSH 1700 1700 1700 1700 772 Volume to Capacity 0.12 0.12 0.12 0.12 0.16 Queue Length 95th (ft)000015Control Delay (s/veh) 0.0 0.0 0.0 0.0 10.6 Lane LOS BApproach Delay (s/veh) 0.0 10.6 Approach LOS B Intersection Summary Average Delay 1.4Intersection Capacity Utilization 23.8% ICU Level of Service A Analysis Period (min) 15 Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 5HQWRQ0DUNHW &LW\&HQWHU3DUNLQJ,QJUHVV QG6WUHHW 7RWDO$0 HCM Unsignalized Intersection Capacity Analysis 2026 Total AM 24-0640 Renton Market 12:49 am 09/09/2024 2026 Total AM Synchro 12 ReportCivTech Inc.Page 2 Movement EBT EBR WBL WBT NBL NBR Lane ConfigurationsTraffic Volume (veh/h) 0 0 34 442 0 0 Future Volume (Veh/h) 0 0 34 442 0 0Sign Control Free Free Stop Grade 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 0 0 37 480 0 0 Pedestrians Lane Width (ft)Walking Speed (ft/s) Percent BlockageRight turn flare (veh) Median type None None Median storage veh)Upstream signal (ft) 76 236 pX, platoon unblocked vC, conflicting volume 0 194 0vC1, stage 1 conf vol vC2, stage 2 conf volvCu, unblocked vol 0 194 0 tC, single (s) 4.1 6.8 6.9 tC, 2 stage (s)tF (s) 2.2 3.5 3.3 p0 queue free % 98 100 100 cM capacity (veh/h) 1622 759 1084 Direction, Lane # WB 1 WB 2 WB 3 WB 4 Volume Total 106 137 137 137 Volume Left 37000 Volume Right 0000cSH 1622 1700 1700 1700 Volume to Capacity 0.02 0.08 0.08 0.08 Queue Length 95th (ft)2000Control Delay (s/veh) 2.7 0.0 0.0 0.0 Lane LOS AApproach Delay (s/veh) 0.5 Approach LOS Intersection Summary Average Delay 0.5Intersection Capacity Utilization 10.3% ICU Level of Service A Analysis Period (min) 15 5HQWRQ0DUNHW &LW\&HQWHU3DUNLQJ,QJUHVV QG6WUHHW 7RWDO30 HCM Unsignalized Intersection Capacity Analysis 2026 Total PM 24-0640 Renton Market 12:50 am 09/09/2024 2026 Total PM Synchro 12 ReportCivTech Inc.Page 2 Movement EBT EBR WBL WBT NBL NBR Lane ConfigurationsTraffic Volume (veh/h) 0 0 113 736 0 0 Future Volume (Veh/h) 0 0 113 736 0 0Sign Control Free Free Stop Grade 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 0 0 123 800 0 0 Pedestrians Lane Width (ft)Walking Speed (ft/s) Percent BlockageRight turn flare (veh) Median type None None Median storage veh)Upstream signal (ft) 76 236 pX, platoon unblocked vC, conflicting volume 0 446 0vC1, stage 1 conf vol vC2, stage 2 conf volvCu, unblocked vol 0 446 0 tC, single (s) 4.1 6.8 6.9 tC, 2 stage (s)tF (s) 2.2 3.5 3.3 p0 queue free % 92 100 100 cM capacity (veh/h) 1622 500 1084 Direction, Lane # WB 1 WB 2 WB 3 WB 4 Volume Total 237 229 229 229 Volume Left 123000 Volume Right 0000cSH 1622 1700 1700 1700 Volume to Capacity 0.08 0.13 0.13 0.13 Queue Length 95th (ft)6000Control Delay (s/veh) 4.1 0.0 0.0 0.0 Lane LOS AApproach Delay (s/veh) 1.1 Approach LOS Intersection Summary Average Delay 1.1Intersection Capacity Utilization 15.7% ICU Level of Service A Analysis Period (min) 15 Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 5HQWRQ0DUNHW /RJDQ$YHQXH QG6WUHHW 7RWDO$0 Timings 2026 Total AM 24-0640 Renton Market 12:49 am 09/09/2024 2026 Total AM Synchro 12 ReportCivTech Inc.Page 3 Lane Group WBT NBL NBT SBT SBR Lane ConfigurationsTraffic Volume (vph) 296 22 61 30 42 Future Volume (vph) 296 22 61 30 42Turn Type NA Perm NA NA Perm Protected Phases 2 8 4 Permitted Phases 8 4Detector Phase 28844 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0Minimum Split (s) 22.5 22.5 22.5 22.5 22.5 Total Split (s) 38.0 37.0 37.0 37.0 37.0Total Split (%) 50.7% 49.3% 49.3% 49.3% 49.3% Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 All-Red Time (s) 1.0 1.0 1.0 1.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 Total Lost Time (s) 4.5 4.5 4.5 4.5 Lead/LagLead-Lag Optimize? Recall Mode C-Max None None Max MaxAct Effct Green (s) 33.5 32.5 32.5 32.5 Actuated g/C Ratio 0.45 0.43 0.43 0.43 v/c Ratio 0.17 0.11 0.04 0.06Control Delay (s/veh) 4.1 13.2 12.5 4.5 Queue Delay 0.0 0.0 0.0 0.0 Total Delay (s/veh) 4.1 13.2 12.5 4.5LOS A BBA Approach Delay (s/veh) 4.1 13.3 7.9Approach LOS A B A Intersection Summary Cycle Length: 75 Actuated Cycle Length: 75 Offset: 0 (0%), Referenced to phase 2:WBTL and 6:, Start of GreenNatural Cycle: 45 Control Type: Actuated-CoordinatedMaximum v/c Ratio: 0.17 Intersection Signal Delay (s/veh): 5.8 Intersection LOS: A Intersection Capacity Utilization 26.7% ICU Level of Service AAnalysis Period (min) 15 Splits and Phases: 3: Logan Avenue & 2nd Street 5HQWRQ0DUNHW /RJDQ$YHQXH QG6WUHHW 7RWDO30 Timings 2026 Total PM 24-0640 Renton Market 12:50 am 09/09/2024 2026 Total PM Synchro 12 ReportCivTech Inc.Page 3 Lane Group WBT NBL NBT SBT SBR Lane ConfigurationsTraffic Volume (vph) 522 30 22 28 234 Future Volume (vph) 522 30 22 28 234Turn Type NA Perm NA NA Perm Protected Phases 2 8 4 Permitted Phases 8 4Detector Phase 28844 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0Minimum Split (s) 22.5 22.5 22.5 22.5 22.5 Total Split (s) 38.0 37.0 37.0 37.0 37.0Total Split (%) 50.7% 49.3% 49.3% 49.3% 49.3% Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 All-Red Time (s) 1.0 1.0 1.0 1.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 Total Lost Time (s) 4.5 4.5 4.5 4.5 Lead/LagLead-Lag Optimize? Recall Mode C-Max None None Max MaxAct Effct Green (s) 33.5 32.5 32.5 32.5 Actuated g/C Ratio 0.45 0.43 0.43 0.43 v/c Ratio 0.26 0.08 0.03 0.31Control Delay (s/veh) 10.2 12.9 12.5 4.6 Queue Delay 0.0 0.0 0.0 0.0 Total Delay (s/veh) 10.2 12.9 12.5 4.6LOS B BBA Approach Delay (s/veh) 10.3 13.0 5.5Approach LOS B B A Intersection Summary Cycle Length: 75 Actuated Cycle Length: 75 Offset: 0 (0%), Referenced to phase 2:WBTL and 6:, Start of GreenNatural Cycle: 45 Control Type: Actuated-CoordinatedMaximum v/c Ratio: 0.32 Intersection Signal Delay (s/veh): 9.1 Intersection LOS: A Intersection Capacity Utilization 40.1% ICU Level of Service AAnalysis Period (min) 15 Splits and Phases: 3: Logan Avenue & 2nd Street Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 5HQWRQ0DUNHW /RJDQ$YHQXH QG6WUHHW 7RWDO$0 HCM Signalized Intersection Capacity Analysis 2026 Total AM 24-0640 Renton Market 12:49 am 09/09/2024 2026 Total AM Synchro 12 ReportCivTech Inc.Page 4 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane ConfigurationsTraffic Volume (vph) 0 0 0 19 296 135 22 61 0 0 30 42 Future Volume (vph) 0 0 0 19 296 135 22 61 0 0 30 42Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 4.5 4.5 4.5 4.5 Lane Util. Factor 0.86 1.00 1.00 1.00Frt 0.95 1.00 1.00 0.85 Flt Protected 0.99 0.98 1.00 1.00 Satd. Flow (prot) 6106 1838 1863 1583Flt Permitted 0.99 0.94 1.00 1.00 Satd. Flow (perm) 6106 1756 1863 1583 Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 0 0 0 21 322 147 24 66 0 0 33 46 RTOR Reduction (vph)00008100000026 Lane Group Flow (vph)00004090090003320 Turn Type Perm NA Perm NA NA Perm Protected Phases 2 8 4 Permitted Phases 2 8 4Actuated Green, G (s) 33.5 32.5 32.5 32.5 Effective Green, g (s) 33.5 32.5 32.5 32.5 Actuated g/C Ratio 0.45 0.43 0.43 0.43Clearance Time (s) 4.5 4.5 4.5 4.5 Vehicle Extension (s) 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 2727 760 807 685v/s Ratio Prot 0.02 v/s Ratio Perm 0.07 c0.05 0.01 v/c Ratio 0.14 0.11 0.04 0.02Uniform Delay, d1 12.3 12.6 12.2 12.1 Progression Factor 0.46 1.00 1.00 1.00Incremental Delay, d2 0.1 0.0 0.0 0.0 Delay (s) 5.8 12.7 12.3 12.2 Level of Service A B B BApproach Delay (s/veh) 0.0 5.8 12.7 12.3 Approach LOS AABB Intersection Summary HCM 2000 Control Delay (s/veh) 7.6 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.13 Actuated Cycle Length (s) 75.0 Sum of lost time (s) 9.0 Intersection Capacity Utilization 26.7% ICU Level of Service AAnalysis Period (min) 15 c Critical Lane Group 5HQWRQ0DUNHW /RJDQ$YHQXH QG6WUHHW 7RWDO30 HCM Signalized Intersection Capacity Analysis 2026 Total PM 24-0640 Renton Market 12:50 am 09/09/2024 2026 Total PM Synchro 12 ReportCivTech Inc.Page 4 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane ConfigurationsTraffic Volume (vph) 0 0 0 34 522 125 30 22 0 0 28 234 Future Volume (vph) 0 0 0 34 522 125 30 22 0 0 28 234Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 4.5 4.5 4.5 4.5 Lane Util. Factor 0.86 1.00 1.00 1.00Frt 0.97 1.00 1.00 0.85 Flt Protected 0.99 0.97 1.00 1.00 Satd. Flow (prot) 6216 1810 1863 1583Flt Permitted 0.99 0.87 1.00 1.00 Satd. Flow (perm) 6216 1633 1863 1583 Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 0 0 0 37 567 136 33 24 0 0 30 254 RTOR Reduction (vph)000054000000117 Lane Group Flow (vph)000068600570030137 Turn Type Perm NA Perm NA NA Perm Protected Phases 2 8 4 Permitted Phases 2 8 4Actuated Green, G (s) 33.5 32.5 32.5 32.5 Effective Green, g (s) 33.5 32.5 32.5 32.5 Actuated g/C Ratio 0.45 0.43 0.43 0.43Clearance Time (s) 4.5 4.5 4.5 4.5 Vehicle Extension (s) 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 2776 707 807 685v/s Ratio Prot 0.02 v/s Ratio Perm 0.11 0.03 c0.09 v/c Ratio 0.24 0.08 0.03 0.19Uniform Delay, d1 12.9 12.4 12.2 13.1 Progression Factor 0.89 1.00 1.00 1.00Incremental Delay, d2 0.2 0.0 0.0 0.6 Delay (s) 11.7 12.5 12.3 13.8 Level of Service B B B BApproach Delay (s/veh) 0.0 11.7 12.5 13.6 Approach LOS ABBB Intersection Summary HCM 2000 Control Delay (s/veh) 12.3 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.22 Actuated Cycle Length (s) 75.0 Sum of lost time (s) 9.0 Intersection Capacity Utilization 40.1% ICU Level of Service AAnalysis Period (min) 15 c Critical Lane Group Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 5HQWRQ0DUNHW 5HQWRQ0DUNHW'ULYHZD\ /RJDQ$YHQXH 7RWDO$0 HCM Unsignalized Intersection Capacity Analysis 2026 Total AM 24-0640 Renton Market 12:49 am 09/09/2024 2026 Total AM Synchro 12 ReportCivTech Inc.Page 5 Movement WBL WBR NBT NBR SBL SBT Lane ConfigurationsTraffic Volume (veh/h) 0 0 69 3 5 59 Future Volume (Veh/h) 0 0 69 3 5 59Sign Control Stop Free Free Grade 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 0 0 75 3 5 64 Pedestrians Lane Width (ft)Walking Speed (ft/s) Percent BlockageRight turn flare (veh) Median type None None Median storage veh)Upstream signal (ft) 259 302 pX, platoon unblocked vC, conflicting volume 151 77 78vC1, stage 1 conf vol vC2, stage 2 conf volvCu, unblocked vol 151 77 78 tC, single (s) 6.4 6.2 4.1 tC, 2 stage (s)tF (s) 3.5 3.3 2.2 p0 queue free % 100 100 100 cM capacity (veh/h) 839 985 1520 Direction, Lane # NB 1 SB 1 Volume Total 78 69 Volume Left 0 5 Volume Right 3 0cSH 1700 1520 Volume to Capacity 0.05 0.00 Queue Length 95th (ft) 0 0Control Delay (s/veh) 0.0 0.6 Lane LOS AApproach Delay (s/veh) 0.0 0.6 Approach LOS Intersection Summary Average Delay 0.3Intersection Capacity Utilization 10.6% ICU Level of Service A Analysis Period (min) 15 5HQWRQ0DUNHW 5HQWRQ0DUNHW'ULYHZD\ /RJDQ$YHQXH 7RWDO30 HCM Unsignalized Intersection Capacity Analysis 2026 Total PM 24-0640 Renton Market 12:50 am 09/09/2024 2026 Total PM Synchro 12 ReportCivTech Inc.Page 5 Movement WBL WBR NBT NBR SBL SBT Lane ConfigurationsTraffic Volume (veh/h) 0013142 Future Volume (Veh/h) 0013142Sign Control Stop Free Free Grade 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 0013152 Pedestrians Lane Width (ft)Walking Speed (ft/s) Percent BlockageRight turn flare (veh) Median type None None Median storage veh)Upstream signal (ft) 259 302 pX, platoon unblocked vC, conflicting volume 35 3 4vC1, stage 1 conf vol vC2, stage 2 conf volvCu, unblocked vol 35 3 4 tC, single (s) 6.4 6.2 4.1 tC, 2 stage (s)tF (s) 3.5 3.3 2.2 p0 queue free % 100 100 99 cM capacity (veh/h) 969 1082 1618 Direction, Lane # NB 1 SB 1 Volume Total 4 17 Volume Left 0 15 Volume Right 3 0cSH 1700 1618 Volume to Capacity 0.00 0.01 Queue Length 95th (ft) 0 1Control Delay (s/veh) 0.0 6.4 Lane LOS AApproach Delay (s/veh) 0.0 6.4 Approach LOS Intersection Summary Average Delay 5.2Intersection Capacity Utilization 10.9% ICU Level of Service A Analysis Period (min) 15 Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 5HQWRQ0DUNHW /RJDQ$YHQXH 'ULYHZD\QRIUG6WUHHW 7RWDO$0 HCM 7th TWSC 2026 Total AM 24-0640 Renton Market 12:49 am 09/09/2024 2026 Total AM Synchro 12 ReportCivTech Inc.Page 7 Intersection Int Delay, s/veh 0.4 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 1 5 0 67 63 6 Future Vol, veh/h 1 5 0 67 63 6Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free FreeRT Channelized - None - None - None Storage Length - 0 - - - - Veh in Median Storage, # 0 - - 0 0 -Grade, % 0 - - 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2Mvmt Flow 1 5 07368 7 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 145 72 - 0 - 0 Stage 1 72 - - - - - Stage 2 73 - - - - - Critical Hdwy 6.42 6.22 - - - -Critical Hdwy Stg 15.42----- Critical Hdwy Stg 25.42-----Follow-up Hdwy 3.518 3.318 - - - - Pot Cap-1 Maneuver 848 991 0 - - - Stage 1 951 - 0 - - - Stage 2 950 - 0 - - - Platoon blocked, % - - - Mov Cap-1 Maneuver 848 991 - - - -Mov Cap-2 Maneuver 848 - - - - - Stage 1 951 - - - - - Stage 2 950 - - - - - Approach EB NB SB HCM Control Delay, s/v 8.65 0 0HCM LOS A Minor Lane/Major Mvmt NBTEBLn1 SBT SBR Capacity (veh/h) - 991 - - HCM Lane V/C Ratio - 0.005 - -HCM Control Delay (s/veh) - 8.7 - - HCM Lane LOS - A - -HCM 95th %tile Q(veh) - 0 - - 5HQWRQ0DUNHW /RJDQ$YHQXH 'ULYHZD\QRIUG6WUHHW 7RWDO30 HCM 7th TWSC 2026 Total PM 24-0640 Renton Market 12:50 am 09/09/2024 2026 Total PM Synchro 12 ReportCivTech Inc.Page 7 Intersection Int Delay, s/veh 0 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 0 0 0 3 2 0 Future Vol, veh/h 0 0 0 3 2 0Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free FreeRT Channelized - None - None - None Storage Length - 0 ---- Veh in Median Storage, # 0 - - 0 0 -Grade, % 0 - - 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2Mvmt Flow 0 0 0 3 2 0 Major/Minor Minor2 Major1 Major2 Conflicting Flow All - 2 - 0 - 0 Stage 1 ------ Stage 2 ------ Critical Hdwy - 6.22 - - - -Critical Hdwy Stg 1 ------ Critical Hdwy Stg 2 ------Follow-up Hdwy -3.318---- Pot Cap-1 Maneuver 0 1082 0 - - - Stage 1 0 - 0 - - - Stage 2 0 - 0 - - - Platoon blocked, % - - - Mov Cap-1 Maneuver - 1082 ----Mov Cap-2 Maneuver ------ Stage 1 ------ Stage 2 ------ Approach EB NB SB HCM Control Delay, s/v 0 0 0HCM LOS A Minor Lane/Major Mvmt NBTEBLn1 SBT SBR Capacity (veh/h)---- HCM Lane V/C Ratio ----HCM Control Delay (s/veh) - 0 - - HCM Lane LOS - A - -HCM 95th %tile Q(veh) ---- Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 5HQWRQ0DUNHW UG6WUHHW /RJDQ$YHQXH 7RWDO$0 Timings 2026 Total AM 24-0640 Renton Market 12:49 am 09/09/2024 2026 Total AM Synchro 12 ReportCivTech Inc.Page 8 Lane Group EBT NBR SBL Lane ConfigurationsTraffic Volume (vph) 223 14 70 Future Volume (vph) 223 14 70Turn Type NA Perm Prot Protected Phases 2 4 Permitted Phases 3Detector Phase 2 3 4 Switch Phase Minimum Initial (s) 5.0 5.0 5.0Minimum Split (s) 22.5 22.5 23.0 Total Split (s) 20.5 14.5 15.0Total Split (%) 41.0% 29.0% 30.0% Yellow Time (s) 3.5 3.5 4.0 All-Red Time (s) 1.0 1.