HomeMy WebLinkAboutR-3693033CY) I I + I, I
1
I
co _ _
-----------------------
CY) I _--------------
-- OP G — OP---- OF
OF
I IA11111111111-
LU OF V i OP OF OP 0 O II OP p m� jpy OP OF
OP pp OF a,.., ..W OP I + �— OP
" - — — — OP — OP I — — — — — — — — — — — — — — — — — — — —
z ----1— — ------
_ -------------------—------- i— T
— - - - - - + + •-+ OP OP 0 QE OF T T T— — — — — — — — — — — — — — — — —
s O I -------
m O
D �+ °
Q
_� +i-----�"OQ fP
—----------------=------ S ----- --------m ----�aos ----------------------
0 I / +
. 1 —
L I EXISTING BURIED POWER
� I �
a I TO BE RELOCATED BY OTHERS. I I
I A X °
o I I
I +I_ PWR
EXISTING 36" CMP TO BE EXTENDED,
SEE DWGS UT-2 & DD-5 FOR DETAILS
I 4
EXISTING FIBER OPTIC A 4
1 4 C 6 T 7 F I� EXISTING FIBER OPTIC
— BNSF ROW I---_--_ —— 6 I
N I
BFO-- — — — — — —
—�—IiL— 1 4
�—BF✓T-----
BF - --- �F�---- gFQ---- ------ _— — — — — — — — — --BF BNSF ROW
BF0
BNSF ROW
'= BFO
------------
— — — — — — — — — — — — — —
— -
- - - --- m — OPI
8 - - - - - - - EXISTING � , 5 ------ BFp NSF ROW
gN I BNSF/SOUND I ° F ______-____-- -- � __ ------------_ I
3 4 TRANSIT f i 0* EXISTING BNSF/SOUND 08
EXISTING FIBER OPTIC MANHOLES I i TRANSIT MANHOLES I- -I
E EXISTING 4 2 I 2 4 3 4 I I EXISTING FIBER OPTIC
0 OVERHEAD POWER CONSTRUCTION I 8
o EASEMENT I CONSTRUCTION
FIBER OPTIC RELOCATION CONSTRUCTION SEQUENCING
O I EASEMENT - NOTES:
o STAGE 1 STAGE 2 I U ' w 2 to 11 1 I 1, SEE UT DWGS FOR FIBER OPTIC RELOCATION
4 O INSTALL FIBER OPTIC (FO) VAULTS AND CONDUIT FOR AT&T & BNSF INSTALL CASING UNDER EASTERN BRIDGES FOR PERMANENT LOCATION OF o -1 1 SEQUENCING IN BRIDGE VICINITY.
WITHIN 3 FEET OF WESTERN EDGE OF BNSF'S ROW. O ALL FO LINES. CONNECT CASING UNDER BNSF BRIDGE TO BNSF/SOUND m 1 4 1 I 2. SEE EASEMENT PLANS FOR CONSTRUCTION
TRANSIT CONDUITS INSTALLED IN CONSTRUCTION SEQUENCING NOTE 2. 1 I o I EASEMENTS.
O INSTALL FO VAULTS AND CONDUITS FOR BNSF/SOUND TRANSIT ON RELOCATE BNSF/SOUND TRANSIT FO LINES ONTO EASTERN BRIDGE, BY O N I I
g 2 NORTH AND SOUTH SIDES OF STRANDER BLVD IN VICINITY OF PROPOSED OTHERS. ABANDON TEMPORARY CONDUITS. O I EXISTING 60" WATER
+ EXISTING OVERHEAD 3. SEE UTILITY PLANS FOR CONDUITS, LOCATION AND
g BNSF BRIDGE AND INSTALL TEMPORARY VAULTS AND CONDUITS TO THE N I TYPE OF VAULTS.
T EAST. TO BE LOCATED IN ORDER TO AVOID CONSTRUCTION ACTIVITIES STAGE 3 POWER LINES ASSOCIATED WITH BRIDGE. CONTRACTOR TO DETERMINE LOCATION. 1 I 30' ROW
I 4. SEE F DWGS FOR CONFIGURATION OF CONDUITS
6 CUT HOLE IN WEST SHORING WALLS & INSTALL AT&T CONDUIT. I I I BEHIND ABUTMENTS.
LL O INSTALL BNSF/SOUND TRANSIT VAULTS AND CONDUIT ON EASTERN EDGE 1 _ _ J - _ - _—
a OF CONSTRUCTION EASEMENT, BY OTHERS. RELOCATE AT&T FO LINES TO EASTERN SIDE OF BRIDGE THROUGH WEST I I EXISTING 14" & 12" 5. SEE BNSF BRIDGE PLANS FOR SHORING AND
o N PETROLEUM LINES I I BRIDGE.
LL O SHORING WALLS, BY OTHERS. REMOVE TEMPORARY CONDUIT BETWEEN I + I
TEMPORARILY RELOCATE ALL FO LINES TO THE CONDUITS AND VAULTS AT&T VAULTS. - - - N I
N O N CONSTRUCTED IN CONSTRUCTION SEQUENCING NOTES 1 (AT&T) & 2 I I
(BNSF/SOUND TRANSIT), BY OTHERS. I
EXISTING I
1 36" SANITARY SEWER
o I --a 60 0 6n 19n
� I O
+ I I I
z scale R-369333
>_
12 FEDAID: STPUL-127005) RECORD..... °��� Y CITY OF STRANDER BOULEVARD EXTENSION 5/20/15
HPP-127COD5) ') BergerABAMm_ AS SHOWN �`"" S RENTON PHASE 1, SEGMENT 2A
SOME DATA ON RECORD DRAWINGS DRAWING
IS BASED UPON INFORMATION `� "" BEE Public Works Department
PROVIDED BY THE CONSTRUCTION E DATUM
Seder 9th Avenue South, suite 300 � Approved For construction CONSTRUCTION STAGING FIBER OPTIC RELOCATION CS-4
in CONTRACTOR TO THE CITY OF Federal Way, Washington 98003-2600 KK Nns
.. RENTON, THE CORRECTNESS TO THIS 206 431-2300 Fax: 206 431-2250 NO. REVISION BY DATE APPR SHEETI
DATA HAS NOT BEEN VERIFIED. ) ) - Robert M. Hanson P.E. Date 33 -23