HomeMy WebLinkAboutMFP25000098.pdfNote: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. DEPARTMENT OF PUBLIC WORKS Page 1 of 3 | Published: 10/27/2021 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN APPLICATION Published: 10/27/2021 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. 1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents. 2. The following items are all required for submittal of the TCP Application: ☐Electronic Copy of the TCP Application ☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall: Include map(s) showing the location of the project and work area. Be legible lettering and clear, contrasting, symbols of viewing or printing. Must indicate street names, and north arrow and scale. Types of plans required: o Work hour plan – show all mobility impacts during construction hours. o Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. o Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. o Pedestrian access/detour plan, if applicable. - Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. 3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].” Project Name: Permit #: Site Address: Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Construction Company: Contact Name: Phone/Cell: _________________________ Business Address: City/State: Zip: Description of Work: Approval By: _________________________________________________ Date:____________________ Transportation Engineering PLEASE SEE ATTACHED POTELCO, INC 6905 S 228TH ST KENT, WA 98032 105106268 751 PARK AVE N JENNY CHAU 253-208-9480 MFP25000098 Monday Friday 9 am 3 pm Holly Powers - CED 1/14/2025 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 3 | Published: 10/27/2021 PERMIT HOLDER AGREES TO ALL THE FOLLOWING: Must have approved Traffic Control Plan (TCP) prior to commencing the work. Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the traveled way. Comply with all traffic regulations of the City of Renton and the State of Washington. Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends and holidays) prior to starting any work. Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140 with any questions. Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes. Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. All permit conditions shall be met. NOTES: Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by a traffic control plan layout or reference to WSDOT. Approved Temporary Traffic Control Plan must be at the work site during work hours. Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 3 of 3 | Published: 10/27/2021 In the case of Temporary No Parking Zones, all the following apply in addition to previous: Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). I certify that the information on this application and within the submittal documents are accurate to the best of my knowledge and I acknowledge all the requirements on this application. Applicant’s Signature Date Applicant’s Name (Print) CORRIE RYDBERG 1/7/2025 12 11 12 11 12 12 11 12 11 12 BU S ST O P P A R K A V E N N 8TH ST 12111112 J01 S/W CLOSED R9 - 9 CROSS HERE S/W