HomeMy WebLinkAboutContract16th
CAG-25-019
Docusign Envelope ID: 2832FDBE-1280-4C12-9FFF-C12789F53396
A.Prevailing Wage Rates:
B.
Contractor must comply with the State of Washington prevailing wage
requirements. Contractor must file an Intent To Pay Prevailing Wage at the
beginning of the project and an Affidavit of Wages Paid at the end of the project
with the Washington State Department of Labor and Industries.
The State of Washington prevailing wage rates applicable for this project, which is
located in King County, may be found at the following website address ofthe
Department of Labor and Industries:
http://www.lni.wa.gov/Tradeslicensing/PrevWage/default.asp
http://www.lni.wa.gov/TradesLicensing/PrevWage/WageRates/default.asp
Pursuant to WAC 296-127-011, the applicable effective date for prevailing wage
rates paid for the duration of this contract shall be the date the contract is
executed as reflected in the 11Effective Date'' identified at the top of the first page
of this Agreement.
Upon request, the City will provide a copy of the applicable prevailing wages for
this project .. Alternatively, the rates may be viewed at the City of Renton City Hall
by making an appointment with the contact person identified herein or prior to
contract award with the contact person identified as the City of Renton contact in
Paragraph 15 Notices of this agreement.
Retainage held by the City or in Escrow Account:
Pursuant to RCW Chapter 60.28, a sum equaJ to five percent (5%) of the monies
earned by the Contractor will be retained from payments made by the City to the
Contractor unde.r this Contract. This retainage shall be used as a trust fund for the
protection and payment (1) to the State with respect to taxes imposed pursuant
to RCW Title 82 and (2) the claims of any person arising under the Contract.
Monies retained under the provisions of RCW Chapter 60.28 shall be: Contraaot must pick one -if contractor does not pick one then the first option(retainage held in a fund by the City} applies.
__ x __ Retained in a fund by the City.
or
___ Deposited by the City in an escrow {interest-bearing) account in a bank,
mutual saving bank, or savings and loan association (interest on moni.es s.o
E)
PAGE2.0F12
Docusign Envelope ID: 2832FDBE-1280-4C12-9FFF-C12789F53396
C.
D.
retained shall be paid to the Contractor). Deposits are to be in the name of the
City and are not to be allowed to be withdrawn without the City's written
authorization. The City will issue a check representing the sum of the monies
reserved, payable to the bank or trust company. Such check shall be converted
into bonds and securities chosen by the Contractor as the interest accrues.
At or before the time the Contract is executed, the Contractor shall designate the
option desired. The Contractor in choosing option (2) agrees to assume full
responsibility to pay all costs that may accrue from escrow services, brokerage
charges or both, and further agrees to assume all risks in connection with the
investment of the retained percentages in securities.
The City may also, at its option, accept a bond in lieu of retainage.
For Agreements over $150,000:
Pursuant to RCW 60.28 and 39.08 The City requires a 5 % Retainage be withheld
and that the Contractor will provide a Performance and Payment (Contract) Bond
on the City approved form upon execution of the Agreement. Payment of the initial
95% will be made in the next pay cycle of the Renton Finance Department after
receipt of such voucher or invoice (pay cycles are bi-wee.kly). The remaining 5%
will be retained for the purpose of completion of the project and fulfillment of
claims and liens.
For Agreements under $150,000
Pursuant to RCW 60.28 and 39.08 the City requires a 5 % Retainage be withheld
and that the Contractor will provide either a Performance and Payment {Contract)
Bond on the City approved form upon execution of the Agreement or waive the
payment and performance bond and instead the City will reta.in 10%. Payment of
the initial 95% will be made in the next pay cycle of the Renton Finance Department
after receipt of such voucher or invoice (pay cycles are bi-weekly}. The remaining
5% will be retained for the purpose of completion of the project and fulfillment of
claims and liens. (Unless the Contractor waives the payment and performance
bond below and opts for a 10% retainage below.)
Contractor must pick one -if contractor does not pick one then the first option (5% retainage with contract bond} applies:
___ To provide a payment and performance bond {contract bond) in the
amount of 100% of the estimate including taxes with a 5% retainage.
or
PAGE30F12
Docusign Envelope ID: 2832FDBE-1280-4C12-9FFF-C12789F53396
x To waive a payment and performance bond (contract bond) and instead
the city will retain the remaining 10% will be retained for the purpose of
completion of the project and fulfillment of claims and liens.
E.City shall have the right to withhold payment to Contractor for any work not
completed in a satisfactory manner until such time as Contract.or modifies such
work so that the same is satisfactory.
F.Final Acceptance. Final Acceptance of the Project. occurs when the Parks and
Recreation Department Administrator, or their designee, has determined that the
Project is one hundred percent (100%) complete and has been constructed in
accordance with the Plans and Specifications.
G.Payment in the Event of Termination. In the event this Contract is terminated by
the either party, the Contractor shall not be entitled to receive any further amounts
due under this Contract until the work specified in the Scope of Wo.rk is
satisfactorily completed, as scheduled, up to the date of termination. At such time,
if the unpaid balance of the amount to be paid under the Contract exceeds the
expense incurred by the Oty in finishing the work, and all damages sustar ned by
the City or which may be sustained by the City or which may be sustained by the
reason of such refusal, neglect, failure or discontinuance of Contractor performing
the work, such excess shall be paid by the City to the Contractor; If the City's
expense and damages exceed the unpaid balance, Contractor and his surety .shall
be jointly and severally liable therefore to the City and shall pay such difference to
the City. Such expense and damages shall include all reasonable legal expenses
and costs incurred by the City to protect the rights and interests of the City under
the Contract.
