Loading...
HomeMy WebLinkAboutR-3693115y J METAL ROOFING SYSTEM PROVIDE AND INSTALL A COMPLETE, WEATHERTIGHT ROOFING SYSTEM, INCLUDING INTEGRAL FLASHING AND VENTED RIDGE ASSEMBLY. SUPPLIER: TAYLOR METAL PRODUCTS, SALEM, OR; OR EQUIVILENT APPROVED BY ENGINEER. WARRANTY: 30 YEARS ON PAINT FINISH, 50 YEARS ON RUST THROUGH ROOF PANELS: A. PROFILE: 1 1/8" BY 12" PANELS W/ SNAP -TOGETHER LOCK SEAMS B. MATERIAL: 26 GAUGE STEEL, CONFORM TO ASTM A-653 G-90 HOT DIP GALVANIZED C. FINISH: THREE COAT, THERMO-CURED W/ 70% RESINS FASTENERS: GALVANIZED; DESIGN FOR MINIMUM OF 55 PSF WIND UPLIFT. PANEL FABRICATION: FABRICATE PANELS AT FACTORY. ROOFING SHALL BE DARK COLORED. COORDINATE COLOR SELECTION WITH THE CITY OF RENTON PUBLIC WORKS DEPARTMENT. MAN DOOR PROVIDE AND INSTALL ALL COMPONENTS FOR A COMPLETE DOOR, FRAME AND LOCKSET. PRODUCTS: A. DOOR: AMWELD 25LE SERIES, BY AMWELD BUILDING PRODUCTS, GARRETTSVILE, OH, OR EQUIVALENT APPROVED BY ENGINEER; FULL FLUSH, 1-3/4" THICK, 18GA PANELS, GALVANIZED FINISH, POLYSTYRENE INSLULATING CORE W/ FULL ADHESIVE BOND. B. FRAME: AMWELD 400 SERIES, OR EQUIVALENT APPROVED BY ENGINEER; 16 GA GALVANIZED MATERIAL, WELDED AND GROUND SMOOTH CONSTRUCTION. C. CYLINDERS: THE CONTRACTOR SHALL FURNISH AND INSTALL ALL SCREW -IN TYPE CYLINDERS AND KEYWAYS TO ESTABLISH THE FACILITY STANDARD. THE CONTRACTOR SHALL PROVIDE CONSTRUCTION CYLINDERS AND KEYS FOR USE DURING CONSTRUCTION. FOLLOWING ACCEPTANCE, OWNER WILL RE -KEY THE CYLINDERS WITH BESTLOCK 5AAA CYLINDERS. D. DESIGN: PROVIDE LEVER HANDLES AT ALL LOCKSETS OF THE BEST 9K SERIES, UNLESS OTHERWISE NOTED. E. STRIKES: PROVIDE EACH LOCKSET, HANDSET, OR DEADLOCK WITH A BOX STRIKE. PROVIDE STANDARD TYPE STRIKES WITH EXTENDED LIPS WHERE REQUIRED TO PROTECT ADJACENT TRIM FROM BEING MARRED BY LATCH BOLT. VERIFY CUTOUT TYPES PROVIDED IN METAL FRAMES. F. FILL METAL FRAME WITH GROUT AFTER INSTALLATION. SPECIAL INSPECTION PROGRAM TYPES OF WORK CONTINUOUS PERIODIC SOILS GRADING, EXCAVATION & FILL X CONCRETE PLACEMENT OF REINFORCING STEEL X PLACING OF REINFORCED CONCRETE X STRUCTURAL MASONRY UNIT PLACEMENT X PLACEMENT OF REINFORCING STEEL X GROUT SPACE X GROUT PLACEMENT X ADHESIVE ANCHOR INSTALLATION X WOOD WOOD DIAPHRAGM FASTENING X CONCRETE ANCHORS X FEDAID: STPUL-1276(004) HPP-1276(005) IS BASED UPON INFORMATION PROVIDED BY THE CONSTRUCTION CONTRACTOR TO THE CITY OF RENTON, THE CORRECTNESS TO THIS *J BergerABAM 33301 9th Avenue South, Suite 300 Federal Way, Washington 98003-2600 (206) 431-2300 Fax:(206) 431-2250 SPECIAL INSPECTION PROGRAM NOTES: 1. PROVIDE SUFFICIENT ADVANCED NOTIFICATION OF CONSTRUCTION ACTIVITIES TO THE ENGINEER AND OWNER TO ALLOW FOR INSPECTION OF WORK. 2. MAINTAIN ACCESS TO WORK REQUIRING INSPECTION UNTIL IT HAS BEEN INSPECTED AND INDICATED TO BE IN CONFORMANCE. 