CLOSED R9 - 1 1 A W2 0 - 1 ROAD WORK AHEAD RIGHT LANE CLOSED AHEAD W2 0 - 5 R W4 - 2 R X' ≥ X' ≥ X'≥ W20-1 RO A D WO R K AH E A D W20-1 RO A D WO R K AH E A D W2 0 - 1 ROAD WORK AHEAD 12 11 12 11 12 ARRW-BRD PLACE SIGN AT INTERSECTION OF PARK AVE N & N 6TH ST CROSS HERE S/W CLOSEDAHEAD R9 - 1 1 BU S ST O P N SIGN SPACING MPH 60/65 45/55 35/40 30 25 "X" 1000' 500' 350' 200' 100' CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 Project Address: Page PSE PUGET SOUND ENERGY Designer: Job # REV Kali-Jamal Collins 424-425-6425 Kali-jamal.collins@pse.com 1 OF 2751 Park Ave N, Renton, WA 0 514972400 11/08/2024 Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated, if indicated use ADA compliant channelization. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 10' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place during approved work hours as per jurisdictional requirements. (Generally between 9 a.m. and 4 p.m. on non-arterials and from 9 a.m. to 3 p.m. on arterials. If night time work is approved, signaling and flaggers shall conform to WAC 296-155-305. Night time work to take place between _____________and ______________.) 8. All Flagger and Downstream tapers shall be 50'-100'. MINIMUM TAPER LENGTH=L (FT.) LANE WIDTH 10 11 12 20 70 75 80 25 105 115 125 30 150 165 180 35 205 225 245 40 270 295 320 45 475 495 540 POSTED SPEED (MPH) 50 500 550 600 55 550 605 660 60 - 660 720 65 - - 780 70 - - 840 LEGEND 28" TRAFFIC CONE SIGN LOCATION TRAFFIC FLOW WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY WORK AREA CHEVRON ARROW BOARD FLAGGER UNIFORMED POLICE OFFICERPOLICE STOP UG/BOX/VAULTVAULT TEMPORARY TRAFFIC CONTROL PLAN Puget Sound Energy Traffic Control Supervisor: Jamal I. Collins Card No. 013375 Card Exp. 10/2026 Kali-Jamal.Collins@pse.com (425)424-6425 12 11 12 11 12 12 11 12 11 12 BU S ST O P P A R K A V E N N 8TH ST 12111112 12111112 PV1 J02 V01 ARRW-BRD W2 0 - 1 ROAD WORK AHEAD RIGHT LANE CLOSED AHEAD W2 0 - 5 R W4 - 2 R X' ≥ X' ≥ X'≥ W20-1 RO A D WO R K AH E A D W20-1 RO A D WO R K AH E A D W2 0 - 1 ROAD WORK AHEAD BU S ST O P MOVE BUS STOP 500' SOUTH. KING COUNTY METRO WILL BE CONTACTED AT 206-477-1150 FIVE DAYS IN ADVANCE OF SCHEDULED DATE. CROSS HERE S/W CLOSED R9 - 1 1 A S/W CLOSEDR9 - 9 PLACE SIGN AT INTERSECTION OF PARK AVE N & N 6TH ST CROSS HERE S/W CLOSEDAHEAD R9 - 1 1 Project Address: Page PSE PUGET SOUND ENERGY Designer: Job # REV Kali-Jamal Collins 424-425-6425 Kali-jamal.collins@pse.com 2 OF 2751 Park Ave N, Renton, WA 0 514972400 11/08/2024 Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated, if indicated use ADA compliant channelization. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 10' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place during approved work hours as per jurisdictional requirements. (Generally between 9 a.m. and 4 p.m. on non-arterials and from 9 a.m. to 3 p.m. on arterials. If night time work is approved, signaling and flaggers shall conform to WAC 296-155-305. Night time work to take place between _____________and ______________.) 