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 Total Lost Time (s) 4.5 4.5 5.0 Lead/Lag Lead LagLead-Lag Optimize? Yes Yes Recall Mode C-Max None MaxAct Effct Green (s) 16.0 5.5 22.5 Actuated g/C Ratio 0.32 0.11 0.45 v/c Ratio 0.27 0.02 0.09Control Delay (s/veh) 13.4 0.0 10.1 Queue Delay 0.0 0.0 0.0 Total Delay (s/veh) 13.4 0.0 10.1LOS BAB Approach Delay (s/veh) 13.5Approach LOS B Intersection Summary Cycle Length: 50 Actuated Cycle Length: 50 Offset: 0 (0%), Referenced to phase 2:EBTL and 6:, Start of GreenNatural Cycle: 70 Control Type: Actuated-CoordinatedMaximum v/c Ratio: 0.28 Intersection Signal Delay (s/veh): 12.3 Intersection LOS: B Intersection Capacity Utilization 26.9% ICU Level of Service AAnalysis Period (min) 15 Splits and Phases: 6: 3rd Street & Logan Avenue 5HQWRQ0DUNHW UG6WUHHW /RJDQ$YHQXH 7RWDO30 Timings 2026 Total PM 24-0640 Renton Market 12:50 am 09/09/2024 2026 Total PM Synchro 12 ReportCivTech Inc.Page 8 Lane Group EBT NBR SBL Lane ConfigurationsTraffic Volume (vph) 885 19 2 Future Volume (vph) 885 19 2Turn Type NA Perm Prot Protected Phases 2 4 Permitted Phases 3Detector Phase 2 3 4 Switch Phase Minimum Initial (s) 5.0 5.0 5.0Minimum Split (s) 22.5 22.5 23.0 Total Split (s) 25.0 10.0 15.0Total Split (%) 50.0% 20.0% 30.0% Yellow Time (s) 3.5 3.5 4.0 All-Red Time (s) 1.0 1.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 Total Lost Time (s) 4.5 4.5 5.0 Lead/Lag Lead LagLead-Lag Optimize? Yes Yes Recall Mode C-Max None MaxAct Effct Green (s) 20.5 5.5 18.0 Actuated g/C Ratio 0.41 0.11 0.36 v/c Ratio 0.68 0.04 0.00Control Delay (s/veh) 15.0 0.1 13.5 Queue Delay 0.0 0.0 0.0 Total Delay (s/veh) 15.0 0.1 13.5LOS BAB Approach Delay (s/veh) 15.0Approach LOS B Intersection Summary Cycle Length: 50 Actuated Cycle Length: 50 Offset: 0 (0%), Referenced to phase 2:EBTL and 6:, Start of GreenNatural Cycle: 70 Control Type: Actuated-CoordinatedMaximum v/c Ratio: 0.69 Intersection Signal Delay (s/veh): 14.7 Intersection LOS: B Intersection Capacity Utilization 43.8% ICU Level of Service AAnalysis Period (min) 15 Splits and Phases: 6: 3rd Street & Logan Avenue Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 5HQWRQ0DUNHW UG6WUHHW /RJDQ$YHQXH 7RWDO$0 HCM Signalized Intersection Capacity Analysis 2026 Total AM 24-0640 Renton Market 12:49 am 09/09/2024 2026 Total AM Synchro 12 ReportCivTech Inc.Page 9 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane ConfigurationsTraffic Volume (vph) 61223200000147000 Future Volume (vph) 61223200000147000Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 4.5 4.5 5.0 Lane Util. Factor 0.95 1.00 1.00Frt 0.99 0.86 1.00 Flt Protected 0.98 1.00 0.95 Satd. Flow (prot) 3499 1611 1770Flt Permitted 0.98 1.00 0.95 Satd. Flow (perm) 3499 1611 1770 Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 66242200000157600 RTOR Reduction (vph)0100000015000 Lane Group Flow (vph) 0 30900000007600 Turn Type Perm NA Perm Prot Protected Phases 2 4 Permitted Phases 2 3Actuated Green, G (s) 12.4 1.1 22.5 Effective Green, g (s) 12.4 1.1 22.5 Actuated g/C Ratio 0.25 0.02 0.45Clearance Time (s) 4.5 4.5 5.0 Vehicle Extension (s) 3.0 3.0 3.0 Lane Grp Cap (vph) 867 35 796v/s Ratio Prot c0.04 v/s Ratio Perm 0.09 c0.00 v/c Ratio 0.35 0.00 0.09Uniform Delay, d1 15.5 23.9 7.9 Progression Factor 1.00 1.00 1.00Incremental Delay, d2 1.1 0.1 0.2 Delay (s) 16.6 24.0 8.1 Level of Service B C AApproach Delay (s/veh) 16.6 0.0 24.0 8.1 Approach LOS B A C A Intersection Summary HCM 2000 Control Delay (s/veh) 15.3 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.18 Actuated Cycle Length (s) 50.0 Sum of lost time (s) 14.0 Intersection Capacity Utilization 26.9% ICU Level of Service AAnalysis Period (min) 15 c Critical Lane Group 5HQWRQ0DUNHW UG6WUHHW /RJDQ$YHQXH 7RWDO30 HCM Signalized Intersection Capacity Analysis 2026 Total PM 24-0640 Renton Market 12:50 am 09/09/2024 2026 Total PM Synchro 12 ReportCivTech Inc.Page 9 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane ConfigurationsTraffic Volume (vph) 0885300000019200 Future Volume (vph) 0885300000019200Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 4.5 4.5 5.0 Lane Util. Factor 0.95 1.00 1.00Frt 0.99 0.86 1.00 Flt Protected 1.00 1.00 0.95 Satd. Flow (prot) 3522 1611 1770Flt Permitted 1.00 1.00 0.95 Satd. Flow (perm) 3522 1611 1770 Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 0962330000021200 RTOR Reduction (vph)0500000021000 Lane Group Flow (vph) 0 9900000000200 Turn Type NA Perm Prot Protected Phases 2 4 Permitted Phases 2 3Actuated Green, G (s) 16.9 1.1 18.0 Effective Green, g (s) 16.9 1.1 18.0 Actuated g/C Ratio 0.34 0.02 0.36Clearance Time (s) 4.5 4.5 5.0 Vehicle Extension (s) 3.0 3.0 3.0 Lane Grp Cap (vph) 1190 35 637v/s Ratio Prot c0.28 c0.00 v/s Ratio Perm c0.00 v/c Ratio 0.83 0.01 0.00Uniform Delay, d1 15.2 23.9 10.2 Progression Factor 1.00 1.00 1.00Incremental Delay, d2 6.8 0.1 0.0 Delay (s) 22.0 24.0 10.2 Level of Service C C BApproach Delay (s/veh) 22.0 0.0 24.0 10.2 Approach LOS C A C B Intersection Summary HCM 2000 Control Delay (s/veh) 22.1 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.39 Actuated Cycle Length (s) 50.0 Sum of lost time (s) 14.0 Intersection Capacity Utilization 43.8% ICU Level of Service AAnalysis Period (min) 15 c Critical Lane Group Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 5HQWRQ0DUNHW %XUQHWW$YHQXH QG6WUHHW 7RWDO$0 Timings 2026 Total AM 24-0640 Renton Market 12:49 am 09/09/2024 2026 Total AM Synchro 12 ReportCivTech Inc.Page 10 Lane Group WBT NBL NBT SBT SBR Lane ConfigurationsTraffic Volume (vph) 382 69 17 6 22 Future Volume (vph) 382 69 17 6 22Turn Type NA Prot NA NA Perm Protected Phases 2384 Permitted Phases 4Detector Phase 23844 Switch Phase Minimum Initial (s) 5.0 5.0 4.0 5.0 5.0Minimum Split (s) 23.0 23.0 23.0 23.0 23.0 Total Split (s) 25.0 25.0 50.0 25.0 25.0Total Split (%) 33.3% 33.3% 66.7% 33.3% 33.3% Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 All-Red Time (s) 1.0 1.0 1.0 1.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 Lead/Lag Lead Lag LagLead-Lag Optimize? Yes Yes Yes Recall Mode C-Max Max Max Max MaxAct Effct Green (s) 20.0 20.0 45.0 20.0 20.0 Actuated g/C Ratio 0.27 0.27 0.60 0.27 0.27 v/c Ratio 0.34 0.15 0.01 0.01 0.04Control Delay (s/veh) 22.7 22.2 6.1 20.5 0.1 Queue Delay 0.0 0.0 0.0 0.0 0.0 Total Delay (s/veh) 22.7 22.2 6.1 20.5 0.1LOS CCACA Approach Delay (s/veh) 22.7 19.1 4.8Approach LOS C B A Intersection Summary Cycle Length: 75 Actuated Cycle Length: 75 Offset: 0 (0%), Referenced to phase 2:WBTL, Start of GreenNatural Cycle: 70 Control Type: Actuated-CoordinatedMaximum v/c Ratio: 0.35 Intersection Signal Delay (s/veh): 21.2 Intersection LOS: C Intersection Capacity Utilization 29.2% ICU Level of Service AAnalysis Period (min) 15 Splits and Phases: 7: Burnett Avenue & 2nd Street 5HQWRQ0DUNHW %XUQHWW$YHQXH QG6WUHHW 7RWDO30 Timings 2026 Total PM 24-0640 Renton Market 12:50 am 09/09/2024 2026 Total PM Synchro 12 ReportCivTech Inc.Page 10 Lane Group WBT NBL NBT SBT SBR Lane ConfigurationsTraffic Volume (vph) 520 199 33 17 19 Future Volume (vph) 520 199 33 17 19Turn Type NA Prot NA NA Perm Protected Phases 2384 Permitted Phases 4Detector Phase 23844 Switch Phase Minimum Initial (s) 5.0 5.0 4.0 5.0 5.0Minimum Split (s) 23.0 23.0 23.0 23.0 23.0 Total Split (s) 25.0 25.0 50.0 25.0 25.0Total Split (%) 33.3% 33.3% 66.7% 33.3% 33.3% Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 All-Red Time (s) 1.0 1.0 1.0 1.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 Lead/Lag Lead Lag LagLead-Lag Optimize? Yes Yes Yes Recall Mode C-Max Max Max Max MaxAct Effct Green (s) 20.0 20.0 45.0 20.0 20.0 Actuated g/C Ratio 0.27 0.27 0.60 0.27 0.27 v/c Ratio 0.47 0.45 0.03 0.03 0.04Control Delay (s/veh) 24.3 26.7 6.2 20.7 0.1 Queue Delay 0.0 0.0 0.0 0.0 0.0 Total Delay (s/veh) 24.3 26.7 6.2 20.7 0.1LOS CCACA Approach Delay (s/veh) 24.3 23.8 9.7Approach LOS C C A Intersection Summary Cycle Length: 75 Actuated Cycle Length: 75 Offset: 0 (0%), Referenced to phase 2:WBTL, Start of GreenNatural Cycle: 70 Control Type: Actuated-CoordinatedMaximum v/c Ratio: 0.48 Intersection Signal Delay (s/veh): 23.6 Intersection LOS: C Intersection Capacity Utilization 38.6% ICU Level of Service AAnalysis Period (min) 15 Splits and Phases: 7: Burnett Avenue & 2nd Street Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 5HQWRQ0DUNHW %XUQHWW$YHQXH QG6WUHHW 7RWDO$0 HCM Signalized Intersection Capacity Analysis 2026 Total AM 24-0640 Renton Market 12:49 am 09/09/2024 2026 Total AM Synchro 12 ReportCivTech Inc.Page 11 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane ConfigurationsTraffic Volume (vph) 0003438217691700622 Future Volume (vph) 0003438217691700622Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 5.0 5.0 5.0 5.0 5.0 Lane Util. Factor 0.91 1.00 1.00 1.00 1.00Frt 0.99 1.00 1.00 1.00 0.85 Flt Protected 0.99 0.95 1.00 1.00 1.00 Satd. Flow (prot) 5036 1770 1863 1863 1583Flt Permitted 0.99 0.95 1.00 1.00 1.00 Satd. Flow (perm) 5036 1770 1863 1863 1583 Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 0003741518751800724 RTOR Reduction (vph)0000600000018 Lane Group Flow (vph)0000464075180076 Turn Type Perm NA Prot NA NA Perm Protected Phases 2 3 8 4 Permitted Phases 2 4Actuated Green, G (s) 20.0 20.0 45.0 20.0 20.0 Effective Green, g (s) 20.0 20.0 45.0 20.0 20.0 Actuated g/C Ratio 0.27 0.27 0.60 0.27 0.27Clearance Time (s) 5.0 5.0 5.0 5.0 5.0 Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 1342 472 1117 496 422v/s Ratio Prot c0.04 c0.01 0.00 v/s Ratio Perm 0.09 0.00 v/c Ratio 0.34 0.15 0.01 0.01 0.01Uniform Delay, d1 22.2 21.0 6.0 20.2 20.2 Progression Factor 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.7 0.7 0.0 0.0 0.0 Delay (s) 22.9 21.7 6.0 20.2 20.3 Level of Service C C A C CApproach Delay (s/veh) 0.0 22.9 18.7 20.3 Approach LOS A C B C Intersection Summary HCM 2000 Control Delay (s/veh) 22.1 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.17 Actuated Cycle Length (s) 75.0 Sum of lost time (s) 15.0 Intersection Capacity Utilization 29.2% ICU Level of Service AAnalysis Period (min) 15 c Critical Lane Group 5HQWRQ0DUNHW %XUQHWW$YHQXH QG6WUHHW 7RWDO30 HCM Signalized Intersection Capacity Analysis 2026 Total PM 24-0640 Renton Market 12:50 am 09/09/2024 2026 Total PM Synchro 12 ReportCivTech Inc.Page 11 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane ConfigurationsTraffic Volume (vph) 0 0 0 54 520 15 199 33 0 0 17 19 Future Volume (vph) 0 0 0 54 520 15 199 33 0 0 17 19Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 5.0 5.0 5.0 5.0 5.0 Lane Util. Factor 0.91 1.00 1.00 1.00 1.00Frt 0.99 1.00 1.00 1.00 0.85 Flt Protected 0.99 0.95 1.00 1.00 1.00 Satd. Flow (prot) 5043 1770 1863 1863 1583Flt Permitted 0.99 0.95 1.00 1.00 1.00 Satd. Flow (perm) 5043 1770 1863 1863 1583 Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 0 0 0 59 565 16 216 36 0 0 18 21 RTOR Reduction (vph)0000400000015 Lane Group Flow (vph)000063602163600186 Turn Type Perm NA Prot NA NA Perm Protected Phases 2 3 8 4 Permitted Phases 2 4Actuated Green, G (s) 20.0 20.0 45.0 20.0 20.0 Effective Green, g (s) 20.0 20.0 45.0 20.0 20.0 Actuated g/C Ratio 0.27 0.27 0.60 0.27 0.27Clearance Time (s) 5.0 5.0 5.0 5.0 5.0 Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 1344 472 1117 496 422v/s Ratio Prot c0.12 c0.02 0.01 v/s Ratio Perm 0.13 0.00 v/c Ratio 0.47 0.45 0.03 0.03 0.01Uniform Delay, d1 23.0 22.9 6.1 20.3 20.2 Progression Factor 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 1.1 3.1 0.0 0.1 0.0 Delay (s) 24.2 26.1 6.1 20.5 20.2 Level of Service C C A C CApproach Delay (s/veh) 0.0 24.2 23.2 20.3 Approach LOS A C C C Intersection Summary HCM 2000 Control Delay (s/veh) 23.8 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.32 Actuated Cycle Length (s) 75.0 Sum of lost time (s) 15.0 Intersection Capacity Utilization 38.6% ICU Level of Service AAnalysis Period (min) 15 c