Loading...
HomeMy WebLinkAboutFinal Agenda Packet CITY OF RENTON AGENDA - City Council Regular Meeting 7:00 PM - Monday, January 13, 2025 Council Chambers, 7th Floor, City Hall – 1055 S. Grady Way Please note that this regular meeting of the Renton City Council is being offered as a hybrid meeting and can be attended in person at the Council Chambers, 7th floor of City Hall, 1055 S Grady Way, Renton, 98057 or remotely through Zoom. For those wishing to attend by Zoom: Please (1) click this link https://us02web.zoom.us/j/84938072917?pwd=TUNCcnppbjNjbjNRMWpZaXk2bjJnZz09 (or copy/paste the URL into a web browser) or (2) call-in to the Zoom meeting by dialing 253-215- 8782 and entering 849 3807 2917 Passcode 156708, or (3) call 425-430-6501 by 5 p.m. on the day of the meeting to request an invite with a link to the meeting. Registration for Audience Comment: Registration will be open at all times, but speakers must register by 5 p.m. on the day of a Council meeting in order to be called upon. Anyone who registers after 5 p.m. on the day of the Council meeting will not be called upon to speak and will be required to re-register for the next Council meeting if they wish to speak at that next meeting.  Request to Speak Registration Form: o Click the link or copy/paste the following URL into your browser: https://forms.office.com/g/bTJUj6NrEE  You may also call 425-430-6501 or email jsubia@rentonwa.gov or cityclerk@rentonwa.gov to register. Please provide your full name, city of residence, email address and/or phone number, and topic in your message.  A sign-in sheet is also available for those who attend in person. Video on Demand: Please click the following link to stream Council meetings live as they occur, or to select previously recorded meetings: Renton Channel 21 Video on Demand 1. CALL TO ORDER AND PLEDGE OF ALLEGIANCE 2. ROLL CALL 3. SPECIAL PRESENTATION a) Small Business Administration Resources for Disaster Recovery 4. ADMINISTRATIVE REPORT a) Administrative Report 5. AUDIENCE COMMENTS  All remarks must be addressed to the Council as a whole, if a response is requested please provide your name and address, including email address, to the City Clerk to allow for follow-up.  Speakers must sign-up prior to the Council meeting.  Each speaker is allowed three minutes.  When recognized, please state your name & city of residence for the record. NOTICE to all participants: Pursuant to state law, RCW 42.17A.555, campaigning for or against any ballot measure or candidate in City Hall and/or during any portion of the council meeting, including the audience comment portion of the meeting, is PROHIBITED. 6. CONSENT AGENDA The following items are distributed to Councilmembers in advance for study and review, and the recommended actions will be accepted in a single motion. Any item may be removed for further discussion if requested by a Councilmember. a) Approval of Council Meeting minutes of January 6, 2025. Council Concur b) AB - 3725 Public Works Transportation Systems Division submits CAG-22-200, 2022 Overlay Project, contractor CPM Development Corporation dba Icon Materials, Inc., and recommends executing Change Order No. 1 (contract reconciliation), acceptance of the project, and release of retainage after 60 days after all state releases have been obtained and all liens have been legally cleared. Council Concur c) AB - 3726 Public Works Transportation Systems Division recommends execution of Supplemental Agreement #3 to CAG-23-015, contractor Transpo Group USA, Inc., in the amount of $331,154.69 for construction management services for the S 7th St Corridor Improvement project. Refer to Transportation (Aviation) Committee 7. UNFINISHED BUSINESS Topics listed below were discussed in Council committees during the past week. Those topics marked with an asterisk (*) may include legislation. Committee reports on any topics may be held by the Chair if further review is necessary. a) Finance Committee: 1) Vouchers; 2) Interagency Agreement-2025-Sub-grants 5489 Region 7 - 8 Law Enforcement Liaison; 3) KC Corridor HVE IAA FFY2025; 4) Edward Byrne FY 2024 Justice Assistance Grant (JAG); 5) Authorize Sub-Agreement with the Puget Sound Regional Council for the Renton Comprehensive Safety Action Plan; 6) Amendment #1 – GCB 2433, WSDOT Project Coordinator Agreement*; 7) Bid Award: Talbot Hill Reservoir Park Improvements Construction 8. LEGISLATION Resolution: a) Resolution No. 4546: WSDOT Project Coordinator Agreement (See Item 7.a) 9. NEW BUSINESS (Includes Council Committee agenda topics; visit rentonwa.gov/cityclerk for more information.) 