HomeMy WebLinkAboutChange Order - 290
Contract Title:Rainier Ave S Corridor Improvements —Phase 4
Change Order No.29
Contractor:
Contract No.:
Federal Aid No.:
Change Order No.
Contract Title:
Contract No.
Pivetta Brothers Construction,Inc.
CAG-22-163
STPUL4615(005)
Ordered by Engineer D Force Account
D Proposed by the Contractor (VECP)Bid ItemIUnilateralDBidItem Price Adjustment
Q Lump Sum
If yes,must receive concurrence from Local Programs
Affects DEE Work:No D Yes prior to execution.
Amount Working Days
Original Contract:$28,284,172.90 500
Current Contract:$35,296,321.28 654
Estimated Net Change This Order:$27,621.89 0
New Contract:$35,323,943.17 654
ep red By:Is e By:.
It7/2
Re ident Engineer Date E4gineer (City of Renton Transportation Date
Design Manager)
Reviewed By:Consent By:,
1/8/2025
Egineerof Record Date Surety (Greater than 25%cost and/or 20%Date
time increase)
Reviewed By:Endorsed By:%Lk 1/9/2025
City f Renton r ject Manager Date Contractor Date
Reviewed By:Executed By:
City Attorney Date City of Renton Public Works Date
Administrator /Mayor
/g /i;
29
CAG-22-163
Rainier Ave S.Corridor Improvements —Phase 4
Page lof 16
Docusign Envelope ID: FBD8946C-B35D-4718-BED6-FB625D986CDA
1/17/2025 | 2:44 PM PST
^EydW'
'ͲϮϮͲϭϲϯ͕KηϮϵͲϮϱ
Approved by Cheryl Beyer via email 1/9/2025
Contract Title:
Change Order No. 29
Rainier Ave S Corridor Improvements -Phase 4
Contractor: Pivetta Brothers Construction, Inc.
Contract No.: CAG-22-163
Federal Aid No.: STPUL-1615(005)
181 Ordered by Engineer □Force Account□Proposed by the Contractor (VECP)181 Bid Item □Unilateral □Bid Item Price Adjustment□Lump Sum
Affects DBE Work: 181 No D Yes If yes, must receive concurrence from Local Programs
Original Contract:
Current Contract:
Estimated Net Change This Order:
New Contract:
�
dBy:
�,�
Reviewed By:
�� Erl'gineer'o(Record -----::
Reviewed By:
r ject Manager
Reviewed By:
City Attorney
29
prior to execution.
1{.1L20,,
Date
1/8/2025
Date
1/9/2025
Date
Date
Amount Working Days
$28,284,172.90 500
$35,296,321.28 654
$27,621.89 0
$35,323,943.17 654
r/4�� gineer (City of Renton Transportation
Design Manager)
Consent By:
Surety (Greater than 25% cost and/or 20%
time increase)
Endorsed By:
B .11 Ad Digitally signed by Bill Adams
1 ams �;�s ���ga?da�0
Contractor
Executed By:
City of Renton Public Works
Administrator/ Mayor
f/qf...��-
'oate
Date
1/20/2025
Date
Date
Change Order No.
Contract Title: Rainier Ave S. Corridor Improvements -Phase 4
Contract No. CAG-22-163
Page 1 of 16
THE CONTRACT IS MODIFIED AS FOLLOWS:
Description of Change:
This Change requires the Contractor to remove and dispose of sections of asbestos
concrete pipe in an approved facility in accordance with all local,state,and federal
regulations.
Proposal Schedule of Prices:
ADD the following to Schedule A:
29-C22 -Removal and Disposal of Asbestos Concrete Pipe,$DAY @ $3,136.00 =
$25,088.00
Specification and/or Special Provision:
SP 2-02.3(2)is supplemented as follows:
Removal and Disposal of Asbestos Material
Prior to performance of any contract work,the Contractor shall obtain all
permits from and provide notification to,the Washington State Department of
Labor and Industries,the Washington State Department of Ecology,the local
clean air agency,and other permitting and regulatory agencies with jurisdiction
over the work involving asbestos as the laws,rules,and regulations require.
Prior to commencing asbestos related work,the Contractor shall submit as a
Type 1 Working Drawing any and all written verification of approvals and
notifications that have been given and/or obtained from the required
jurisdictional agencies.The Contractor shall include a schedule of activities for all
work involving asbestos removal as part of the Type 1 Working Drawing.
Asbestos related work shall also be shown on the Contractor’s project progress
schedule.
The Contractor shall designate a Washington State Certified Asbestos Supervisor
(CAS),certified in accordance with WAC 295-65-012,to supervise the asbestos
removal and to ensure that the handling and removal of asbestos is
accomplished by certified asbestos workers,pursuant to Washington State
Department of Labor and Industries standards.The Contractor shall ensure that
the removal and disposal of asbestos meets the requirements of EPA regulation
40 CFR Part 61,local health department regulations,and all other applicable
regulations.
The Contractor shall ensure the safety of all workers,visitors to the site,and the
public in accordance with all applicable laws,rules,and regulations.
Change Order No.29
Contract Title:Rainier Ave S.Corridor Improvements —Phase 4
Contract No.CAG-22-163
Page 2 of 16
Docusign Envelope ID: FBD8946C-B35D-4718-BED6-FB625D986CDA
Description:
None.
