Loading...
HomeMy WebLinkAboutR-3693154PA PERFORMANCE TEST PROCEDURE 1. THE PERFORMANCE TEST SHALL BE NAVE BY INCREMENTALLY LOADING AND UNLOADING THE GROUND ANCHORS IN ACCORDANCE WITH THE FOLLOWING SCHEDULE. PERFORMANCE TEST SCHEDULE AL 4.500E AL G.25D1_ 0.250L* 0,7501_+ 0.250L 0.50DL AL AL 0.500E 0.150L 0.250L 0.25L 0.750L I.00DL 0.50014 0.50DL I.ODOL 1,200E AL 0.150L 1.200L■ 1.33OLa TEST LOAD 0.25DL 1.000Ls AL REDUCE TO LOCK-GFF LUAU 2. THE ANCHOR MOVEMENTS SHALL BE MEASURED FROM THE INITIAL ALIGNMENT LOAD AND RECORDED TO THE NEAREST .001 INCHES WITH RESPECT TO AN INDEPENDENT FIXED REFERENCE POINT AT THE ALIGNMENT LOAD AND AT EACH INCREMENT OF LOAD. THE ALIGNMENT LOAD 15 A NOMINAL LOAD MAINTAINED ON THE SOIL ANCHOR TO KEEP THE TESTING EQUIPMENT IN POSITION. 3. THE TEST LOAD SHALL BE MONITORED WITH A PRESSURE GAUGE. A REFERENCE GAUGE SHALL BE PLACED IN A SERIES WITH THE PRE55ME GAUGE DURING EACH PERFORMANCE TEST. IF THE REFERENCE PRESSURE GAUGE AND THE PRESSURE GAUGE READINGS DIFFER BY MORE THAN 10 PERCENT: THE JACK, PRESSURE CAUGE. AND REFERENCE GAUGE SHALL BE RECALIaRATED. AT LOAD INCREMENTS OTHER THAN THE MAXIMUM LOAD. THE LOAD SHALL BE HELD JUST LONG ENOUGH TO OBTAIN THE MOVEMENT READING, BUT NO MORE THAN ONE MINUTE. 4. THE PUMP SHALL BE CAPABLE OF APPLYING EACH LOAD INCREMENT IN LESS THAN 60 SECONDS. 5. THE WIMUM TEST LOAD 1N A PERFORMANCE TEST SHALL BE HELD FOR 10 MINUTES. THE ANCHOR MOVEMENT WITH RESPECT TO A FIXED REFERENCE SHALL BE MEASURED AND RECORDED AT 1 MINUTE, 2, 3, 4. 5. 6 AND 10 MINUTES. IF THE ANCHOR MOVEMENT BETNEENI MINUTE AND 10 MINUTES EXCEEDS 0.04 INCHES, THE MAXIMUM TEST LOAD SHALL BE HELD FOR AN ADDITIONAL 50 MINUTES. IF THE LOAD HOLD IS EXTENDED. THE ANCHOR MOVEMENT SHALL BE RECORDED AT 15 MINUTES. 20, 25. 30, 45 AND 60 MINUTES. THE LOAD HOLD 114E SHALL BEGIN WHEN THE PUMP STARTS TO RAISE THE LOAD FROM THE 1.200L LOAD INCREMENT TO THE 1.330E LOAD INCREMENT, 6. LOCK -OFF THE LOAD AT 100% OF THE DESIGN LOAD UNLESS NOTED OTHERWISE. (SEE THE GROIN ANCHOR SUMMARY TABLE,) 7. PLOT THE ANCHOR MOVEMENT VERSUS LOAD FOR EACH LUAU INCREMENT MARKED WITH AN ASTERISK Is) IN THE PERFORMANCE TEST SCHEDULE AND PLOT THE RESIDUAL MOVEMENT OF THE ANCHOR AT EACH ALIGNMENT LOAD VERSUS THE HIGHEST PREVIOUSLY APPLIED LOAD. GRAPH FORMAT SHALL BE APPROVED BY THE ENGINEER PRIOR TO USE, 8. A PERFORMANCE TESTED GROUND ANCHOR WITH A 10 MINUTE