Critical Lane Group Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 5HQWRQ0DUNHW UG6WUHHW %XUQHWW$YHQXH 7RWDO$0 Timings 2026 Total AM 24-0640 Renton Market 12:49 am 09/09/2024 2026 Total AM Synchro 12 ReportCivTech Inc.Page 12 Lane Group EBT EBR NBT NBR SBL SBT Lane ConfigurationsTraffic Volume (vph) 212 37 43 27 30 18 Future Volume (vph) 212 37 43 27 30 18Turn Type NA Perm NA Perm Perm NA Protected Phases 6 8 4 Permitted Phases 6 8 4Detector Phase 668844 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 4.0 4.0Minimum Split (s) 29.0 29.0 23.0 23.0 23.0 23.0 Total Split (s) 37.0 37.0 28.0 28.0 28.0 28.0Total Split (%) 56.9% 56.9% 43.1% 43.1% 43.1% 43.1% Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 Lead/LagLead-Lag Optimize? Recall Mode C-Max C-Max Max Max Max MaxAct Effct Green (s) 32.0 32.0 23.0 23.0 23.0 Actuated g/C Ratio 0.49 0.49 0.35 0.35 0.35 v/c Ratio 0.16 0.05 0.07 0.04 0.09Control Delay (s/veh) 9.4 3.4 14.3 5.3 14.6 Queue Delay 0.0 0.0 0.0 0.0 0.0 Total Delay (s/veh) 9.4 3.4 14.3 5.3 14.6LOS AABA B Approach Delay (s/veh) 8.7 10.9 14.7Approach LOS A B B Intersection Summary Cycle Length: 65 Actuated Cycle Length: 65 Offset: 0 (0%), Referenced to phase 2: and 6:EBTL, Start of GreenNatural Cycle: 55 Control Type: Actuated-CoordinatedMaximum v/c Ratio: 0.17 Intersection Signal Delay (s/veh): 9.8 Intersection LOS: A Intersection Capacity Utilization 27.3% ICU Level of Service AAnalysis Period (min) 15 Splits and Phases: 8: 3rd Street & Burnett Avenue 5HQWRQ0DUNHW UG6WUHHW %XUQHWW$YHQXH 7RWDO30 Timings 2026 Total PM 24-0640 Renton Market 12:50 am 09/09/2024 2026 Total PM Synchro 12 ReportCivTech Inc.Page 12 Lane Group EBT EBR NBT NBR SBL SBT Lane ConfigurationsTraffic Volume (vph) 632 132 73 84 55 49 Future Volume (vph) 632 132 73 84 55 49Turn Type NA Perm NA Perm Perm NA Protected Phases 6 8 4 Permitted Phases 6 8 4Detector Phase 668844 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 4.0 4.0Minimum Split (s) 29.0 29.0 23.0 23.0 23.0 23.0 Total Split (s) 37.0 37.0 28.0 28.0 28.0 28.0Total Split (%) 56.9% 56.9% 43.1% 43.1% 43.1% 43.1% Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 Lead/LagLead-Lag Optimize? Recall Mode C-Max C-Max Max Max Max MaxAct Effct Green (s) 32.0 32.0 23.0 23.0 23.0 Actuated g/C Ratio 0.49 0.49 0.35 0.35 0.35 v/c Ratio 0.48 0.16 0.11 0.14 0.20Control Delay (s/veh) 12.2 2.4 14.8 4.5 15.9 Queue Delay 1.2 0.0 0.0 0.0 0.0 Total Delay (s/veh) 13.4 2.4 14.8 4.5 15.9LOS BABA B Approach Delay (s/veh) 11.8 9.3 16.0Approach LOS B A B Intersection Summary Cycle Length: 65 Actuated Cycle Length: 65 Offset: 0 (0%), Referenced to phase 2: and 6:EBTL, Start of GreenNatural Cycle: 55 Control Type: Actuated-CoordinatedMaximum v/c Ratio: 0.49 Intersection Signal Delay (s/veh): 11.9 Intersection LOS: B Intersection Capacity Utilization 44.9% ICU Level of Service AAnalysis Period (min) 15 Splits and Phases: 8: 3rd Street & Burnett Avenue Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 5HQWRQ0DUNHW UG6WUHHW %XUQHWW$YHQXH 7RWDO$0 HCM Signalized Intersection Capacity Analysis 2026 Total AM 24-0640 Renton Market 12:49 am 09/09/2024 2026 Total AM Synchro 12 ReportCivTech Inc.Page 13 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane ConfigurationsTraffic Volume (vph) 51212370000432730180 Future Volume (vph) 51212370000432730180Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 5.0 5.0 5.0 5.0 5.0 Lane Util. Factor 0.95 1.00 1.00 1.00 1.00Frt 1.00 0.85 1.00 0.85 1.00 Flt Protected 0.99 1.00 1.00 1.00 0.96 Satd. Flow (prot) 3505 1583 1863 1583 1807Flt Permitted 0.99 1.00 1.00 1.00 0.85 Satd. Flow (perm) 3505 1583 1863 1583 1587 Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 55230400000472933200 RTOR Reduction (vph) 0 0 200000019000 Lane Group Flow (vph) 0 285 20000047100530 Turn Type Perm NA Perm NA Perm Perm NA Protected Phases 6 8 4 Permitted Phases 6 6 8 4Actuated Green, G (s) 32.0 32.0 23.0 23.0 23.0 Effective Green, g (s) 32.0 32.0 23.0 23.0 23.0 Actuated g/C Ratio 0.49 0.49 0.35 0.35 0.35Clearance Time (s) 5.0 5.0 5.0 5.0 5.0 Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 1725 779 659 560 561v/s Ratio Prot 0.03 v/s Ratio Perm 0.08 0.01 0.01 c0.03 v/c Ratio 0.16 0.02 0.07 0.01 0.09Uniform Delay, d1 9.1 8.4 13.9 13.6 14.0 Progression Factor 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.2 0.0 0.2 0.0 0.3 Delay (s) 9.3 8.5 14.1 13.7 14.3 Level of Service A A B B BApproach Delay (s/veh) 9.2 0.0 13.9 14.3 Approach LOS AABB Intersection Summary HCM 2000 Control Delay (s/veh) 10.6 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.14 Actuated Cycle Length (s) 65.0 Sum of lost time (s) 10.0 Intersection Capacity Utilization 27.3% ICU Level of Service AAnalysis Period (min) 15 c Critical Lane Group 5HQWRQ0DUNHW UG6WUHHW %XUQHWW$YHQXH 7RWDO30 HCM Signalized Intersection Capacity Analysis 2026 Total PM 24-0640 Renton Market 12:50 am 09/09/2024 2026 Total PM Synchro 12 ReportCivTech Inc.Page 13 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane ConfigurationsTraffic Volume (vph) 1426321320000738455490 Future Volume (vph) 1426321320000738455490Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 5.0 5.0 5.0 5.0 5.0 Lane Util. Factor 0.95 1.00 1.00 1.00 1.00Frt 1.00 0.85 1.00 0.85 1.00 Flt Protected 0.99 1.00 1.00 1.00 0.97 Satd. Flow (prot) 3507 1583 1863 1583 1815Flt Permitted 0.99 1.00 1.00 1.00 0.83 Satd. Flow (perm) 3507 1583 1863 1583 1547 Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Adj. Flow (vph) 1546871430000799160530 RTOR Reduction (vph) 0 0 730000059000 Lane Group Flow (vph) 0 841 700000793201130 Turn Type Perm NA Perm NA Perm Perm NA Protected Phases 6 8 4 Permitted Phases 6 6 8 4Actuated Green, G (s) 32.0 32.0 23.0 23.0 23.0 Effective Green, g (s) 32.0 32.0 23.0 23.0 23.0 Actuated g/C Ratio 0.49 0.49 0.35 0.35 0.35Clearance Time (s) 5.0 5.0 5.0 5.0 5.0 Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 1726 779 659 560 547v/s Ratio Prot 0.04 v/s Ratio Perm 0.24 0.04 0.02 c0.07 v/c Ratio 0.48 0.09 0.11 0.05 0.20Uniform Delay, d1 11.0 8.7 14.1 13.8 14.6 Progression Factor 1.00 1.00 1.00 1.00 1.00Incremental Delay, d2 0.9 0.2 0.3 0.1 0.8 Delay (s) 12.0 8.9 14.5 14.0 15.4 Level of Service B A B B BApproach Delay (s/veh) 11.5 0.0 14.2 15.4 Approach LOS BABB Intersection Summary HCM 2000 Control Delay (s/veh) 12.3 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.37 Actuated Cycle Length (s) 65.0 Sum of lost time (s) 10.0 Intersection Capacity Utilization 44.9% ICU Level of Service AAnalysis Period (min) 15 c Critical Lane Group Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 5HQWRQ0DUNHW %XUQHWW$YHQXH 5HQWRQ0DUNHW'ULYHZD\ 7RWDO$0 HCM Unsignalized Intersection Capacity Analysis 2026 Total AM 24-0640 Renton Market 12:49 am 09/09/2024 2026 Total AM Synchro 12 ReportCivTech Inc.Page 14 Movement EBL EBR NBL NBT SBT SBR Lane ConfigurationsTraffic Volume (veh/h) 0 13 0 94 40 0 Future Volume (Veh/h) 0 13 0 94 40 0Sign Control Stop Free Free Grade 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 0 14 0 102 43 0 Pedestrians Lane Width (ft)Walking Speed (ft/s) Percent BlockageRight turn flare (veh) Median type None None Median storage veh)Upstream signal (ft) 261 298 pX, platoon unblocked vC, conflicting volume 145 43 43vC1, stage 1 conf vol vC2, stage 2 conf volvCu, unblocked vol 145 43 43 tC, single (s) 6.4 6.2 4.1 tC, 2 stage (s)tF (s) 3.5 3.3 2.2 p0 queue free % 100 99 100 cM capacity (veh/h) 847 1027 1566 Direction, Lane # EB 1 NB 1 SB 1 Volume Total 14 102 43 Volume Left 0 0 0 Volume Right 14 0 0cSH 1027 1700 1700 Volume to Capacity 0.01 0.06 0.03 Queue Length 95th (ft) 1 0 0Control Delay (s/veh) 8.6 0.0 0.0 Lane LOS AApproach Delay (s/veh) 8.6 0.0 0.0 Approach LOS A Intersection Summary Average Delay 0.8Intersection Capacity Utilization 29.2% ICU Level of Service A Analysis Period (min) 15 5HQWRQ0DUNHW %XUQHWW$YHQXH 5HQWRQ0DUNHW'ULYHZD\ 7RWDO30 HCM Unsignalized Intersection Capacity Analysis 2026 Total PM 24-0640 Renton Market 12:50 am 09/09/2024 2026 Total PM Synchro 12 ReportCivTech Inc.Page 14 Movement EBL EBR NBL NBT SBT SBR Lane ConfigurationsTraffic Volume (veh/h) 0 31 0 215 71 0 Future Volume (Veh/h) 0 31 0 215 71 0Sign Control Stop Free Free Grade 0% 0% 0% Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 0 34 0 234 77 0 Pedestrians Lane Width (ft)Walking Speed (ft/s) Percent BlockageRight turn flare (veh) Median type None None Median storage veh)Upstream signal (ft) 261 298 pX, platoon unblocked 0.99 vC, conflicting volume 311 77 77vC1, stage 1 conf vol vC2, stage 2 conf volvCu, unblocked vol 304 77 77 tC, single (s) 6.4 6.2 4.1 tC, 2 stage (s)tF (s) 3.5 3.3 2.2 p0 queue free % 100 97 100 cM capacity (veh/h) 684 984 1522 Direction, Lane # EB 1 NB 1 SB 1 Volume Total 34 234 77 Volume Left 0 0 0 Volume Right 34 0 0cSH 984 1700 1700 Volume to Capacity 0.03 0.14 0.05 Queue Length 95th (ft) 3 0 0Control Delay (s/veh) 8.8 0.0 0.0 Lane LOS AApproach Delay (s/veh) 8.8 0.0 0.0 Approach LOS A Intersection Summary Average Delay 0.9Intersection Capacity Utilization 38.6% ICU Level of Service A Analysis Period (min) 15 Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 5HQWRQ0DUNHW %XUQHWW$YHQXH 5HQWRQ0DUNHW'ULYHZD\ 7RWDO$0 HCM 7th TWSC 2026 Total AM 24-0640 Renton Market 12:49 am 09/09/2024 2026 Total AM Synchro 12 ReportCivTech Inc.Page 15 Intersection Int Delay, s/veh 0.8 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 0 13 0 94 40 0 Future Vol, veh/h 0 13 0 94 40 0Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free FreeRT Channelized - None - None - None Storage Length - - - - - - Veh in Median Storage, # 0 - - 0 0 -Grade, % 0 - - 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2Mvmt Flow 0140102430 Major/Minor Minor2 Major1 Major2 Conflicting Flow All - 43 - 0 - 0 Stage 1 - - - - - - Stage 2 - - - - - - Critical Hdwy -6.22----Critical Hdwy Stg 1 ------ Critical Hdwy Stg 2 ------Follow-up Hdwy - 3.318 - - - - Pot Cap-1 Maneuver 0 1027 0 - - 0 Stage 1 0 - 0 - - 0 Stage 2 0 - 0 - - 0 Platoon blocked, % - - Mov Cap-1 Maneuver - 1027 - - - -Mov Cap-2 Maneuver - - - - - - Stage 1 - - - - - - Stage 2 - - - - - - Approach EB NB SB HCM Control Delay, s/v 8.56 0 0HCM LOS A Minor Lane/Major Mvmt NBTEBLn1 SBT Capacity (veh/h) - 1027 - HCM Lane V/C Ratio - 0.014 -HCM Control Delay (s/veh) - 8.6 - HCM Lane LOS - A -HCM 95th %tile Q(veh) - 0 - 5HQWRQ0DUNHW %XUQHWW$YHQXH 5HQWRQ0DUNHW'ULYHZD\ 7RWDO30 HCM 7th TWSC 2026 Total PM 24-0640 Renton Market 12:50 am 09/09/2024 2026 Total PM Synchro 12 ReportCivTech Inc.Page 15 Intersection Int Delay, s/veh 0.9 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 0 31 0 215 71 0 Future Vol, veh/h 0 31 0 215 71 0Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free FreeRT Channelized - None - None - None Storage Length ------ Veh in Median Storage, # 0 - - 0 0 -Grade, % 0 - - 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2Mvmt Flow 0340234770 Major/Minor Minor2 Major1 Major2 Conflicting Flow All - 77 - 0 - 0 Stage 1 ------ Stage 2 ------ Critical Hdwy - 6.22 - - - -Critical Hdwy Stg 1 ------ Critical Hdwy Stg 2 ------Follow-up Hdwy -3.318---- Pot Cap-1 Maneuver 0 984 0 - - 0 Stage 1 0 - 0 - - 0 Stage 2 0 - 0 - - 0 Platoon blocked, % - - Mov Cap-1 Maneuver - 984 ----Mov Cap-2 Maneuver ------ Stage 1 ------ Stage 2 ------ Approach EB NB SB HCM Control Delay, s/v 8.79 0 0HCM LOS A Minor Lane/Major Mvmt NBTEBLn1 SBT Capacity (veh/h) - 984 - HCM Lane V/C Ratio - 0.034 -HCM Control Delay (s/veh) - 8.8 - HCM Lane LOS - A -HCM 95th %tile Q(veh) - 0.1 - Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 Renton Market – Renton, Washington Traffic Impact Analysis 44 APPENDIX K: 2031 BUILD PEAK HOUR ANALYSIS Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 5HQWRQ0DUNHW &LW\&HQWHU3DUNLQJ(JUHVV QG6WUHHW 7RWDO$0 HCM Unsignalized Intersection Capacity Analysis 2031 Total AM 24-0640 Renton Market 12:49 am 09/09/2024 2031 Total AM Synchro 12 ReportCivTech Inc.Page 1 Movement EBT EBR WBL WBT NBL NBR Lane ConfigurationsTraffic Volume (veh/h) 0 0 1 518 10 0 Future Volume (Veh/h) 0 0 1 518 10 0Sign Control Free Free Stop Grade 0% 0% 0% Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90Hourly flow rate (vph) 0 0 1 576 11 0 Pedestrians Lane Width (ft)Walking Speed (ft/s) Percent BlockageRight turn flare (veh) Median type None None Median storage veh)Upstream signal (ft) 148 164 pX, platoon unblocked vC, conflicting volume 0 146 0vC1, stage 1 conf vol vC2, stage 2 conf volvCu, unblocked vol 0 146 0 tC, single (s) 4.1 6.8 6.9 tC, 2 stage (s)tF (s) 2.2 3.5 3.3 p0 queue free % 100 99 100 cM capacity (veh/h) 1622 831 1084 Direction, Lane # WB 1 WB 2 WB 3 WB 4 NB 1 Volume Total 83 165 165 165 11 Volume Left 100011 Volume Right 00000cSH 1622 1700 1700 1700 831 Volume to Capacity 0.00 0.10 0.10 0.10 0.01 Queue Length 95th (ft)00001Control Delay (s/veh) 0.1 0.0 0.0 0.0 9.4 Lane LOS A AApproach Delay (s/veh) 0.0 9.4 Approach LOS A Intersection Summary Average Delay 0.2Intersection Capacity Utilization 17.5% ICU Level of Service A Analysis Period (min) 15 5HQWRQ0DUNHW &LW\&HQWHU3DUNLQJ(JUHVV QG6WUHHW 7RWDO30 HCM Unsignalized Intersection Capacity Analysis 2031 Total PM 24-0640 Renton Market 3:04 pm 10/03/2024 2031 Total PM Synchro 12 ReportCivTech Inc.Page 1 Movement EBT EBR WBL WBT NBL NBR Lane ConfigurationsTraffic Volume (veh/h) 0 0 0 807 125 1 Future Volume (Veh/h) 0 0 0 807 125 1Sign Control Free Free Stop Grade 0% 0% 0% Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90Hourly flow rate (vph) 0 0 0 897 139 1 Pedestrians Lane Width (ft)Walking Speed (ft/s) Percent BlockageRight turn flare (veh) Median type None None Median storage veh)Upstream signal (ft) 148 164 pX, platoon unblocked vC, conflicting volume 0 224 0vC1, stage 1 conf vol vC2, stage 2 conf volvCu, unblocked vol 0 224 0 tC, single (s) 4.1 6.8 6.9 tC, 2 stage (s)tF (s) 2.2 3.5 3.3 p0 queue free % 100 81 100 cM capacity (veh/h) 1622 744 1084 Direction, Lane # WB 1 WB 2 WB 3 WB 4 NB 1 Volume Total 224 224 224 224 140 Volume Left 0000139 Volume Right 00001cSH 1700 1700 1700 1700 745 Volume to Capacity 0.13 0.13 0.13 0.13 0.19 Queue Length 95th (ft)000017Control Delay (s/veh) 0.0 0.0 0.0 0.0 10.9 Lane LOS BApproach Delay (s/veh) 0.0 10.9 Approach LOS B Intersection Summary Average Delay 1.5Intersection Capacity Utilization 25.3% ICU Level of Service A Analysis Period (min) 15 Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 5HQWRQ0DUNHW &LW\&HQWHU3DUNLQJ,QJUHVV QG6WUHHW 7RWDO$0 HCM Unsignalized Intersection Capacity Analysis 2031 Total AM 24-0640 Renton Market 12:49 am 09/09/2024 2031 Total AM Synchro 12 ReportCivTech Inc.Page 2 Movement EBT EBR WBL WBT NBL NBR Lane ConfigurationsTraffic Volume (veh/h) 0 0 35 487 0 0 Future Volume (Veh/h) 0 0 35 487 0 0Sign Control Free Free Stop Grade 0% 0% 0% Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90Hourly flow rate (vph) 0 0 39 541 0 0 Pedestrians Lane Width (ft)Walking Speed (ft/s) Percent BlockageRight turn flare (veh) Median type None None Median storage veh)Upstream signal (ft) 76 236 pX, platoon unblocked vC, conflicting volume 0 213 0vC1, stage 1 conf vol vC2, stage 2 conf volvCu, unblocked vol 0 213 0 tC, single (s) 4.1 6.8 6.9 tC, 2 stage (s)tF (s) 2.2 3.5 3.3 p0 queue free % 98 100 100 cM capacity (veh/h) 1622 737 1084 Direction, Lane # WB 1 WB 2 WB 3 WB 4 Volume Total 116 155 155 155 Volume Left 39000 Volume Right 0000cSH 1622 1700 1700 1700 Volume to Capacity 0.02 0.09 0.09 0.09 Queue Length 95th (ft)2000Control Delay (s/veh) 2.6 0.0 0.0 0.0 Lane LOS AApproach Delay (s/veh) 0.5 Approach LOS Intersection Summary Average Delay 0.5Intersection Capacity Utilization 10.9% ICU Level of Service A Analysis Period (min) 15 5HQWRQ0DUNHW &LW\&HQWHU3DUNLQJ,QJUHVV QG6WUHHW 7RWDO30 HCM Unsignalized Intersection Capacity Analysis 2031 Total PM 24-0640 Renton Market 3:04 pm 10/03/2024 2031 Total PM Synchro 12 ReportCivTech Inc.Page 2 Movement EBT EBR WBL WBT NBL NBR Lane ConfigurationsTraffic Volume (veh/h) 0 0 119 811 0 0 Future Volume (Veh/h) 0 0 119 811 0 0Sign Control Free Free Stop Grade 0% 0% 0% Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90Hourly flow rate (vph) 0 0 132 901 0 0 Pedestrians Lane Width (ft)Walking Speed (ft/s) Percent BlockageRight turn flare (veh) Median type None None Median storage veh)Upstream signal (ft) 76 236 pX, platoon unblocked vC, conflicting volume 0 489 0vC1, stage 1 conf vol vC2, stage 2 conf volvCu, unblocked vol 0 489 0 tC, single (s) 4.1 6.8 6.9 tC, 2 stage (s)tF (s) 2.2 3.5 3.3 p0 queue free % 92 100 100 cM capacity (veh/h) 1622 467 1084 Direction, Lane # WB 1 WB 2 WB 3 WB 4 Volume Total 261 257 257 257 Volume Left 132000 Volume Right 0000cSH 1622 1700 1700 1700 Volume to Capacity 0.08 0.15 0.15 0.15 Queue Length 95th (ft)7000Control Delay (s/veh) 4.1 0.0 0.0 0.0 Lane LOS AApproach Delay (s/veh) 1.0 Approach LOS Intersection Summary Average Delay 1.0Intersection Capacity Utilization 16.9% ICU Level of Service A Analysis Period (min) 15 Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 5HQWRQ0DUNHW /RJDQ$YHQXH QG6WUHHW 7RWDO$0 Timings 2031 Total AM 24-0640 Renton Market 12:49 am 09/09/2024 2031 Total AM Synchro 12 ReportCivTech Inc.Page 3 Lane Group WBT NBL NBT SBT SBR Lane ConfigurationsTraffic Volume (vph) 326 24 68 33 46 Future Volume (vph) 326 24 68 33 46Turn Type NA Perm NA NA Perm Protected Phases 2 8 4 Permitted Phases 8 4Detector Phase 28844 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0Minimum Split (s) 22.5 22.5 22.5 22.5 22.5 Total Split (s) 38.0 37.0 37.0 37.0 37.0Total Split (%) 50.7% 49.3% 49.3% 49.3% 49.3% Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 All-Red Time (s) 1.0 1.0 1.0 1.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 Total Lost Time (s) 4.5 4.5 4.5 4.5 Lead/LagLead-Lag Optimize? Recall Mode C-Max None None Max MaxAct Effct Green (s) 33.5 32.5 32.5 32.5 Actuated g/C Ratio 0.45 0.43 0.43 0.43 v/c Ratio 0.19 0.13 0.04 0.07Control Delay (s/veh) 4.2 13.4 12.5 4.3 Queue Delay 0.0 0.0 0.0 0.0 Total Delay (s/veh) 4.2 13.4 12.5 4.3LOS A BBA Approach Delay (s/veh) 4.2 13.5 7.8Approach LOS A B A Intersection Summary Cycle Length: 75 Actuated Cycle Length: 75 Offset: 0 (0%), Referenced to phase 2:WBTL and 6:, Start of GreenNatural Cycle: 45 Control Type: Actuated-CoordinatedMaximum v/c Ratio: 0.20 Intersection Signal Delay (s/veh): 5.9 Intersection LOS: A Intersection Capacity Utilization 27.9% ICU Level of Service AAnalysis Period (min) 15 Splits and Phases: 3: Logan Avenue & 2nd Street 5HQWRQ0DUNHW /RJDQ$YHQXH QG6WUHHW 7RWDO30 Timings 2031 Total PM 24-0640 Renton Market 3:04 pm 10/03/2024 2031 Total PM Synchro 12 ReportCivTech Inc.Page 3 Lane Group WBT NBL NBT SBT SBR Lane ConfigurationsTraffic Volume (vph) 575 33 24 31 259 Future Volume (vph) 575 33 24 31 259Turn Type NA Perm NA NA Perm Protected Phases 2 8 4 Permitted Phases 8 4Detector Phase 28844 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0Minimum Split (s) 22.5 22.5 22.5 22.5 22.5 Total Split (s) 38.0 37.0 37.0 37.0 37.0Total Split (%) 50.7% 49.3% 49.3% 49.3% 49.3% Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 All-Red Time (s) 1.0 1.0 1.0 1.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 Total Lost Time (s) 4.5 4.5 4.5 4.5 Lead/LagLead-Lag Optimize? Recall Mode C-Max None None Max MaxAct Effct Green (s) 33.5 32.5 32.5 32.5 Actuated g/C Ratio 0.45 0.43 0.43 0.43 v/c Ratio 0.29 0.09 0.04 0.36Control Delay (s/veh) 10.4 13.0 12.5 7.5 Queue Delay 0.0 0.0 0.0 0.0 Total Delay (s/veh) 10.4 13.0 12.5 7.5LOS B BBA Approach Delay (s/veh) 10.4 13.1 8.1Approach LOS B B A Intersection Summary Cycle Length: 75 Actuated Cycle Length: 75 Offset: 0 (0%), Referenced to phase 2:WBTL and 6:, Start of GreenNatural Cycle: 45 Control Type: Actuated-CoordinatedMaximum v/c Ratio: 0.37 Intersection Signal Delay (s/veh): 9.9 Intersection LOS: A Intersection Capacity Utilization 42.6% ICU Level of Service AAnalysis Period (min) 15 Splits and Phases: 3: Logan Avenue & 2nd Street Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 5HQWRQ0DUNHW /RJDQ$YHQXH QG6WUHHW 7RWDO$0 HCM 7th Signalized Intersection Summary 2031 Total AM 24-0640 Renton Market 12:49 am 09/09/2024 2031 Total AM Synchro 12 ReportCivTech Inc.Page 5 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane ConfigurationsTraffic Volume (veh/h) 0 0 0 20 326 149 24 68 0 0 33 46 Future Volume (veh/h) 0 0 0 20 326 149 24 68 0 0 33 46Initial Q (Qb), veh 000000000 Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 0 0 1870 1870Adj Flow Rate, veh/h 22 362 166 27 76 0 0 37 51 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90Percent Heavy Veh, % 222220022 Cap, veh/h 129 2136 708 219 585 0 0 810 687 Arrive On Green 0.15 0.15 0.15 0.43 0.43 0.00 0.00 0.43 0.43Sat Flow, veh/h 290 4783 1585 365 1349 0 0 1870 1585 Grp Volume(v), veh/h 141 243 166 103 0 0 0 37 51 Grp Sat Flow(s),veh/h/ln 1856 1609 1585 1714 0 0 0 1870 1585Q Serve(g_s), s 5.0 5.0 6.9 0.0 0.0 0.0 0.0 0.9 1.4 Cycle Q Clear(g_c), s 5.0 5.0 6.9 2.5 0.0 0.0 0.0 0.9 1.4 Prop In Lane 0.16 1.00 0.26 0.00 0.00 1.00Lane Grp Cap(c), veh/h 829 1437 708 803 0 0 0 810 687 V/C Ratio(X) 0.17 0.17 0.23 0.13 0.00 0.00 0.00 0.05 0.07 Avail Cap(c_a), veh/h 829 1437 708 803 0 0 0 810 687HCM Platoon Ratio 0.33 0.33 0.33 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 0.00 0.00 0.00 1.00 1.00Uniform Delay (d), s/veh 19.8 19.8 20.6 12.7 0.0 0.0 0.0 12.3 12.4 Incr Delay (d2), s/veh 0.4 0.3 0.8 0.1 0.0 0.0 0.0 0.1 0.2 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0%ile BackOfQ(95%),veh/ln 4.0 3.4 5.0 1.8 0.0 0.0 0.0 0.6 0.9 Unsig. Movement Delay, s/veh LnGrp Delay(d), s/veh 20.3 20.1 21.4 12.8 0.0 0.0 0.0 12.4 12.7LnGrp LOS C C C B B B Approach Vol, veh/h 550 103 88 Approach Delay, s/veh 20.5 12.8 12.5Approach LOS C B B Timer - Assigned Phs 2 4 8 Phs Duration (G+Y+Rc), s 38.0 37.0 37.0 Change Period (Y+Rc), s 4.5 4.5 4.5Max Green Setting (Gmax), s 33.5 32.5 32.5 Max Q Clear Time (g_c+I1), s 8.9 3.4 4.5 Green Ext Time (p_c), s 3.6 0.3 0.5 Intersection Summary HCM 7th Control Delay, s/veh 18.5HCM 7th LOS B 5HQWRQ0DUNHW /RJDQ$YHQXH QG6WUHHW 7RWDO30 HCM 7th Signalized Intersection Summary 2031 Total PM 24-0640 Renton Market 3:04 pm 10/03/2024 2031 Total PM Synchro 12 ReportCivTech Inc.Page 5 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane ConfigurationsTraffic Volume (veh/h) 0 0 0 37 575 137 33 24 0 0 31 259 Future Volume (veh/h) 0 0 0 37 575 137 33 24 0 0 31 259Initial Q (Qb), veh 000000000 Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 0 0 1870 1870Adj Flow Rate, veh/h 41 639 152 37 27 0 0 34 288 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90Percent Heavy Veh, % 222220022 Cap, veh/h 149 2321 534 386 263 0 0 810 687 Arrive On Green 0.15 0.15 0.15 0.43 0.43 0.00 0.00 0.43 0.43Sat Flow, veh/h 334 5197 1195 715 606 0 0 1870 1585 Grp Volume(v), veh/h 228 394 211 64 0 0 0 34 288 Grp Sat Flow(s),veh/h/ln 1854 1609 1655 1321 0 0 0 1870 1585Q Serve(g_s), s 8.2 8.2 8.5 0.1 0.0 0.0 0.0 0.8 9.4 Cycle Q Clear(g_c), s 8.2 8.2 8.5 1.5 0.0 0.0 0.0 0.8 9.4 Prop In Lane 0.18 0.72 0.58 0.00 0.00 1.00Lane Grp Cap(c), veh/h 828 1437 739 648 0 0 0 810 687 V/C Ratio(X) 0.27 0.27 0.28 0.10 0.00 0.00 0.00 0.04 0.42 Avail Cap(c_a), veh/h 828 1437 739 648 0 0 0 810 687HCM Platoon Ratio 0.33 0.33 0.33 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 0.00 0.00 0.00 1.00 1.00Uniform Delay (d), s/veh 21.2 21.2 21.3 12.5 0.0 0.0 0.0 12.3 14.7 Incr Delay (d2), s/veh 0.8 0.5 1.0 0.1 0.0 0.0 0.0 0.1 1.9 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0%ile BackOfQ(95%),veh/ln 7.1 6.0 6.6 1.1 0.0 0.0 0.0 0.6 6.3 Unsig. Movement Delay, s/veh LnGrp Delay(d), s/veh 22.0 21.6 22.3 12.5 0.0 0.0 0.0 12.4 16.6LnGrp LOS C C C B B B Approach Vol, veh/h 832 64 322 Approach Delay, s/veh 21.9 12.5 16.1Approach LOS C B B Timer - Assigned Phs 2 4 8 Phs Duration (G+Y+Rc), s 38.0 37.0 37.0 Change Period (Y+Rc), s 4.5 4.5 4.5Max Green Setting (Gmax), s 33.5 32.5 32.5 Max Q Clear Time (g_c+I1), s 10.5 11.4 3.5 Green Ext Time (p_c), s 5.6 1.1 0.3 Intersection Summary HCM 7th Control Delay, s/veh 19.9HCM 7th LOS B Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 5HQWRQ0DUNHW 5HQWRQ0DUNHW'ULYHZD\ /RJDQ$YHQXH 7RWDO$0 HCM Unsignalized Intersection Capacity Analysis 2031 Total AM 24-0640 Renton Market 12:49 am 09/09/2024 2031 Total AM Synchro 12 ReportCivTech Inc.Page 6 Movement WBL WBR NBT NBR SBL SBT Lane ConfigurationsTraffic Volume (veh/h) 0 0 76 3 6 65 Future Volume (Veh/h) 0 0 76 3 6 65Sign Control Stop Free Free Grade 0% 0% 0% Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90Hourly flow rate (vph) 0 0 84 3 7 72 Pedestrians Lane Width (ft)Walking Speed (ft/s) Percent BlockageRight turn flare (veh) Median type None None Median storage veh)Upstream signal (ft) 259 302 pX, platoon unblocked vC, conflicting volume 172 86 87vC1, stage 1 conf vol vC2, stage 2 conf volvCu, unblocked vol 172 86 87 tC, single (s) 6.4 6.2 4.1 tC, 2 stage (s)tF (s) 3.5 3.3 2.2 p0 queue free % 100 100 100 cM capacity (veh/h) 815 973 1509 Direction, Lane # NB 1 SB 1 Volume Total 87 79 Volume Left 0 7 Volume Right 3 0cSH 1700 1509 Volume to Capacity 0.05 0.00 Queue Length 95th (ft) 0 0Control Delay (s/veh) 0.0 0.7 Lane LOS AApproach Delay (s/veh) 0.0 0.7 Approach LOS Intersection Summary Average Delay 0.3Intersection Capacity Utilization 11.7% ICU Level of Service A Analysis Period (min) 15 5HQWRQ0DUNHW 5HQWRQ0DUNHW'ULYHZD\ /RJDQ$YHQXH 7RWDO30 HCM Unsignalized Intersection Capacity Analysis 2031 Total PM 24-0640 Renton Market 3:04 pm 10/03/2024 2031 Total PM Synchro 12 ReportCivTech Inc.Page 6 Movement WBL WBR NBT NBR SBL SBT Lane ConfigurationsTraffic Volume (veh/h) 0013162 Future Volume (Veh/h) 0013162Sign Control Stop Free Free Grade 0% 0% 0% Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90Hourly flow rate (vph) 0013182 Pedestrians Lane Width (ft)Walking Speed (ft/s) Percent BlockageRight turn flare (veh) Median type None None Median storage veh)Upstream signal (ft) 259 302 pX, platoon unblocked vC, conflicting volume 41 3 4vC1, stage 1 conf vol vC2, stage 2 conf volvCu, unblocked vol 41 3 4 tC, single (s) 6.4 6.2 4.1 tC, 2 stage (s)tF (s) 3.5 3.3 2.2 p0 queue free % 100 100 99 cM capacity (veh/h) 960 1082 1618 Direction, Lane # NB 1 SB 1 Volume Total 4 20 Volume Left 0 18 Volume Right 3 0cSH 1700 1618 Volume to Capacity 0.00 0.01 Queue Length 95th (ft) 0 1Control Delay (s/veh) 0.0 6.5 Lane LOS AApproach Delay (s/veh) 0.0 6.5 Approach LOS Intersection Summary Average Delay 5.4Intersection Capacity Utilization 11.0% ICU Level of Service A Analysis Period (min) 15 Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 5HQWRQ0DUNHW /RJDQ$YHQXH 'ULYHZD\QRIUG6WUHHW 7RWDO$0 HCM 7th TWSC 2031 Total AM 24-0640 Renton Market 12:49 am 