10. ADJOURNMENT COMMITTEE OF THE WHOLE MEETING AGENDA (Preceding Council Meeting) CANCELED Hearing assistance devices for use in the Council Chambers are available upon request to the City Clerk CITY COUNCIL MEETINGS ARE TELEVISED LIVE ON GOVERNMENT ACCESS CHANNEL 21 To view Council Meetings online, please visit rentonwa.gov/councilmeetings Mayor’s Office Memorandum DATE: January 9, 2025 TO: James Alberson, Jr., Council President Members of the Renton City Council FROM: Armondo Pavone, Mayor Ed VanValey, Chief Administrative Officer SUBJECT: Administrative Report • Applications are being accepted through January 20 for the Renton Civic Academy. The Academy will take place February 13-March 20 and is open to Renton residents and businessowners ready to take the next step in being informed and involved in the community. To complete the application visit yourvoice.rentonwa.gov/civic-academy. For questions, contact Casey King at cking@rentonwa.gov or via phone at 206-550-4503. • Information about preventative street maintenance, traffic impact projects, and road closures happening this week can be found at http://rentonwa.gov/traffic. All projects are weather permitting and unless otherwise noted, streets will always remain open.  Monday, January 13 through Friday, January 17, 8:00am-3:00pm. Intermittent lane closure on Rainier Ave N between Airport Way and S 3rd St for construction work. Approved traffic control plans were issued for all work and will be followed. Questions may be directed to Joe Nerlfi, 425-757-9657.  Monday, January 13 through Friday, January 17, 8:00am-3:00pm. Intermittent lane closure on NE Sunset Blvd between Edmonds Ave NE and Kirkland Ave NE for construction work. Approved traffic control plans were issued for all work and will be followed. Questions may be directed to Brad Stocco, 425-282-2373.  Monday, January 13 through Friday, January 17, 8:00am-3:00pm. Shifting lane closures both east and west on NE Sunset Blvd between Redmond Pl NE to Union Ave NE for utility installation and frontage improvements. Approved traffic control plans were issued for all work and will be followed. Questions may be directed to Brad Stocco, 425-282-2373.  Monday, January 13 through Friday, January 17, 8:00am-3:00pm. S Tobin St will be closed between Williams Ave S and Burnett Ave S for construction work. Approved traffic control plans were issued for all work and will be followed, including a detour and flaggers. Questions may be directed to Rob Blackburn, 206-379-1489.  Tuesday, January 14, 7:00am-4:00pm. City Street Maintenance will be removing traffic buttons on SR 515 between S 27th Pl and S 16th Street. Lane No. 2 will be closed AGENDA ITEM #4. a) James Alberson, Jr., Council President Members of the Renton City Council Page 2 of 2 January 9, 2025 in both directions. Questions may be directed to PW Shops, 425-430-7400.  On-going Street Closure January 21 through May 22, 2025 (City of Renton Resolution No. 4545). FULL STREET CLOSURE on Houser Way N between Lake Washington Blvd N and Lowe’s Business Access Road in support of WSDOT I-405 Renton to Bellevue Widening and Express Toll Lane project. Approved traffic control plans were issued for all work and will be followed. Questions may be directed to Justin Johnson, 425-902-7102. AGENDA ITEM #4. a) January 6, 2025 REGULAR COUNCIL MEETING MINUTES CITY OF RENTON MINUTES - City Council Regular Meeting 7:00 PM - Monday, January 6, 2025 Council Chambers, 7th Floor, City Hall – 1055 S. Grady Way CALL TO ORDER AND PLEDGE OF ALLEGIANCE Mayor Pavone called the meeting of the Renton City Council to order at 7:00 PM and led the Pledge of Allegiance. ROLL CALL Councilmembers Present: James Alberson, Jr., Council President Carmen Rivera, Council Position No. 2 Valerie O'Halloran, Council Position No. 3 Ryan McIrvin, Council Position No. 4 Ed Prince, Council Position No. 5 Ruth Pérez, Council Position No. 6 Councilmembers Absent: Kim-Khánh Vǎn, Council Position No. 7 MOVED BY ALBERSON, SECONDED BY PÉREZ, COUNCIL EXCUSE ABSENT COUNCIL MEMBER VǍN. CARRIED. ADMINISTRATIVE STAFF PRESENT Armondo Pavone, Mayor Ed VanValey, Chief Administrative Officer Shane Moloney, City Attorney Jason Seth, City Clerk Gina Estep, Community & Economic Development Administrator Amanda Free, Economic Development Assistant Director Commander Chandler Swain, Police Department Attended Remotely: Judith Subia, Chief of Staff Kari Roller, Finance Administrator Kim Gilman, Interim Human Resources / Risk Management Administrator Martin Pastucha, Public Works Administrator Ron Straka, Public Works Utility Systems Director AGENDA ITEM #6. a) January 6, 2025 REGULAR COUNCIL MEETING MINUTES Deb Needham, Emergency Management Director Chief Jon Schuldt, Police Department Administrator ADMINISTRATIVE REPORT CAO Ed VanValey reviewed a written administrative report summarizing the City’s recent progress towards goals and work programs adopted as part of its business plan for 2023 and beyond. Items noted were: • Preventative street maintenance will continue to impact traffic and result in occasional street closures. AUDIENCE COMMENTS • Everett Gin Mun Chun, Renton, expressed concern about alleged illegal activity occurring