Materials:
None.
Measurement:
2-02.4 is supplemented with the following:
“Removal and Disposal of Asbestos Concrete Pipe,”per day.
The per day cost of “Removal and Disposal of Asbestos Concrete Pipe”shall consist
of all work required to remove and dispose of the asbestos concrete pipe in
compliance with the specifications.
Payment:
2-02.5 is supplemented with the following:
“Removal and Disposal of Asbestos Concrete Pipe,”per day.
Materials Specifications:
None.
Plans:
None.
Reason for Change:
During the course of construction,it was discovered that sections of existing sanitary sewer
pipe to be removed between MH2145 —MH6345 and MH2111 —MH2112 contain asbestos.
This pipe to be removed was not identified in the plans as containing asbestos.Asbestos
Containing Material (ACM)necessitates specialized handling,removal,and disposal
procedures that comply with all applicable asbestos abatement regulations.This Change is
necessary to cover the additional costs associated with the removal,transportation,and
disposal of the ACM at an approved facility.
Equitable Adjustment:
This Change Order does include an equitable adjustment per Section 1-09.4 of the 2022
WSDOT/APWA Standard Specifications.See attached.
Change Order No.29
Contract Title:Rainier Ave S.Corridor Improvements —Phase 4
Contract No.CAG-22-163
Page 3 of 16
Docusign Envelope ID: FBD8946C-B35D-4718-BED6-FB625D986CDA
Estimated Cost:$27,621.89
Extended Overhead:$0.00
Force Account Time related $0.00
damages per 1-09.6.6.d:
Total:$27,621.89
29-C22 -Removal and Disposal of Asbestos Concrete Pipe
An independent estimate was prepared for the cost of Removal and Disposal of
Asbestos Concrete Pipe.This was calculated to be $3,777.54 per day.The
Contractor’s quote of $2,800.00 plus markup ($336.00)per day is accepted.The
estimated cost of Removal and Disposal of Asbestos Concrete Pipe is $3,136.00/day
($25,088.00 for 8).
Extension of Time:The Time for Completion is extended 0 Working Days.
Affects DBE Work:
No.
Sections 1-04.4 and 1-04.5 of the 2022 WSDOT/APWA Standard Specifications shall govern
this Change Order.The Work of the referenced Contract is modified to include the changes
detailed herein.The payment provided for herein shall constitute the complete and final
settlement for all costs of labor,equipment,materials,overhead,profit,permit fees,and all
other claims that may be made by the Contractor as a result of this change.
To be attached to Change Order:
1-Estimated Change Order Cost
2-Plans
fl 3-Field Directive/Request for Information Response
4-Change Order Quotation
5-Project Labor List
El 6-Force Account Equipment Rate Request (DOT Form 422-010 EF)
El 7-Equitable Adjustment Determination
El 8-Additional Working Days Calculation
Change Order No.29
Contract Title:Rainier Ave S.Corridor Improvements —Phase 4
Contract No.CAG-22-163
Page 4 of 16
Docusign Envelope ID: FBD8946C-B35D-4718-BED6-FB625D986CDA
AC Pipe Removal -Estimated Change Order Cost
Change Order Cost (Equitable Adjustment)Change Order No.29
Project Name:Rainier Ave S Corridor Improvements -Phase 4
Contractor:Pivetta Brothers Construction,Inc.
Contract No:CAG-22-163
Federal Aid No:STPUL-1615f 005)By:Shannon Tremper
Construction Manager:Perteet Date:10/17/2024
Item No.Description Quantity Unit Unit Price Estimated Cost
Independent Cost Estimate
29-C22 Removal and Disposal of Asbestos Concrete Pipe
Labor (Foreman)-Pivetta 32 Hours $142.50 $4,560.00
Labor.(Operator(-Pivetta 64 Hours $127.50 $8,160.00
Labor -(Truck Driver)-Pivetta 12 Hours $85.00 $1,020.00
Labor Markup $13,740.00 Cents/Dollar $0.31 $4,259.40
Equipment.(Flatbed Trucks)-Pivetta 64 Hours $40.00 $2,560.00
Equipment-)Dump Truck)-Pivetta 12 Hours $72A30 $864.00
Equipment Markup $3,424.00 Cents/Dollar $0.21 $719.04
5ervices-(Dump Feel .Pivetta 8 EA $500.00 $4,000.00
Services Markup $4,000.00 Cents/Dollar $0.21 $840.00
CALCULATED TOTAL:$26,982.44
Subcontractor Markup 12%:$3,237.89
TOTAL:$30,220.33
CALCULATED TOTAL PER DAY:$3,777.54
ESTIMATED TOTAL PER DAY:$3,136.00[Item Change Schedule C
29-C22 Removal and Disposal of Asbestos Concrete Pipe 8 DAY $3,136.00 $25,088.00
Tax (Schedule C)$2,533.89
TOTAL:$27,621.89
Summary of Contractors Quotes:
Item Quote Location Estimated Cost
$2,800.00/day for 8 days,÷ markup
Serial Lettero49 .$10,000 in lost production
Total Quoted Added Cost:$37,104.00
Change Order #29,Page 5 of 16
Docusign Envelope ID: FBD8946C-B35D-4718-BED6-FB625D986CDA
ovaI -Change Order Quotation
)1812 Pease Avenue Sumner WA 98390 www.piveua.com IT:253.862.7890 I
F:253.470.5008
October 12,2024
To:Michelle faltaous
City of Renton
1055 South Grady Way
Renton,Washington 98057
Reference Project:CAG-22-163,Rainier Ave S Corridor Improvements —Phase 4 Project
Subject:PCO-062 -Asbestos Sewer Pipe
Mrs.Michelle Faltaous:
Pivetta Brothers Construction,Inc (Pivetta)has discovered two runs of existing 8in diameter
asbestos concrete sewer pipe that must be removed per contract.The two runs are located at S
Tobin St (—Rainier Ave STA 28+50)and S 2nd St (—Rainier Ave STA 19+60]and equate to
approximately 120 lineal feet.
