Loading...
HomeMy WebLinkAboutR-3693033CY) I I + I, I 1 I co _ _ ----------------------- CY) I _-------------- -- OP G — OP---- OF OF I IA11111111111- LU OF V i OP OF OP 0 O II OP p m� jpy OP OF OP pp OF a,.., ..W OP I + �— OP " - — — — OP — OP I — — — — — — — — — — — — — — — — — — — — z ----1— — ------ _ -------------------—------- i— T — - - - - - + + •-+ OP OP 0 QE OF T T T— — — — — — — — — — — — — — — — — s O I ------- m O D �+ ° Q _� +i-----�"OQ fP —----------------=------ S ----- --------m ----�aos ---------------------- 0 I / + . 1 — L I EXISTING BURIED POWER � I � a I TO BE RELOCATED BY OTHERS. I I I A X ° o I I I +I_ PWR EXISTING 36" CMP TO BE EXTENDED, SEE DWGS UT-2 & DD-5 FOR DETAILS I 4 EXISTING FIBER OPTIC A 4 1 4 C 6 T 7 F I� EXISTING FIBER OPTIC — BNSF ROW I---_--_ —— 6 I N I BFO-- — — — — — — —�—IiL— 1 4 �—BF✓T----- BF - --- �F�---- gFQ---- ------ _— — — — — — — — — --BF BNSF ROW BF0 BNSF ROW '= BFO ------------ — — — — — — — — — — — — — — — - - - - --- m — OPI 8 - - - - - - - EXISTING � , 5 ------ BFp NSF ROW gN I BNSF/SOUND I ° F ______-____-- -- � __ ------------_ I 3 4 TRANSIT f i 0* EXISTING BNSF/SOUND 08 EXISTING FIBER OPTIC MANHOLES I i TRANSIT MANHOLES I- -I E EXISTING 4 2 I 2 4 3 4 I I EXISTING FIBER OPTIC 0 OVERHEAD POWER CONSTRUCTION I 8 o EASEMENT I CONSTRUCTION FIBER OPTIC RELOCATION CONSTRUCTION SEQUENCING O I EASEMENT - NOTES: o STAGE 1 STAGE 2 I U ' w 2 to 11 1 I 1, SEE UT DWGS FOR FIBER OPTIC RELOCATION 4 O INSTALL FIBER OPTIC (FO) VAULTS AND CONDUIT FOR AT&T & BNSF INSTALL CASING UNDER EASTERN BRIDGES FOR PERMANENT LOCATION OF o -1 1 SEQUENCING IN BRIDGE VICINITY. WITHIN 3 FEET OF WESTERN EDGE OF BNSF'S ROW. O ALL FO LINES. CONNECT CASING UNDER BNSF BRIDGE TO BNSF/SOUND m 1 4 1 I 2. SEE EASEMENT PLANS FOR CONSTRUCTION TRANSIT CONDUITS INSTALLED IN CONSTRUCTION SEQUENCING NOTE 2. 1 I o I EASEMENTS. O INSTALL FO VAULTS AND CONDUITS FOR BNSF/SOUND TRANSIT ON RELOCATE BNSF/SOUND TRANSIT FO LINES ONTO EASTERN BRIDGE, BY O N I I g 2 NORTH AND SOUTH SIDES OF STRANDER BLVD IN VICINITY OF PROPOSED OTHERS. ABANDON TEMPORARY CONDUITS. O I EXISTING 60" WATER + EXISTING OVERHEAD 3. SEE UTILITY PLANS FOR CONDUITS, LOCATION AND g BNSF BRIDGE AND INSTALL TEMPORARY VAULTS AND CONDUITS TO THE N I TYPE OF VAULTS. T EAST. TO BE LOCATED IN ORDER TO AVOID CONSTRUCTION ACTIVITIES STAGE 3 POWER LINES ASSOCIATED WITH BRIDGE. CONTRACTOR TO DETERMINE LOCATION. 1 I 30' ROW I 4. SEE F DWGS FOR CONFIGURATION OF CONDUITS 6 CUT HOLE IN WEST SHORING WALLS & INSTALL AT&T CONDUIT. I I I BEHIND ABUTMENTS. LL O INSTALL BNSF/SOUND TRANSIT VAULTS AND CONDUIT ON EASTERN EDGE 1 _ _ J - _ - _— a OF CONSTRUCTION EASEMENT, BY OTHERS. RELOCATE AT&T FO LINES TO EASTERN SIDE OF BRIDGE THROUGH WEST I I EXISTING 14" & 12" 5. SEE BNSF BRIDGE PLANS FOR SHORING AND o N PETROLEUM LINES I I BRIDGE. LL O SHORING WALLS, BY OTHERS. REMOVE TEMPORARY CONDUIT BETWEEN I + I TEMPORARILY RELOCATE ALL FO LINES TO THE CONDUITS AND VAULTS AT&T VAULTS. - - - N I N O N CONSTRUCTED IN CONSTRUCTION SEQUENCING NOTES 1 (AT&T) & 2 I I (BNSF/SOUND TRANSIT), BY OTHERS. I EXISTING I 1 36" SANITARY SEWER o I --a 60 0 6n 19n � I O + I I I z scale R-369333 >_ 12 FEDAID: STPUL-127005) RECORD..... °��� Y CITY OF STRANDER BOULEVARD EXTENSION 5/20/15 HPP-127COD5) ') BergerABAMm_ AS SHOWN �`"" S RENTON PHASE 1, SEGMENT 2A SOME DATA ON RECORD DRAWINGS DRAWING IS BASED UPON INFORMATION `� "" BEE Public Works Department PROVIDED BY THE CONSTRUCTION E DATUM Seder 9th Avenue South, suite 300 � Approved For construction CONSTRUCTION STAGING FIBER OPTIC RELOCATION CS-4 in CONTRACTOR TO THE CITY OF Federal Way, Washington 98003-2600 KK Nns .. RENTON, THE CORRECTNESS TO THIS 206 431-2300 Fax: 206 431-2250 NO. REVISION BY DATE APPR SHEETI DATA HAS NOT BEEN VERIFIED. ) ) - Robert M. Hanson P.E. Date 33 -23