at 110 Pelly Ave N. He also urged Council to address the dilapidated building located near N 6th St and Park Ave N. • Angela Laulainen, Renton, urged Council to address the issues occurring at the vacant building located at N 6th St and Park Ave N. • P. Michael Lobalzo, Renton, also expressed concerns about the vacant building located at N 6th St and Park Ave N. • Mark Widmer, Renton, urged Council to listen to the concerns of residents and address the problems occurring at the vacant building located at N 6th St and Park Ave N. • Ellie Robertshaw, Renton, stated that Renton's 2025 minimum wage was set at $20.90, a three percent increase, and that it should be $21.10, a four percent increase. She noted that Tukwila and Seattle increased their minimum wages by four percent and urged the city to do the same. • Sheryl Friez, Renton, voiced concerns about public safety issues in the North Renton Neighborhood and urged Council to address the problems occurring at the vacant building located at N 6th St and Park Ave N. • Michael Westgaard, Renton, noted that the cities of Tukwila and Seattle increased their minimum wage to $21.10, a four percent increase over 2024. He stated that Renton only increased its minimum wage by three percent and urged city officials to correct this perceived error. He stated that the minimum wage in Renton should match that of Seattle and Tukwila. • Ben Johnson, Renton, urged Council to explore the use of "attractive nuisance" legislation to address the problems occurring at the vacant building located at N 6th St and Park Ave N. • Patrick Dickinson, Renton, submitted documents to Council regarding the use of fluoride in city water. He requested that Council to study the documents and then begin the process to stop fluoridating the city's water supply. • Cheryl Jackson-Williams, unincorporated King County, noted that 572 people reached out to her and asked her to represent them in urging Council to reconsider funding this year's Juneteenth event. She noted that Juneteenth events are intentionally staggered so that residents can attend any or all of the celebrations occurring in the region. AGENDA ITEM #6. a) January 6, 2025 REGULAR COUNCIL MEETING MINUTES • Dr. Linda Smith, Renton, also urged Council to reconsider funding the Juneteenth event. She stated that Juneteenth began in Renton prior to it becoming a national holiday and it is an important event for the community to celebrate. She also noted that a shooting incident occurred in her neighborhood where many vehicles and homes, including her own, were hit by stray bullets. She urged Council to take public safety seriously. • Lori Madson, Renton, urged Council to consider using every available tool to address the vacant building located at N 6th St and Renton Ave N. • Diane Dobson, Renton, urged Council to make public safety in downtown and other areas of Renton a priority. CONSENT AGENDA The following items are distributed to Councilmembers in advance for study and review, and the recommended actions will be accepted in a single motion. Any item may be removed for further discussion if requested by a Councilmember. a) Approval of Council Meeting minutes of December 9, 2024. Council Concur. b) AB - 3720 Mayor Pavone recommended confirmation of his reappointment of Mara Fiksdal to the Planning Commission for a three-year term expiring on January 31, 2028. Council Concur. c) AB - 3722 Parks & Recreation Department - PPNR reported bid opening on November 26, 2024, for the Talbot Hill Reservoir Park Improvements Construction project (CAG-24-229) and recommended awarding the contract to the lowest responsive and responsible bidder Active Construction, Inc., in the amount of $875,875.00; and approval of additional budget appropriations in the amount of $162,000 to cover the budget gap. Refer to Finance Committee. d) AB - 3723 Police Department recommended execution of the Edward Byrne Memorial Justice Assistance Grant (JAG) FY2024 Agreement to accept up to $29,013 in grant funds to support the department's domestic violence victim advocacy program. Refer to Finance Committee. e) AB - 3721 Police Department recommended execution of a subgrant agreement awarded by the Washington Traffic Safety Commission, to accept $10,000 in grant funds for straight time or overtime when officers are conducting high visibility enforcement efforts along the corridor identified as 140th Ave SE from SR 169 south to 132nd Ave SE to SR 18. Refer to Finance Committee. MOVED BY ALBERSON, SECONDED BY PÉREZ, COUNCIL CONCUR TO APPROVE THE CONSENT AGENDA AS PUBLISHED. CARRIED. UNFINISHED BUSINESS Topics listed below were discussed in Council committees during the past week. Those topics marked with an asterisk (*) may include legislation. Committee reports on any topics may be held by the Chair if further review is necessary. a) Transportation Committee: Chair McIrvin presented a