GENERAL USE
PROPERTY TO BE USED FOR THE CONSTRUCTION OF PUBLIC
AND PRIVATE UTILITIES WITHIN THE ADJOINING RIGHT OF WAY,
EXCAVATION, GRADING, STRUCTURAL WALLS, SLOPE
STABILIZATION, TEMPORARY DEWATERING SYSTEM, BALLAST AND
TRACKS RELATING TO THE PROJECT. ACTIVITIES INCLUDE THE
TRANSPORT , STOCKPILING AND STAGING OF MATERIALS AS
LONG AS SUCH ACTIVITIES DO NOT EXTEND BEYOND THE HIGH
VISIBILITY FENCE SHOWN ON THE SITE PREP AND EROSION
CONTROL PLANS.
PARCEL # 2 (2523049087)
THE PARCEL HAS BEEN DIVIDED INTO SIX AREAS: AREA A, B, C, D, E AND F.
THESE AREAS WITHIN THE PARCEL HAVE BEEN DESIGNATED BY THE PROPERTY
q OWNER FOR PARTICULAR USES /ACTIVITIES AND ARE DESCRIBED BELOW
UNDER EACH LISTED AREA.
a
SEE THE DOCUMENT 'RENTON TCL 1 FINAL", RENTON TCL 2 FINAL", AND
'RENTON TCL 3 FINAL", INCLUDED IN APPENDIX F OF THE SPECIAL
PROVISIONS FOR THE TERMS AND CONDITION OF THE PROPERTY AND
T PROVISIONS FOR AREA A & B, C & D AND E & F, RESPECTIVELY. AREAS C
& D AND E & F ARE DENOTED AS AREAS A & B IN THEIR RESPECTIVE
a DOCUMENTS CONTAINED IN THE SPECIAL PROVISIONS.
GENERAL USE OF AREA A & B
a PROPERTY TO BE USED FOR THE CONSTRUCTION OF PUBLIC AND PRIVATE
o UTILITIES WITHIN THE ADJOINING RIGHT OF WAY, EXCAVATION, GRADING,
STRUCTURAL WALLS, SLOPE STABILIZATION, TEMPORARY DEWATERING SYSTEM,
N BALLAST AND TRACKS RELATING TO THE PROJECT. ACTIVITIES INCLUDE THE
TRANSPORT AND STAGING OF MATERIALS. THE CONTRACTOR MUST SUBMIT A
m REQUEST TO SOUND TRANSIT IF SIGNS OR BARRICADES ARE TO BE PLACED
WITHIN THE PROPERTY.
Z
E
v
FEDAID: STPUL-1276(004)
HPP-1276(005)
T SOME DATA ON RECORD DRAWINGS
IS BASED UPON INFORMATION
PROVIDED BY THE CONSTRUCTION
in CONTRACTOR TO THE CITY OF
.. RENTON, THE CORRECTNESS TO THIS
DATA HAS NOT BEEN VERIFIED.
UPRR • •
556.4�// 26+ 8.57 �r�W— _7�
TN01. 221 366.85' LT 7/
_.
/ STA 1020+93.15/-
333.12' LT
f //
O
2523049006 /
I/ CITY OF TUKWILA L /
z 7350 S 163RD ST
TUKWILA, WA 98055
Y6ECTION LINE S
STA 1026+44.95
50.00' LT
�/ TA 1020+89.91 / / / � / / 2523049022 /
j 50 G0' LT ///�
/ / ✓ / / BNSF
� Z L � L2`Os 2o''E,11 11_111/1 1_
555.04'
CONSTRUCTION "BNSF ROW" LINE
� BNSF -�.- � •
1021+00 N2° 06' 0"E 1022+00 1023+00 1024+00 1 _ _1025+00 _ 1026+00
MATCH LINE (SEE SHEET ES-5)
GENERAL USE OF AREA C & D
PROPERTY TO BE USED FOR THE CONSTRUCTION OF TEMPORARY TIEBACKS
AND/OR GROUND ANCHORS. THE TIEBACKS/GROUND ANCHORS SHALL BE
ALLOWED TO REMAIN IN PLACE. THE CONTRACTOR SHALL SUBMIT AN
AS -BUILT PLAN TO SOUND TRANSIT WITHIN 60 DAYS OF AFTER INSTALLATION.
ALLOWED ACTIVITIES INCLUDE TRANSPORT AND STAGING OF MATERIALS,
EXCAVATION, GRADING, STRUCTURAL WALLS, SLOPE STABILIZATION,
TEMPORARY DEWATERING SYSTEM, BALLAST AND TRACKS RELATING TO THE
PROJECT. THE CONTRACTOR MUST SUBMIT A REQUEST TO SOUND TRANSIT IF
SIGNS OR BARRICADES ARE TO BE PLACED WITHIN THE PROPERTY.