The concrete sewer pipe at S Tobin St was tested by Jordan Widener of Widener &Associates
and confirmed to be Non-Fibrous Asbestos on September 26,2024.The concrete sewer pipe at
5 2’’St was discovered around October 2,2024 and was identical to the asbestos concrete pipe
at S Tobin St
In Ms.Widener’s email it is stated “for Washington State,the removal of non-friable asbestos-
containing waste does not require a licensed asbestos contractor...”.Pivetta does not specialize
in asbestos pipe removal and reached out to firms that specialize in asbestos to ensure it was
handled safely/properly per local agency guidelines.Both firms informed Pivetta that per LNI
(Labor and Industries)and PSCAA (Puget Sound Clean Air Agency)work with asbestos pipe
needs to be performed by an asbestos company.
Pivetta believes the presence of asbestos concrete sewer pipe is a differing site condition and
requests a change order for removal and disposal of asbestos concrete sewer pipe.
Pivetta has received pricing from 3 Kings Environmental for a cost of $2,800 per day to
remove,handle and dispose of asbestos concrete pipe.Pivetta estimates 3 Kings
Environmental would need to be onsite for approximately eight days.This would allow four
days for each sewer run to removed.Pivetta also believes careful removal of this asbestos pipe
in full sticks will require extra time during the shift that can be assessed and agreed upon by
Pivetta’s crews and the City of Renton inspector in the field.Pivetta typically has the ability to
crush concrete pipe into the excavation spoils for quick removal and must now carefully
expose and removal the pipe in full sticks.Pivetta estimates the associated cost as follows:
Serial Letter:049
Change Order #29,Page 6 of 16
Docusign Envelope ID: FBD8946C-B35D-4718-BED6-FB625D986CDA
AC Pipe Removal -Change Order Quotation
3 Kings Environmental $2,800 per day over 8 days:$22,400
Pivetta Prime Markup:$4,704
Pivetta Loss of Production:$10,000
Total Cost:$37,104
Pivetta requests an asbestos pipe force account bid item in order to be compensated for 3
Kings Environmental asbestos pipe removal/disposal and for quantifiable loss of production
during trench excavation/pipe removal.
Please feel free to contact me at (206)617-3978,if you have any questions or concerns.
Respectfully,
Russell Owen
Project Engineer
w/Attachments:
3 Kings Environmental Proposal.pdf
Asbestos Pipe Test Results.pdf
Additional Asbestos Pipe Discovered.pdf
Cc:
Jordan Howe,Perteet
Bill Adams,Pivetta
Change Order #29,Page 7 of 16
Docusign Envelope ID: FBD8946C-B35D-4718-BED6-FB625D986CDA
AC Pipe Removal -Change Order Quotation
3 Kings Environmental
Proposal
ENVIRONMENTAL •EXcAVATING •DEMO
October 9,2024
To:Pivetta Brothers Construction,Inc.Proposal #P24630
Russell Owen
1812 Pease Ave
Sumner,WA 98390
RE:Renton Rainier Ave Ph 4
Rainier Ave
Renton,WA 98057
Mr.Owen:
Thank you for the opportunity to submit a proposal for asbestos abatement of the above-mentioned project.
3 Kings Environmental Inc.will provide labor,materials,equipment,and disposal to perform the following:
Base Bid -Perform asbestos abatement of the 8”asbestos-containing pipe (up to 120 Lf).Assumes pipe is to be
fully exposed by others,with assistance to remove pipe from trench.Excludes shoring.Assumes 2 person crew.
removing up to 50 LF per day.Enctudes permits,disposal,and materials.
Price $2,800.00/Day
This proposal is valid for 30 days from proposal date.Schedule to be determined based on mutual agreement.
Proposal exclusions
State taxes or fees,bonds,permits &fees (with the exception of clean air,L&I,or DEQ notifications),<1%materials,
additional insurance coverages,all other hazardous materials,salvage for others,lead abatement,repairs to ceiling caused
by abatement in attic or nail pops,others to make “safe”for removal,work area to be clear and free of all
furnishings/debris,any repairs or replacement of disturbed materials,private or publicly installed utilities,shoring,
temporary walls and coverings,industrial hygienist,weatherproofing,unforeseen conditions not normally found in this type
of construction,accelerated schedule.Layout to be provided by general contractor.This proposal is to become a part of the
contract.In case of any conflict between the terms of this proposal and those of the bid documents in this contract,the
terms of this proposal control and supersede the terms contained in the bid or contract documents.