report recommending concurrence in the staff recommendation to adopt the resolution authorizing the 120-day closure (Houser Way N) to occur between January 21, 2025, and May 22, 2025, for the purpose of installing a watermain and improving storm drainage facilities supporting the I-405, Renton to Bellevue, Widening and Express Toll Lane Project. AGENDA ITEM #6. a) January 6, 2025 REGULAR COUNCIL MEETING MINUTES MOVED BY MCIRVIN, SECONDED BY PÉREZ, COUNCIL CONCUR IN THE COMMITTEE RECOMMENDATION. CARRIED. LEGISLATION Resolution: a) Resolution No. 4545: A resolution of the City of Renton, Washington, authorizing temporary full street closure of Houser Way North between Lake Washington Boulevard North and Lowe's Business Access Road. MOVED BY MCIRVIN, SECONDED BY PÉREZ, COUNCIL ADOPT THE RESOLUTION AS READ. CARRIED. NEW BUSINESS (Includes Council Committee agenda topics; visit rentonwa.gov/cityclerk for more information.) ADJOURNMENT & EXECUTIVE SESSION MOVED BY ALBERSON, SECONDED BY PÉREZ, COUNCIL RECESS THE COUNCIL MEETING INTO EXECUTIVE SESSION FOR APPROXIMATELY 30 MINUTES TO DISCUSS POTENTIAL LITIGATION PURSUANT TO RCW 42.30.110.(i) AND THE COUNCIL MEETING IS TO ADJOURN WHEN THE EXECUTIVE SESSION ADJOURNS. CARRIED. Time: 7:49 PM The executive session was conducted, and no action was taken. The Council meeting adjourned when the executive session adjourned. Time: 8:20 PM Jason A. Seth, MMC, City Clerk Jason Seth, Recorder 06 Jan 2025 AGENDA ITEM #6. a) Council Committee Meeting Calendar January 6, 2025 January 13, 2025 Monday 3:45 p.m. Community Services Committee, Chair O’Halloran Location: Council Conference Room/Videoconference 1. Emerging Issues in Parks & Recreation 4:45 p.m. Finance Committee, Chair Pérez Location: Council Conference Room/Videoconference 1. Interagency Agreement-2025-Sub-grants 5489 Region 7_8 Law Enforcement Liaison 2. KC Corridor HVE IAA FFY2025 3. Edward Byrne FY 2024 Justice Assistance Grant (JAG) 4. Authorize Sub-Agreement with the Puget Sound Regional Council for the Renton Comprehensive Safety Action Plan 5. Amendment #1 – GCB 2433, WSDOT Project Coordinator Agreement 6. Bid Award: Talbot Hill Reservoir Park Improvements Construction 7. Vouchers 8. Emerging Issues in Finance 6:00 p.m. Planning & Development Committee, Chair Prince Location: Council Conference Room/Videoconference 1. Long Range Planning Staff Introductions 2. Middle Housing/ADU Update 3. Emerging Issues in CED CANCELED Committee of the Whole, Chair Alberson 7:00 p.m. Council Meeting Location: Council Chambers/Videoconference AGENDA ITEM #6. a) AB - 3725 City Council Regular Meeting - 13 Jan 2025 SUBJECT/TITLE: Project Acceptance: 2022 Overlay, CAG-22-200 with CPM Development Corporation DBA ICON Materials, Inc. RECOMMENDED ACTION: Council Concur DEPARTMENT: Public Works Transportation Systems Division STAFF CONTACT: Hebe Bernarndo, Project Manager EXT.: 7232 FISCAL IMPACT SUMMARY: The original contract amount was $853,483.00 and due to a reduction in various bid item quantities, the final contract amount is $680,076.85, a decrease of $173,406.15. Execution of attached Change Order No. 1 is an internal document to reconcile the contract amounts at the bid phase with actual amounts upon project completion. SUMMARY OF ACTION: The 2022 Curb Ramps for Overlay Project was awarded on August 8, 2022, to CPM Development Corporation DBA ICON Materials, Inc. The project construction began on September 9, 2022, and was physically completed on July 7, 2023. The project consisted of excavation; grading; pavement removal and planing; asphalt paving; adjustments to utility frames, grates, and covers; pavement markings, and property restoration. EXHIBITS: A. A. Final Contract Voucher Certificate B. B. Final Progress Payment C. C. Change Order No. 1, Contract Reconciliation STAFF RECOMMENDATION: Accept the 2022 Overlay Project with CPM Development Corporation DBA ICON Materials, Inc., execute Change Order No. 1, authorize execution of Change Order No. 1 (Contract Reconciliation) and authorize the release of retainage upon approval received from the Washington State Department of Labor and Industries, Employment Security Department, and Department of Revenue. AGENDA ITEM #6. b) uuuvslun :uvau in.my lunlo?ucv‘rlur-Duac-«ecr IJC‘OJEW FINALCONTRACTVOUCHERCERTIFICATE Contractor CPM Development Corporation DBAICONMaterials,Inc., Street Address 1508 Valentine Ave SE City State Zip Date Paci?c WA 98047 12/05/2024 City Contract Number City Project Number Federal-AidNumber (if applicable) CAG-22—200 04071 Contract Title 2022 Overlay Date Work Physically Complete Final Amount 10/18/2022 $680,076.85 CONTRA R’S CERTIFICATION i,The undersigned,having first been duly sworn,certify that i am authorized to sign for the claimant;that In oonnectian with the work performed and to the best of my knowledge no loan,gratuity or gift In any form whatsoever has been extended to any employee of the City of Renton nor have I rented or purchased any equipment or materials from any employee of the City of Remon;I further certify that the attached final estimate is a true and com statement showing all the monies due me from the City of Renton for work performed and material furnished under this contract;that I have carefully examined said ?nal estimate and understand the same and that i release the City of Renton from any and all claims of whatsoever nature which I may have,arising out of the performance of said contract,which are not set forth in said estimate. [?rm W“'26“ 54.; Contractor Authorized Signature (Required) .5)!