HomeMy WebLinkAboutCM_Construction_Mitigation_180214_v19. CONSTRUCTION MITIGATION DESCRIPTION Information contained in this section is minimal because the concrete elements of the helipad are being constructed along with sections of the roof of Tower 2 and because preparations for helipad use amount to installation of lights and signs. Proposed Construction Dates Tower 2 is currently being constructed. It is projected to be complete and helipad fixtures installed, if approved, by the end of December 2018. Hours and Days of Operation These will be the same as those used to construct Tower 2. Proposed Hauling/Transportation Routes Not applicable Measures to be Implemented to Minimize Effects Not applicable Special Hours of Construction Not applicable Preliminary Traffic Control Plan Not applicable.