Loading...
HomeMy WebLinkAboutR-3693044L0 `: :`..`: :STAB. � MLCH L1J Uj W LU U) .. ♦ ::: W y: U IPA: MATCH LINE (SEE SHEET TE-3) ,I MATCH LINE (SEE SHEET TE-8) LEGEND: LL\\\\\ o — — - ROW LINE I\ \ \ \ \ \I CONSTRUCTION EASEMENT T PROPERTY LINE 1 71 - - - - - - - - - EASEMENT LINE ��' ,/ ACCESS EASEMENT WETLAND BOUNDARY LL - - - - - - WETLAND BUFFER SHOOFLY CONSTRUCTION EASEMENT SF SILT FENCE CG CLEARING AND GRUBBING LIMITS WETLAND AREA HVF HIGH VISIBILITY FENCE FM TEMPORARY PIPE FOR ® 12' SHOOFLY ACCESS ROAD CONSTRUCTION DEWATERING + + FUTURE PERMANENT ***+* PROVIDE PROTECTION OVER EXISTING WATER MAIN. SEE SLOPE EASEMENT DETAIL A ON SHEET RB-2 FUTURE RIGHT-OF-WAY o AQUISITION Z d FEDAID: STPUL-1276(004) )DRAWINGS BergerABAM RECORD SOME DA AP ON2RECORD IS BASED UPON INFORMATION DRAWING PROVIDED BY THE CONSTRUCTION 33301 9th Avenue South, Suite 300 in CONTRACTOR TO THE CITY OF .. RENTON, THE CORRECTNESS TO THIS Federal Way, Washington 98003-2600 N0. DATA HAS NOT BEEN VERIFIED. (206) 431-2300 Fax: (206) 431-2250 CONSTRUCTION NOTES: 1. ALL BMP NUMBERS CORRESPOND TO THE DEPARTMENT OF ECOLOGY STORMWATER MANAGEMENT MANUAL FOR WESTERN WASHINGTON AND SHALL BE INSTALLED, MAINTAINED, AND REMOVED IN ACCORDANCE WITH SAID MANUAL. 2. CONTRACTOR SHALL ADJUST SILT FENCE AND OTHER BMP'S TO FIT SITE CONDITIONS AND AS APPROVED BY THE ENGINEER. 3. HIGH VISIBILITY FENCE SHALL BE INSTALLED AS SHOWN ON THE PLANS. 4. SILT FENCE SHALL BE PLACED 2' INSIDE OF THE HIGH VISIBILITY FENCE AND AS SHOWN ON THE PLANS. 5. CONTRACTOR SHALL INSTALL STABILIZED CONSTRUCTION ENTRANCES AT ACCESS POINTS TO THE WORK AREAS OR AS DIRECTED BY THE ENGINEER. 6. CONTRACTOR SHALL INSPECT PAVED ACCESS ROUTES WEEKLY FOR TRACKED MUD FROM THE CONSTRUCTION SITE, AND REMOVE ANY MATERIAL TO PREVENT IT ENTERING THE DOWNSTREAM STORMWATER CONVEYANCE SYSTEM. VEG BMP C101: PRESERVING NATURAL VEGETATION BUFF BMP C102: BUFFER ZONES HVF BMP C103: HIGH VISIBILITY FENCE ENTR ® BMP C105: STABILIZED CONSTRUCTION ENTRANCE STAB BMP C107: CONSTRUCTION ROAD STABILIZATION SEED BMP C120: TEMPORARY AND PERMANENT SEEDING MLCH BMP C121: MULCHING COVR BMP C123: PLASTIC COVERING TOP BMP C125: TOPSOILING DUST BMP C140: DUST CONTROL CONC BMP C151: CONCRETE HANDLING SAW BMP C152: SAW CUTTING AND SURFACING POLLUTION PREVENTION IP BMP C220: STORM DRAIN INLET PROTECTION SF BMP C223: SILT FENCE SWEEP MISC. BMP: STREET SWEEPING PUMP MISC. BMP: TEMPORARY PUMP FOR STORMWATER PIPE MISC. BMP: TEMPORARY PIPING FOR CONSTRUCTION STORMWATER XX * ITEM INCLUDED IF PROPOSED ACCESS IS USED GENERAL NOTES: 1. STOCKPILE LOCATIONS SHALL BE LOCATED AS ALLOWED ON EASEMENT DRAWINGS. 2. CONTRACTOR SHALL MAINTAIN BMP C150: MATERIALS ON HAND, ON -SITE IN AN AREA EASILY ACCESSIBLE. 3. STORM WATER DISCHARGE SAMPLING LOCATIONS TO BE FIELD LOCATED BY THE CESCL. 4. CONTRACTOR TO FOLLOW BMP C153: MATERIAL DELIVERY, STORAGE AND CONTAINMENT IN THE STORAGE OF HAZARDOUS MATERIALS ONSITE. 5. SEE SHEET TE-1 FOR ADDITIONAL NOTES. 6. CONSTRUCTION ROAD STABILIZATION ROUTES ARE ILLUSTRATIVE ONLY, CONTRACTOR TO DETERMINE ACTUAL ROUTE. COST FOR ROAD STABILIZATION IS PART OF CONSTRUCTION ACCESS. 7. STATIONS AND OFFSETS ARE TO CONSTRUCTION ALIGNMENT "BNSF ROW". 7. SEE EASEMENT DRAWINGS FOR ALLOWABLE ACTIVITIES ON EACH PARCEL. 8. CONTRACTOR SHALL INSTALL THE PROPOSED STORMWATER TREATMENT POND PRIOR TO BEGINNING ANY MASS EXCAVATION. STORMWATER PUMPED FROM THE EXCAVATION SHALL BE ROUTED TO THE POND FOR TREATMENT BEFORE BEING DISCHARGED. 9. CONTRACTOR TO PROVIDE NOTICE TO JOHN HOWAT, OF THE CITY OF TUKWILA MAINTENANCE DEPARTMENT 10 WORKING DAYS PRIOR TO RELOCATING ANY STOCKPILED MATERIALS. SEE SHEET G-7 FOR CONTACT INFORMATION. "�" BEE �NAS REVISION BY DATE APPR - AS SHOWN �� DATUM 40 0 14� scale CITY OF RENTON Public Works Department Approved For Construction 40 8 I KEY PLAN R-369344 feet STRANDER BOULEVARD EXTENSION 5/20/15 PHASE 1, SEGMENT 2A SITE PREP AND TEMP EROSION CONTROL PLANS TE-6 SHEET 5