“ea Tyi e r Townsend Printed Signature Name ce er Subscribed and sworn to before me this De Mb 20 24..WAS [M Notary Public in and for the State of “SI""9“" A1 ona washi on residingat g '"gt CITY OF RENTON CERTIFICATION I,cey/tytheattached finalestynat to be based upon actuainjasurements,and to be true and correct. //./ ’ ‘(“4/4 Appove Date CITV 0F RENTON ACCEPTANCE The City of Renton hereby accepts the completed contract,pursuant to Section 1435.12 of the Contract Provisions. I Public Works Administrator Date of Council Acceptance Contractor’s claims,if any,must be included and the (narration certification most be labeled indicating a claim is attached, AGENDA ITEM #6. b) Certi?cate Of Completion Envelope Id:1AC10A7B-49EC-470F—BC32-43EF13E43EDO Subject:Complete with Dowsign:CAG—ZZ-ZDO-FinelContract Voucher Cert-To iconpd/ Source Envelope: Document Pages:1 Certi?cate Pagee:4 AutnNev:Enabted Envelopeld Stamping:Enabled Signatures:1 initials:0 Time Zone:(UTC+01z00)Amsterdam.Benin,Bern.Rome.Stockholm,Vienna Record Tracking Status:Original 12/10/2024 6:53:12 PM SignerEvente Tyler Townsend tyiertownsendaiaonmatenalseom Project Manager Security Level:Email,Account Authentication (None) Electronic Record and Signature Dlectoeure: Accepted:12/12/20244:16:50 PM 1D:W-796H091-9485336598333759 In Person Signer Evente Editor DeliveryEvents Agent Delivery Events Intermediary Delivery Evente Certi?ed Delivery Evente Carbon Copy Events Wltneee Events Notary Events Envelope Summary Evente Envelope Sent Cert/?ed Delivered Signing Complete Completed Payment Evente Holden Kristin Pof‘l'illo kr'istinpcrtlllo?icenmeter‘ielejern Signature @23qu Signature Adoption:Pre-eelecied Style Using IP Address:173.180.2525 Signature Stetue Statue Statue statue Signature Signeture Statue Heshed/Encrypted Seeurtty Checked Security Checked Security Checked Statue Electronic Record end Signature Diecioeure I?docusign. Status:Completed Envelope Originator: Kristin Fertile 42 FitzwlitiamSquare Dubtln,Dublin 2 002 R279 knellwortllloQieenmeter-leleoorn 1P Address:173.160.2525 Location:DocuSign “meetamp Sent:12/10/2024 6:56:14 PM Wewed:12110I2024 7:27:32 PM Signed:12/12/2024 4:17:31 PM ?meetamp Tlmeetamp Timeetamp “meet-mp Tlmeetemp 11meetamp TIM-temp Timeetamp ?metampe 12110/2024 6:50:14 PM 12/10/2024 7:27:32 PM 12/12/2024 4:17:31 PM 12/12/2024 4:17:31 PM Tlmeetempe AGENDA ITEM #6. b) AGENDA ITEM #6. b) AGENDA ITEM #6. b) AGENDA ITEM #6. b) AGENDA ITEM #6. b) AGENDA ITEM #6. b) Contract Title:2022 Overlay Change Order No.1 Contractor:CPM Development Corporation DBA ICON Materials,Inc. Contract No.:CAG-ZZ-ZOO Federal Aid No.: IZI Ordered by Engineer El Force Account El Proposed by the Contractor (VECP)Bid Item IZI Unilateral I]Bid Item Price Adjustment Lump Sum If yes,must receive concurrence from Local Programs Affects DBE Work:XINo Yes prior to execution. Amount Working Days Original Contract:$853,483.00 40 Current Contract:$853,483.00 31 Estimated Net Change This Order:$473,406.15 -9 New Contract:$680,076.85 31 Prepared By:Is ue By'/W IWM I Engm (City enton Transportation DateResidentEngineerDate Design Manager) Reviewed By:Consent By: Engineer of Record Date Surety (Greater than 25%cost and/or 20%Date time increase) Re i )MedBy:I I l Endorsed By: ,,/?:7 '.rMI2%;Wm Cityof Rento/Project Manager Date Contractor Date Reviewed By:Executed By: City Attorney Date City of Renton Public Works Date Change Order No.1 Administrator/Mayor Contract Title:2022 Overlay Contract No.CAG-ZZ-ZOO Page 1 of 3 AGENDA ITEM #6. b) THE CONTRACTiS MODIFIED AS FOLLOWS: Description of Change: The Change Order adjusts bid item quantities to match the actual work completed. Proposal Schedule of Prices: Description: None. Materials: None. Measurement: None. Payment: None. Materials Speci?cations: None. Plans: None. Reason for Change: At the time of bidding,bid item quantities are estimated based on the anticipated scope of work.Upon project completion,the actual quantities for each bid item are finalized.To ensure accurate contract reconciliation,this Change Order adjusts the original bid item quantities to match the actual quantities of work performed,aligning the total contract amount with the total payment for the completed work. Equitable