Loading...
HomeMy WebLinkAboutR-3693150CA (D M O LU F_ ............................................ _.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.-_.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._..__._.._I._.._.._.._.. BNSF R.O.W. To Tocomo MY South) FO FO FO FO FO FO FO FO FO FO FO +1 O U` c_ �O t3+ - � o 0 u, E4' +I m � FO ti — T T^ BNSF R.O.W. OP C � :E L - - - _ - _ - _ _ _ _ - - _ _ - - _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ - - - _ _ _ _ _ _ _ _ _ _ _ _ -0 T N — 3 �8 N - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - _ - - - - - -\- - - Note 3 -- - --�—T --- - - - - - - T - - - - - - - - T - - - - - - - - -T- - - - - - - - - T - - - - - - - - - T- - - - - - - Note 3 - - T - -- - - - - - T - - - T- -- ------------------------- - i- - . --- - - -- - - 4 o ti --- - - ---"--'- -- -- -- --'-- - --- - - -- - ----------- --- - ----------- --- - - 777777T i NOTES; 4. PILE SUPPORTED RETAINING WALLS NOT SHOWN. 5• STATION CALLOUTS REFERENCE MAIN 1. M T T T T T T T ............................ _..................................................................................... I 1 Teflporory Shoring 6 7 to be designed by Contractor between node 2 and node 5. I I i I -OP OP OP OP OP OP OP C.lOP- 41'-9" 54'-9" Span 2 Span 1 Abut. #3 Pier #2 Abut. #1 Sta. 102E+40.10 Sta. 1028+81.85 Sta. 1029+36.60 18'-31,2" 100'-6" Face-to-Foce of Parapets -New Bridge 1 18'-31r," 137'-1" iZf�l Jvo3v PLAN �u��E�� 1141 04-3 f?'4hMo /(� 3.1 0 8 16 `Jli�lirLiC C� `F �J r 7i stole feet 0 u` FO a 0 -T T ' T T NSF R.O. W. .._.._.._.._..--.----.._.._.._.._.._.._.._ ............................. Proposed Temporary Sheet Pile Shoring w/ Tiebacks n (Stage I) 5 OP OP NOTES: 1. SHORI OR EXTRA EVATION CLASS A BETWEEN NODE 2 AND NO5 TO BE DESIGNED BY THE CONTRA TOR IN ACCOR ANCE WITH WSDOT STANDARD SPECIFICATION 2-09. 2. ALL TEMPORARY TIEBACKS AND SHEET PILES SHALL BE REMOVED TO A MINIMUM OF 3'-0" BELOW BASE OF RAIL OR FINISHED GRADE. WHICHEVER IS LOWER. REMAINDER OF TEMPORARY SHORING MATERIAL. TIEBACKS, AND TIE RODS, TO REMAIN U.N.O. 3. SHEET PILE TO REMAIN AS REOUIRED FOR RELOCATION OF UTILITIES BEHIND BRIDGE ABUTMENT. MAXIMUM SHEET PILE CANTILEVER RETAINED HEIGHT = 4'-0".9 OX = KEY POINT LOCATION ON UNFOLDED SHORING ELEVATION DRAWING R - 3 693 1 50 FEC.1.0: STPUL-1276(004) HPP-1276(005) �i BergerABAM 33301 9th Avenue South, Suite 300 Federal Way, Washington 98003-2600 (206) 431-2300 Fax: (206) 431-2250 HANSON C ;op, right Hanson Professional Services Inc. 2011 swnxa ZZ A'- SHOWN .m+rmwsin.n0 DATUM CITY OF UNTON Public Works Department Approved For Construction Robert M. Hanson P.E. Dote STRANDER BOULEVARD EXTENSION PHASE 1, SEGMENT2A BNSF BRIDGE NO.11.07 L.S.0051 TEMPORARY SHORING PLAN - STAGE I 12/05/11 CALL 48 HOURS BEFORE YOU DIG 1-800-424-5555 -RECORD DRAWINGS 7/31 /2014 H"G �°- �� CL:' � `u r �R0 a' oa+ AAN RA_05 NO. RE.ISION BY DATE . PPR uAF = 161 231