Loading...
HomeMy WebLinkAboutR-3693076CO CO O O CO co C? i O T 6 - 6 z N Y m Of Q Q m w m O T U �r OF OF OP OP OP OP OP OP @ OP G G I G G G G G G G G G G I — G G G G G G G G G G °P OP - OP OP OP OP OP OP OP OP 0 I SS SS S SS SS SS SS SS SS Ss EXISTING OVERHEAD POWER EXISTING OVERHEAD DISTRIBUTION POWER �EXISJING 36" EXISTING 14" & 12" TRANSMISSION LINE LINE. SEE SPECIAL PROVISIONS FOR 1E I REQUIREMENTS TO DEENERGIZE LINE. SANITARY SEWER PETROLEUM LINES — — — — — _ — — ------------------------ IgFO BFO—-- -----—I----- W STA 1029+53.28 M I m 297.44' RT B2 1 SW 27TH ST U..I 1 O w I m := 1 U) SD 113 LF — LLU I O N I m Z JG= i II °' 2 SEPSE RELOCATION PLANS — — — — — — — — — — —-- ----- — — —PWRlPWRPWR�PWR PWR PWR �-1WR-=—PWR--iPWR —T— --- m---- — — — — — — — — — — — — — I I I I I ova °je II STA 1028+50.67 P1 387.96' RT STA 1028+413B 0T3.0III I 1 I 249 LF I I I I I I I CONSTRUCTION EASEMENT I ------------------------------ I OF Ss 242 LF 9 NOTES: a LL o BZ INSTALL MANHOLE TYPE 444—LA FOR BNSF/SOUND TRANSIT. Pi INSTALL PSE PROVIDED VAULT TYPE 5106. IL a INSTALL 4-2" SCHEDULE 40 PVC CONDUITS IN UTILITY TRENCH. FOR UTILITY TRENCH DETAIL SEE U T6 a A SEE PSE RELOCATION PLANS AND CHANGE CIFW 08 z E o FEDAID: H P-1276(005) m HPP-1276(005) �) Berger 33301 9th Avenue South, Suite 300 Federal Way, Washington 98003-2600 (206) 431-2300 Fax: (206) 431-2250 RECORD DRAWING SOME DATA ON RECORD DRAWINGS IS BASED UPON INFORMATION PROVIDED BY THE CONSTRUCTION in CONTRACTOR TO THE CITY OF m RENTON, THE CORRECTNESS TO THIS DATA HAS NOT BEEN VERIFIED. NO. GENERAL NOTES: 1. SEE DRAWING F-1 THRU F-4 FOR CONFIGURATION OF CONDUITS AND CASING BEHIND ABUTMENTS. 2. SEE AT&T PLANS FOR DETAILS CONCERNING INSTALLATION OF AT&T FIBER OP11C LINES. 3. SEE CS DRAWINGS FOR CONSTRUCTION SEQUENCING OF FIBER OPTIC LINES. 4. STATIONING AND OFFSETS ON THIS DRAWING REFER TO "BNSF ROW" LINE. SEE ALIGNMENT PLANS. " BEE KK NAS REVISION BY DATE APPR �� DATUM OP OP G G G G G s 7�--- OP Ss R-369376 20 0 Scale T-369310 CITY OF STRANDER BOULEVARD EXTENSION 5/20/15 RENTON PHASE 1, SEGMENT 2A Public Works Department Approved For Construction UTILITY RELOCATION DETAILS UT-5 „_____ SHEET 1