8.Hold Harmless: Contractor shall indemnify, defend and hold harmless City,, its elected
officials, officers, agents, employees and volunteers, from and against any and all cl aims,
losses or liability, or any portion of the same, including but not limited to reasonable
attorneys' fees, legal expenses and litigation costs, arising from injury or death to persons,
including injuries, sickness, disease or death of Contractor's own employees, agents and
volunteers, or damage to property caused by Contractor's negligent act or omission,
except for those acts caused by or resulting from a negligent act or omission by City and
its officers, agents., employees and volunteers.
Should a court of competent jurisdiction determine that this agreement is subject to RCW
4.24.115, (Validity of agreement to indemnify against liability for negligence relative to
construction, alteration,. improvement, etc., of structure or improvement attached to real
estate ... ) then, in the event of liability for damages arising out of bodily injury to persons
or damages to property caused by or resulting from the concurrent negligence of theE)
PAGE40F12
Docusign Envelope ID: 2832FDBE-1280-4C12-9FFF-C12789F53396
9.
contractor and City, its officers, offi.cials, employees and volunteers, Contractor's liability
shall be only to the extent of Contractor's negligence.
It is further specifically and expressly understood that the indemnification provided in this
Agreement constitute Contractor's waiver of immunity under the Industrial Insurance Act,
RCW Title 51, solely for the purposes of this indemnification. The Parties have mutually
negotiated and agreed to this waiver. The provisions of this section shall survive the
expiration or termination of this Agreement.
Insurance: Contractor shall secure and maintain:
A.Commercial general liability insurance in the minimum amounts of $1,000,000 for
each occurrence/$2,000,000 aggregate for the Term of this Agreement.
B.Professional liability insurance, in the minimum amount of $1,000,000 for each
occurrence, shall also be secured for any professional services being provided to
City that are excluded in the commercial general liability insurance.
C.Workers' compensation coverage, as required by the Industrial Insurance laws .of
the State of Washington, shall also be secured.
D.Commercial Automobile Liability for owned, leased, hired or non-owned, leased,
hired or non-owned, with minimum limits of $1,000,000 per occurrence combined
single limit, if there will be any use of Contractor's vehicles on the City's Premises
by or on behalf of the City, beyond normal commutes.
E.It is agreed that on Contractor's commercial general liability policy, the City of
Renton will be named as an Additional Insured on a non-contributory primary
basis. City's insurance policies shall not be a source for payment of any Contractor
liability.
F.Subject to City's review and acceptance, a certificate of i nsurance showing the
proper endorsements, shall be delivered to City before executing the work of this
Agreement.
G.Contractor shall provide City with written notice of any policy cancellation, within
two (2) business days of their receipt of such notice.
H.Additional Insurance if marked as ''Required" by City:
1.□ Required. Builders Risk insurance covering interests of the City, the
Contractor, Subcontractors, and Sub-contractors in the work. Builders Risk
i nsurance shall be on a special perils policy form and shall insure against
the perils of fire and extended coverage and physical loss or damage
including flood, earthquake, theft, vandalism, malicious mischief, and
PAGE50F12
Docusign Envelope ID: 2832FDBE-1280-4C12-9FFF-C12789F53396
collapse. The Builders Risk insurance shall include coverage for temporary
buildings, debris removal and damage to materials in transit or stored off
site. This Builders Risk insurance covering the work will have a deductible
of $5,000 for each occurrence, which will be the responsibility of the
Contractor. Higher deductibles for flood and earthquake perils may be
accepted by the City upon written request by the Contractor and written
acceptance by the City. Any increased deductibles accepted by the City will
remain the responsibility of the Contractor. The Builders Risk insurance
shall be maintained until final acceptance of the work by the City.
2.□ Required. Contractors Pollution Liability insurance covering losses
caused by pollution conditions that arise from the operations of the
Contractor. Contractors Pollution Liability insurance shall be written in an
amount of at least $1,000,000 per loss, with an annual aggregate of at least
$1,000,000. Contractors Pollution Liability shall cover bodily injury,
property damage, cleanup costs and defense including costs and expenses
incurred in the investigation, defense, or settlement of claims.
If the Contractors Pollution Liability insurance is written on a claims-made
basis, the Contractor warrants that any retroactive date applicable to
coverage under the policy precedes the effective date of this contract; and
that continuous coverage will be maintained or an extended discovery
period will be exercised for a period of three (3) years beginning from the
time that work under the contract is completed.
The City shall be named by endorsement as an additional insured on the
Contractors Pollution Liability insurance policy.
If the scope of services as defined in this contract includes the disposal of
any hazardous materials from the job site, the Contractor must furnish to
the City evidence of Pollution liability insurance maintained by the disposal
site operator for losses arising from the insured facility accepting waste
under this contract. Coverage certified to the Public Entity under this
paragraph must be maintained in minimum amounts of $1,000,000 per loss,
with an annual aggregate of at least $1,000,000.
Pollution Liability coverage at least as broad as that provided under ISO
Pollution Liability-Broadened Coverage for Covered Autos Endorsement CA
99 48 shall be provided and the Motor carrier Act Endorsement (MCS 90)
shall be attached.
PAGE60F12
Docusign Envelope ID: 2832FDBE-1280-4C12-9FFF-C12789F53396
Approved as to Legal Form
Shane Moloney
Renton City Attorney
Small works Contract 8-1-24
PAGE110F12
Approved by Cheryl Beyer via email 1/10/2025