LOAD HOLD IS ACCEPTABLE IF: a. THE ANCHOR WILL CARRY THE MAXIMUM TEST LOAD WITH LESS THAN 0.04 INCHES OF MOVEMENT OETNEEN 1 MINUTE AND 10 MINUTES, AND b. THE TOTAL MOVEMENT AT THE MAXIMUM TEST LOAD EXCEEDS 80 PERCENT OF THE THEORETICAL ELASTIC ELONGATION OF THE UNBONDEO LENGTH. AND c. THE TOTAL MOVEMENT AT THE MAXIMUM TEST LOAD DOES NOT EXCEED THE THEORETICAL ELASTIC ELONGATION OF THE UNBOWED LENGTH PLUS 50% OF THE THEORETICAL ELASTIC ELONGATION OF THE 813NDED LENGTH. 9. A PERFORMANCE TESTED GROUND ANCHOR WITH A 60 MINUTE LOAD HOLD IS ACCEPTABLE IF: a. THE ANCHOR WILL CARRY THE MAXIMUM TEST LOAD WITH LESS THAN 0.00 INCHES OF MOVEMENT BETWEEN 6 MINUTES AND 60 MINUTES, AND b, THE TOTAL MOVEMENT AT THE MAXIMUM TEST LOAD EXCEEDS 80 PERCENT OF THE THEORETICAL ELASTIC ELONGATION OF THE UNDONOED LENGTH, AND c. THE TOTAL MOVEMENT AT THE MAXIMUM TEST LOAD DOES NOT EXCEED THE THEORETICAL ELASTIC ELONGATION OF THE UNBONOED tENGTH PLUS 50% OF THE THEORETICAL ELASTIC ELONGATION OF THE BONDED LENGTH. IO. SEE GROUND ANCHOR SPECIFICATION 6-17 AMA 6-19 IN THE SPECIAL PROVISIONS FOR COMPLETE GROUND ANCHOR REQUIREMENTS AND PROCEDURES REGARDING ANCHORS THAT HAVE UNACCEPTABLE MOVEMENTS. 11, 5% OR A MINIMUM OF 3 GROUNO ANCHORS SHALL OF PERFORMANCE TESTED AND CREEP TESTED. PROOF TEST PROCEDURE ANCHOR NO.: I. THE PROOF TEST SHALL BE MADE BY IRCREMENTALLY DESIGN LOAD: LOADING THE GROUND ANCHORS IN ACCORDANCE WITH THE FOLLOWING SCHEDULE - PROOF TEST SCHEDULE AL 0.250L 0.500L 0.75UL I,OODL 1.20DL 1.330L REDUCE TO LOCK -OFF LOAD 2. THE ANCHOR MOVEMENTS SHALL BE MEASURED FROM THE INITIAL ALIGNMENT LOAD AND RECORDED TO THE NEAREST .001 INCHES WITH RESPECT TO AN INDEPENDENT FIXED REFERENCE POINT AT THE ALIGNMENT LOAD AND AT EACH INCREMENT OF LOAD. THE ALIGNMENT LOAD IS A NOMINAL LOAD MAINTAINED ON THE ANCHOR TO KEEP THE TESTING EQUIPMENT IN POSITION. 3. THE TEST LOAD SHALL BE MONITORED WITH A PRESSURE GAUGE. AT LOAD INCREMENTS OTHER THAN THE MANIMUM TEST LOAD, THE LOAD SHALL BE HELD JUST LONG ENOUGH TO OBTAIN THE MOVEMENT READING, BUT NOT MORE THAN DNE MINUTE. A. THE PUMP SHALL BE CAPABLE OF APPLYING EACH LOAD INCREMENT IN LESS THAN 60 SECOHOS. 5. THE MAXIMUM TEST LOAD IN A PROOF TEST SHALL BE HELD FOR 10 MINUTES, THE ANCHOR MOVEMENT WITH REPPECT TO A FIXED REFERENCE SHALL BE MEASURED AND RECORDED AT 1 MINUTE. 2. 3. 4. 5. 