8. All Flagger and Downstream tapers shall be 50'-100'. MINIMUM TAPER LENGTH=L (FT.) LANE WIDTH 10 11 12 20 70 75 80 25 105 115 125 30 150 165 180 35 205 225 245 40 270 295 320 45 475 495 540 POSTED SPEED (MPH) 50 500 550 600 55 550 605 660 60 - 660 720 65 - - 780 70 - - 840 LEGEND 28" TRAFFIC CONE SIGN LOCATION TRAFFIC FLOW WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY WORK AREA CHEVRON ARROW BOARD FLAGGER UNIFORMED POLICE OFFICERPOLICE STOP UG/BOX/VAULTVAULT TEMPORARY TRAFFIC CONTROL PLAN Puget Sound Energy Traffic Control Supervisor: Jamal I. Collins Card No. 013375 Card Exp. 10/2026 Kali-Jamal.Collins@pse.com (425)424-6425 N SIGN SPACING MPH 60/65 45/55 35/40 30 25 "X" 1000' 500' 350' 200' 100' CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 If needed, inspector may require additional Traffic control measures in the field. CO M P A C T CO M P A C T CO M P A C T CO M P A C T CO M P A C T CO M P A C T CO M P A C T CO M P A C T CO M P A C T 318377-166192 318374-166191 25 kVA 120/240V (A) 318366-166182 ROW 90' PCR 24 10 ' PA R K A V E N 751 318361-166185 318359-166185 50 kVA 120/240V (A) J J CUSTOMER SUPPLIED 9' X 11' WORK PIT W/ 6" BEDDING OF 5/8" CRUSHED ROCK CUSTOMER SUPPLIED 8' X 10' WORK PIT W/ 6" BEDDING OF 5/8" CRUSHED ROCK PSE PROVIDED & CUSTOMER INSTALLED 1-4" SCH'L 80 CONTINUOUS PVC CONDUIT ± 240' IN CUSTOMER PROVIDED TRENCH J 318359-166185 50 kVA 120/240V (A) 318361-166185 318377-166192 CUSTOMER SUPPLIED 4' X 4' RECEIVING PIT PSE PROVIDED & CUSTOMER INSTALLED 1-2" SCH'L 80 CONTINUOUS PVC CONDUIT ± 15' IN CUSTOMER PROVIDED TRENCH 90° R=60" 105' 13 5 ' 15 ' J CUSTOMER PROVIDED & INSTALLED 1-4" HDPE PVC CONDUIT ± 105' IN CUSTOMER PROVIDED TRENCH CUSTOMER SUPPLIED 4' X 4' MINIMUM RECEIVING PIT PSE INST. 1-RUN 1/0 UG JKT CABLE ± 260' (AØEKA446) (BØEKA447) (CØEKA448) PSE INST. 1-RUN 1/0 UG JKT CABLE ± 35' (AØEKA449) J 318359-166185 50 kVA 120/240V (A) 318361-166185 318377-166192 J PRIMARY CABLE & CONDUIT TABLE LOCATION CONDUIT CABLE ASBUILT INFORMATION - FOREMAN COMPLETE FROM TO SIZE (IN)QTY. DESIGN LENGTH (FT) BENDS PULL (LBS) PULL REV (LBS) CABLE SIZE DESIGN LENGTH (FT) PHASE - ID TAG RECORD RECORD PHASE TAPPED & ACTUAL FOOTAGE INSTALLED 90°45°22°11°A B C MANUFACTURER COMPOUND YEAR NOTES CONDUIT CABLE J01 J02 4 1 240 1 298 305 3Ø 1/0AL JKT 260 EKA446 EKA447 EKA448 - J02 V01 2 1 15 51 46 1Ø 1/0AL JKT 35 EKA449 -- 2" PVC (FT) & BENDS =15 0 0 0 0 1Ø 1/0 AL JKT TOTAL (FT) =35 4" PVC (FT) & BENDS =240 1 0 0 0 3Ø 1/0 AL JKT TOTAL (FT) =260 UNDERGROUND CIRCUIT MAP SCALE: 1" = 100' SITE PLAN SCALE: 1" = 50' JOB SITE CUSTOMER DEVELOPMENT NOTES: A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO STARTING ANY SITE WORK. CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET SOUND ENERGY STANDARDS & LOCAL MUNICIPALITY. **DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL** CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING: CROSSING/BORING. -OPEN TRENCH OR BORING FOR CROSSINGS ARE ALLOWED PER LOCAL MUNICIPALITY PERMIT REQUIREMENTS. -CROSSINGS IN RIGHT OF WAY MUST BE SCHEDULED WITH PROJECT MANAGER PRIOR TO CONSTRUCTION. -PROJECT MANAGER OR DESIGNATED REPRESENTATIVE