If you have any questions,feel free to contact me.
Ewuy We-Iw
Project Manager
3 Kings Environmental,Inc.
Phone:253-750-4143
Fax:360-666-8202
eweisst3kingsinc.com
fed ID #9 1-1724720 Contractors Registration #3KINGE e Order #29,3c15284
Docusign Envelope ID: FBD8946C-B35D-4718-BED6-FB625D986CDA
AC Pipe Removal -Change Order QuotationAsbestosPipeTestResults
Russell Owen
From:Jordan Widener <jordancw@widener-enviro.com>
Sent:Thursday,September26,2024 12:48 PM
To:Jordan Howe;Russell Owen;Anthony Trail
Cc:Michelle Faltaous;Bill Adams
Subject:FW:Your completed NVL Report document:Rainer Ave S Renton
Attachments:241 7335d.pdf
Hi All,
Asbestos results are back on the culvert.We are positive for Non-Fibrous Asbestos and need to send in a
notification/permit to remove the pipe.I will start on the application but need the following details:
•How long is the segment of pipe that needs to be removed?
•What is the total quantity removed?
•How will the pipe be handled?
o Crushed in place or hauled off to a landfill?
o If hauled off,what landfill will it be hauled to?(see link for landfill requirements
https://www.psclea nair.gov/193/Disposal-Facilities)
Also,for Washington State,the removal of non-friable asbestos-containing waste does not require a licensed asbestos
contractor if the material is in good condition and handled appropriately.However,it’s essential to follow the chosen
landfill’s disposal guidelines for handling,transport,and disposal to ensure safety and compliance!
Thanks,
Jordan W.
Widener &Associates
510-725-2291
From:clientservices@nvllabs.com <clientservices@nvllabs.com>
Sent:Thursday,September 26,2024 12:10 PM
To:Jordan Widener <jordancw@widener-enviro.com>
Subject:Your completed NVL Draft Report document:Rainer Ave S Renton
Your requested analysis is complete,ptease see the attached document:
Client Job Number:RainerAveS.
NVL Labs Batch ID:2417335
Company Name:Widener &Associates (W&A)
Project Location:Renton
Date:9/26/2024
Thank you for choosing NVL Labs,we appreciate your business!
Thanks &Regards,
Client Services
NVL
1kDLJSTIAL HG!NE SIRVICIS
UIQRMOP.Y •WHL6EHtiI *
1
Change Order #29,Page 9 0116
Docusign Envelope ID: FBD8946C-B35D-4718-BED6-FB625D986CDA
AC Pipe Removal -Change Order Quotation
Asbestos Pipe Test Results
www.nvllabs.com
Your feedback is very important to us!
ph:206.547.0100
I
fax:206.634.1936
toll free:1.888.NVLLABS (685.5227)
4708 Aurora Avenue North,Seattle,WA 98103
1 Please consider the environment before printing this email message.
Disclaimer:This message contains confidenbal information and is intended only for use by the intended recipients.If you are not the intended recipient you should not disseminate,
disbibute or copy this e-mail.Please notify the sender immediately by e-mail if you have received this e-mail by mistake and delete this e-mail from your system.E-mail transmission
cannot be guaranteed to be secure or error-free as information could be intercepted,corrupted,lost,destroyed,arrive late or incomplete,or contain viruses.The sender therefore does
not accept liability for any errors or omissions in the contents of this message,which arise as a result of e-mail transmission.Ifverification is required please request a hard-copy version.
2
Change Order #29,Page 10 of 16
Docusign Envelope ID: FBD8946C-B35D-4718-BED6-FB625D986CDA
AC Pipe Removal -Change Order Quotation •:
Asbestos Pipe Test Results
Bulk Asbestos Fibers Analysis
By Polarized Light Microscopy
Client:Widener &Associates (W&A)Batch #:2417335.00
Address:1902 120th P1.SE Suite 202 Client Project #:Rainer Ave S.
Everett,WA 98208 Date Received:9/25/2024
Samples Received:1
Attention:Mr.Jordan Widener Samples Analyzed:1
Project Location:Renton Method:EPAI600IR-93/1 16
Lab ID:24102830 Client Sample #:Rainer Ave S Con.Pipe
Location:Renton
Layer I of I Description:Light brown brittle material
Non-Fibrous Materials:Other Fibrous Materials:%Asbestos Type:%
Binder/Filler,Fine particles,Fine grains None Detected ND Chrysotile 17%
Crocidolite 13%
[AnaIYZed by:Hilary Crumley Date:09/26/2024 0 RA FT
Note:If samples are not homogeneous,then subsamples of the components were analyzed separately.All bulk samples ate analyzed using both EPA
600/R-93/1 16 and EPA 40 CFR Appendix E to Subpart E of Part 763 with the following measurement uncertainties for the reported %Asbestos (1 %0-3%,
5%=1-9%,1O%=5-15%,20%=10-30%,50%=40-60%).This report relates only to the items tested.If sample was not collected by NVL personnel,then the
accuracy of the results is limited by the methodology and acuity of the sample collector.This report shall not be reproduced except in full,without written
approval of NVL Laboratories,Inc.It shall not be used to claim product endorsement by NVLAP or any other agency of the US Government.