Adjustment: This Change Order does include an equitable adjustment per Section 1-09.4 of the 2022 WSDOT/APWAStandard Specifications.See attached. Extension of Time:The Time for Completion is reduced by 9 Working Days. Affects DBE Work: No. Change Order No.1 Contract Title:2022 Overlay Contract No.CAG»22-200 Page 2 of 3 AGENDA ITEM #6. b) Sections M and %of the go_2_2_WSDOT/APWAStandard Specifications shall govern this Change Order.The Work of the referenced Contract is modified to include the changes detailed herein.The payment provided for herein shall constitute the complete and final settlement for all costs of labor,equipment,materials,overhead,profit,permit fees,and all other claims that may be made by the Contractor as a result of this change. To be attached to Change Order: 1-Estimated Change Order Cost 2-Plans 3-Field Directive/Request for information Response 4-Change Order Quotation 5-Project Labor List 6-Force Account Equipment Rate Request (DOT Form 422-010 EF) 7-Equitable Adjustment Determination 8-Additional Working Days Calculation ————_——— Change Order No.1 Contract Title:2022 Overlay Contract No.CAG»22-200 Page 3 of 3 AGENDA ITEM #6. b) Change Order No.1 Quantity Reconciliation Project Name:2022 Overlay Federal Aid No. City Contract No.CAG 22-200 Contractor:CPM Development Corporation DBA ICON Materials,Inc. Payments Change Order 1 Contract Final Totals Change Change Bid Item Description Unit Unit Price Quantity Amount Quantity Amount Quantity Amount Order No. 1 ROADWAYSURVEYING LS.4,500.00 1 54,500.00 1,000 34150000 0.000 $000 2 LICENSEDSURVEYING FA.8,000.00 1 $8,000.00 0.000 $0.00 71.000 $8,000.00 3 SPCCPLAN LS.180.00 1 $180.00 1.000 3180.00 0.000 $0.00 4 MOBILIZATION L.S.107,000.00 1 $107,000.00 1.00 $107,000.00 0.000 $0.00 5 PROJECTTEMPORARYTRAFFIC L.S.4,500.00 1 $4,500.00 1.00 $4,500.00 0000 $0.00 6 TRAFFICCONTROLSUPERVISOR LS.31,000.00 1 $31,000.00 100 $31,000.00 0000 50,00 7 PEDESTRIANTRAFFICCONTROL LS.1,900.00 1 51,900.00 100 $1,900.00 0.000 $0.00 8 FLAGGERS HR 72.00 640 $46,030.00 497.50 $35,320.00 442.500 $10,260.00 9 OTHERTRAFFICCONTROLLABOR “R 70.00 180 $12,600.00 65.500 54,585.00 -114.500 $3,015.00 10 CONSTRUCTIONSIGNS CLASSA S.F.1.00 1,296 $129600 000 $0100 711296000 $1,296.00 11 SEQUENTIALARROW HR 2.00 1,848 53,696.00 120.00 $240.00 4,728,000 753,456.00 12 PORTABLECHANGEABLEMESSAGE HR 3.00 5,280 515,840.00 0.00 $0.00 6.280.000 $15,840.00 13 OFF-DUTYPOLICEOFFICERWITH HR 160.00 88 $14,080.00 101.50 $16,240.00 13.500 $2,160.00 REMOVINGASPHALTCONC.S.Y.30.00 470 14 PAVEMENT $14,100.00 0.00 50.00 -470.000 $14,100.00 15 ROADWAY EXCAVATIONINCL.HAUL C.Y.90.00 140 $12,600.00 140.00 $12,600.00 0.000 $0.00 UNSUITABLEFOUNDATION C V 180 00 2016EXCAVATION,INCL.HAUL '''$3,600.00 0.00 $0.00 -20.000 63,600.00 L TE Ex . 17 OCA [STING UT‘mES LS 120 0°1 $120.00 1.000 $120.00 0.000 $0.00 18 CRUSHEDSURFACINGBASECOURSE TON 80.00 150 $12,000.00 202.96 $16,236.80 52.960 54,236.80 19 PLANINGBITUMINOUSPAVEMENT s.v.5.75 18,300 $105,225.00 17,801.00 $102,355.75 7499.000 $2,869.25 PAVEMENTREPAIREXCAVATION,S Y 22 0°1 70020INCL.HAUL ''''$37,400.00 570.00 $12,540.00 1130.000 $24,860.00 21 ”MA CL'1’2 IN"PG SSH'ZZ TON “6'00 230°$266,800.00 2,005.89 $232,683.24 294.110 $34,116.76 22 COMMERCIALHMA TON 150.00 150 $22,500.00 0.00 $0.00 450.000 $22,500.00 23 TEMPORARYHMA TON 141.00 40 $5,640.00 1.50 $211.50 738.500 $5,426.50 24 JOB MIX COMPLIANCEADJUSTMENT CALC 0.00 1 $0.00 000 $0.00 71000 $0.00 25 COMPACTIONPRICEADJUSTMENT CALC 0.00 1 $000 0000 50-00 71,000 $0.00 26 ADJUSTMANHOLE EACH 700.00 18 $12,600.00 1900 $13,300.00 1.000 $700.00 27 ADJUSTEXISTINGCATCHBASIN EACH 700.00 9 $6,300.00 7.00 $4,900.00 2000 $1,400.00 28 ADJUSTWATERVALVEBOX EACH 500.00 26 $13,000.00 3 1.00 515,500.00 5.000 $2,500.00 29 ADJUSTGAS VALVEBox EACH 500.00 20 $10,000.00 21.00 $10,500.00 1.000 $500.00 30 ADJUSTMONUMENT CASE EACH 500.00 10 55,000.00 1300 $6,500.00 3.000 $1,500 00 31 ROOF DRAIN EACH 1.50.00 4 5600.00 4.00 $600.00 0000 $0.00 | 32 EROSIONCONTROLAND WATER LS 1,100.00 1 $1,100.00 1.00 $1,100.00 0.000 $0.00 33 INLETPROTECTION EACH 50.00 42 $2,100.00 30.00 $1,500.00 712000 $600.00 34 STREETCLEANING HR 200.00 128 $25,600.00 0 00 $0.00 428.000 $25,600.00 35 CEMENTCONC'VALLEYGUT-[ER LF “'00 300 $19,200.00 320.00 $20,430.00 20.000 51,280.00 36 RAISEDPAVEMENTMARKERTYPE1 HD 546.00 8.50 5,641.00 6.21 33139066 72190 $1,250.34 37 RAISEDPAVEMENT MARKERTYPE2 HD 661.00 200 $1,322.00 1.85 $1,222.85 0150 $99.15 Page 1 of2 AGENDA ITEM #6. b) Change Order No.1 Quantity Reconciliation Project Name:2022 Overlay Federal Aid No. City Contract No.CAG 22-200 Contractor:CPM Development Corporation DBA ICON Materials,Inc. Payments Change Order 1 Final Totals Quantity Amount Contract Bid Item Description Unit Unit Price Quantity Amount Change AmountQuantity PERMANENTSIGNING $1,100.00 0000 PLASTICLlNE 9,557.000 $10,990.55 383.000 PLASTICCROSSWALKLINE 297.000 7118.000$1,782.00 