Loading...
HomeMy WebLinkAboutR-3693151Temporary Retaining Wall 'A' IBy Contractor) CY) O Ground line at LU Back of Wall T/T Elev. See RA-Oi ao Excavation Line Elev. (-)I . 00 42'-8" Temporary Retaining Wall #1 Elev. 36-00 G.E. = 30. G.E. - 32.50­- \ Elev. 33.82--1 134'-63,4" Temporary Retaining Wall W2 Abut. #3 16'-01'4" 102'-6" Bk.-to-Bk. of Abutments New Bridge ............... .... ....... . ... ........... ........... ...... ........ ........................ . ........................ ........... 6 S120. @ 6' -0 36' -0 5 Si2a. @ 6'-0' 30 ' -0 7 - -0" 5'-0" 8 SDCl- 6'-0" = 48'-D" 42'-8" Abut. $11 16,-0"2 E I ev. 33.82 ........ G.E. = 30.57- Ion 7 Spa. @ 5'-6" = 38'-6" ki U-t-LTUUT s Be I ow 3'-0. 3'-0" 3 -03,4" V-- ----- ------ - ------- - --- ------- ----- --- Bottorn of Sheeting Elev. 1-)18.00 SHORING ELEVATION STAGE I NOTES: 1. AFTER THE SHEET PILE IS DRIVEN TO ITS FINAL LOCATION, NO EXCAVATION IN FRONT OF THE WALL SHALL BE MADE IN EXCESS OF 1'-6" BELOW THE GROUND ANCHOR HOLE Temporary Retaining Wall 'B' LOCATION IN THE SHEET PILE UNITL THE GROUND ANCHOR. WALERS, ETC. HAVE BEEN IBy Contractor) INSTALLED. TESTED. AND APPROVED. 134'-63,4" -8 42' Temporary Retaining Wall 'C' j 2. SEVERAL ANCHORS WILL NEED TO BE RELEASED. AND PORTIONS OF WALER BEAM REMOVED, Temporary Retaining Wall #3 (By Contrector) IN ORDER TO CONSTRUCT THE REINFORCED CONCRETE ABUTMENTS AND PIER. ONCE THE CONCRETE FOUNDATION HAS ACHIEVED ADEQUATE STRENGTH, BLOCKING (OR OTHER MEANS Elev. 36.00 FINAL GROUND ANCHOR LOCATIONS SHALL BE PROVIDED AT THE DISCRETION OF THE CONTRACTOR) SHALL BE INSTALLED FULL DEPTH OF THE Elev. 33.82 G.E. = 32.50 i AT LOCATIONS THAT DO NOT EXCEED THE INDICATED FOUNDATION SLAB FOR A MINIMUM OF 10'-0" (MEASURED PARALLEL TO FACE OF Tee RA-02 /T Elev. SPACINGS BY MORE THAN 6". THE ANCHOR LOCATIONS SHEETING) ON BOTH SIDES OF ANCHORS TO BE REMOVED. BLOCKING 15 TO BE C.E.30.57-7,1 -- - - - - - SHALL BE REVISED TO BE LOCATED AWAY FROM PILE INSTALLED SUCH THAT NO MOVEMENT OF THE SHEETING BELOW THE TOP OF THE KNUCKLE LOCATIONS AND TO LIMIT THE AMOUNT OF FOUNDATION SLAB WILL OCCUR AFTER THE ANCHORS INDICATED BELOW ARE RELEASED. SHEETING WEB REMOVAL REQUIRED TO PROVIDE THE NECESSARY HOLES THROUGH THE SHEETING. THE FOLLOWING ANCHORS ARE ANTICIPATED TO INTERFERE WITH THE ABUTMENTS AND PIER: GROUND ANCHORS 14C-16C, 21C. 22C. AND 30C-32C 0 GROUND ANCHORS 148-168, 21B. 22B. AND 308-32B THE GROUND ANCHORS AT LEVEL C (14C-16C. 21C. 22C. AND 30C-32C) SHALL BE It li. I #el 0 0, 1 RELEASED FIRST GROUND ANCHORS AT LEVEL B 114B-16B. 21B. 22B. AND 30B-32B) d, L RELEASED ONLY AFTER GIVEN ABUTMENT OR PIER HAVE BEEN RELEASED. THE SHORING SYSTEM DETAILED IN 35B o T 4 THE PLANS HAS BEEN DESIGNED FOR RELEASE OF ONLY THOSE ANCHORS INDICATED ABOVE. b SHOULD THE CONTRACTOR DESIRE TO RELEASE ANCHORS OTHER THAN THOSE LISTED ABOVE. THE CONTRACTOR SHALL SUBMIT DESIGN CALCULATIONS AND DETAILS FOR APPROVAL PRIOR TO ALTERING THE SHORING SYSTEM DETAILED IN THE PLANS. THE CONTRACTOR SHALL NOT PROCEED WITH MODIFICATIONS TO THE SHORING SYSTEM UNTIL THE ENGINEER HAS 35C PROVIDED APPROVAL. E 3. SHORING OR EXTRA EXCAVATION CLASS A BETWEEN NODE 2 AND NODE 5 TO BE DESIGNED BY THE CONTRACTOR IN ACCORDANCE WITH WSDOT STANDARD SPECIFICATION 2-09. Excavation Line Elev. (-)1.00 OWNER HAS NOT SECURED RIGHT-OF-WAY To INSTALL GROUND ANCHORS FOR SHORING BETWEEN o NODES 2 TO I OR NODES 6 TO 5 EAST OF THE EASTERN BNSF ROW LINE SHOWN ON THE PLANS. Continued 4. ALL TEMPORARY TIEBACKS AND SHEET PILES SHALL BE REMOVED TO A MINIMUM OF 3'-0" 6'-0' 5'-B" 5 Spa. @ 5'-0" 25'-0' 3, -0' BELOW BASE OF RAIL OR FINISHED GRADE. WHICHEVER IS LOWER. REMAINDER OF TEMPORARY Above Anchor Locations SHORING MATERIAL. TIEBACKS. AND TIE RODS, TO REMAIN U.N.O. 3' -0 CONTRACTOR DESIGNED TEMPORARY SHORING AND GROUND ANCHORS BETWEEN NODES 7 TO 6 SHALL BE REMOVED TO AN ELEVATION BELOW -1.0. ANCHOR DESIGNATION WHERE 'X' 15 THE COLUMN NUMBER ai Bottom of Sheeting AND 'Y' IS THE LEVEL. Elev. (-)18.00 G.E. = GROUND ANCHOR ELEVATION AT WALL SHORING ELEVATION STAGE I (CONT.) F.L. = FOLD LINE 0 WORK WITH SHEETS RA-05. RA-09. AND RA-10. R-3693151 FEDAID: STPUL-1276(004) I -=In- CITY OF STRANDER BOULEVARD EXTENSION 12/05/11 HPP-1276(005) AS SHOWN .4- 1/ a- - RENTON PHASE 1, SEGMENT 2A BergerABAM N RECORD DRAWINGS 7/31/2014 VPT 8 CALL 48 HOURS N�w,;o- <0!HANS0 Public Works Department BEFORE YOU DIG 33301 9th Avenue South, Suite 300 Approved For Construction BNSF BRIDGE NO, 11.07 L.S. 0051 RA-06 Federal Way, Washington 98003-2600 L �11 APPR ANN F - - - TEMPORARY SHORING ELEVATION - STAGE I - -2311 C Copyright Flown Pro!essicnol Smices Inc. 2011 REVISION BY --MAF Robert M. Hanson P.E. Date 162 1-800-424-5555 (206) 431-2300 Fax: (206) 431-2250