09/09/2024 2031 Total AM Synchro 12 ReportCivTech Inc.Page 8 Intersection Int Delay, s/veh 0.4 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 1 6 0 73 70 7 Future Vol, veh/h 1 6 0 73 70 7Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free FreeRT Channelized - None - None - None Storage Length - 0 - - - - Veh in Median Storage, # 0 - - 0 0 -Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2Mvmt Flow 1 7 08178 8 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 163 82 - 0 - 0 Stage 1 82 - - - - - Stage 2 81 - - - - - Critical Hdwy 6.42 6.22 - - - -Critical Hdwy Stg 15.42----- Critical Hdwy Stg 25.42-----Follow-up Hdwy 3.518 3.318 - - - - Pot Cap-1 Maneuver 828 978 0 - - - Stage 1 942 - 0 - - - Stage 2 942 - 0 - - - Platoon blocked, % - - - Mov Cap-1 Maneuver 828 978 - - - -Mov Cap-2 Maneuver 828 - - - - - Stage 1 942 - - - - - Stage 2 942 - - - - - Approach EB NB SB HCM Control Delay, s/v 8.71 0 0HCM LOS A Minor Lane/Major Mvmt NBTEBLn1 SBT SBR Capacity (veh/h) - 978 - - HCM Lane V/C Ratio - 0.007 - -HCM Control Delay (s/veh) - 8.7 - - HCM Lane LOS - A - -HCM 95th %tile Q(veh) - 0 - - 5HQWRQ0DUNHW /RJDQ$YHQXH 'ULYHZD\QRIUG6WUHHW 7RWDO30 HCM 7th TWSC 2031 Total PM 24-0640 Renton Market 3:04 pm 10/03/2024 2031 Total PM Synchro 12 ReportCivTech Inc.Page 8 Intersection Int Delay, s/veh 0 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 0 0 0 3 2 0 Future Vol, veh/h 0 0 0 3 2 0Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free FreeRT Channelized - None - None - None Storage Length - 0 ---- Veh in Median Storage, # 0 - - 0 0 -Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2Mvmt Flow 0 0 0 3 2 0 Major/Minor Minor2 Major1 Major2 Conflicting Flow All - 2 - 0 - 0 Stage 1 ------ Stage 2 ------ Critical Hdwy - 6.22 - - - -Critical Hdwy Stg 1 ------ Critical Hdwy Stg 2 ------Follow-up Hdwy -3.318---- Pot Cap-1 Maneuver 0 1082 0 - - - Stage 1 0 - 0 - - - Stage 2 0 - 0 - - - Platoon blocked, % - - - Mov Cap-1 Maneuver - 1082 ----Mov Cap-2 Maneuver ------ Stage 1 ------ Stage 2 ------ Approach EB NB SB HCM Control Delay, s/v 0 0 0HCM LOS A Minor Lane/Major Mvmt NBTEBLn1 SBT SBR Capacity (veh/h)---- HCM Lane V/C Ratio ----HCM Control Delay (s/veh) - 0 - - HCM Lane LOS - A - -HCM 95th %tile Q(veh) ---- Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 5HQWRQ0DUNHW UG6WUHHW /RJDQ$YHQXH 7RWDO$0 Timings 2031 Total AM 24-0640 Renton Market 12:49 am 09/09/2024 2031 Total AM Synchro 12 ReportCivTech Inc.Page 9 Lane Group EBT NBR SBL Lane ConfigurationsTraffic Volume (vph) 246 16 77 Future Volume (vph) 246 16 77Turn Type NA Perm Prot Protected Phases 2 4 Permitted Phases 3Detector Phase 2 3 4 Switch Phase Minimum Initial (s) 5.0 5.0 5.0Minimum Split (s) 22.5 22.5 23.0 Total Split (s) 25.0 10.0 15.0Total Split (%) 50.0% 20.0% 30.0% Yellow Time (s) 3.5 3.5 4.0 All-Red Time (s) 1.0 1.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 Total Lost Time (s) 4.5 4.5 5.0 Lead/Lag Lead LagLead-Lag Optimize? Yes Yes Recall Mode C-Max None MaxAct Effct Green (s) 20.5 5.5 18.0 Actuated g/C Ratio 0.41 0.11 0.36 v/c Ratio 0.24 0.02 0.13Control Delay (s/veh) 10.2 0.0 13.4 Queue Delay 0.0 0.0 0.0 Total Delay (s/veh) 10.2 0.0 13.4LOS BAB Approach Delay (s/veh) 10.2Approach LOS B Intersection Summary Cycle Length: 50 Actuated Cycle Length: 50 Offset: 0 (0%), Referenced to phase 2:EBTL and 6:, Start of GreenNatural Cycle: 70 Control Type: Actuated-CoordinatedMaximum v/c Ratio: 0.24 Intersection Signal Delay (s/veh): 10.4 Intersection LOS: B Intersection Capacity Utilization 28.1% ICU Level of Service AAnalysis Period (min) 15 Splits and Phases: 6: 3rd Street & Logan Avenue 5HQWRQ0DUNHW UG6WUHHW /RJDQ$YHQXH 7RWDO30 Timings 2031 Total PM 24-0640 Renton Market 3:04 pm 10/03/2024 2031 Total PM Synchro 12 ReportCivTech Inc.Page 9 Lane Group EBT NBR SBL Lane ConfigurationsTraffic Volume (vph) 975 21 2 Future Volume (vph) 975 21 2Turn Type NA Perm Prot Protected Phases 2 4 Permitted Phases 3Detector Phase 2 3 4 Switch Phase Minimum Initial (s) 5.0 5.0 5.0Minimum Split (s) 22.5 22.5 23.0 Total Split (s) 25.0 10.0 15.0Total Split (%) 50.0% 20.0% 30.0% Yellow Time (s) 3.5 3.5 4.0 All-Red Time (s) 1.0 1.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 Total Lost Time (s) 4.5 4.5 5.0 Lead/Lag Lead LagLead-Lag Optimize? Yes Yes Recall Mode C-Max None MaxAct Effct Green (s) 20.5 5.5 18.0 Actuated g/C Ratio 0.41 0.11 0.36 v/c Ratio 0.77 0.04 0.00Control Delay (s/veh) 17.4 0.1 13.5 Queue Delay 0.0 0.0 0.0 Total Delay (s/veh) 17.4 0.1 13.5LOS BAB Approach Delay (s/veh) 17.5Approach LOS B Intersection Summary Cycle Length: 50 Actuated Cycle Length: 50 Offset: 0 (0%), Referenced to phase 2:EBTL and 6:, Start of GreenNatural Cycle: 75 Control Type: Actuated-CoordinatedMaximum v/c Ratio: 0.78 Intersection Signal Delay (s/veh): 17.1 Intersection LOS: B Intersection Capacity Utilization 46.4% ICU Level of Service AAnalysis Period (min) 15 Splits and Phases: 6: 3rd Street & Logan Avenue Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 5HQWRQ0DUNHW UG6WUHHW /RJDQ$YHQXH 7RWDO$0 HCM Signalized Intersection Capacity Analysis 2031 Total AM 24-0640 Renton Market 12:49 am 09/09/2024 2031 Total AM Synchro 12 ReportCivTech Inc.Page 10 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane ConfigurationsTraffic Volume (vph) 68246200000167700 Future Volume (vph) 68246200000167700Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 4.5 4.5 5.0 Lane Util. Factor 0.95 1.00 1.00Frt 0.99 0.86 1.00 Flt Protected 0.98 1.00 0.95 Satd. Flow (prot) 3498 1611 1770Flt Permitted 0.98 1.00 0.95 Satd. Flow (perm) 3498 1611 1770 Peak-hour factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90Adj. Flow (vph) 76273200000188600 RTOR Reduction (vph)0100000018000 Lane Group Flow (vph) 0 35000000008600 Turn Type Perm NA Perm Prot Protected Phases 2 4 Permitted Phases 2 3Actuated Green, G (s) 16.9 1.1 18.0 Effective Green, g (s) 16.9 1.1 18.0 Actuated g/C Ratio 0.34 0.02 0.36Clearance Time (s) 4.5 4.5 5.0 Vehicle Extension (s) 3.0 3.0 3.0 Lane Grp Cap (vph) 1182 35 637v/s Ratio Prot c0.05 v/s Ratio Perm 0.10 c0.00 v/c Ratio 0.29 0.01 0.13Uniform Delay, d1 12.1 23.9 10.7 Progression Factor 1.00 1.00 1.00Incremental Delay, d2 0.6 0.1 0.4 Delay (s) 12.8 24.0 11.2 Level of Service B C BApproach Delay (s/veh) 12.8 0.0 24.0 11.2 Approach LOS B A C B Intersection Summary HCM 2000 Control Delay (s/veh) 13.0 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.21 Actuated Cycle Length (s) 50.0 Sum of lost time (s) 14.0 Intersection Capacity Utilization 28.1% ICU Level of Service AAnalysis Period (min) 15 c Critical Lane Group 5HQWRQ0DUNHW UG6WUHHW /RJDQ$YHQXH 7RWDO30 HCM Signalized Intersection Capacity Analysis 2031 Total PM 24-0640 Renton Market 3:04 pm 10/03/2024 2031 Total PM Synchro 12 ReportCivTech Inc.Page 10 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane ConfigurationsTraffic Volume (vph) 3975330000021200 Future Volume (vph) 3975330000021200Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 4.5 4.5 5.0 Lane Util. Factor 0.95 1.00 1.00Frt 0.99 0.86 1.00 Flt Protected 0.99 1.00 0.95 Satd. Flow (prot) 3521 1611 1770Flt Permitted 0.99 1.00 0.95 Satd. Flow (perm) 3521 1611 1770 Peak-hour factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90Adj. Flow (vph) 3 1083 370000023200 RTOR Reduction (vph)0500000022000 Lane Group Flow (vph) 0 11180000001200 Turn Type Perm NA Perm Prot Protected Phases 2 4 Permitted Phases 2 3Actuated Green, G (s) 16.9 1.1 18.0 Effective Green, g (s) 16.9 1.1 18.0 Actuated g/C Ratio 0.34 0.02 0.36Clearance Time (s) 4.5 4.5 5.0 Vehicle Extension (s) 3.0 3.0 3.0 Lane Grp Cap (vph) 1190 35 637v/s Ratio Prot c0.00 v/s Ratio Perm 0.32 c0.00 v/c Ratio 0.93 0.01 0.00Uniform Delay, d1 16.0 23.9 10.2 Progression Factor 1.00 1.00 1.00Incremental Delay, d2 15.0 0.1 0.0 Delay (s) 31.1 24.0 10.2 Level of Service C C BApproach Delay (s/veh) 31.1 0.0 24.0 10.2 Approach LOS C A C B Intersection Summary HCM 2000 Control Delay (s/veh) 30.9 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.44 Actuated Cycle Length (s) 50.0 Sum of lost time (s) 14.0 Intersection Capacity Utilization 46.4% ICU Level of Service AAnalysis Period (min) 15 c Critical Lane Group Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 5HQWRQ0DUNHW %XUQHWW$YHQXH QG6WUHHW 7RWDO$0 Timings 2031 Total AM 24-0640 Renton Market 12:49 am 09/09/2024 2031 Total AM Synchro 12 ReportCivTech Inc.Page 12 Lane Group WBT NBL NBT SBT SBR Lane ConfigurationsTraffic Volume (vph) 421 76 18 7 24 Future Volume (vph) 421 76 18 7 24Turn Type NA Prot NA NA Perm Protected Phases 2384 Permitted Phases 4Detector Phase 23844 Switch Phase Minimum Initial (s) 5.0 5.0 4.0 5.0 5.0Minimum Split (s) 23.0 23.0 23.0 23.0 23.0 Total Split (s) 27.0 25.0 48.0 23.0 23.0Total Split (%) 36.0% 33.3% 64.0% 30.7% 30.7% Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 All-Red Time (s) 1.0 1.0 1.0 1.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 Lead/Lag Lead Lag LagLead-Lag Optimize? Yes Yes Yes Recall Mode C-Max Max Max Max MaxAct Effct Green (s) 22.0 20.0 43.0 18.0 18.0 Actuated g/C Ratio 0.29 0.27 0.57 0.24 0.24 v/c Ratio 0.35 0.17 0.01 0.01 0.05Control Delay (s/veh) 21.4 22.4 7.0 22.0 0.2 Queue Delay 0.0 0.0 0.0 0.0 0.0 Total Delay (s/veh) 21.4 22.4 7.0 22.0 0.2LOS CCACA Approach Delay (s/veh) 21.4 19.5 5.2Approach LOS C B A Intersection Summary Cycle Length: 75 Actuated Cycle Length: 75 Offset: 0 (0%), Referenced to phase 2:WBTL, Start of GreenNatural Cycle: 70 Control Type: Actuated-CoordinatedMaximum v/c Ratio: 0.36 Intersection Signal Delay (s/veh): 20.3 Intersection LOS: C Intersection Capacity Utilization 30.2% ICU Level of Service AAnalysis Period (min) 15 Splits and Phases: 7: Burnett Avenue & 2nd Street 5HQWRQ0DUNHW %XUQHWW$YHQXH QG6WUHHW 7RWDO30 Timings 2031 Total PM 24-0640 Renton Market 3:04 pm 10/03/2024 2031 Total PM Synchro 12 ReportCivTech Inc.Page 12 Lane Group WBT NBL NBT SBT SBR Lane ConfigurationsTraffic Volume (vph) 572 216 37 18 21 Future Volume (vph) 572 216 37 18 21Turn Type NA Prot NA NA Perm Protected Phases 2384 Permitted Phases 4Detector Phase 23844 Switch Phase Minimum Initial (s) 5.0 5.0 4.0 5.0 5.0Minimum Split (s) 23.0 23.0 23.0 23.0 23.0 Total Split (s) 27.0 25.0 48.0 23.0 23.0Total Split (%) 36.0% 33.3% 64.0% 30.7% 30.7% Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 All-Red Time (s) 1.0 1.0 1.0 1.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 Lead/Lag Lead Lag LagLead-Lag Optimize? Yes Yes Yes Recall Mode C-Max Max Max Max MaxAct Effct Green (s) 22.0 20.0 43.0 18.0 18.0 Actuated g/C Ratio 0.29 0.27 0.57 0.24 0.24 v/c Ratio 0.48 0.50 0.03 0.04 0.05Control Delay (s/veh) 23.0 27.8 7.1 22.3 0.1 Queue Delay 0.0 0.0 0.0 0.0 0.0 Total Delay (s/veh) 23.0 27.8 7.1 22.3 0.1LOS CCACA Approach Delay (s/veh) 23.0 24.8 10.5Approach LOS C C B Intersection Summary Cycle Length: 75 Actuated Cycle Length: 75 Offset: 0 (0%), Referenced to phase 2:WBTL, Start of GreenNatural Cycle: 70 Control Type: Actuated-CoordinatedMaximum v/c Ratio: 0.51 Intersection Signal Delay (s/veh): 23.0 Intersection LOS: C Intersection Capacity Utilization 40.8% ICU Level of Service AAnalysis Period (min) 15 Splits and Phases: 7: Burnett Avenue & 2nd Street Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 5HQWRQ0DUNHW %XUQHWW$YHQXH QG6WUHHW 7RWDO$0 HCM 7th Signalized Intersection Summary 2031 Total AM 24-0640 Renton Market 12:49 am 09/09/2024 2031 Total AM Synchro 12 ReportCivTech Inc.Page 14 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane ConfigurationsTraffic Volume (veh/h) 0003842118761800724 Future Volume (veh/h) 0003842118761800724Initial Q (Qb), veh 000000000 Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 0 0 1870 1870Adj Flow Rate, veh/h 4246820842000827 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90Percent Heavy Veh, % 222220022 Cap, veh/h 125 1395 59 475 1072 0 0 449 380 Arrive On Green 0.29 0.29 0.29 0.27 0.57 0.00 0.00 0.24 0.24Sat Flow, veh/h 427 4756 202 1781 1870 0 0 1870 1585 Grp Volume(v), veh/h 182167181842000827 Grp Sat Flow(s),veh/h/ln 1849 1702 1834 1781 1870 0 0 1870 1585Q Serve(g_s), s 5.8 5.8 5.8 2.7 0.3 0.0 0.0 0.2 1.0 Cycle Q Clear(g_c), s 5.8 5.8 5.8 2.7 0.3 0.0 0.0 0.2 1.0 Prop In Lane 0.23 0.11 1.00 0.00 0.00 1.00Lane Grp Cap(c), veh/h 542 499 538 475 1072 0 0 449 380 V/C Ratio(X) 0.34 0.33 0.34 0.18 0.02 0.00 0.00 0.02 0.07 Avail Cap(c_a), veh/h 542 499 538 475 1072 0 0 449 380HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 0.00 0.00 1.00 1.00Uniform Delay (d), s/veh 20.8 20.8 20.8 21.2 6.9 0.0 0.0 21.8 22.0 Incr Delay (d2), s/veh 1.7 1.8 1.7 0.8 0.0 0.0 0.0 0.1 0.4 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0%ile BackOfQ(95%),veh/ln 4.7 4.4 4.7 2.2 0.2 0.0 0.0 0.2 0.7 Unsig. Movement Delay, s/veh LnGrp Delay(d), s/veh 22.4 22.6 22.5 22.0 6.9 0.0 0.0 21.8 22.4LnGrp LOS CCCCA CC Approach Vol, veh/h 530 104 35 Approach Delay, s/veh 22.5 19.1 22.3Approach LOS C B C Timer - Assigned Phs 2 3 4 8 Phs Duration (G+Y+Rc), s 27.0 25.0 23.0 48.0 Change Period (Y+Rc), s 5.0 5.0 5.0 5.0Max Green Setting (Gmax), s 22.0 20.0 18.0 43.0 Max Q Clear Time (g_c+I1), s 7.8 4.7 3.0 2.3 Green Ext Time (p_c), s 2.7 0.1 0.1 0.1 Intersection Summary HCM 7th Control Delay, s/veh 21.9HCM 7th LOS C 5HQWRQ0DUNHW %XUQHWW$YHQXH QG6WUHHW 7RWDO30 HCM 7th Signalized Intersection Summary 2031 Total PM 24-0640 Renton Market 3:04 