6 AND 10 MINUTES. IF THE ANCHOR MOVEMENT BETWEEN 1 MINUTE AND 10 MINUTES EXCEEDS 0.04 INCHES, THE MAXIMUM TEST LOAD SHALL BE HELD FOR AN ADDITIONAL 50 MINUTES. IF THE LOAD HOLD 15 EXTENDEOI THE ANCHOR MOVEMENT SHALL RE RECORDED AT 15 MINUTES, 20, 25, 30, 45 AND 60 MINUTES. THE LOAD HOLD TIME SHALL BEGIN WHEN THE PUMP STARTS TO RAISE THE LOAD FROM THE 1.20DL LOAD INCREMENT TO THE 1.33DL LOAD INCREMENT. G. LOCK -OFF THE LOAD AT 100% OF THE DESIGN LOAD UNLESS NOTED OTHERWISE. SSEE THE GROUND ANCHOR SUMMARY TABLE., 7. PLOT IRE ANCHOR MOVEMENT VERSUS LOAD FOR EACH LOAD INCREMENT GRAPH FORMAT SHALL BE APPROVED BY THE ENGINEER PRIOR TO USE. 8. A PROOF TESTED GROUND ANCHOR WITH A 10 MINUTE LOAD HOLD IS ACCEPTABLE IF: a. THE ANCHOR WILL CARRY THE MAXIMUM TEST LOAD WITH LESS THAN 0.94 INCHES OF MOVEMENT BETWEEN 1 MINUTE AND 10 MINUTES, AND b. THE TOTAL MOVEMENT AT THE MAXIMUM TEST LOAD EXCEEDS 80 PERCENT OF THE THEORETICAL ELASTIC ELONGATION OF THE UNBOWED LENGTH, AND c. THE TOTAL MOVEMENT AT THE MAXIMUM TEST LOAD DOES NOT EXCEED THE THEORETICAL ELASTIC ELONGATION OF THE UNBONQEn LENGTH PLUS 50% OF THE THEORETICAL ELASTIC ELONGATION OF THE BONDED LENGTH. A PROOF TESTED GROUND ANCHOR WITH A 60 MINUTE LDAO HOLD IS ACCEPTABLE IF: a. THE ANCHOR WILL CARRY THE MAXIMUM TEST LOAD WITH LESS THAN 0.08 INCHES OF MOVEMENT BETWEEN 6 MINUTES AND 60 MINUTES. AND b. THE TOTAL MOVEMENT AT THE MAXIMUM TEST LOAD EXCEEDS 80 PERCENT OF THE THEORETICAL ELASTIC ELONGATION OF THE UNBDNOED LENGTH. AND c. THE TOTAL MOVEMENT AT THE MAXIMUM TEST LOAD DOES NOT EXCEED THE THEORETICAL ELASTIC ELONGATION OF THE UNBONDED LENGTH PLUS 50% OF THE THEORETICAL ELASTIC ELONGATION OF THE BONDED LENGTH. 10. SEE GROUND ANCHOR SPECIFICATION 6-17 AND 6-19 IN THE SPECIAL PROVISIONS FOR COMPLETE GROUND ANCHOR REQUIREMENTS AND PROCEDURES REGARDING ANCHORS THAT HAVE UNACCEPTABLE MOVEMENTS. 11. EACH PRODUCTION ANCHOR SHALL BE PROOF TESTED. ■" 6" min. dia. cash, &*& Prestressing Steel Strands with smooth plastic sheathing SECTION A -A PERFORMANCE TEST REMARKS: AL = AL{GNAENT LOAD OIL = DESIGN LOAD, FOR GROUND ANCHOR • GRAPH REQUIRED. SEE NOTE T OF TEST PROCEDURE L.U. = LOCK -OFF LOAD. SEE NOTE 6 OF TEST PROCEDURE ANCHDR NO.: DESIGN LOAD: &taMLTTAL G5'4 SL,L f3 r, tTrA L 0 -6 O Q F T_ ❑0o36A VFf 0Gr,55 at# 5pocer 6 centrOI i 2ers alternating La 5' maximum spaing External grout snot in ten5ionl ails See Nate 3 SECTION B-B External grout I in