No preview available
HomeMy WebLinkAboutChange Order - 31Docusign Envelope ID: 7F536D0F-73E4-455B-B0AA-BD040E1 F26C7 Contract Title: Change Order No. 31 Rainier Ave S Corridor Improvements -Phase 4 Contractor: Pivetta Brothers Construction, Inc. Contract No.: CAG-22-163 Federal Aid No.: STPUL-1615(005) 181 Ordered by Engineer 181 Force Account □Proposed by the Contractor (VECP)181 Bid Item □Unilateral □Bid Item Price Adjustment□Lump Sum Affects DBE Work: 181 No □Yes If yes, must receive concurrence from Local Programs Original Contract: Current Contract: Estimated Net Change This Order: New Contract: � Reviewed By: d�� �neeloi Record """ Reviewed By: Reviewed By: City Attorney 31 prior to execution. f '7 'l,,-2.C Date 1/9/2025 Date 1/10/2025 Date Date Amount Working Days $28,284,172.90 500 $35,323,943.17 654 $33,119.18 0 $35,357,062.35 654 ·m�-�v:ientonTransportation 1J�--lz< I Dfte Design Manager) Consent By: Surety (Greater than 25% cost and/or 20% Date time increase) Endorsed By: Contractor Date Executed By: DocuSigned by: Martin Pastucha 1;24;202s I 9:22 AM Ps1 City of Renton P s ••• Administrator/ Mayor Date Change Order No. Contract Title: Rainier Ave S. Corridor Improvements -Phase 4 Contract No. CAG-22-163 Page 1 of 7 CAG-22-163, CO #31-25 **SEE NEXT PAGE** Approved by Cheryl Beyer via email 1/15/2025 Change Order No.31 Contract Title:Rainier Ave S Corridor Improvements —Phase 4 Contractor:Pivetta Brothers Construction,Inc. Contract No.:CAG-22-163 Federal Aid No.:STPUL-1615(005) Ordered by Engineer 1 Force Account 1 Proposed by the Contractor (VECP)Bid Item Unilateral U Bid Item Price Adjustment Q Lump Sum If yes,must receive concurrence from Local Programs Affects DBE Work:No U Yes prior to execution. Amount Working Days Original Contract:$28,284,172.90 500 Current Contract:$35,323,943.17 654 Estimated Net Change This Order:$33,119.18 0 New Contract:$35,357,062.35 654 ‘iearedBy:Iss By:.\j\ R sident Engineer Date LE”ngineer (City’fenton Transportation /Date Design Manager) Reviewed By:Consent By: 1/9/2025 Ehgineet’tf Record Date Surety (Greater than 25%cost and/or 20%Date time increase) Reviewed By:Endorsed By: ‘,]1tz%.dk 1/10/2025 City’t1 RentonPject Manager Date Contractor Date Reviewed By:Executed By: City Attorney Date City of Renton Public Works Date Administrator!Mayor Change Order No. Contract Title: Contract No. 31 Rainier Ave S.Corridor Improvements —Phase 4 CAG-22-163 Page 1 of 7