pm 10/03/2024 2031 Total PM Synchro 12 ReportCivTech Inc.Page 14 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane ConfigurationsTraffic Volume (veh/h) 0 0 0 60 572 16 216 37 0 0 18 21 Future Volume (veh/h) 0 0 0 60 572 16 216 37 0 0 18 21Initial Q (Qb), veh 000000000 Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 0 0 1870 1870Adj Flow Rate, veh/h 67 636 18 240 41 0 0 20 23 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90Percent Heavy Veh, % 222220022 Cap, veh/h 147 1396 39 475 1072 0 0 449 380 Arrive On Green 0.29 0.29 0.29 0.27 0.57 0.00 0.00 0.24 0.24Sat Flow, veh/h 501 4758 135 1781 1870 0 0 1870 1585 Grp Volume(v), veh/h 247 227 247 240 41 0 0 20 23 Grp Sat Flow(s),veh/h/ln 1845 1702 1846 1781 1870 0 0 1870 1585Q Serve(g_s), s 8.2 8.2 8.2 8.6 0.7 0.0 0.0 0.6 0.8 Cycle Q Clear(g_c), s 8.2 8.2 8.2 8.6 0.7 0.0 0.0 0.6 0.8 Prop In Lane 0.27 0.07 1.00 0.00 0.00 1.00Lane Grp Cap(c), veh/h 541 499 542 475 1072 0 0 449 380 V/C Ratio(X) 0.46 0.45 0.46 0.51 0.04 0.00 0.00 0.04 0.06 Avail Cap(c_a), veh/h 541 499 542 475 1072 0 0 449 380HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 0.00 0.00 1.00 1.00Uniform Delay (d), s/veh 21.6 21.6 21.6 23.3 7.0 0.0 0.0 21.9 22.0 Incr Delay (d2), s/veh 2.8 3.0 2.8 3.8 0.1 0.0 0.0 0.2 0.3 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0%ile BackOfQ(95%),veh/ln 6.8 6.3 6.8 7.1 0.5 0.0 0.0 0.5 0.6 Unsig. Movement Delay, s/veh LnGrp Delay(d), s/veh 24.4 24.6 24.4 27.1 7.0 0.0 0.0 22.1 22.3LnGrp LOS CCCCA CC Approach Vol, veh/h 721 281 43 Approach Delay, s/veh 24.4 24.2 22.2Approach LOS C C C Timer - Assigned Phs 2 3 4 8 Phs Duration (G+Y+Rc), s 27.0 25.0 23.0 48.0 Change Period (Y+Rc), s 5.0 5.0 5.0 5.0Max Green Setting (Gmax), s 22.0 20.0 18.0 43.0 Max Q Clear Time (g_c+I1), s 10.2 10.6 2.8 2.7 Green Ext Time (p_c), s 3.4 0.5 0.1 0.2 Intersection Summary HCM 7th Control Delay, s/veh 24.3HCM 7th LOS C Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 5HQWRQ0DUNHW UG6WUHHW %XUQHWW$YHQXH 7RWDO$0 Timings 2031 Total AM 24-0640 Renton Market 12:49 am 09/09/2024 2031 Total AM Synchro 12 ReportCivTech Inc.Page 15 Lane Group EBT EBR NBT NBR SBL SBT Lane ConfigurationsTraffic Volume (vph) 234 41 47 30 32 19 Future Volume (vph) 234 41 47 30 32 19Turn Type NA Perm NA Perm Perm NA Protected Phases 6 8 4 Permitted Phases 6 8 4Detector Phase 668844 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 4.0 4.0Minimum Split (s) 29.0 29.0 23.0 23.0 23.0 23.0 Total Split (s) 35.0 35.0 25.0 25.0 25.0 25.0Total Split (%) 58.3% 58.3% 41.7% 41.7% 41.7% 41.7% Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 Lead/LagLead-Lag Optimize? Recall Mode C-Max C-Max Max Max Max MaxAct Effct Green (s) 30.0 30.0 20.0 20.0 20.0 Actuated g/C Ratio 0.50 0.50 0.33 0.33 0.33 v/c Ratio 0.18 0.05 0.08 0.05 0.10Control Delay (s/veh) 8.5 3.0 14.2 5.5 14.6 Queue Delay 0.0 0.0 0.0 0.0 0.0 Total Delay (s/veh) 8.5 3.0 14.2 5.5 14.6LOS AABA B Approach Delay (s/veh) 7.9 10.9 14.6Approach LOS A B B Intersection Summary Cycle Length: 60 Actuated Cycle Length: 60 Offset: 0 (0%), Referenced to phase 2: and 6:EBTL, Start of GreenNatural Cycle: 55 Control Type: Actuated-CoordinatedMaximum v/c Ratio: 0.18 Intersection Signal Delay (s/veh): 9.2 Intersection LOS: A Intersection Capacity Utilization 28.1% ICU Level of Service AAnalysis Period (min) 15 Splits and Phases: 8: 3rd Street & Burnett Avenue 5HQWRQ0DUNHW UG6WUHHW %XUQHWW$YHQXH 7RWDO30 Timings 2031 Total PM 24-0640 Renton Market 3:04 pm 10/03/2024 2031 Total PM Synchro 12 ReportCivTech Inc.Page 15 Lane Group EBT EBR NBT NBR SBL SBT Lane ConfigurationsTraffic Volume (vph) 698 146 80 93 59 54 Future Volume (vph) 698 146 80 93 59 54Turn Type NA Perm NA Perm Perm NA Protected Phases 6 8 4 Permitted Phases 6 8 4Detector Phase 668844 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 4.0 4.0Minimum Split (s) 29.0 29.0 23.0 23.0 23.0 23.0 Total Split (s) 35.0 35.0 25.0 25.0 25.0 25.0Total Split (%) 58.3% 58.3% 41.7% 41.7% 41.7% 41.7% Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 Lead/LagLead-Lag Optimize? Recall Mode C-Max C-Max Max Max Max MaxAct Effct Green (s) 30.0 30.0 20.0 20.0 20.0 Actuated g/C Ratio 0.50 0.50 0.33 0.33 0.33 v/c Ratio 0.54 0.18 0.14 0.17 0.24Control Delay (s/veh) 11.7 2.2 14.8 4.5 16.1 Queue Delay 1.3 0.0 0.0 0.0 0.0 Total Delay (s/veh) 13.0 2.2 14.8 4.5 16.1LOS BABA B Approach Delay (s/veh) 11.5 9.3 16.2Approach LOS B A B Intersection Summary Cycle Length: 60 Actuated Cycle Length: 60 Offset: 0 (0%), Referenced to phase 2: and 6:EBTL, Start of GreenNatural Cycle: 55 Control Type: Actuated-CoordinatedMaximum v/c Ratio: 0.54 Intersection Signal Delay (s/veh): 11.6 Intersection LOS: B Intersection Capacity Utilization 48.2% ICU Level of Service AAnalysis Period (min) 15 Splits and Phases: 8: 3rd Street & Burnett Avenue Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 5HQWRQ0DUNHW UG6WUHHW %XUQHWW$YHQXH 7RWDO$0 HCM 7th Signalized Intersection Summary 2031 Total AM 24-0640 Renton Market 12:49 am 09/09/2024 2031 Total AM Synchro 12 ReportCivTech Inc.Page 17 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane ConfigurationsTraffic Volume (veh/h) 55234410000473032190 Future Volume (veh/h) 55234410000473032190Initial Q (Qb), veh 000 000000 Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 0 1870 1870 1870 1870 0Adj Flow Rate, veh/h 61 260 46 0 52 33 36 21 0 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90Percent Heavy Veh, % 222 022220 Cap, veh/h 342 1464 793 0 623 528 390 207 0 Arrive On Green 0.50 0.50 0.50 0.00 0.33 0.33 0.33 0.33 0.00Sat Flow, veh/h 684 2929 1585 0 1870 1585 877 621 0 Grp Volume(v), veh/h 164 157 46 0 52 33 57 0 0 Grp Sat Flow(s),veh/h/ln 1836 1777 1585 0 1870 1585 1498 0 0Q Serve(g_s), s 2.9 2.9 0.9 0.0 1.1 0.9 0.1 0.0 0.0 Cycle Q Clear(g_c), s 2.9 2.9 0.9 0.0 1.1 0.9 1.3 0.0 0.0 Prop In Lane 0.37 1.00 0.00 1.00 0.63 0.00Lane Grp Cap(c), veh/h 918 888 793 0 623 528 597 0 0 V/C Ratio(X) 0.18 0.18 0.06 0.00 0.08 0.06 0.10 0.00 0.00 Avail Cap(c_a), veh/h 918 888 793 0 623 528 597 0 0HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.99 0.99 0.99 0.00 1.00 1.00 1.00 0.00 0.00Uniform Delay (d), s/veh 8.2 8.2 7.7 0.0 13.7 13.6 13.8 0.0 0.0 Incr Delay (d2), s/veh 0.4 0.4 0.1 0.0 0.3 0.2 0.3 0.0 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0%ile BackOfQ(95%),veh/ln 2.0 1.9 0.5 0.0 0.9 0.6 1.0 0.0 0.0 Unsig. Movement Delay, s/veh LnGrp Delay(d), s/veh 8.7 8.7 7.9 0.0 14.0 13.8 14.1 0.0 0.0LnGrp LOS AAA BBB Approach Vol, veh/h 367 85 57 Approach Delay, s/veh 8.6 13.9 14.1Approach LOS A B B Timer - Assigned Phs 4 6 8 Phs Duration (G+Y+Rc), s 25.0 35.0 25.0 Change Period (Y+Rc), s 5.0 5.0 5.0Max Green Setting (Gmax), s 20.0 30.0 20.0 Max Q Clear Time (g_c+I1), s 3.3 4.9 3.1 Green Ext Time (p_c), s 0.2 2.0 0.3 Intersection Summary HCM 7th Control Delay, s/veh 10.1HCM 7th LOS B 5HQWRQ0DUNHW UG6WUHHW %XUQHWW$YHQXH 7RWDO30 HCM 7th Signalized Intersection Summary 2031 Total PM 24-0640 Renton Market 3:04 pm 10/03/2024 2031 Total PM Synchro 12 ReportCivTech Inc.Page 17 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane ConfigurationsTraffic Volume (veh/h) 1556981460000809359540 Future Volume (veh/h) 1556981460000809359540Initial Q (Qb), veh 000 000000 Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 0 1870 1870 1870 1870 0Adj Flow Rate, veh/h 172 776 162 0 89 103 66 60 0 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90Percent Heavy Veh, % 222 022220 Cap, veh/h 328 1479 793 0 623 528 318 262 0 Arrive On Green 0.50 0.50 0.50 0.00 0.33 0.33 0.33 0.33 0.00Sat Flow, veh/h 656 2959 1585 0 1870 1585 679 787 0 Grp Volume(v), veh/h 482 466 162 0 89 103 126 0 0 Grp Sat Flow(s),veh/h/ln 1838 1777 1585 0 1870 1585 1466 0 0Q Serve(g_s), s 10.7 10.7 3.4 0.0 2.0 2.8 1.4 0.0 0.0 Cycle Q Clear(g_c), s 10.7 10.7 3.4 0.0 2.0 2.8 3.4 0.0 0.0 Prop In Lane 0.36 1.00 0.00 1.00 0.52 0.00Lane Grp Cap(c), veh/h 919 888 793 0 623 528 580 0 0 V/C Ratio(X) 0.52 0.52 0.20 0.00 0.14 0.19 0.22 0.00 0.00 Avail Cap(c_a), veh/h 919 888 793 0 623 528 580 0 0HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.56 0.56 0.56 0.00 1.00 1.00 1.00 0.00 0.00Uniform Delay (d), s/veh 10.2 10.2 8.4 0.0 14.0 14.3 14.4 0.0 0.0 Incr Delay (d2), s/veh 1.2 1.2 0.3 0.0 0.5 0.8 0.9 0.0 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0%ile BackOfQ(95%),veh/ln 6.3 6.1 1.9 0.0 1.5 1.8 2.3 0.0 0.0 Unsig. Movement Delay, s/veh LnGrp Delay(d), s/veh 11.4 11.4 8.7 0.0 14.5 15.1 15.2 0.0 0.0LnGrp LOS BBA BBB Approach Vol, veh/h 1110 192 126 Approach Delay, s/veh 11.0 14.8 15.2Approach LOS B B B Timer - Assigned Phs 4 6 8 Phs Duration (G+Y+Rc), s 25.0 35.0 25.0 Change Period (Y+Rc), s 5.0 5.0 5.0Max Green Setting (Gmax), s 20.0 30.0 20.0 Max Q Clear Time (g_c+I1), s 5.4 12.7 4.8 Green Ext Time (p_c), s 0.5 6.4 0.6 Intersection Summary HCM 7th Control Delay, s/veh 11.9HCM 7th LOS B Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 5HQWRQ0DUNHW %XUQHWW$YHQXH 5HQWRQ0DUNHW'ULYHZD\ 7RWDO$0 HCM 7th TWSC 2031 Total AM 24-0640 Renton Market 12:49 am 09/09/2024 2031 Total AM Synchro 12 ReportCivTech Inc.Page 19 Intersection Int Delay, s/veh 0.7 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 0 14 0 102 45 0 Future Vol, veh/h 0 14 0 102 45 0Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free FreeRT Channelized - None - None - None Storage Length - - - - - - Veh in Median Storage, # 0 - - 0 0 -Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2Mvmt Flow 0160113500 Major/Minor Minor2 Major1 Major2 Conflicting Flow All - 50 - 0 - 0 Stage 1 - - - - - - Stage 2 - - - - - - Critical Hdwy -6.22----Critical Hdwy Stg 1 ------ Critical Hdwy Stg 2 ------Follow-up Hdwy - 3.318 - - - - Pot Cap-1 Maneuver 0 1018 0 - - 0 Stage 1 0 - 0 - - 0 Stage 2 0 - 0 - - 0 Platoon blocked, % - - Mov Cap-1 Maneuver - 1018 - - - -Mov Cap-2 Maneuver - - - - - - Stage 1 - - - - - - Stage 2 - - - - - - Approach EB NB SB HCM Control Delay, s/v 8.59 0 0HCM LOS A Minor Lane/Major Mvmt NBTEBLn1 SBT Capacity (veh/h) - 1018 - HCM Lane V/C Ratio - 0.015 -HCM Control Delay (s/veh) - 8.6 - HCM Lane LOS - A -HCM 95th %tile Q(veh) - 0 - 5HQWRQ0DUNHW %XUQHWW$YHQXH 5HQWRQ0DUNHW'ULYHZD\ 7RWDO30 HCM 7th TWSC 2031 Total PM 24-0640 Renton Market 3:04 pm 10/03/2024 2031 Total PM Synchro 12 ReportCivTech Inc.Page 19 Intersection Int Delay, s/veh 0.8 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 0 33 0 235 78 0 Future Vol, veh/h 0 33 0 235 78 0Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free FreeRT Channelized - None - None - None Storage Length ------ Veh in Median Storage, # 0 - - 0 0 -Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2Mvmt Flow 0370261870 Major/Minor Minor2 Major1 Major2 Conflicting Flow All - 87 - 0 - 0 Stage 1 ------ Stage 2 ------ Critical Hdwy - 6.22 - - - -Critical Hdwy Stg 1 ------ Critical Hdwy Stg 2 ------Follow-up Hdwy -3.318---- Pot Cap-1 Maneuver 0 972 0 - - 0 Stage 1 0 - 0 - - 0 Stage 2 0 - 0 - - 0 Platoon blocked, % - - Mov Cap-1 Maneuver - 972 ----Mov Cap-2 Maneuver ------ Stage 1 ------ Stage 2 ------ Approach EB NB SB HCM Control Delay, s/v 8.85 0 0HCM LOS A Minor Lane/Major Mvmt NBTEBLn1 SBT Capacity (veh/h) - 972 - HCM Lane V/C Ratio - 0.038 -HCM Control Delay (s/veh) - 8.8 - HCM Lane LOS - A -HCM 95th %tile Q(veh) - 0.1 - Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 5HQWRQ0DUNHW QG6WUHHW %XUQHWW3ODFH 7RWDO$0 HCM Unsignalized Intersection Capacity Analysis 2031 Total AM 24-0640 Renton Market 12:49 am 09/09/2024 2031 Total AM Synchro 12 ReportCivTech Inc.Page 20 Movement EBL EBT WBT WBR SBL SBR Lane ConfigurationsTraffic Volume (veh/h) 00359502 Future Volume (Veh/h) 00359502Sign Control Free Free Stop Grade 0% 0% 0% Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90Hourly flow rate (vph) 00399602 Pedestrians Lane Width (ft)Walking Speed (ft/s) Percent BlockageRight turn flare (veh) Median type None None Median storage veh)Upstream signal (ft) 258 54 pX, platoon unblocked vC, conflicting volume 405 402 103vC1, stage 1 conf vol vC2, stage 2 conf volvCu, unblocked vol 405 402 103 tC, single (s) 4.1 6.8 6.9 tC, 2 stage (s)tF (s) 2.2 3.5 3.3 p0 queue free % 100 100 100 cM capacity (veh/h) 1150 576 932 Direction, Lane # WB 1 WB 2 WB 3 WB 4 SB 1 Volume Total 114 114 114 63 2 Volume Left 00000 Volume Right 00062cSH 1700 1700 1700 1700 932 Volume to Capacity 0.07 0.07 0.07 0.04 0.00 Queue Length 95th (ft)00000Control Delay (s/veh) 0.0 0.0 0.0 0.0 8.9 Lane LOS AApproach Delay (s/veh) 0.0 8.9 Approach LOS A Intersection Summary Average Delay 0.0Intersection Capacity Utilization 15.3% ICU Level of Service A Analysis Period (min) 15 5HQWRQ0DUNHW QG6WUHHW %XUQHWW3ODFH 7RWDO30 HCM Unsignalized Intersection Capacity Analysis 2031 Total PM 24-0640 Renton Market 3:04 pm 10/03/2024 2031 Total PM Synchro 12 ReportCivTech Inc.Page 20 Movement EBL EBT WBT WBR SBL SBR Lane ConfigurationsTraffic Volume (veh/h) 00359502 Future Volume (Veh/h) 00359502Sign Control Free Free Stop Grade 0% 0% 0% Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90Hourly flow rate (vph) 00399602 Pedestrians Lane Width (ft)Walking Speed (ft/s) Percent BlockageRight turn flare (veh) Median type None None Median storage veh)Upstream signal (ft) 258 54 pX, platoon unblocked vC, conflicting volume 405 402 103vC1, stage 1 conf vol vC2, stage 2 conf volvCu, unblocked vol 405 402 103 tC, single (s) 4.1 6.8 6.9 tC, 2 stage (s)tF (s) 2.2 