Loading...
HomeMy WebLinkAboutR-3693148rn (m M O W F- To Tacoma MY South) Face of Parapet 2„ HP11.07-1 (N.S.) HP11.07-IA (F.S.) Fnra-+n-Fnrp of Pnrnna+s - Npw Rririnp To Seottle MY North) Face of 2„ Parapet 43'-5" 56'-5" End of Beam HP11.07-3 (N.S.) 4 HP11.07-6 (N.S.) End of Beom HP11.07-3A (F.S.) End of Beam HP11.07-6A (F.S.) HP11.07-2 1N,5.1 HP11.07-4 (N.S.) HP11.07-5 (N.S.1 HP11.07-7 IN.S.) HP11.07-6 fN.S.) HP11.07-2A 1F.5.) HP11.07-4A (F.S. 1 HP11.07-5A (F.5.1 HP11.07-7A (F.S.) HP11.07-6A (F.S.) Main 1 Main 2 ¢ Main 2 Shoofly Shoofly 17'-1" Min. Main 1 i 14'-358' 18'-0" HP11,07-8 (N.S.) HP11.07-BA IF.S. ) V-71,e' T/Tie (+0.067 Grade) KP11.07-3 IF.S.1 t" n KP11.07-6 IF.S.1 KP11.07-4 (N.S.) --- E KP11.07-1 (B.S.) KP11.07-4 IFS.1 F F KP11,07-5 (F.S.) KP11.07-2 (B.S. 1 E KP11.07-5 IN,S,1 i TYP. U.N.O. KP11.07-3 (N:S.) KP11.07-6 IN.S.) TYP. U.N.O. 32' -614' C I ear 4 7' -53,4' C I ear l i i ' I I � ll evxposac for shall i a. i pe aep i gmentedesealer 20" Did. casing for pp ; (Ty ,) p I eD concrete surfaces in conformance with O 12" Did. stormdroin O O WSDOT specification 6-02.3(14)C and WSDOT "Washington Gray", Typ. pipe. see Drainage Plans for details of color ELEVATION (Looking RY West) Main 1 E 2 Bridge Future Main Main 1 i � Main 2 14'-35r8"± 7' -11% " 18'-0" Main 3 TYPICAL SECTION - (STAGE I) (Looking Ry North) Main 3 a or See RA-39. RA-40 & RA-41 for KP and HP Details. R -3693 1 48 FED'JD: STPUL-127f;004) HPP-1z76(oos) i BergerABAM �� 333019thAvenue5outh,Suite3D0 Federal Way, Washington 98003-2600 (206) 431-2300 Fax: (206) 431-2250 HANSON C Co ht Hanson Professiaml Services Inc. 2011 P9riq ° As sr+owN ,�, DnTUM CITY OF ':R� RENTON Public Wxks Department Approved For Construction Robert M. Hanson P.E. Dote STRANDER BOULEVARD EXTENSION PHASE 1, SEGMENT2A BNSFBRIDGEN0.11.07 LS.0051 ELEVATION AND TYPICAL SECTION 2/05/ 1 CALL 48 HOURS BEFORE YOU DIG 1-800-424-5555 RECORD DRAWINGS 7/31/2014 i+Nc wwcw "cop man .us pl� SCtlL w.�r w RA - 03 N0. REVISION BY DATE APPR w uAr 1 59 p231