Loading...
HomeMy WebLinkAboutR-3693126L:� z a EE TOP OF SHOOFLY WEST EMBANKMENT BNSF ROW TOE OF WEST TOPSOIL TYPE SHOOFLY 2 EMBANKEMENT 7 EXISTING 12 0" / GROUND SHOOFLY MAINTENANCE ROAD KEY -IN CONSTRUCTION GEOTEXTILE FOR SEPARATION, TYP SOUTH END TERMINATION DETAIL SCALE: 1"=20' o FEDAID: STPUL-1276(004) m HPP-1276(005) �) Berger ABAM 33301 9th Avenue South, Suite 300 Federal Way, Washington 98003-2600 (206) 431-2300 Fax: (206) 431-2250 RECORD DRAWING T SOME DATA ON RECORD DRAWINGS a IS BASED UPON INFORMATION PROVIDED BY THE CONSTRUCTION CONTRACTOR TO THE CITY OF y RENTON, THE CORRECTNESS TO THIS DATA HAS NOT BEEN VERIFIED. NO. VARIES Z PHASE 1A MAIN 1 SHOOFLY 14'-0" j TOP RAIL 2.0% EXISTING BNSF EMBANKMENT KEY IN AT EACH STEP 12" SUBBALLAST MAY NOT EXCEED 2 FEET VERTICALLY, TYP I QUARRY SPALLS, 1 FT DEPTH, TYP I TYPICAL SECTION - WEST SHOOFLY TERMINATION SCALE: 1"=4' H 1"=4' V " BEE REVISION BY DATE APPR TOP TIE CONSTRUCTION NOTES: 1. BALLAST, TIES AND RAIL TO BE CONSTRUCTED BY OTHERS. 2. REFER TO BNSF SHOOFLY PLAN RR-6 TO RR-9 SHEETS FOR ALIGNMENTS, PROFILES AND ELEVATIONS. _I 11036+00 i1 11037+00 �� DATUM Y- c NORTH END TERMINATION DETAIL SCALE: 1 "=20' R-3693126 CITY OF STRANDER BOULEVARD EXTENSION 5/20/15 RENTON PHASE 1, SEGMENT 2A Public Works Department Approved For Construction SHOOFLY EMBANKMENT PLACEMENT RR-3 . ,. „----- I -- WEST END DETAILS