HomeMy WebLinkAboutR-3693042O
z
m
a
V
C-0
w VEG\\\\\'
LL STAB
LL
w
LL \
J STA&
VEG\�������������
.BUFF.�������������
COVR,�������������������
HVF STA 1038+26.47
SEED ��
80.00LT
.TOP
1 FrFNIn•
79
1037+00 — 1038+00BNSF RR ,—_ 1039+00 1040+00 1042+00 _ 1043+00 ��
MATCH LINE (SEE SHEET TE-7)
o — —
— ROW LINE
y
PROPERTY LINE
— — — — — — — —
— EASEMENT LINE
d
WETLAND BOUNDARY
LL - — — — —
- WETLAND BUFFER
SF
SILT FENCE
CG
CLEARING AND GRUBBING LIMITS
a HVF
HIGH VISIBILITY FENCE
FM
TEMPORARY PIPE FOR
CONSTRUCTION DEWATERING
N
o
Z
E
FEDAID: STPUL-1276(004)
HPP-1276(005)
SOME DATA ON RECORD DRAWINGS
IS BASED UPON INFORMATION
PROVIDED BY THE CONSTRUCTION
in CONTRACTOR TO THE CITY OF
.. RENTON, THE CORRECTNESS TO THIS
DATA HAS NOT BEEN VERIFIED.
CONSTRUCTION NOTES:
T �T
1.
ALL BMP NUMBERS CORRESPOND TO THE DEPARTMENT OF ECOLOGY
CONSTRUCTION EASEMENT
STORMWATER MANAGEMENT MANUAL FOR WESTERN WASHINGTON AND SHALL
BE INSTALLED, MAINTAINED, AND REMOVED IN ACCORDANCE WITH SAID
MANUAL.
F/',/
ACCESS EASEMENT
2.
CONTRACTOR SHALL ADJUST SILT FENCE AND OTHER BMP'S TO FIT SITE
SHOOFLY CONSTRUCTION EASEMENT
CONDITIONS AND AS APPROVED BY THE ENGINEER.
WETLAND AREA
3.
HIGH VISIBILITY FENCE SHALL BE INSTALLED AS SHOWN ON THE PLANS.
4.
SILT FENCE SHALL BE PLACED 2' INSIDE OF THE HIGH VISIBILITY FENCE AND
®
12' SHOOFLY ACCESS ROAD
AS SHOWN ON THE PLANS.
+ +
PROVIDE PROTECTION OVER
5.
CONTRACTOR SHALL INSTALL STABILIZED CONSTRUCTION ENTRANCES AT
+ + +
+ +
EXISTING WATER MAIN. SEE
ACCESS POINTS TO THE WORK AREAS OR AS DIRECTED BY THE ENGINEER.
DETAIL A ON SHEET RB-2
6.
CONTRACTOR SHALL INSPECT PAVED ACCESS ROUTES WEEKLY FOR TRACKED
MUD FROM THE CONSTRUCTION SITE, AND REMOVE ANY MATERIAL TO
PREVENT IT ENTERING THE DOWNSTREAM STORMWATER CONVEYANCE SYSTEM.
*J BergerABAM
RECORD
33301 9th Avenue South, Suite 300
D RAW I N G
Federal Way, Washington 98003-2600
(206) 431-2300 Fax:(206) 431-2250
LEGEND:
VEG
BMP C101: PRESERVING NATURAL VEGETATION
BUFF
BMP C102: BUFFER ZONES
HVF
BMP C103: HIGH VISIBILITY FENCE
ENTR
®
BMP C105: STABILIZED CONSTRUCTION ENTRANCE
II
STAB
BMP C107: CONSTRUCTION ROAD STABILIZATION
_
*
�
SEED
BMP C120: TEMPORARY AND PERMANENT SEEDING
IP
r
MLCH
BMP C121: MULCHING
COVR
BMP C123: PLASTIC COVERING
*
TOP
BMP C125: TOPSOILING
IP
P
DUST
BMP C140: DUST CONTROL
BMP C151: CONCRETE HANDLING
ENTR
— — ----
SAW
BMP C152: SAW CUTTING AND SURFACING POLLUTION PREVENTION
IP *
IP
BMP C220: STORM DRAIN INLET PROTECTION
SF
BMP C223: SILT FENCE
SWEEP
MISC. BMP: STREET SWEEPING
PUMP
MISC. BMP: TEMPORARY PUMP FOR STORMWATER
-
PIPE
*
MISC. BMP: TEMPORARY PIPING FOR CONSTRUCTION STORMWATER
ail
XX
ITEM INCLUDED IF PROPOSED ACCESS IS USED
y
GENERAL NOTES:
1. STOCKPILE LOCATIONS SHALL BE LOCATED AS ALLOWED ON
EASEMENT DRAWINGS.
2. CONTRACTOR SHALL MAINTAIN BMP C150: MATERIALS ON HAND,
ON —SITE IN AN AREA EASILY ACCESSIBLE.
3. STORM WATER DISCHARGE SAMPLING LOCATIONS TO BE FIELD
LOCATED BY THE CESCL.
4. CONTRACTOR TO FOLLOW BMP C153: MATERIAL DELIVERY,
STORAGE AND CONTAINMENT IN THE STORAGE OF HAZARDOUS
MATERIALS ONSITE.
5. SEE SHEET TE-1 FOR ADDITIONAL NOTES.
6. CONSTRUCTION ROAD STABILIZATION ROUTES ARE ILLUSTRATIVE
ONLY, CONTRACTOR TO DETERMINE ACTUAL ROUTE. COST FOR
ROAD STABILIZATION IS PART OF CONSTRUCTION ACCESS.
7. STATIONS AND OFFSETS ARE TO CONSTRUCTION ALIGNMENT
"BNSF ROW".
7. SEE EASEMENT DRAWINGS FOR ALLOWABLE ACTIVITIES ON EACH PARCEL.
8. CONTRACTOR SHALL INSTALL THE PROPOSED STORMWATER TREATMENT POND
PRIOR TO BEGINNING ANY MASS EXCAVATION. STORMWATER PUMPED FROM
THE EXCAVATION SHALL BE ROUTED TO THE POND FOR TREATMENT BEFORE
BEING DISCHARGED.
9. CONTRACTOR TO PROVIDE NOTICE TO JOHN HOWAT, OF THE CITY OF TUKWILA
MAINTENANCE DEPARTMENT 10 WORKING DAYS PRIOR TO RELOCATING ANY
STOCKPILED MATERIALS. SEE SHEET G-7 FOR CONTACT INFORMATION.
10. ONLY ONE OF TWO ACCESS ROAD LOCATIONS WILL BE UTILIZED BY THE
CONTRACTOR. THE ENGINEER WILL DESIGNATE WHICH ACCESS ROAD LOCATION
WILL BE USED.
"�" BEE
�NAS
NO. REVISION BY DATE APPR -
AS SHOWN
�� DATUM
40 0
scale
CITY OF
RENTON
Public Works Department
Approved For Construction
40
KEY PLAN
fPaf
R-369342
STRANDER BOULEVARD EXTENSION 5/20/15
PHASE 1, SEGMENT 2A
SITE PREP AND TEMP EROSION CONTROL PLANS TE-4
SHEET 3