PLASTICSTOP LINE PLASTICTRAFFICARROW EACH 172.00 TEMPORARYPAVEMENTMARKING» 41.000 5348.50 5.00 $860.00 9,400.00 $3,290.00 477.000 $1,504.50 -Z.000 75344.00 0.000 Sub-Totals $680,076.85 $173,406.15 Washington State Sales Tax “$0.00 $0.00 5353,433 on $680,076.85 $173,406.15 Change Order Totals $0.00 $0.00 Washington State Sales Tax —I_$0.00 $0.00 $0.00 Base Bid Plus C.0.Totals $853,483.00 $680,076.85 -$173,406.15 Page Zon AGENDA ITEM #6. b) AB - 3726 City Council Regular Meeting - 13 Jan 2025 SUBJECT/TITLE: Supplemental Agreement #3 to CAG-23-015 Professional Services Agreement with Transpo Group USA, Inc. for Construction Management Services for the South 7th Street Corridor Project RECOMMENDED ACTION: Refer to Transportation (Aviation) Committee DEPARTMENT: Public Works Transportation Systems Division STAFF CONTACT: Bob Hanson, Transportation Design Manager EXT.: 7223 FISCAL IMPACT SUMMARY: This professional services supplemental agreement #3 for construction management services with Transpo Group USA, Inc. totals $331,154.69. The total South 7th Street Corridor Project budget is $3,556,020. After this supplemental agreement #3 and execution of the construction contract with Active Construction, Inc., a project budget balance of $236,783 remains. SUMMARY OF ACTION: The South 7thStreet Corridor Improvements Project develops this corridor as a key east-west bicycle route into the downtown. The project installs a multi-use path on the north side of S 7thStreet between Shattuck and Burnett Ave S., and intersection improvements at multiple intersections along the corridor from Shattuck Ave S to Oakesdale Ave S. The intersection improvements from Shattuck Ave S westward along this corridor will improve bicycle facilities and intersection operations for cyclists. Bicycle improvements include push-button activation, green bike lanes through conflict/crossing zones, and pavement markings. This project will also upgrade an existing marked crosswalk with flashing beacons with higher visibility technology. The multi-use path will upgrade curb ramps along its path to ADA standards. The City of Renton Trails and Bicycle Master Plan (2009) identified a need for a defined bicycle route between Downtown and the western city limits. The existing signed shared roadway along the South 7thStreet corridor currently serves as a key bicycle route into and out of downtown Renton to the west. King Country Parks has also identified the 7th Street corridor as a potential regional trail alignment. The project improvements will also serve as key non-motorized access to the new Sound Transit BRT station and existing WSDOT Park and Ride at South 7th Street and Shattuck Ave S. The multi-used trail will also provide non-motorized access between the new Sound Transit BRT station and the Downtown Transit Center and Piazza. This supplemental agreement #3 retains the services of Transpo Group USA, Inc. for construction management services for the project. The consultant will be responsible for project start up activities, project execution, and closeout requirements. Project execution includes documentation, construction meetings, reviewing submittals, responding to requests for information, change orders, progress payments, daily reports, and AGENDA ITEM #6. c) traffic control inspection. The services provided by the consultant are based on estimate of construction activity for approximately three months. The consultant will provide the services of a project engineer, resident engineer, document control specialist and construction observer. Payment for services will be based on actual hours worked and expenses incurred. This project is funded in part by a $1,669,020 FHWA grant, a $1,000,000 System Access Fund Award from Sound Transit, and a State Transportation Improvement Board (TIB) award of $229,495. EXHIBITS: A. Supplemental Agreement #3 STAFF RECOMMENDATION: Authorize the Mayor and City Clerk to execute a supplement agreement #3 to CAG-23-015 professional services agreement with Transpo Group USA, Inc. to provide construction management services totaling $331,154.69 for the South 7th Street Corridor Improvement Project. AGENDA ITEM #6. c) AGENDA ITEM #6. c) AGENDA ITEM #6. c) AGENDA ITEM #6. c) AGENDA ITEM #6. c) AGENDA ITEM #6. c) AGENDA ITEM #6. c) AGENDA ITEM #6. c) AGENDA ITEM #6. c) AGENDA ITEM #6. c) AGENDA ITEM #6. c) AGENDA ITEM #6. c) AGENDA ITEM #6. c) AGENDA ITEM #6. c) AGENDA ITEM #6. c) AGENDA ITEM #6. c) AGENDA ITEM #6. c) AGENDA ITEM #6. c) AGENDA ITEM #6. c) AGENDA ITEM #6. c) AGENDA ITEM #6. c) AGENDA ITEM #6. c) AGENDA ITEM #6. c) AGENDA ITEM #6. c) AGENDA ITEM #6. c) AGENDA ITEM #6. c) AGENDA ITEM #6. c) AGENDA ITEM #6. c) AGENDA ITEM #6. c) AGENDA ITEM #6. c) AGENDA ITEM #6. c) AGENDA ITEM #6. c) AGENDA ITEM #6. c) AGENDA ITEM #6. c) AGENDA ITEM #6. c) AGENDA ITEM #6. c) 1 CITY OF RENTON, WASHINGTON RESOLUTION NO. _______ A RESOLUTION