HomeMy WebLinkAboutR-3693049CO I LEGEND
CO
CY) TO BE BUILT BY THE CONTRACTOR FOR
THE SOUND TRANSIT TUKWILA STATION
PROJECT AS SHOWN IN THESE PLANS
FOR THE STRANDER BOULEVARD
EXTENSION PROJECT
LU
~ TO BE BUILT AS PART OF THE SOUND /
TRANSIT TUKWILA STATION PROJECT AS
SHOWN IN THE CONTRACT PLANS FOR
THAT PROJECT
N
N
r
m
a
a
a
N 1
2)
m
O
m
Q
V
33 2 - -
1 � V
CONSTRUCTION (j "AR" L
�6
ti-0. \
_W— —�--------
1s.s�l I I I I I ACCESS ROAD 12.0% _
N N N N rn m ,n 16.0% N to I !N 0.5%
LOW
10� POINT o
13 12 71 + — —
��76
? >8\ 11 12 13_
14—
15-
3 �_291 I' 'N
2711 /
v, V O
�I
0
e N I 27.5
U N N 28
O
0o MATCH c }
o N EXISTING v 28 p
0
U N N
N HIGH POINT
0
m M
4 N M I
N I
LL
I
M I
v N M I
IL Id M
27
PUMP STATION
(SEE PS SHEETS FOR SITE DETAILS)
6 "' I 0.5%
I
NOTES:
1. FINISHED GRADE SHOWN
N
2. SEE ES DWGS FOR PROPERTY INFORMATION
I I 3. SEE TESC PLANS FOR GRADING LIMITS
Z
E
d
FEDAID: STPUL-127
HPP-1276(005)
005)
BergerABAM
RECORD
n SOME DATA ON RECORD DRAWINGS
IS BASED UPON INFORMATION
DRAWING
DRAWING
PROVIDED BY THE CONSTRUCTION
9th Avenue South, Suite 300
in CONTRACTOR TO THE CITY OF
.. RENTON, THE CORRECTNESS TO THIS
Federal Way, Washington 98003-2600
NO.
DATA HAS NOT BEEN VERIFIED.
(206) 431-2300 Fax: (206) 431-2250
0.3%
0.3%
END PATH GRADINGI J
STA "AR" 1+68.23 ji O O
y y
I I 2:1 I� o � Z
I � � o �2 �
IM
I W ym W
N
GRADE AS REQUIRED TO ACHIEVE I N m m
/ BASE OF SUBGRADE ELEVATION I M M
(1' BELOW FINISH GRADE). FINAL
GRADE AND PAVING BY OTHERS.
N M
C
I MM M
R\W �/ 29-30
28 M
----------- I 26 27
X; 2% MAX
(n,P) 2524
—�22
I
I
I
I
I
I
I
I
I
���
lu
_1
6' PEDESTRIAN PATH o0 1
m 1a
16
15
071 ++ 13 14 18+00 w �19+00
0
— — — — — — —
I
------
)INSTRUCTION q "S" LINE 0.5% N SW 2%T ST
3LVD + STRUCTURAL > >
STRUCTURAL I I - ---- — - - - - - I'll
- ----------- - - RETAINING WALL - -
RETAINING WALL
C/)
I 2: 1 6 3:1 a: - Ni m
N I M N
_ m
2:1
0.6%
BEE
REVISION BY DATE APPR ^"
I ^ +
N
LN O
HIGH POINT
27.5 27,5 �
I
uj
I J >
I O 2Z tO o
I y C6
co 43Y �
W2 Ito
Uj Wm W
N I 4.
m m W ov
I
I p
o
II r+
I 2:1
I
I I
AS SHOWN CITY OF
RENTON
DATUM Public Works Department
Approved For Construction
Kuc kco�ixcw Rohert M. Hanson P.F. Date
N )
G
�I 11
N MODULAR BLOCK WALL
I N o
I^ N o
MII N �
2:1
I
I
"BNSF VIT1" LINE
I
I I
II I
II
---25—
II I
I
I
I
I I I
2:1
I �j/20 o zo R-369349
scale
STRANDER BOULEVARD EXTENSION 5/20/15
PHASE 1, SEGMENT 2A
FINAL GRADING PLAN GR-1
SHEET