ASB-02 a el of 3
ChangeOrder#29,Pagellofl6
Docusign Envelope ID: FBD8946C-B35D-4718-BED6-FB625D986CDA
Asbestos Pipe Test Results
Company Widener &Associates (W&A)
Address 1902 120th P1.SE Suite 202
Everett,WA 98208
Mr.Jordan Widener
(425)348-3059
(510)725-2291
NVL
NVL Batch Number 2417335.00
TAT 1 Day AH No
Rush TAT
Due Date 9/26/2024 Time 1:30 PM
Email jordancw@widener-enviro.com
Fax
Print Name Signature Company Date Time
Sampled by Client
-
Relinquished by Client
Office Use Only Print Name Signature Company Date Time
Received by Kelly AuVu 9/251?4 1330
Analyzed by Hilary Crumley 9/26/24
Results_Called_by
D Faxed D Emailed
Special
Instructions:
Date:9/252024
Tme 2:03 PM
Entered By RacheUe MWer
AC Pipe Removal -CA BOiciORATORY SERVICES •:
Project Manager
Phone
Cell
Project Name!Number:Rainer Ave S.Project Location:Renton
Subcategory PLM Bulk
Item Code ASB-02 EPA 600/R-93-1 16 Asbestos by PLM <bulk>
Total Number of Samples 1 Rush Samples
Lab ID Sample ID Description A/R
1 24102830 Rainer Ave S Con.Pipe A
page 2 of 3
Change Order #29,Page 12 of 16
Docusign Envelope ID: FBD8946C-B35D-4718-BED6-FB625D986CDA
AC PirDe..Remoal -Cbana Order Quotation 241 7AsbestosiipelestR5(1It5
Asbestos
WALK-IN Lead
INDUSTRIAL NYGIRUS SAM PIE SUBMITTAL FORM Mold
RD*1OR MAENtI II4IIIIT Other (specify)
t’lo-V1..S Sk2ô (610)W5
Eie.c WA oi r”£Wv(’C”
AvLS..
Pricing 1-Hr 2-Hr 4-Hr 1-Day J 1 Hour (Asbestos only)
Asbestos 10500 93.50 82.50 J 2 Hours (Lead only)
Lead N/A 104.50 93.50 82.50 J 1 Hours (Asbestos,Lead,&Mold)
Mold N/A N/A 150.00 99.00 24 Hours (Asbestos,Lead,&Mold)
Total Number of Samples i
i
Desci iption
____
1
5 —
_______________-
Pr’.:.Time
Samiled U’
Relinquish by
Office Use Only
Sc .‘.tur (_‘.fllra .—
ececedbv _Q_[
/4A4---—I ‘
A ‘alvze.i by —._I
Called by —-
_______________________
Fa’ed/Ernii)by
4708 Aurora Ave N,Seattle,WA 98103 p 206 547.0100 I
f 206.634.1936 I www.nvllabs.com
Change Order #29,Page 13 of 16page3of3
Docusign Envelope ID: FBD8946C-B35D-4718-BED6-FB625D986CDA
AC PiQe Removal -Chanqe Qrder QuotationAdditionalAsbestosPipeDiscoverect
Russell Owen
From:Russell Owen
Sent:Monday,October 7,2024 6:17 AM
To:Jordan Widener;Jordan Howe;Anthony Trail
Cc:Michelle Faltaous;Bill Adams
Subject:RE:Your completed NVL Report document:Rainer Ave S Renton
Attachments:asbestos pipe two runs.pdf
Jordan W/Miche[le,
I’m working on getting dumpsite identified and wi[[[et you know short[y.
We encountered more asbestos pipe at the existing 2nd St sewer crossing [ate ast week when we were
removing/reptacing SSMHO3.The pipe materiat is the same as before so we wi[t just ptan on treating this as the
same asbestos pipe as was found/tested down at Tobin.
Thanks,
RUSSELL OWEN
VEU
1812 Pease Avenue
Sumner,WA 98390
From:Jordan Widener <jordancw@widener-enviro.com>
Sent:Thursday,September 26,2024 3:32 PM
To:Russell Owen <Russell@pivetta.com>;Jordan Howe <jordan.howe@perteet.com>;Anthony Trail
<anthony@ pivetta .com>
Cc:Michelle Faltaous <MFaltaous@Rentonwa.gov>;Bill Adams <bill@pivetta.com>
Subject:RE:Your completed NVL Report document:Rainer Ave S Renton
No copy yet,I will get it filled out and apply later today.
Thanks,
Jordan W.
Widener &Associates
510-725-2291
From:Russell Owen <Russell@pivetta.com>
Sent:Thursday,September 26,2024 3:30 PM
To:Jordan Widener <ordancw@widener-enviro.com>;Jordan Howe <iordan.howe@perteet.com>;Anthony Trail
<anthonypivetta.com>
Change Order #29,Page 14 of 16
Docusign Envelope ID: FBD8946C-B35D-4718-BED6-FB625D986CDA
91
.
1
0
9
1
.