OF THE CITY OF RENTON, WASHINGTON, AUTHORIZING THE MAYOR AND CITY CLERK TO ENTER INTO CAG-19-059 AMENDMENT NO 1, TO AN INTERLOCAL AGREEMENT WITH WSDOT, WHICH AMENDMENT IS TITLED “GCB 2433 COORDINATOR AGREEMENT CITY OF RENTON I-405 – RENTON TO BELLEVUE CORRIDOR WIDENING AND EXPRESS TOLL LANES PROJECT, AMENDMENT NO. 1.” WHEREAS, the City and Washington State Department of Transportation (WSDOT) are authorized, pursuant to RCW Chapter 39.34, the Interlocal Cooperation Act, to enter into an interlocal government cooperative agreement; and WHEREAS, City and WSDOT entered into “GCB 2433 Coordinator Agreement City of Renton I-405 – Renton to Bellevue Widening and Express Toll Lanes Project” (the “Agreement”) in March 2019, which provides that WSDOT will reimburse the City for certain costs spent by a City project coordinator on the I-405 – Renton to Bellevue Corridor Widening and Express Toll Lanes Project (the “Project”) City Numbered CAG-19-059; and WHEREAS, the duration of the Project has increased from the originally estimated duration, requiring the City and WSDOT to adjust the terms of the Agreement relating to project duration, number of hours spent by the project coordinator, and the maximum agreement amount; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DO RESOLVE AS FOLLOWS: SECTION I. The Mayor and City Clerk are hereby authorized to enter into CAG-19-059 Amendment No 1, to an interlocal agreement with WSDOT, which amendment is titled “GCB AGENDA ITEM # a) RESOLUTION NO. _______ 2 2433 Coordinator Agreement City of Renton I-405 – Renton to Bellevue Corridor Widening and Express Toll Lanes Project, Amendment No. 1” attached hereto as Exhibit “A” and incorporated by this reference. PASSED BY THE CITY COUNCIL the day of , 2024. Jason A. Seth, City Clerk APPROVED BY THE MAYOR this day of , 2024. Armondo Pavone, Mayor Approved as to form: Shane Moloney, City Attorney RES- PW:24RES030:11/27/2024 AGENDA ITEM # a) RESOLUTION NO. _______ 3 EXHIBIT “A” Click or tap here to enter text. AGENDA ITEM # a) GCB 2433 Amendment No. 1 Page 1 of 2 GCB 2433 Coordinator Agreement City of Renton I-405 – Renton to Bellevue Corridor Widening and Express Toll Lanes Project Amendment No. 1 THIS Amendment No. 1 is made and entered into by the City of Renton (CITY) and the Washington State Department of Transportation (WSDOT), collectively referred to as the “Parties” and individually referred to as “Party.” Recitals A. The Parties entered into the Design-Build Coordinator and City Staff Review Agreement (“GCB 2433”) on March 11, 2019, which provided CITY expedited services and WSDOT to reimburse the CITY for costs directly related to services for the project known as the I-405 – Renton to Bellevue Corridor Widening and Express Toll Lanes Project (“Project”). B. GCB 2433 Section 7.1 allows for the Parties to adjust or increase the number of hours based on the Project contract duration as mutually agreed by both Parties. C. The Project contract duration has been extended to a later date than anticipated at the signing of GCB 2433. D. In consideration of the change in the Project contract duration, GCB 2433 estimate does not reflect the actual number of hours for CITY services in GCB 2433 and it is necessary to amend GCB 2433 to reflect the current estimate and the maximum Agreement amount agreed to by the Parties. Now therefore, pursuant to Revised Code of Washington (RCW) 39.34.080, which authorizes a public agency to contract with another public agency to perform any governmental service that each public agency is authorized to perform, and in consideration of the terms, conditions, covenants, and performances contained herein, it is mutually agreed as follows: 1. The dates in the first sentence of Section 5.2 “June 2019 and December 2024”, are hereby replaced with “June 2019 and December 2025”. 2. The number of hours in the third to last sentence in Section 7.1 “three thousand (3000)”, is hereby replaced with “five thousand five hundred (5500)”. 3. Section 7.4 is hereby deleted in its entirety and replaced with the following: 7.4 The maximum amount payable by WSDOT to the CITY under this Agreement is Four Hundred Forty Thousand Dollars ($440,000). AGENDA ITEM # a) GCB 2433 Amendment No. 1 Page 2 of 2 4. All other terms and conditions of the original Agreement shall remain in full force and effect, except as modified by this Amendment No. 1. In witness whereof, the Parties hereto have executed this Amendment No. 1 as of the latest date written below: CITY WASHINGTON STATE DEPARTMENT OF TRANSPORTATION By: By: Armondo Pavone Lisa Hodgson Mayor I-405/SR 167 Program Administrator Date: Date: APPROVED AS TO FORM APPROVED AS TO FORM By: By: Not required per WSDOT process. Printed: Printed: Not required per WSDOT process. Title: Assistant Attorney General Not required per WSDOT process. Date: Date: Not required per WSDOT process. AGENDA ITEM # a)