HomeMy WebLinkAboutChange Order - 9Docusign Envelope ID: 4AF021 FD-3246-4F29-8AF4-0290ABD7F622 Contract Title: Reconciliation Change Order No. 9 Highlands to Landing Pedestrian Lighting Phase II Contractor:Colvico, Inc. Contract No. :CAG-21-004 Federal Aid No. :N/A � Ordered by Engineer□Proposed by the Contractor (VECP) � Unilateral Original Contract: Current Contract: Date Date v�/;9 �, Date Estimated Net Change This Order: New Contract: Prepared By: Resident Engineer Reviewed By: Engineer of Record Reviewed By: �Manager City Attorney Date 9 □Lump Sum□Bid Item D Force Account Amount Working Days $330,490.83 60 $335,439.55 60 $10,724.41 0 $346,163.96 60 � By: 65 ,.� �u ngme�y of Renton Transportation �/4� Date Design Manager) Consent By: Surety (Greater than 25% cost and/or 20% Date time increase) Endorsed By: Contractor Date Executed By: Docus;gned bye G,Q�i���a��stucha 1/17/2025 City of Renton P u blic Works Date Administrator/ Mayor Change Order No. Contract Title: Highlands to Landing Pedestrian Lighting Phase II Contract No. CAG-21-004 Page 1 of 3 I 12:41 PM F CAG-21-004, CO #9-25 Reviewed By: Approved by Cheryl Beyer via email 1/9/2025