Loading...
HomeMy WebLinkAboutR-3693074Cc) 170 u � CCOO R1 STA 1028+24.84 C? C? I 57.33' LT (D r "t 't I 6 STA 1028+28.73 Q' Q 130 LF 5000028+26.11 P1 r� 60.81' LT I w Cc STA 1028+20.35 A2 46.70' LT STA 1028+29.19 50.00LT 8 11 110 LF 296 LF 1 30 LF 110 LFL L N — — — — — — — — _ — — — [� _ _ N BFO BFO 12 LF Q ^BFG BFO BFO BFO , N STA 1028+01.48 a? B2 45.00' LT o �I + m LU ao 1028+00 z w = 1029+00 m U) Q 0 w wl y) w z J PROTECT EXISTING = I POWER POLE 9 U 108 LF 108 LF - � — BFO BFO B - Q STA 1028+29.91 8 50.00' RT 1029+54.WA- STA 1029+73.04 B2 I EXISTING FIBER OPTIC TO NSTRUCTION t-"BNSF ROW"LIN€ 46.98' LT BE ABANDONED IN PLACE 11 L6F 364 LFWEST SHOOFLY 28 LF 14 LF — — — — — — — — — — — —JF�0=- - — — — — — — — — — — — — — — — — — — — — — — — — — — BFO BFO BFO BFO BFO BFO BFO BFO BFO- / Y \ 0 0 270 LF 1030+00 5 � 210 LF OF OP I in OP I " I I m o TA 3`p PROP BNSF ROW BY OTHERS r + (100' RT BNSF MI-1) B2 STA 1027+96.11 ` 68.34' RT TA 44.: I IB2STA m I B2 01029+ 4.5RT 1028+03.12 I 68.34' RT B2 STA 1029+51.1, 94.50' RT STA 1028+10.12 62 68.34' RT m STA 1029+58.1: STA 1028+17.12 I I1.I `I y B2 94.50' RT B2 I 68.34' RT 1 d = STA 1029+65.1, m Ix B2 94.50 RT STA 1028+23.69 I" I R1 69.40' RT CASING ON BP FUEL LINE I I TO BE EXTENDED, BY OTHERS I 0 EXISTING OVERHEAD DISTRIBUTION I- I 00 POWER LINE. SEE SPECIAL I PROVISIONS FOR REQUIREMENTS i EXISTING TO DEENERGIZE LINE. m I A 36" SANITARY SEWER — li II I I GENERAL NOTES: EXISTING OVERHEAD DISTRIBUTION IIII II POWER LINE. SEE SPECIAL PROVISIONS 1. SEE DRAWING F-1 THRU F-4 FOR CONFIGURATION 249 LF m I FOR REQUIREMENTS TO DEENERGIZE LINE. OF CONDUITS AND CASING BEHIND ABUTMENTS. II 2. SEE AT&T PLANS FOR DETAILS CONCERNING INSTALLATION OF AT&T FIBER OPTIC LINES. o IIII I I 7 EXISTING 14" & 12" 3. SEE CS DRAWINGS FOR CONSTRUCTION SEQUENCING m IJJ I SEE PSE -a RELOCATION PETROLEUM LINES - OF FIBER OPTIC LINES. I I I PLANS 4. STATIONING AND OFFSETS ON THIS DRAWING REFER .0 TO "BNSF ROW" LINE. SEE ALIGNMENT PLANS. — — — m I — — MATCH LINE (SEE SHEET UT-5) 12 FEDAID: STPUL-127 HPP-1276(005) 005) BergerABAM RECORD n SOME DATA ON RECORD DRAWINGS IS BASED UPON INFORMATION DRAWING PROVIDED BY THE CONSTRUCTION 33301 9th Avenue South, Suite 300 in CONTRACTOR TO THE CITY OF .. RENTON, THE CORRECTNESS TO THIS Federal Way, Washington 98003-2600 N0. DATA HAS NOT BEEN VERIFIED. (206)431-2300 Fax: (206)431-2250 I I III III 0 I � I I I II N c I ��242 LF — =1031+00 BNSF 1032+00 I I am BFO 1 BNSF ROW PROTECT EXISTING GUY M WIRES AND POWER POLES M BFO BFO BFO Fn,� BNSF ROW EXISTING OVERHEAD EXISTING FIBER OPTICTO EAST SHOOFLY BE ABANDONED IN PLACE POWER TRANSMISSION LINE BY OTHERS /// NOTES:--------------------1 I A2 INSTALL AT&T PROVIDED MANHOLE TYPE 444-LA. INSTALL BNSF PROVIDED MANHOLE TYPE 444-LA FOR SOUND TRANSIT AND/OR BNSF. B2 Ri INSTALL STANDARD DUTY PULL BOX PER WSDOT STD PLAN J-90.10-01 I P1 INSTALL PSE PROVIDED VAULT TYPE 5106 Q INSTALL 1-2" & 1-4" SCHEDULE 40 PVC CONDUITS IN UTILITY TRENCH. FOR UTILITY TRENCH DETAILS SEE 1 UT6 ,2 COORDINATE WITH BNSF FOR INSTALLATION OF CONDUIT. CONTRACTOR SHALL PROVIDE SURVEYING. Q INSTALL 4-2" SCHEDULE 40 PVC CONDUITS IN UTILITY TRENCH. FOR UTILITY TRENCH DETAIL SEE 3 UT6 INSTALL 1-6" RGS CONDUIT IN UTILITY TRENCH AND THROUGH BRIDGE. FOR UTILITY TRENCH DETAILS SEE UT6 .4 Q INSTALL 6-2" & 2-2" RGS CONDUIT IN UTILITY TRENCH AND THROUGH 10" AND 12" BRIDGE CASINGS. FOR UTILITY TRENCH DETAIL SEE UT6 Q INSTALL 4-6" RGS FOR FUTURE UTILITY CONNECTIONS. CONNECT TO PULLBOXES FOR UTILITY TRENCH DETAILS SEE 2 UT7 SEE PSE RELOCATION PLANS AND CHANGE ORDER #8 Q INSTALL 4-6" RGS FOR PSE. FOR UTILITY TRENCH DETAILS SEE 2 Qg UT7 INSTALL 10" SCHEDULE 40 STEEL CASING, SEE@U7 A INSTALL 12" SCHEDULE 40 STEEL CASING, SEE B 11 un 1 INSTALL 1-4" SCHEDULE 40 PVC CONDUIT IN UTILITY TRENCH. FOR UTILITY TRENCH DETAIL SEE UT6 12 INSTALL 1-2" SCHEDULE 40 PVC CONDUIT IN UTILITY TRENCH. FOR UTILITY TRENCH DETAIL SEE 1 0 UT6 INSTALL 1-4" RGS CONDUIT IN UTILITY TRENCH, SEE UT6 R-369374 04 INSTALL 1-8" SCHEDULE 40 STEEL CASING BEE �NAS REVISION BY DATE APPR ^" scale T-369308 AS SHOWN '"m"` ""°9°"'B°' , CITY OF STRANDER BOULEVARD EXTENSION 5/20/15 RENTON PHASE 1, SEGMENT 2A DATUM Public Works Department Approved For construction UTILITY RELOCATION PLAN UT-3 Kuc kco�ixcw Rohert M. Hanson P.F. Date SHEET 2 7Q -9,7