3. DEFINITIONS: A. CONTINUOUS INSPECTION: THE INSPECTOR IS OBSERVING THE WORK REQUIRING INSPECTION AT ALL TIMES. B. PERIODIC INSPECTION: THE INSPECTOR IS ON SITE AS REQUIRED TO CONFIRM THAT THE WORK REQUIRING INSPECTION IS IN CONFORMANCE. 4• SPECIAL INSPECTIONS SHALL CONFORM TO SECTIONS 1704 AND 1707 OF THE 2009 IBC. 5• SPECIAL INSPECTIONS AND ASSOCIATED TESTING SHALL BE PERFORMED BY THE OWNER. 6. THE SPECIAL INSPECTOR SHALL OBSERVE THE INDICATED WORK FOR COMPLIANCE WITH THE APPROVED CONSTRUCTION DOCUMENTS. ALL DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE CONTRACTOR FOR CORRECTION AND NOTED IN THE INSPECTION REPORTS. 7. THE SPECIAL INSPECTOR SHALL FURNISH INSPECTION REPORTS FOR EACH INSPECTION TO THE BUILDING OFFICIAL, ENGINEER, CONTRACTOR, AND OWNER. THE SPECIAL INSPECTION AGENCY SHALL SUBMIT A FINAL REPORT INDICATING THE WORK REQUIRING SPECIAL INSPECTION WAS INSPECTED AND IS IN CONFORMANCE WITH THE APPROVED CONSTRUCTION DOCUMENTS AND THAT ALL DISCREPANCIES NOTED IN THE INSPECTION REPORTS HAVE BEEN CORRECTED. STRUCTURAL TESTING REQUIREMENTS 1. STRUCTURAL FILL OR BACK -FILL: VERIFY COMPACTION WITH RANDOM FIELD DENSITY TESTS. 2• CONCRETE, GROUT, AND MORTAR: VERIFY STRENGTH WITH COMPRESSION TESTING OF FIELD SAMPLES. STRUCTURAL OBSERVATIONS 1. STRUCTURAL OBSERVATIONS SHALL CONFORM TO SECTION 1709 OF THE 2009 IBC STRUCTURAL OBSERVATIONS SHALL BE MADE AT THE FOLLOWING STAGES IN THE CONSTRUCTION: * PRIOR TO FIRST CONCRETE POUR * DURING MASONRY CONSTRUCTION. * DURING ROOF SHEATHING INSTALLATION. 2• STRUCTURAL OBSERVATIONS SHALL BE PERFORMED BY THE ENGINEER OF RECORD OR HIS DESIGNEE. * THE CONTRACTOR IS RESPONSIBLE FOR NOTIFYING THE ENGINEER IN ADVANCE OF THE STAGES LISTED ABOVE. 3• THE ENGINEER OR HIS DESIGNEE SHALL OBSERVE THE INDICATED WORK FOR GENERAL COMFORMANCE WITH THE APPROVED CONSTRUCTION DOCUMENTS. ALL DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE CONTRACTOR FOR CORRECTION AND NOTED IN THE OBSERVATION REPORTS. 4• THE ENGINEER SHALL FURNISH OBSERVATION REPORTS FOR EACH SITE OBSERVATION TO THE OWNER. GUTTERS AND DOWNSPOUTS 1. GUTTERS AND DOWNSPOUTS SHALL BE MANUFACTURED, FORMED GUTTERS AND DOWNSPOUTS OF ZINC -COATED STEEL PRE -PAINTED TO MATCH METAL ROOF COLOR. THICKNESS OF GUTTERS AND DOWNSPOUTS SHALL BE 0.028 INCH, MINIMUM. GUTTERS SHALL HAVE CONTINUOUS REMOVABLE LEAF SCREEN WITH SHEET METAL FRAME. RECORD - MCH DRAWING jCH­-j4AS VKB NO. REVISION BY DATE APP WAS SHOWN CITY OF V RENTON DATUM Public Works Department Approved For Construction Kuc kco�ixcw Rohert M. Hanson P.F. F STRANDER BOULEVARD EXTENSION PHASE 1, SEGMENT 2A STORM PUMP STATION STRUCTURAL NOTES - SHEET 2 R-3693115 5/20/15 PS-23