6d
‘6
J
0
p
J
Q
0
6
u
2
q
3
ps
J
e
A
o
D
s
T
Q
Od
i
d
so
s
q
s
v
!‘
-
‘
O
f
l
T
P
P
v
uo
q
e
;
o
n
op
.
i
r
j
o6
u
e
q
-
IB
A
O
W
O
d
ad
!
d
DV
31
0
0
1
0
1
0
31
0
0
od
f
i
3
V
l
O
i
O
i
•o
o
11
0
8E
81
0
Qg
+
3
3
VI
S
01
90
9
VI
S
NV
’
l
d
SN
O
I
I
I
C
N
O
D
ON
I
I
S
I
X
J
(i
d
CU
E
MN
01
1
0
1
CU
E
s(
V
30
1
0
-
I
d
-
SI
N
3
I
N
3
0
0
U
d
V
I
I
HO
C
I
H
U
O
D
S
3M
U3
I
N
I
V
U
01
3
1
0M
M
.0
9
IH
O
I
M
I
Mo
l
d
09
U
V
3
l
1
l
lO
t
MD
I
I
I
00
0
9
0
0
zr
t
Mo
l
d
3d
0
3
0
0
1
0
1
Ot
t
Mo
l
d
00
1
0
0
1
0
0
NO
I
I
O
Z
I
1
3
N
M
O
O
3
I
Mo
l
d
13
3
N
M
0
3
0
3
1
0
0
M3
1
0
M
W
W
l
l
i
l
10
1
0
3
00
OZ
O
O
r
/
U
1
3
0
3
0
0
0
rr
’
’
0
’
b0
0
0
3
3
-
v
1
o
r
o
33
0
00
Na
I
J
1
9
0
3
1
01
1
0
0
1
3
1
10
1
1
1
1
0
1
0
M
0
0
l0
d
l
1
0
O
l
d
d
r
.o
.
,
r
01
0
ro
o
d
NO
I
N
3
N
JO
AI
D
Q
ai
e
or
00
1
31
0
0
3
1
0
0
-D
M
3
1
1
11
1
1
0
0
ON
I
O
n
10
1
Mo
l
d
10
M
3
1
1
Al
l
_
n
f
l
IN
0
0
1
10
1
31
3
0
1
d
03
1
0
1
Mo
l
d
13
1
A
M
TM
4
0
0
d
13
0
3
0
_J
S
L
_
Mo
l
d
03
0
3
0
lb
31
1
0
1
d
31
0
1
1
0
1
0
30
MI
l
d
39
1
0
1
1
1
0
00
31
1
3
0
1
d
00
1
1
0
0
1
00
Mo
l
d
00
1
0
0
0
1
OH
MI
l
d
30
3
1
0
Mo
0
0
0
0
d
I
l
d
31
0
It
MI
l
d
01
0
0
1
8
0
9
3
DM
1
1
0
3
3
13
3
0
0
11
0
0
3
1
0
3
I
I
I
I
I
I
13
3
1
MI
31
1
1
3
0
00
OH
00
CL
0
I
I
I
51
3
3
H
S
ON
I
C
N
O
d
S
3
U
U
O
O
V1
I
d
S
0
H
SN
I
H
S
I
N
N
f
l
I
SI
N
O
d
S
AN
V
N
I
N
3
I
3
A
3V
d
O
H
S.
A
0
0
f
l
8
AI
I
A
V
U
S
NO
I
N
J
U
‘c
:
C
.
-
I
-
13
1
0
1
d
Oo
M
3
N
3
1
0
1
d
N
I
-,
-
--
I
-
11
1
0
1
0
00
0
1
0
0
9
0
0
18
-
-
83
1
3
0
0
1
0
0
0
1
3
ot
I
lL
03
)
1
lD
T
O
M
d
01
M
3
H
3
1
0
M
d
M
I
“—
7
11
1
0
1
0
01
0
0
1
0
0
9
0
0
18
IN
V
O
V
A
u-
.
(,
,
7
03
1
3
0
0
1
0
1
0
3
38
01
00
.9
1
‘4
’
,4
_
,
-
-
r
“i
-
o
-
A
(L
I
33
0
4
i
,t
.
‘-
/
r
-
‘-
I
-
I
VN
’
-
’
1
/
aw
I
i
q
o
v
i
/
/L
I
ld
H”
-
H
:t
*
--
-
-C
U,U,
H
-r
XO
M
3
d
d
H
00
9
1
.
1
3_
n
I
l
O
d
0
13
1
3
1
0
9
3
11
1
1
1
0
33
0
MO
I
I
I
M
1
0
d
N
I
05
1
I
O
d
00
9
0
1
1
3
09
3
lO
U
d
I
=
11
1
0
3
1
M
1
09
5
1
0
9
3
11
8
11
1
3
M0
1
1
0
1
0
1
d
1
3
33
1
3
1
0
0
1
0
0
90
M0
0
3
0
1
1
0
M
0
3
10
9
01
Mo
I
l
d
03
1
3
0
1
1
0
3
38
10
0
0
03
3
0
1
0
3
0
09
1
0
3
0
1
11
0
33
1
3
0
1
0
0M
r
0
1
3
1
3
&
1
f
l
11
0
CM
I
11
0
31
0
3
0
3
0
3
00
0
31
0
3
0
1
10
3
1
1
3
01
3
1
0
1
1
1
.