AREA A,C&E
THE FOLLOWING CONSTRUCTION ACTIVITIES ARE ALLOWED:
THE STAGING AND STOCKPILING OF MATERIALS AND ANY EQUIPMENT THAT
ARE TO BE USED SOLELY FOR THE PURPOSE OF THE CONSTRUCTION OF THE
SHOOFLY EMBANKMENT LOCATED WITHIN THE BNSF RIGHT-OF-WAY.
' 31.50'
lUITSWOR11907
THE CONSTRUCTION OF A TEMPORARY HAUL ROAD COMPRISED OF QUARRY
SPALLS AND GRAVEL TO BE USED TO SUPPORT THE CONSTRUCTION ACTIVITIES
DESCRIBED ABOVE IS ALLOWED. TEMPORARY HAUL ROAD WILL REMAIN IN
PLACE AT THE END OF CONSTRUCTION.
AREA B.D&F
THE FOLLOWING CONSTRUCTION ACTIVITIES ARE ALLOWED:
THE STAGING AND STOCKPILING OF MATERIAL NECESSARY TO CONSTRUCT A
FUTURE TWO-LANE ROADWAY WITHIN AREA B. THE ELEMENTS ASSOCIATED
WITH THE TWO LANE ROAD INCLUDE THE ASPHALT, CURB &GUTTER, AND
\\\\\I
C \ \ \ \ J
STORMWATER COLLECTION SYSTEM TO BE MAINTAINED BY THE CITY OF
RENTON. CONSTRUCTION OF A TEMPORARY 30' WIDE HAUL ROAD. TEMPORARY
HAUL ROAD SHALL REMAIN IN PLACE AT THE END OF CONSTRCUTION.
f///�
'��
PARCEL # 39 (2523049022)
SEE UNDERPASS AGREEMENT IN APPENDIX D OF SPECIAL
PROVISIONS FOR EASEMENTS IN BNSF ROW
NOTE: STATIONS & OFFSETS ARE TO THE CONSTRUCTION ALIGNMENT "BNSF ROW"
RECORD ...._. AS SHOWN
BergerABAM DRAWING
33301 9th Avenue South, Suite 300 BEES
DATUM
Federal Way, Washington 98003-2600 KK Nns
(!
(206) 431-2300 Fax: (206) 431-2250 N0. REVISION BY DATE APPR _ �'"` PC01�'""`
13+00 4+00
STA "S., 13+00.00 =
0
0o R/W CL STA 4+00.19, 7.50' RT --_�
)INSTRUCTION "ROW" LINE
)INSTRUCTION CE "S" LINE
A=2'0617
I
r1
A=0'13'48" A=0'48'29"
R=5686.65 0
0 9=5686.65 CH=80.20
0+
+ T=11.42 CHBRG-N1'22'O9"E
=104.
T46 =104. 6
i
CH=22.84 R=5686.65
CHBRG=NO'19'02"W
CHBRG=SO'51'00" W T=40.10
L=208.89'
22.84' L=80.20' I
\ \ \ \ \ \ \ \
STA "S" 14+37.54
30.30' LT
\ \ \\\\\\\
\ \ \\\\\\yC?
W
\ \\ \\\\\\ LLI
W
w,
w
0.00'\\I cn
\'8LU
N \ \ \
LU
\\\ \\\\\\ VJ
z�z
Z
0
+0
cM
r
w♦\\\ 2
\\•rW
2523049087
\ \ \ \ \ \ \ \ \
CPSTRA (SOUND TRANSIT)
\ \ \ \ \ \ \
\\\\\\ \\\\
240.02' 1 1 53.93' 1 80.28'
STA "S" 18+13.5�1028+0�0�Ni
STA "S" 18+13.56STA "BNSFROW"STA 1028+79.08
1027+00 29+00
ROW LINE
PROPERTY LINE
EASEMENT LINE
ROW ACQUISITION LINE
ROW DEDICATION LINE
RIGHT-OF-WAY
CONSTRUCTION EASEMENT
CONSTRUCTION EASEMENT (SHOOFLY)
ACCESS EASEMENT
40 0 40
scale
CITY OF
• RENTON
Public Works Department
Approved For Construction
KEY PLAN
fPaf
STRANDER BOULEVARD EXTENSION
PHASE 1, SEGMENT 2A
EASEMENTLAYOUT
SHEET 1
R-369321
5/20/15
ES-2