HomeMy WebLinkAboutR-3693148rn
(m
M
O
W
F-
To Tacoma
MY South)
Face of
Parapet 2„
HP11.07-1 (N.S.)
HP11.07-IA (F.S.)
Fnra-+n-Fnrp of Pnrnna+s - Npw Rririnp
To Seottle
MY North)
Face of
2„ Parapet
43'-5"
56'-5"
End of Beam HP11.07-3 (N.S.) 4
HP11.07-6 (N.S.) End of Beom
HP11.07-3A (F.S.) End of Beam
HP11.07-6A (F.S.)
HP11.07-2 1N,5.1 HP11.07-4 (N.S.) HP11.07-5 (N.S.1
HP11.07-7 IN.S.) HP11.07-6 fN.S.)
HP11.07-2A 1F.5.) HP11.07-4A (F.S. 1 HP11.07-5A (F.5.1
HP11.07-7A (F.S.) HP11.07-6A (F.S.)
Main 1 Main 2 ¢ Main 2
Shoofly Shoofly
17'-1" Min.
Main 1
i
14'-358' 18'-0"
HP11,07-8 (N.S.)
HP11.07-BA IF.S. ) V-71,e'
T/Tie (+0.067 Grade)
KP11.07-3 IF.S.1
t"
n
KP11.07-6 IF.S.1
KP11.07-4 (N.S.)
--- E
KP11.07-1 (B.S.) KP11.07-4 IFS.1 F
F KP11,07-5 (F.S.) KP11.07-2 (B.S. 1
E
KP11.07-5 IN,S,1
i
TYP. U.N.O. KP11.07-3 (N:S.)
KP11.07-6 IN.S.) TYP. U.N.O.
32' -614' C I ear
4 7' -53,4' C I ear
l
i
i
'
I
I
�
ll evxposac for shall
i a. i pe
aep i gmentedesealer
20" Did. casing for
pp
; (Ty ,)
p I eD
concrete surfaces in conformance with
O
12" Did. stormdroin
O
O
WSDOT specification 6-02.3(14)C and
WSDOT "Washington Gray", Typ.
pipe. see Drainage
Plans for details
of color
ELEVATION
(Looking RY West)
Main 1 E 2 Bridge
Future Main Main 1 i � Main 2
14'-35r8"±
7' -11% "
18'-0"
Main 3
TYPICAL SECTION - (STAGE I)
(Looking Ry North)
Main 3
a
or
See RA-39. RA-40 & RA-41 for KP and HP Details. R -3693 1 48
FED'JD: STPUL-127f;004)
HPP-1z76(oos)
i BergerABAM
��
333019thAvenue5outh,Suite3D0
Federal Way, Washington 98003-2600
(206) 431-2300 Fax: (206) 431-2250
HANSON
C Co ht Hanson Professiaml Services Inc. 2011
P9riq
°
As sr+owN
,�,
DnTUM
CITY OF
':R� RENTON
Public Wxks Department
Approved For Construction
Robert M. Hanson P.E. Dote
STRANDER BOULEVARD EXTENSION
PHASE 1, SEGMENT2A
BNSFBRIDGEN0.11.07 LS.0051
ELEVATION AND TYPICAL SECTION
2/05/ 1
CALL 48 HOURS
BEFORE YOU DIG
1-800-424-5555
RECORD DRAWINGS 7/31/2014
i+Nc
wwcw
"cop
man
.us
pl�
SCtlL w.�r w
RA - 03
N0.
REVISION
BY
DATE
APPR
w
uAr
1 59 p231