HomeMy WebLinkAboutCM_Construction_Mitigation_180214_v19. CONSTRUCTION MITIGATION DESCRIPTION
Information contained in this section is minimal because the concrete elements of the helipad are
being constructed along with sections of the roof of Tower 2 and because preparations for
helipad use amount to installation of lights and signs.
Proposed Construction Dates
Tower 2 is currently being constructed. It is projected to be complete and helipad fixtures
installed, if approved, by the end of December 2018.
Hours and Days of Operation
These will be the same as those used to construct Tower 2.
Proposed Hauling/Transportation Routes
Not applicable
Measures to be Implemented to Minimize Effects
Not applicable
Special Hours of Construction
Not applicable
Preliminary Traffic Control Plan
Not applicable.