3.5 3.3 p0 queue free % 100 100 100 cM capacity (veh/h) 1150 576 932 Direction, Lane # WB 1 WB 2 WB 3 WB 4 SB 1 Volume Total 114 114 114 63 2 Volume Left 00000 Volume Right 00062cSH 1700 1700 1700 1700 932 Volume to Capacity 0.07 0.07 0.07 0.04 0.00 Queue Length 95th (ft)00000Control Delay (s/veh) 0.0 0.0 0.0 0.0 8.9 Lane LOS AApproach Delay (s/veh) 0.0 8.9 Approach LOS A Intersection Summary Average Delay 0.0Intersection Capacity Utilization 15.3% ICU Level of Service A Analysis Period (min) 15 Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 Renton Market – Renton, Washington Traffic Impact Analysis 45 APPENDIX L: QUEUE STORAGE ANALYSIS Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 Queue Storage CalculationsRenton Market Signalized Intersections 2031 Average Vehicle Length, VL (Per Table 9-23, AASHTO "Green Book" 2018, p 9-99)Table 9-23 Y Truck%VL (ft) Intersection Cycle Length (sec):N 0% 25 2% 25 Cycles per Hour:(calculated)Queuing Cycles:2 10% 32 15% 35 Truck % =VL (ft) =25 Average Vehicle Length 20% 38 25% 41 Equation Used Storage Length, SL, = 2 x (vehicles/hour)/(cycles/hour) x Average Vehicle Length Cycle Length Move- ment AM Peak (veh/hr) Midday Peak (veh/hr) PM Peak (veh/hr) Max vehs per 2 cycles AASHTO Storage Length (ft) 75 SB Right 46 0 259 11 275' 60 SB Left 76 0 3 3 75' 60 NB Right 10 0 21 1 25' 60 NB Right 30 0 93 4 100' 60 EB Right 41 0 146 5 125' "Yield" for turns indicates that, while movement may or may not be subject to a Yield sign, vehicles must yield to oncoming traffic and may experience Logan Ave & 2nd St *Note: Truck/Passenger Vehicle split is projected based on percentage and not reflective of acctual vehicle classification counts. Intersection Burnett Ave & 3rd St Logan Ave/Smithers Ave/3rd St Page 1 Appendix K September 2024 Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 Queue Storage CalculationsRenton Market Unsignalized Intersections 2031 Truck % =VL (ft) =25'Average Vehicle Length Table 9-23 Truck%VL (ft) Left Turns (Per AASHTO "Green Book" 2018, pp 9-96 to 9-99)0% 25 Equation 9-3 Equation 9-4 2% 25 U.S. Customary U.S. Customary 5% 28 10% 32 20% 38 25% 41 Per Section 9.7.2.2 Storage Length c (veh/hr) =calculated Left-Turn CapacityVO (veh/hr) =Opposing Major Road Volume t c (sec) = 6.25 85th %-ile Critical Gap tf (sec) = 2.50 Follow-Up Gap SL (ft) =calculated Storage Length P(n>N) =0.005 (a probability, no units) v (veh/hr) =enter below Left-Turn Vehicle Volume Left Turns if above is unsuitable : storage length = 2 x (vehicles/hour)/(60 minutes/hour) x average vehicle length Right Turns : storage length = 2 x (vehicles/hour)/(60 minutes/hour) x average vehicle length Move- ment AM Peak (veh/hr) Midday Peak (veh/hr) PM Peak (veh/hr) Veh per 2 minutes Opposing VO (veh/hr) AASHTO Storage Length (ft) SB Right 2 0 13 1 No Calculation 25' "Yield" for turns indicates that, while movement may or may not be subject to a Yield sign, vehicles must yield to oncoming traffic and may experience delays. Burnett Pl & 2nd St *Note: Truck/Passenger Vehicle split is projected based on percentage and not reflective of acctual vehicle classification counts. Intersection Page 2 Appendix K September 2024 Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 Renton Market – Renton, Washington Traffic Impact Analysis 46 APPENDIX M: SIGHT DISTANCE ANALYSIS Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 Renton Market Sight Distance Analysis Renton Market Sight Distance Analysis Location: Logan Avenue Location: Logan Avenue Assumptions and/or Givens Intersection Sight Distances Elements of Design from AASHTO 6th Edition AASHTO Ref AASHTO Ref Driver Eye Height Case B─Intersections with Stop Control on the Minor Road §9.5.3.2, p 9-42 Passenger Vehicle 3.50 ft §3.2.6.1, p 3-15 Truck 7.60 ft §3.2.6.1, p 3-15 Case B1─Left Turn from the Minor Road §9.5.3.2.1, p 9-43 Object Height Stopping Sight Distance 2.00 ft §3.2.6.2, p 3-15 Design Vehicle Time Gap (tg) Passing Sight Distance 3.50 ft §3.2.6.2, p 3-15 Passenger Car 7.5 sec Tbl 9-6, p 9-44 Vehicle Height 4.25 ft §3.2.6.1, p 3-15 Single-Unit Tuck 9.5 sec Tbl 9-6, p 9-44 Driver Eye Location Combination Truck 11.5 sec Tbl 9-6, p 9-44 From Edge of Major Rd Traveled Way 14.50 ft §9.5.3.2.1, p 9-43 Deceleration Rate (a)Time gap adjustments Passenger Vehicle 11.20 ft/sec2 §3.2.2.2, p 3-4 Add'l lanes to cross (1st is assumed) Truck N/A ft Passenger Car 0.5 sec See Notes Brake reaction time (t) 2.50 sec §3.2.2.1, p 3-3 Trucks 0.7 sec below Minor Approach Upgrade (Per each 1%>3%) 0.2 sec Tbl 9-5, p 9-37 Site Specific Data (Bike & turn lanes are outside traveled way and are not considered)Major Street Design Speed (Vmajor)35 MPH Site data Grades - Approaching Minor Street from: (─ = approaching downhill)Major Road Lanes on Left Approach 1.0 §9.5.3.2.1, p 9-44 Left (GL)%Minor Road Approach Upgrade, if >3% 0 % §9.5.3.2.1, p 9-44Right (GR)% Approach Grade Adjustment Factor Left 1.0 Tbl 9-5, p 9-42 Right 1.0 Time Gap based on site data Major Road Through Lanes on Each Approach 1.0 (Use 1 for RI/RO[/LI] only)Design Vehicle Gap+Adj for Approach Grade>3%+Adjs for Add'l Lanes & Median Median Width (in "Lane Equivalents") (Use 0 for RI/RO[/LI] only) Passenger Car 7.5 sec Minor Road Approach Upgrade, if >3% % Single-Unit Tuck 9.5 sec Minor Road Access (check restricted)x Combination Truck 11.5 sec LI LO/Th RO ISD to left & right along Major Road ISD=1.47Vmajortg (ft) Eq 9-1, p 9-45 Stopping Sight Distance = Brake Reaction Distance + Braking Distance Neglecting Effect of Grade V2 Eq 3-2, p 3-5 ISD to Left a and Right Passenger Car calculated ISD= 385.9 ft Calculated d= 246.2 ft design ISD= 390 ft Design d= 250 ft Single-Unit Tuck calculated ISD= 488.8 ft With Effect of Grade V2 Eq 3-3, p 3-5 design ISD= 490 ft a 32.2 Combination Truck calculated ISD= 591.7 ft design ISD= 595 ft Calculated d= 246.4 ft - left 250 ft - right Design d= 246.4 ft - left 250 ft - right SSD's do not consider design for truck operations, since better visibility is considered to offset longer braking distance. §3.2.2.5, p 3-6 Appendix L Appendix L Page 1 of 4 Page 2 of 4 September 2024 d=1.47Vt+1.075 d=1.47Vt+ 30(( )±G) September 2024 Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 Renton Market Sight Distance Analysis Renton Market Sight Distance Analysis Location: Logan Avenue Location: Logan Avenue Intersection Sight Distances (cont'd)Intersection Sight Distances (cont'd) AASHTO Ref AASHTO Ref Case B2─Right Turn from the Minor Road §9.5.3.2.2, p 9-47 Case F─Left Turns from the Major Road §9.5.3.6, p 9-56 & Case B3─Crossing Maneuver from the Minor Road §9.5.3.2.3, p 9-48 Design Vehicle Time Gap (tg) Passenger Car 5.5 sec Tbl 9-16, p 9-57 Design Vehicle Time Gap (tg) Single-Unit Tuck 6.5 sec Tbl 9-16, p 9-57 Passenger Car 6.5 sec Tbl 9-8, p 9-47 Combination Truck 7.5 sec Tbl 9-16, p 9-57 Single-Unit Tuck 8.5 sec & Combination Truck 10.5 sec Tbl 9-10, p 9-49 Time gap adjustments Add'l lanes to cross (1 assumed) Time gap adjustments Passenger Car 0.5 sec See Notes to Add'l lanes to cross (1st is assumed) - Case B-3 Only* Trucks 0.7 sec Tbl 9-16, p 9-57 Passenger Car 0.5 sec See Notes Trucks 0.7 sec below Site data Minor Approach Upgrade (Per each 1%>3%)Opposing Lanes (adj'd for x-wide median) 0.0 Case B-2 Only 0.1 sec Tbl 9-8, p 9-47 Case B-3 Only 0.2 sec Tbl 9-10, p 9-49 Time Gap based on site data Design Vehicle Gap+Adj for Add'l Opposing Lanes Site data Passenger Car 5.5 sec Major Road Lanes on Left Approach 1.0 §9.5.3.2.2, p 9-47 Single-Unit Tuck 6.5 sec Minor Road Approach Upgrade, if >3% 0 % §9.5.3.2.2, p 9-47 Combination Truck 7.5 sec ISD to front along Major Road ISD=1.47Vmajortg (ft) Eq 9-1, p 9-45 Time Gap based on site data (sec) B2 & B3 B3 Only Passenger Car calculated ISD= 283.0 ft Design Vehicle Gap+Adj for Approach Grade>3%(+Adjs for Add'l Lanes & Median for B3)design ISD= 285 ft Passenger Car 6.5 6.5 Single-Unit Tuck 8.5 8.5 Single-Unit Tuck calculated ISD= 334.4 ft Combination Truck 10.5 10.5 design ISD= 335 ft ISD to left (B2/B3) & right (B3) along Major Rd ISD=1.47Vmajortg (ft) Eq 9-1, p 9-45 Combination Truck calculated ISD= 385.9 ft design ISD= 390 ft ISD to Left ISD to right (B2 & B3) (B3 Only) The differences between Case F and Cases B1, B2 & B3 are reduced Passenger Car calculated ISD= 334.4 334.4 time gaps and no time gap adjustment for any minor approach upgrade. §9.5.3.6, p 9-58 design ISD= 335 335 SIGHT DISTANCE SUMMARY Single-Unit Tuck calculated ISD=437.3 437.3 Governing Combo design ISD= 440 440 Sight Distance Type Case Car SU Truck Truck Combination Truck calculated ISD=540.2 540.2 Stopping design ISD= 545 545 Without effect of grade 250 N/A N/A With effect of grade on left 250 N/A N/A *Number of major road lanes is irrelevant in Case B2.With effect of grade on right 250 N/A N/A Intersection The differences between Case B1 and Cases B2 & B3 are reduced To Right B1 390 490 595 time gaps and time gap adjustment for the minor approach upgrade. §9.5.3.2.3, p 9-48 To Left B2/B3 335 440 545 On Major Road F Restricted Restricted Restricted Appendix L Appendix L Page 3 of 4 September 2024 Page 4 of 4 September 2024 Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 Renton Market Sight Distance Analysis Renton Market Sight Distance Analysis Location: 2nd Street Egress Location: 2nd Street Egress Assumptions and/or Givens Intersection Sight Distances Elements of Design from AASHTO 6th Edition AASHTO Ref AASHTO Ref Driver Eye Height Case B─Intersections with Stop Control on the Minor Road §9.5.3.2, p 9-42 Passenger Vehicle 3.50 ft §3.2.6.1, p 3-15 Truck 7.60 ft §3.2.6.1, p 3-15 Case B1─Left Turn from the Minor Road §9.5.3.2.1, p 9-43 Object Height Stopping Sight Distance 2.00 ft §3.2.6.2, p 3-15 Design Vehicle Time Gap (tg) Passing Sight Distance 3.50 ft §3.2.6.2, p 3-15 Passenger Car 7.5 sec Tbl 9-6, p 9-44 Vehicle Height 4.25 ft §3.2.6.1, p 3-15 Single-Unit Tuck 9.5 sec Tbl 9-6, p 9-44 Driver Eye Location Combination Truck 11.5 sec Tbl 9-6, p 9-44 From Edge of Major Rd Traveled Way 14.50 ft §9.5.3.2.1, p 9-43 Deceleration Rate (a)Time gap adjustments Passenger Vehicle 11.20 ft/sec2 §3.2.2.2, p 3-4 Add'l lanes to cross (1st is assumed) Truck N/A ft Passenger Car 0.5 sec See Notes Brake reaction time (t) 2.50 sec §3.2.2.1, p 3-3 Trucks 0.7 sec below Minor Approach Upgrade (Per each 1%>3%) 0.2 sec Tbl 9-5, p 9-37 Site Specific Data (Bike & turn lanes are outside traveled way and are not considered)Major Street Design Speed (Vmajor)35 MPH Site data Grades - Approaching Minor Street from: (─ = approaching downhill)Major Road Lanes on Left Approach 4.0 §9.5.3.2.1, p 9-44 Left (GL)%Minor Road Approach Upgrade, if >3% 0 % §9.5.3.2.1, p 9-44Right (GR)% Approach Grade Adjustment Factor Left 1.0 Tbl 9-5, p 9-42 Right 1.0 Time Gap based on site data Major Road Through Lanes on Each Approach 4.0 (Use 1 for RI/RO[/LI] only)Design Vehicle Gap+Adj for Approach Grade>3%+Adjs for Add'l Lanes & Median Median Width (in "Lane Equivalents") (Use 0 for RI/RO[/LI] only) Passenger Car 9.0 sec Minor Road Approach Upgrade, if >3% % Single-Unit Tuck 11.6 sec Minor Road Access (check restricted)xx Combination Truck 13.6 sec LI LO/Th RO ISD to left & right along Major Road ISD=1.47Vmajortg (ft) Eq 9-1, p 9-45 Stopping Sight Distance = Brake Reaction Distance + Braking Distance Neglecting Effect of Grade V2 Eq 3-2, p 3-5 ISD to Left a and Right Passenger Car calculated ISD= 463.1 ft Calculated d= 246.2 ft design ISD= 465 ft Design d= 250 ft Single-Unit Tuck calculated ISD= 596.8 ft With Effect of Grade V2 Eq 3-3, p 3-5 design ISD= 600 ft a 32.2 Combination Truck calculated ISD= 699.7 ft design ISD= 700 ft Calculated d= 246.4 ft - left 250 ft - right Design d= 246.4 ft - left 250 ft - right SSD's do not consider design for truck operations, since better visibility is considered to offset longer braking distance. §3.2.2.5, p 3-6 Appendix L Appendix L Page 1 of 4 Page 2 of 4 September 2024 d=1.47Vt+1.075 d=1.47Vt+ 30(( )±G) September 2024 Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 Renton Market Sight Distance Analysis Renton Market Sight Distance Analysis Location: 2nd Street Egress Location: 2nd Street Egress Intersection Sight Distances (cont'd)Intersection Sight Distances (cont'd) AASHTO Ref AASHTO Ref Case B2─Right Turn from the Minor Road §9.5.3.2.2, p 9-47 Case F─Left Turns from the Major Road §9.5.3.6, p 9-56 & Case B3─Crossing Maneuver from the Minor Road §9.5.3.2.3, p 9-48 Design Vehicle Time Gap (tg) Passenger Car 5.5 sec Tbl 9-16, p 9-57 Design Vehicle Time Gap (tg) Single-Unit Tuck 6.5 sec Tbl 9-16, p 9-57 Passenger Car 6.5 sec Tbl 9-8, p 9-47 Combination Truck 7.5 sec Tbl 9-16, p 9-57 Single-Unit Tuck 8.5 sec & Combination Truck 10.5 sec Tbl 9-10, p 9-49 Time gap adjustments Add'l lanes to cross (1 assumed) Time gap adjustments Passenger Car 0.5 sec See Notes to Add'l lanes to cross (1st is assumed) - Case B-3 Only* Trucks 0.7 sec Tbl 9-16, p 9-57 Passenger Car 0.5 sec See Notes Trucks 0.7 sec below Site data Minor Approach Upgrade (Per each 1%>3%)Opposing Lanes (adj'd for x-wide median) 3.0 Case B-2 Only 0.1 sec Tbl 9-8, p 9-47 Case B-3 Only 0.2 sec Tbl 9-10, p 9-49 Time Gap based on site data Design Vehicle Gap+Adj for Add'l Opposing Lanes Site data Passenger Car 7.0 sec Major Road Lanes on Left Approach 4.0 §9.5.3.2.2, p 9-47 Single-Unit Tuck 