HomeMy WebLinkAboutR-3693103O
TOP OF STILLING WELL EL=+13.75
8" DIA. PERFORATED PVC
SUBMERSIBLE LEVEL SENSOR. KPSI
SERIES 705. NO EQUAL. INSTALL PER
MANUFACTURER'S INSTRUCTIONS
BOTTOM OF SENSOR
EL=-2.5 r
BOTTOM OF STILLING WELL I d`
EL=-3.0
WETWELL FLOOR
EL=-4.5
WALL
1. ALL FASTENERS SHALL BE STAINLESS STEEL.
2. THE CONTRACTOR SHALL BUILD THE STILLING WELL BRACKET.
3. ALL ALUMINUM PLATE SHALL BE GRADE 5085 H34.
4. ALL ALUMINUM EXTRUSIONS SHALL BE GRADE 6061 T6.
5. USE REDHEAD'S "TRUBOLT" STAINLESS STEEL ANCHOR BOLTS FOR THE STILLING WELL BRACKETS.
6. THE STILLING WELL MUST NOT BE POSITIONED IN FRONT OF THE INLET PIPE.
7. STILLING WELL PIPE TO BE 8" SCHEDULE 40 PVC OR 3034 PIPE.
LEVEL SENSOR AND STILLING WELL
S-6 SCALE: 1/2"=1'—O"
CONCRETE
WETWELL LID
NOTES:
1. DETAIL SHOWN IS APPLICABLE TO THERN MODEL 5124 CRANE AND
PEDESTAL. IF ACTUAL CRANE AND PEDESTAL MODELS DIFFER SUBMIT
REVISED DRAWINGS AND SUPPORTING CALCULATIONS FOR ALTERNATE
PRODUCTS.
1SE
ER)
/8" DIA SS ANCHOR BOLTS
1/NUT AND WASHER EACH
GRNER. TYP. OF 4.
2 CRANE PEDESTAL BASE DETAIL
S-7 SCALE: NTS
0
STAINLESS STEEL
NUT & LOCK WASH
d c
d
A SECTION
SCALE: NTS
FEDAID: STPUL-1276(004) RECORD w
HPP-1276(005) ') BergerABAM SOME DATA ON RECORD DRAWINGS c� MCH
IS BASED UPON INFORMATION `� VKB
PROVIDED BY THE CONSTRUCTION 33301 9th Avenue South, Suite 300 D RAW I N G
in E
CONTRACTOR TO THE CITY OF Federal Way, Washington 98003-2600 KK NAS
.. RENTON, THE CORRECTNESS TO THIS 206 431-2300 Fax: 206 431-2250 N0. REVISION BY DATE APPR
DATA HAS NOT BEEN VERIFIED. ) ) —
OPENING OF WET WELL
TOP SLAB ABOVE
no
AS SHOWN
�� DATUM
8" SS 90' ELBOW
/IAILI —C /TVA — 7%
FLEXIBLE RUBBER
AT PIPE PENETRA-
KOR-N-SEAL OR
APPROVED EQUAL
t*-3� WETWELL VENT DETAIL
S-6 SCALE: 1 "=1'-O"
3/8 OR 5/16 STAINLESS
STEEL "U" BOLT
RADIUSED MOUNTING
PLATE a
8" P71
IPE
WELD
REDHEAD'S TRUBOLT
STAINLESS STEEL NIA
STAINLESS STEEL ANCHOR BOLT
"U" BOLT a
2"x2".125 SQUARE
ALUMINUM PIPE
ai
WELDED
BOTH SIDES
d '
- ALUMINUM GUSSET
°
bJ GUSSET CUT TO
SHAPE AND WELDED
B SECTION
SCALE: NTS
R-3693103
CITY OF STRANDER BOULEVARD EXTENSION 5/20/15
RENTON PHASE 1, SEGMENT 2A°°�
Public Works Department
Approved For Construction STORM PUMP STATION PS-11
. - 11_---_ I -- MECHANICAL DETAILS