MUST BE ON SITE DURING CONSTRUCTION WORK IN RIGHT OF WAY. -EXCAVATION CONTRACTOR MUST BE LICENSED AND BONDED TO PERFORM WORK IN RIGHT OF WAY. VAULTS & WORK PITS. -REQUIRED TO PROVIDE 4' X 4' WORK PIT AT J01 -REQUIRED TO PROVIDE 9' X 11' WORK PIT W/ 6" BEDDING OF 5/8" CRUSHED ROCK AT J02 -REQUIRED TO PROVIDE 8' X 10' WORK PIT W/ 6" BEDDING OF 5/8" CRUSHED ROCK AT V01 TRENCHING & CONDUIT. -INSTALL ±105' OF 1-4" HDPE CONDUIT FROM J01 TO BP1 -INSTALL ± 135' OF 1-4" SCH'L 80 CONDUIT FROM BP1 TO J02. -INSTALL ± 15' OF 1-2" SCH'L 80 CONDUIT FROM J02 TO V01. -REQUIRED TO PROVIDE AND INSTALL A 3/8" NON-POLY PULL ROPE IN ALL OF THE CONDUITS. JOB SITE READINESS. -JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO CONSTRUCTION DATE. -ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER AND LOCAL MUNICIPALITY. -ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS MUST BE COMPLETED 5 BUSINESS DAYS PRIOR TO SCHEDULED CONSTRUCTION DATE. -REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS, VAULTS & TRENCH AT ALL TIMES. -REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE DAY OF CONSTRUCTION TO COMPLETE BACKFILLING. - IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED. -PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT. -IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP AND SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS . N Vicinity Map 47.49504, -122.20223 ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. JOB SITE ASPLUNDH CONSTRUCTION CORP. - QA/QC T. MYER PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required"THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) NEW CABLE DIAGRAM NOT TO SCALE NEW CONDUIT DIAGRAM NOT TO SCALE SITE SPECIFIC NOTES AT J01: 318377-166192 (3) 2-57, 2-59 -EXISTING VAULT TO REMAIN -INSTALL (3) 12kV ELBOW KIT PER STD 6041.1000 (ELB10J) -INSTALL CABLE TAGS AT J02: 318361-166185 2-60, 2-45, (3) 2-57 -INSTALL (1) HH 4'8" X 7' X 5' HH W/ GROUNDS PER STD 6055.1030 (JBOX15L) -INSTALL (4) 12kV ELBOW KIT PER STD 6041.1000 (ELB10J) -INSTALL (8) DUST CAPS (MID: 7630600) -INSTALL GRID # -INSTALL CABLE TAGS AT V01: 318359-166185 3-19A -INSTALL (1) 8' X 10' W/24" X 60" ACCESS PER STD 6315.1000 (9996110) -INSTALL (1) 50KVA PADMOUNT TRF (MID: 6247100) -INSTALL (1) 12kV ELBOW KIT PER STD 6041.1000 (ELB10J) -INSTALL (1) DUST CAP (MID: 7630600) -INSTALL (3) #6-350 KCMIL SECONDARY CONNECTION BLOCKS (MID: 4842002) -INSTALL CABLE TAG: -INSTALL GRID # -CONNECT 1-RUN OF CUSTOMER OWNED, INSTALLED, & MAINTAINED 250KCMIL SVC AT PV1: 318366-166182 -EXISTING VAULT TO REMAIN AT FV1:(2) 2-60 -EXISTING PSE FIBER VAULT TO MOVE 5' TO 10' NORTH OF EXISTING LOCATION -EXTEND AND RECONNECT EXISTING FIBER AS NEEDED. AT M01:(2) 2-60 -PSE METER DEPT TO INSTALL METER ON 200A PANEL SPAN SPECIFIC NOTES SEE SITE PLAN, TABLES AND ONE LINES FOR INSTALL J01 TO J02:2-55 00 1"2" 00 50'100' Installed at site: Grid Number: kVA Rating: TRANSFORMER INSTALLATION (PM) Company ID#: Primary phase connected to: Tested Secondary Voltage Material ID#: Foreman to redline the following information 50kVA 120/240v 6247100 V01 318359-166185 AØ POWER GENERAL NOTES - COMMERCIAL PROJECT 8. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. Roads shall be paved or have a compacted , crushed rock base in place. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them, or as required by your local municipality. All work is to be done in accordance with local municipal and county permit requirements as applicable. Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits and crossings from the individual unit's meter base to the designated connection point on private property. Inclement weather conditions may cause delays in construction times and dates. 1. 2. 3. 4. 5. 6. 7. 9. 11. 10. CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE PCR-24 11/2023 103.00 96.00 98.00 6.58 0.00 0.00 109.58 96.00 98.00 JOB SITE UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP J. CHAU 253-208-9480 10/09/24 J. CHAU 253-208-9480 10/09/24 E. SCHOTT 714-893-2405 10/09/24 REQUIRED RENTON LIVAWAY SUITES 3Ø PRI L/E TO NEW JBOX, 1Ø L/E TO NEW PM XFMR, RELO FIBER VAULT 751 PARK AVE N, RENTON, WA 98057 N/A N/A N/A 105106268 AS NOTED 1 OF 2 KING N/A N/A CSPSKEPM SW 8-23N-05E N/A N/A 2305E031 2305E040 2305E031NW PCR-24 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A E-Mail: Cell Phone: Project Manager Contact Information: Manager:JENNY CHAU 253-208-9480 JENNY.CHAU@PSE.COM GAS PHONE CABLE TV PROJECT PHASE PWR NOTIF#ORDER# 10 5 1 0 6 2 6 8 SCALE: 6" = 1 MILE OVERHEAD CIRCUIT MAP 2305E040 Owner / Developer Contact Info officeATTN: WEST 77 PARTNERS 2265 116TH AVE NE. SUITE 110-C BELLEVUE, WA 98004 TODD LUST 206-909-0944 CIRCUIT FEET ADDED: SQ. FOOTAGE: PANEL SIZE: HEAT TYPE: EST. DEMAND: LRC: % V. DROP: % FLICKER: 255' 59,712 SQ FT 2500A ELECTRIC 45kW 65A 1.6% 0.7% 515323774 514972400 3002776511 104364627 594162211 105106268 Temp Meter Temp PM XFMR Fiber Vault Relocate Superior FAULT CURRENT TABLE 1Ø PM TRANSFORMERS (240/120V) 120V WINDINGS 240V WINDINGS LOCATION SIZE R/X MIN. %Z FAULT CURRENT MIN. %Z FAULT CURRENT V01 50KVA 0.5 2.34 18,700 AMPS 1.80 12,300 AMPS CUSTOMER OWNED AND INSTALLED SECONDARY WIRE TABLE SITE # OF METERS SOURCE # OF RUNS WIRE SIZE REMARKS M01 1 V01 1 250KCMIL - ALL CUSTOMER-OWNED WIRE MUST BE INSTALLED ACCORDING TO THIS TABLE VAULT & EQUIPMENT TABLE SITE #GRID # VAULT SIZE & COVER TYPE & SIZE EQUIPMENT IN VAULT PRIMARY BUSHINGS TRANSFORMER ID NUMBERS (COMPANY ID) AS-BUILT INFORMATION LB DC FOREMAN: INCLUDE PHASE TAPPED J02 318367- 166181 4'8"x7'x5' w/2-3' Sq Doors Matid: 7663200 J-Box Below Grade w/4-Pos J-Bus x3 Matid: 7625900 4 8 V01 318368- 166178 8'x10' w/ 24"x60" Access Matid: 9996110 50KVA MP TRF 120/240 Matid: 6247100 1 1 MFP25000098 pothole all utilities - including new utilities that are not shown on this sketch. Communications Primary Power Cables or Conduit Excavated Dirt Pile ROADSIDE Final Grade 24" Min 12" Min Separation 36" Min Cover 48" Max Backfill (No rocks over 10" diameter) Separation 12" Min Gas 4" Sand Bedding 32" Typical (Power, Gas, and Communications) JOINT TRENCH DETAIL Primary-Mainline Gas & Communications (NTS) Separation 12" Min 6" or 12" Min Sand