1
00
9
1
3
0
0
1
0
9
3
30
1
10
(D
M
0
0
0
3
3
0
30
11
0
0
9
00
0
0
9
03
0
0
M
1
1
(
13
1
00
0
0
11
0
10
1
31
9
0
0
0
9
d
0
3
0
10
0
1
39
01
03
3
0
9
0
01
0
‘1
0
9
1
01
3
0
1
3
8
1
0
0
3
31
0
3
3
8
03
1
1
3
0
1
0
90
0
1
0
0
3
10
5
09
1
0
3
0
1
13
0
0
3
31
1
30
1
1
0
3
1
3
0
11
0
0
0
00
1
3
0
0
1
0
9
3
30
1
11
0
9
10
1
Il
0
0
0
0
0
d
d
O
Mo
MI
00
0
0
0
31
0
00
0
0
St
O
l
i
d
11
0
0
—
0
0
90
09
0
0
9
0
0
0
00
0
3
3
1
‘0
0
9
0
8
IM
I
d
31
0
3
0
1
11
1
1
1
0
90
0
1
M]
0
9
1
30
0
‘0
0
3
0
0
1
09
0
0
0
00
‘0
0
3
1
0
1
0
11
1
0
1
0
OM
O
U
0
9
O
I
I
M
O
00
9
0
0
3
31
09
1
0
3
0
1
30
1
31
3
1
d
N
0
3
09
31
0
1
0
3
3
0
11
0
0
1
0
0
3
3
3
0
tO
M
SI
00
9
OI
O
I
1
0
9
9
0
J
M
I
31
0
0
1
1
1
0
10
3
0
HO
d
O
03
0
0
8
SI
II
33
M
]
I
M
3
I
M
O
3
0,
1
0
1
3
0
0
1
0
0
9
3
34
1
10
3
03
1
1
d
3
1
d
13
3
8
10
0
Mo
l
d
00
1
1
C
S
3M
U3
I
N
I
V
U
I
—
—
w
—
—
-
I
—
N
4o
d
9
f
4
1
.
-
—
I
31
/
/
—
-
/
3
_o
1
I
1
1
I
4
--
11
0
1
5
S3
I
O
N
1V
U
3
N
3
0
.1
3N
O
Z
O
L
f
l
V
JN
O
d
CN
V
1
S
I
01
8
I
NV
3
4
O
U
f
l
3
/
-
70
3N
V
1
HI
f
l
O
S
SO
d
OU
I
3
V
d
—
I
Docusign Envelope ID: FBD8946C-B35D-4718-BED6-FB625D986CDA
AC
Pi
p
e
Re
m
o
v
a
l
-
Ch
a
n
g
e
Or
d
e
r
Qu
o
t
a
t
i
o
n
Ad
d
i
t
i
o
n
a
l
As
b
e
s
t
o
s
Pi
p
e
Di
s
c
o
v
e
r
e
d
:5
.
,
.
.
.
.
5 “4
,
.
I
.4
-
Ch
a
n
g
e
Or
d
e
r
#2
9
,
Pa
g
e
16
of
16
C”
MC
D
O
N
A
L
D
’
S
.
GE
N
E
R
A
L
NO
T
E
S
z
BR
O
W
N
BE
A
R
CA
R
W
A
S
H
‘4
’
\%
\
F
(
1
zz
z
z
,
C
”
z
-r
“-
.-
(
:
f
f
4
-
_
_
_
Li
,
I—
1/
,
TO
M
M
Y
’
S
CA
F
E
RD0A.
CO
TH
I
S
PL
A
N
HA
S
BE
E
N
PR
E
P
A
R
E
D
IO
N
JA
I
L
CO
N
T
R
A
C
T
O
R
S
CO
N
H
E
M
E
N
C
E
.
IT
IS
BA
S
E
D
UP
O
N
BE
S
T
AV
A
I
L
A
B
L
E
IN
F
O
R
M
A
T
I
O
N
AN
D
IS
NO
T
NE
C
E
S
S
A
B
E
Y
AC
C
O
R
A
T
E
OH
CO
U
P
L
E
T
S
.
2.
TH
E
LO
C
A
O
O
N
HE
EX
I
S
T
i
N
G
UN
D
E
R
G
R
O
U
N
D
UN
I
T
Y
SY
S
T
E
M
S
,
AS
SA
G
A
N
AE
R
E
O
N
.