8.6 sec Minor Road Approach Upgrade, if >3% 0 % §9.5.3.2.2, p 9-47 Combination Truck 9.6 sec ISD to front along Major Road ISD=1.47Vmajortg (ft) Eq 9-1, p 9-45 Time Gap based on site data (sec) B2 & B3 B3 Only Passenger Car calculated ISD= 360.2 ft Design Vehicle Gap+Adj for Approach Grade>3%(+Adjs for Add'l Lanes & Median for B3)design ISD= 365 ft Passenger Car 8.0 9.5 Single-Unit Tuck 10.6 12.7 Single-Unit Tuck calculated ISD= 442.5 ft Combination Truck 12.6 14.7 design ISD= 445 ft ISD to left (B2/B3) & right (B3) along Major Rd ISD=1.47Vmajortg (ft) Eq 9-1, p 9-45 Combination Truck calculated ISD= 493.9 ft design ISD= 495 ft ISD to Left ISD to right (B2 & B3) (B3 Only) The differences between Case F and Cases B1, B2 & B3 are reduced Passenger Car calculated ISD= 411.6 488.8 time gaps and no time gap adjustment for any minor approach upgrade. §9.5.3.6, p 9-58 design ISD= 415 490 SIGHT DISTANCE SUMMARY Single-Unit Tuck calculated ISD=545.4 653.4 Governing Combo design ISD= 550 655 Sight Distance Type Case Car SU Truck Truck Combination Truck calculated ISD=648.3 756.3 Stopping design ISD= 650 760 Without effect of grade 250 N/A N/A With effect of grade on left 250 N/A N/A *Number of major road lanes is irrelevant in Case B2.With effect of grade on right 250 N/A N/A Intersection The differences between Case B1 and Cases B2 & B3 are reduced To Right B3 490 655 760 time gaps and time gap adjustment for the minor approach upgrade. §9.5.3.2.3, p 9-48 To Left B2/B3 415 550 650 On Major Road F Restricted Restricted Restricted Appendix L Appendix L Page 3 of 4 September 2024 Page 4 of 4 September 2024 Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 Renton Market Sight Distance Analysis Renton Market Sight Distance Analysis Location: 2nd Street Ingress Location: 2nd Street Ingress Assumptions and/or Givens Intersection Sight Distances Elements of Design from AASHTO 6th Edition AASHTO Ref AASHTO Ref Driver Eye Height Case B─Intersections with Stop Control on the Minor Road §9.5.3.2, p 9-42 Passenger Vehicle 3.50 ft §3.2.6.1, p 3-15 Truck 7.60 ft §3.2.6.1, p 3-15 Case B1─Left Turn from the Minor Road §9.5.3.2.1, p 9-43 Object Height Stopping Sight Distance 2.00 ft §3.2.6.2, p 3-15 Design Vehicle Time Gap (tg) Passing Sight Distance 3.50 ft §3.2.6.2, p 3-15 Passenger Car 7.5 sec Tbl 9-6, p 9-44 Vehicle Height 4.25 ft §3.2.6.1, p 3-15 Single-Unit Tuck 9.5 sec Tbl 9-6, p 9-44 Driver Eye Location Combination Truck 11.5 sec Tbl 9-6, p 9-44 From Edge of Major Rd Traveled Way 14.50 ft §9.5.3.2.1, p 9-43 Deceleration Rate (a)Time gap adjustments Passenger Vehicle 11.20 ft/sec2 §3.2.2.2, p 3-4 Add'l lanes to cross (1st is assumed) Truck N/A ft Passenger Car 0.5 sec See Notes Brake reaction time (t) 2.50 sec §3.2.2.1, p 3-3 Trucks 0.7 sec below Minor Approach Upgrade (Per each 1%>3%) 0.2 sec Tbl 9-5, p 9-37 Site Specific Data (Bike & turn lanes are outside traveled way and are not considered)Major Street Design Speed (Vmajor)35 MPH Site data Grades - Approaching Minor Street from: (─ = approaching downhill)Major Road Lanes on Left Approach 4.0 §9.5.3.2.1, p 9-44 Left (GL)%Minor Road Approach Upgrade, if >3% 0 % §9.5.3.2.1, p 9-44Right (GR)% Approach Grade Adjustment Factor Left 1.0 Tbl 9-5, p 9-42 Right 1.0 Time Gap based on site data Major Road Through Lanes on Each Approach 4.0 (Use 1 for RI/RO[/LI] only)Design Vehicle Gap+Adj for Approach Grade>3%+Adjs for Add'l Lanes & Median Median Width (in "Lane Equivalents") (Use 0 for RI/RO[/LI] only) Passenger Car 9.0 sec Minor Road Approach Upgrade, if >3% % Single-Unit Tuck 11.6 sec Minor Road Access (check restricted)xx Combination Truck 13.6 sec LI LO/Th RO ISD to left & right along Major Road ISD=1.47Vmajortg (ft) Eq 9-1, p 9-45 Stopping Sight Distance = Brake Reaction Distance + Braking Distance Neglecting Effect of Grade V2 Eq 3-2, p 3-5 ISD to Left a and Right Passenger Car calculated ISD= 463.1 ft Calculated d= 246.2 ft design ISD= 465 ft Design d= 250 ft Single-Unit Tuck calculated ISD= 596.8 ft With Effect of Grade V2 Eq 3-3, p 3-5 design ISD= 600 ft a 32.2 Combination Truck calculated ISD= 699.7 ft design ISD= 700 ft Calculated d= 246.4 ft - left 250 ft - right Design d= 246.4 ft - left 250 ft - right SSD's do not consider design for truck operations, since better visibility is considered to offset longer braking distance. §3.2.2.5, p 3-6 Appendix L Appendix L Page 1 of 4 Page 2 of 4 September 2024 d=1.47Vt+1.075 d=1.47Vt+ 30(( )±G) September 2024 Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 Renton Market Sight Distance Analysis Renton Market Sight Distance Analysis Location: 2nd Street Ingress Location: 2nd Street Ingress Intersection Sight Distances (cont'd)Intersection Sight Distances (cont'd) AASHTO Ref AASHTO Ref Case B2─Right Turn from the Minor Road §9.5.3.2.2, p 9-47 Case F─Left Turns from the Major Road §9.5.3.6, p 9-56 & Case B3─Crossing Maneuver from the Minor Road §9.5.3.2.3, p 9-48 Design Vehicle Time Gap (tg) Passenger Car 5.5 sec Tbl 9-16, p 9-57 Design Vehicle Time Gap (tg) Single-Unit Tuck 6.5 sec Tbl 9-16, p 9-57 Passenger Car 6.5 sec Tbl 9-8, p 9-47 Combination Truck 7.5 sec Tbl 9-16, p 9-57 Single-Unit Tuck 8.5 sec & Combination Truck 10.5 sec Tbl 9-10, p 9-49 Time gap adjustments Add'l lanes to cross (1 assumed) Time gap adjustments Passenger Car 0.5 sec See Notes to Add'l lanes to cross (1st is assumed) - Case B-3 Only* Trucks 0.7 sec Tbl 9-16, p 9-57 Passenger Car 0.5 sec See Notes Trucks 0.7 sec below Site data Minor Approach Upgrade (Per each 1%>3%)Opposing Lanes (adj'd for x-wide median) 3.0 Case B-2 Only 0.1 sec Tbl 9-8, p 9-47 Case B-3 Only 0.2 sec Tbl 9-10, p 9-49 Time Gap based on site data Design Vehicle Gap+Adj for Add'l Opposing Lanes Site data Passenger Car 7.0 sec Major Road Lanes on Left Approach 4.0 §9.5.3.2.2, p 9-47 Single-Unit Tuck 8.6 sec Minor Road Approach Upgrade, if >3% 0 % §9.5.3.2.2, p 9-47 Combination Truck 9.6 sec ISD to front along Major Road ISD=1.47Vmajortg (ft) Eq 9-1, p 9-45 Time Gap based on site data (sec) B2 & B3 B3 Only Passenger Car calculated ISD= 360.2 ft Design Vehicle Gap+Adj for Approach Grade>3%(+Adjs for Add'l Lanes & Median for B3)design ISD= 365 ft Passenger Car 8.0 9.5 Single-Unit Tuck 10.6 12.7 Single-Unit Tuck calculated ISD= 442.5 ft Combination Truck 12.6 14.7 design ISD= 445 ft ISD to left (B2/B3) & right (B3) along Major Rd ISD=1.47Vmajortg (ft) Eq 9-1, p 9-45 Combination Truck calculated ISD= 493.9 ft design ISD= 495 ft ISD to Left ISD to right (B2 & B3) (B3 Only) The differences between Case F and Cases B1, B2 & B3 are reduced Passenger Car calculated ISD= 411.6 488.8 time gaps and no time gap adjustment for any minor approach upgrade. §9.5.3.6, p 9-58 design ISD= 415 490 SIGHT DISTANCE SUMMARY Single-Unit Tuck calculated ISD=545.4 653.4 Governing Combo design ISD= 550 655 Sight Distance Type Case Car SU Truck Truck Combination Truck calculated ISD=648.3 756.3 Stopping design ISD= 650 760 Without effect of grade 250 N/A N/A With effect of grade on left 250 N/A N/A *Number of major road lanes is irrelevant in Case B2.With effect of grade on right 250 N/A N/A Intersection The differences between Case B1 and Cases B2 & B3 are reduced To Right B3 Restricted Restricted Restricted time gaps and time gap adjustment for the minor approach upgrade. §9.5.3.2.3, p 9-48 To Left B2/B3 415 550 650 On Major Road F 365 445 495 Appendix L Appendix L Page 3 of 4 September 2024 Page 4 of 4 September 2024 Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 Renton Market Sight Distance Analysis Renton Market Sight Distance Analysis Location: Burnett Avenue Location: Burnett Avenue Assumptions and/or Givens Intersection Sight Distances Elements of Design from AASHTO 6th Edition AASHTO Ref AASHTO Ref Driver Eye Height Case B─Intersections with Stop Control on the Minor Road §9.5.3.2, p 9-42 Passenger Vehicle 3.50 ft §3.2.6.1, p 3-15 Truck 7.60 ft §3.2.6.1, p 3-15 Case B1─Left Turn from the Minor Road §9.5.3.2.1, p 9-43 Object Height Stopping Sight Distance 2.00 ft §3.2.6.2, p 3-15 Design Vehicle Time Gap (tg) Passing Sight Distance 3.50 ft §3.2.6.2, p 3-15 Passenger Car 7.5 sec Tbl 9-6, p 9-44 Vehicle Height 4.25 ft §3.2.6.1, p 3-15 Single-Unit Tuck 9.5 sec Tbl 9-6, p 9-44 Driver Eye Location Combination Truck 11.5 sec Tbl 9-6, p 9-44 From Edge of Major Rd Traveled Way 14.50 ft §9.5.3.2.1, p 9-43 Deceleration Rate (a)Time gap adjustments Passenger Vehicle 11.20 ft/sec2 §3.2.2.2, p 3-4 Add'l lanes to cross (1st is assumed) Truck N/A ft Passenger Car 0.5 sec See Notes Brake reaction time (t) 2.50 sec §3.2.2.1, p 3-3 Trucks 0.7 sec below Minor Approach Upgrade (Per each 1%>3%) 0.2 sec Tbl 9-5, p 9-37 Site Specific Data (Bike & turn lanes are outside traveled way and are not considered)Major Street Design Speed (Vmajor)35 MPH Site data Grades - Approaching Minor Street from: (─ = approaching downhill)Major Road Lanes on Left Approach 1.0 §9.5.3.2.1, p 9-44 Left (GL)%Minor Road Approach Upgrade, if >3% 0 % §9.5.3.2.1, p 9-44Right (GR)% Approach Grade Adjustment Factor Left 1.0 Tbl 9-5, p 9-42 Right 1.0 Time Gap based on site data Major Road Through Lanes on Each Approach 1.0 (Use 1 for RI/RO[/LI] only)Design Vehicle Gap+Adj for Approach Grade>3%+Adjs for Add'l Lanes & Median Median Width (in "Lane Equivalents") (Use 0 for RI/RO[/LI] only) Passenger Car 7.5 sec Minor Road Approach Upgrade, if >3% % Single-Unit Tuck 9.5 sec Minor Road Access (check restricted)xx Combination Truck 11.5 sec LI LO/Th RO ISD to left & right along Major Road ISD=1.47Vmajortg (ft) Eq 9-1, p 9-45 Stopping Sight Distance = Brake Reaction Distance + Braking Distance Neglecting Effect of Grade V2 Eq 3-2, p 3-5 ISD to Left a and Right Passenger Car calculated ISD= 385.9 ft Calculated d= 246.2 ft design ISD= 390 ft Design d= 250 ft Single-Unit Tuck calculated ISD= 488.8 ft With Effect of Grade V2 Eq 3-3, p 3-5 design ISD= 490 ft a 32.2 Combination Truck calculated ISD= 591.7 ft design ISD= 595 ft Calculated d= 246.4 ft - left 250 ft - right Design d= 246.4 ft - left 250 ft - right SSD's do not consider design for truck operations, since better visibility is considered to offset longer braking distance. §3.2.2.5, p 3-6 Appendix L Appendix L Page 1 of 4 Page 2 of 4 September 2024 d=1.47Vt+1.075 d=1.47Vt+ 30(( )±G) September 2024 Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942 Renton Market Sight Distance Analysis Renton Market Sight Distance Analysis Location: Burnett Avenue Location: Burnett Avenue Intersection Sight Distances (cont'd)Intersection Sight Distances (cont'd) AASHTO Ref AASHTO Ref Case B2─Right Turn from the Minor Road §9.5.3.2.2, p 9-47 Case F─Left Turns from the Major Road §9.5.3.6, p 9-56 & Case B3─Crossing Maneuver from the Minor Road §9.5.3.2.3, p 9-48 Design Vehicle Time Gap (tg) Passenger Car 5.5 sec Tbl 9-16, p 9-57 Design Vehicle Time Gap (tg) Single-Unit Tuck 6.5 sec Tbl 9-16, p 9-57 Passenger Car 6.5 sec Tbl 9-8, p 9-47 Combination Truck 7.5 sec Tbl 9-16, p 9-57 Single-Unit Tuck 8.5 sec & Combination Truck 10.5 sec Tbl 9-10, p 9-49 Time gap adjustments Add'l lanes to cross (1 assumed) Time gap adjustments Passenger Car 0.5 sec See Notes to Add'l lanes to cross (1st is assumed) - Case B-3 Only* Trucks 0.7 sec Tbl 9-16, p 9-57 Passenger Car 0.5 sec See Notes Trucks 0.7 sec below Site data Minor Approach Upgrade (Per each 1%>3%)Opposing Lanes (adj'd for x-wide median) 0.0 Case B-2 Only 0.1 sec Tbl 9-8, p 9-47 Case B-3 Only 0.2 sec Tbl 9-10, p 9-49 Time Gap based on site data Design Vehicle Gap+Adj for Add'l Opposing Lanes Site data Passenger Car 5.5 sec Major Road Lanes on Left Approach 1.0 §9.5.3.2.2, p 9-47 Single-Unit Tuck 6.5 sec Minor Road Approach Upgrade, if >3% 0 % §9.5.3.2.2, p 9-47 Combination Truck 7.5 sec ISD to front along Major Road ISD=1.47Vmajortg (ft) Eq 9-1, p 9-45 Time Gap based on site data (sec) B2 & B3 B3 Only Passenger Car calculated ISD= 283.0 ft Design Vehicle Gap+Adj for Approach Grade>3%(+Adjs for Add'l Lanes & Median for B3)design ISD= 285 ft Passenger Car 6.5 6.5 Single-Unit Tuck 8.5 8.5 Single-Unit Tuck calculated ISD= 334.4 ft Combination Truck 10.5 10.5 design ISD= 335 ft ISD to left (B2/B3) & right (B3) along Major Rd ISD=1.47Vmajortg (ft) Eq 9-1, p 9-45 Combination Truck calculated ISD= 385.9 ft design ISD= 390 ft ISD to Left ISD to right (B2 & B3) (B3 Only) The differences between Case F and Cases B1, B2 & B3 are reduced Passenger Car calculated ISD= 334.4 334.4 time gaps and no time gap adjustment for any minor approach upgrade. §9.5.3.6, p 9-58 design ISD= 335 335 SIGHT DISTANCE SUMMARY Single-Unit Tuck calculated ISD=437.3 437.3 Governing Combo design ISD= 440 440 Sight Distance Type Case Car SU Truck Truck Combination Truck calculated ISD=540.2 540.2 Stopping design ISD= 545 545 Without effect of grade 250 N/A N/A With effect of grade on left 250 N/A N/A *Number of major road lanes is irrelevant in Case B2.With effect of grade on right 250 N/A N/A Intersection The differences between Case B1 and Cases B2 & B3 are reduced To Right B3 Restricted Restricted Restricted time gaps and time gap adjustment for the minor approach upgrade. §9.5.3.2.3, p 9-48 To Left B2/B3 335 440 545 On Major Road F Restricted Restricted Restricted Appendix L Appendix L Page 3 of 4 September 2024 Page 4 of 4 September 2024 Docusign Envelope ID: 771C088A-AD2F-443F-9D07-1EF19280E942