Shading after Compaction - A 6" layer of sand is allowed when excavated native material contains rocks no larger than 8" in diameter. Trench and backfill requirements for primary electric line extension trenches (No PSE gas) - A 12" layer of sand is required when excavated native material contains rocks up to 10" in diameter. FLOW DIRECTION LAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL, SECURE WITH PEA GRAVEL BAGS. 6' 3' 8" TECHNIQUES FOR EROSION AND SEDIMENT CONTROL SILT FENCE DETAIL Not to Scale 0150.3200 THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) 4' TRANSFORMER CABINET FOOTPRINT 1Ø PRIMARY CABLE IN 1-2" PVC CONDUIT 4' TOP VIEW 36" MIN COVER 6" CRUSHED ROCK BEDDING TEMPORARY CONCRETE LID 1Ø PRIMARY CABLE 2" PVC CONDUIT TEMPORARY CONCRETE PAD COMPACTED BACKFILL CUSTOMER SUPPLIED SECONDARY PVC TEMPORARY TRANSFORMER INSTALLATION DETAIL Not to scale 6315.1000 CLEAR WORKING SPACE FOR J-BOX NOT TO SCALE FIELD SIDE (PREFERRED) ROAD SIDE (PREFERRED) 6' MIN 3' MIN 3' MIN 3' MIN 2" Excavation - 19-1/2 cubic yards SIDE VIEW 5'-4"Crushed 6" Rock TOP VIEW 9' 11' 7'-0" 4'-0" 1' 4'-8" 4,750 lbs 2,490 lbs VAULT & EXCAVATION DETAIL @ J02 Not to scale 6055.1030 10 5 1 0 6 2 6 8 UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP J. CHAU 253-208-9480 10/09/24 J. CHAU 253-208-9480 10/09/24 E. SCHOTT 714-893-2405 10/09/24 REQUIRED RENTON LIVAWAY SUITES 3Ø PRI L/E TO NEW JBOX, 1Ø L/E TO NEW PM XFMR, RELO FIBER VAULT 751 PARK AVE N, RENTON, WA 98057 N/A N/A N/A 105106268 AS NOTED 2 OF 2 KING N/A N/A CSPSKEPM SW 8-23N-05E N/A N/A 2305E031 2305E040 2305E031NW PCR-24 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A J-BOX B-FLY DETAIL (J01) SCALE: NONE Exist 4" (FEED) Prop 4" (J02) J-BOX B-FLY DETAIL (J02) SCALE: NONE Exist 2" (318377-166192) Prop 4" (J01) Prop 2" (V01) Will maintain 36" Min. depth while directional drilling 36" Min Depth Final Grade TYPICAL BORE COVER TYPICAL BORE NOTE CALL (800) 424-5555 UTILITY NOTIFICATION CENTER A MINIMUM OF 2 BUSINESS DAYS BEFORE BEGINNING ANY EXCAVATION TO PREVENT DAMAGE TO UNDERGROUND FACILITIES & AVOID BODILY INJURY. PSE/POTELCO REPRESENTIVE MUST BE ONSITE FOR DURATION OF BORE POTHOLING IS REQUIRED PRIOR TO BORE. ALL OTHER UTILITIES SHALL HAVE THEIR ALIGNMENTS AND PROFILES MAPPED. BORING CONTRACTOR SHALL PREPARE A PROPOSED BORING ALIGNMENT AND PROFILE ON SITE AND PROVIDE IT TO THE PSE/POTELCO REPRESENTATIVE FOR APPROVAL BEFORE COMMENCING ANY WORK BORING CONTRACTOR SHALL USE CONDUIT AND MATERIALS PROVIDED ONLY BY PSE/POTELCO WHEN OPERATING IN PUBLIC RIGHT OF WAY NEW CONDUIT SHALL BE INSTALLED PER PSE STANDARDS AND ADHERE TO ALL JURISCITION REQUIREMENTS. NEW CONDUIT SHALL BE INSTALLED AT 36" MINIMUM COVERAGE. LOCAL JURISIDICTIONS MAY HAVE DIFFERENT REQUIREMENTS FOR MINIMUM COVERAGE IN PUBLIC RIGHT OF WAY. NEW CONDUIT SHALL MAINTAIN MINIMUM 1-FOOT VERTICAL CLEARANCE BETWEEN OUTER SURFACES OF EXISTING UTILITIES AND STRUCTRES. IT SHALL ALSO MAINTAIN A MINIMUM 5-FOOT HORIZONTAL SEPARATION OF WATER MAIN, STORM DRAIN AND 5-FOOT OF SEWER STRUCTURE. LOCAL JURSIDICTION MAY REQUIRE A DIFFERENT MINIUM SEPARATION.