AR
E
TA
K
E
N
FR
O
M
OT
M
J
Y
Y
LO
C
A
T
E
PA
I
N
S
MA
R
K
S
,
RE
C
O
R
D
TR
A
I
l
i
N
G
S
,
OR
AS
—
B
U
I
L
T
PL
A
N
S
AN
T
AX
E
SA
O
A
T
I
IN
AN
AP
P
R
O
X
I
M
A
T
E
WH
O
ON
L
Y
SH
E
CO
N
T
R
A
C
T
O
R
SH
A
L
L
DE
T
E
R
I
M
N
E
TH
E
EX
A
C
T
LO
C
A
Y
U
N
Of
AL
L
EX
I
S
T
I
N
G
UT
I
L
I
T
I
E
S
BE
F
O
R
E
CO
M
M
E
N
C
I
N
G
WO
R
K
,
AN
D
AG
A
E
E
S
TO
BE
FU
L
L
Y
RE
S
P
O
N
O
B
L
E
FO
R
AN
Y
AN
T
AL
L
DA
M
A
G
E
S
WA
C
A
MI
G
H
T
RE
OC
C
A
S
I
O
N
E
D
BY
SH
E
CO
N
T
R
A
C
T
O
R
S
EM
I
G
R
E
TO
EX
A
C
T
L
Y
LO
C
A
T
E
AN
D
PR
E
S
E
R
V
E
AN
Y
AN
D
AL
L
UX
I
O
E
R
G
X
J
A
J
N
D
UT
I
L
I
T
I
E
S
.
AU
LO
C
A
T
O
R
SE
A
M
C
E
S
MO
O
T
BE
CO
N
T
A
C
T
E
D
PR
I
O
R
TO
AN
Y
CO
N
S
T
R
A
C
Y
G
N
OR
SU
B
S
U
R
F
A
C
E
EX
P
L
O
R
A
T
I
O
N
.
CA
L
L
BY
3.
CO
N
T
O
U
R
IN
T
E
R
V
A
B
.
T
FO
R
T
.
4.
tO
N
EH
T
S
T
N
G
PO
T
H
B
E
E
iN
F
O
R
M
A
T
I
O
N
DE
E
DO
U
T
Y
CO
N
F
L
I
C
T
H
PO
O
N
O
F
E
PL
A
N
S
,
AP
P
E
N
D
I
X
1.
29
+
0
0
S.
A.
‘.
0
W
’—3O
4
,
J
O
L—
-
.
-
+
I—
ST
A
R
B
U
C
K
S
PL
A
N
D
TO
2T
AK
6T
SC
A
L
E
IN
FE
E
T
CO
R
R
E
S
P
O
N
D
I
N
G
SH
E
E
T
S
CA
T
E
G
O
R
Y
ON
S
E
T
EE
S
T
I
N
G
CO
R
I
D
I
Y
O
N
S
PL
A
N
ND
SI
T
E
PR
E
P
A
R
A
T
I
O
N
&
TE
S
C
PL
A
N
51
RO
A
D
W
A
Y
PL
A
N
62
RO
A
D
W
A
Y
PR
O
F
I
L
E
,
DO
T
W
E
Y
E
G
0.
_
.
-
-
__
_
_
_
_
_
_
_
_
_
_
_
XE
O
I
O
N
X
Y
.T
L
_
_
CI
*
T
T
,
AS
SD
t
U
•
PR
O
]
MA
X
AL
_
_
__
_
_
_
_
_
_
_
_
ev
AP
P
.
DA
T
E
.1
.
IL
L
W7
A
-
C
X
G
U
T
X
I
E
t
h
i
N
I
DR
A
I
N
A
G
E
PL
A
N
OR
A
I
N
A
G
E
PR
O
F
I
L
E
SE
l
l
E
R
TE
A
R
DE
N
I
E
R
PR
O
F
I
L
E
11
1
1
5
WA
T
E
R
PL
A
N
WA
T
E
R
PR
O
F
I
L
E
DI
N
T
UT
I
L
I
T
Y
TR
E
N
C
H
PL
A
N
GW
SO
N
Y
UT
I
L
I
T
Y
TR
E
N
C
H
SC
H
E
M
A
T
I
C
15
6
It
L
J
M
I
N
A
Y
O
N
&
iN
T
E
R
C
O
N
N
E
C
T
PL
A
N
20
4
-
-
-
-C
I
T
Y
OF
RE
N
T
O
N
r
RA
I
N
I
E
R
AV
E
S
CO
R
R
I
D
O
R
IM
P
R
O
V
E
M
E
N
T
S
-
PH
A
S
E
4
BI
D
PA
N
S
W
,
,
A
S
D
.
S
A
X
R
.
O
(5
3R
D
ST
TO
NW
3R
D
PL
(
DO
C
U
M
E
N
T
NP
P
5
O
I
,
5
D
P
D
T
CO
N
S
T
R
U
C
T
I
O
N
EX
I
S
T
I
N
G
CO
N
D
I
T
I
O
N
S
PL
A
N
NY
DA
T
E
IU
/
2
2
/
2
T
Z
2
NI
P
S
ST
A
27
+
0
0
TO
ST
A
31
+0
0
CH
A
N
N
E
L
I
Z
A
T
I
O
N
A
SI
G
N
I
N
G
PL
A
N
23
2
LA
N
D
S
C
A
P
E
PL
A
N
24
2
UR
X
A
N
DE
S
I
G
N
25
4
IR
R
I
G
A
T
I
O
N
PL
A
N
26
7
RI
G
H
T
HE
WA
Y
PL
A
N
2B
0
DR
A
W
I
N
G
NO
.
40
PL
O
OW
NO
.
ST
P
i
I
X
J
A
S
TA
T
E
.A
I
T
.
G
G
A
G
G
SH
E
E
T
N
O
.
AS
OP
ST
E
Docusign Envelope ID: FBD8946C-B35D-4718-BED6-FB625D986CDA