terrsio 11 esfressing Steel Strands w�m Front Fcce -Spacer fl+;' minillum��, F,n 7.,i.F 1 f• L� �. centraIIzers at 5' maxiHum spacing, Typ. SHEET -PILE WAIL WITH TEMPORARY GROUND ANCHORS TEMPORARY GROUND ANCHORS E 5f D UNBONDEO LENGTH 6 (FT.] ESTIMATED BONDED [FT.? 75 RS 75 20 75 15 40 29 25 18 90 15 90 90 15 15 15 15 40 29 40 37 25 18 25 - 9Q 22 - Tl 75 28 40 43 25 32 1. ALL 0.6" DIAMETER 7-WIRE. LOW RELAXATION 270 ksi PRESTRESSING STEEL STRANDS SHALL BE ASTM A416. 2. FOR DETAILS OF WALER A BRACKET ASSEMBLY, SEE SHEET NO. RA-10, AND RA-45, 1 3. CONTRACTOR SHALL FURNISH AND INSTALL GROUND ANCHORS MEETING THE REOUIREMENTS FOR OESICN LOAD, UHBDNDEO LENGTH, AND LDCK-OFF LOAD SHOWN IN THE GROUND ANCHOR SUMMARY TABLE. ITEMS INDICATED W1TH 3 ASTERISK I*"I SHALL BE DESIGNED OR SELECTED BY THE CONTRACTOR, ALL MATERIALS AND WORK SHALL BE IN COMPLIANCE KITH THE PERFORMANCE SPECIPICATION FOR GROUND ANCHORS ISEE SPECIAL PROVISIONS). 4. AFTER THE SHEET PILE 15 DRIVEN TO ITS FINAL LOCATION, NO EXCAVATION IN FRONT OF THE WALL SHALL BE MADE IN EXCESS OF 1'-6" BELOW THE GROUND ANCHOR ROLE LOCATION IN THE SHEET PILE UNTIL THE GROUND ANCHOR. WALERS, ETC. HAVE PEEN INSTALLED. TESTED, AND APPROVED. S. ANCHOR DESIGN LOADS S4 M ARE SERVICE LOADS. ESTIMATED BONOED LENGTH SHOWN. THE CONTRACTOR SHALL DETERMINE THE BONDED LENGTH NECESSARY TO SATISFY THE TEST LOAD REQUIREMENTS AND THE DESIGN LOAD REQUIREMENTS, 6. REFERENCE NOTE 161 OF THE PERFORMANCE TEST PROCEDURE AND NOTE 161 OF THE PROOF TEST PROCEDURE. LOCK -OFF THE LOAD AT 20% OF THE DESIGN LOAD FOR ANCHORS 47A-SOA AND 57A-60A, LOCK�FF THE LOAD AT box OF THE DESIGN LOAD FOR ANCHORS 4TC-50C AND SIC-60C. R - 3 6 93 1 54 FEDNDP STPUI_-127C(004) HI P-1276(005) �� BergerA.I3AM �w 33301 9th Avenue South, SL to 3U0 Fed&WWay, Wafiingtnn990o3-250U 206 431-2300 FaK; (206 431-2250 I } ] HANSOM n00 9ht Hcnsan Pralessiwad San Des Inc. 2911 1 TEMPORARY RETAINING WALL_.: CONTRACTOR TJHj ❑ SEOUENCE PREFERENCE MAF 6--24- 2013 �A- SHOWN ,�, „po4 q, OAYUN CITY OF � P! PI RE'` TO Pu6e. works Cnnstructio rwc rr .ed Fvr Cnttstt lion Rasher[ M. Munson A.E. Dote STRANDER BOULEVARD EXTENSION PHASE 1, SEGMENT 2A 6NSFBRIL1Gi=NO. 11.07 L.S.0451 GROUND ANCHOR DETAILS s�2s�13 �vPT CAI_f_48 HOURS BEFORE YOU DIG 1-$00-424-5555 RECORD DRAWINGS 7/31/2014 - - ----'-------.- .-. NO } REV610N gf DAME APR'R `�.v� �> � RA'-�� iu ur r esaw. �165'231