PERFORMANCE TEST PROCEDURE
1. THE PERFORMANCE TEST SHALL BE NAVE BY INCREMENTALLY
LOADING AND UNLOADING THE GROUND ANCHORS IN ACCORDANCE WITH
THE FOLLOWING SCHEDULE.
PERFORMANCE TEST SCHEDULE
AL
4.500E
AL
G.25D1_
0.250L*
0,7501_+
0.250L
0.50DL
AL
AL
0.500E
0.150L
0.250L
0.25L
0.750L
I.00DL
0.50014
0.50DL
I.ODOL
1,200E
AL
0.150L
1.200L■
1.33OLa TEST LOAD
0.25DL
1.000Ls
AL
REDUCE TO LOCK-GFF LUAU
2. THE ANCHOR MOVEMENTS SHALL BE MEASURED FROM THE INITIAL
ALIGNMENT LOAD AND RECORDED TO THE NEAREST .001 INCHES
WITH RESPECT TO AN INDEPENDENT FIXED REFERENCE POINT AT THE
ALIGNMENT LOAD AND AT EACH INCREMENT OF LOAD. THE ALIGNMENT
LOAD 15 A NOMINAL LOAD MAINTAINED ON THE SOIL ANCHOR TO KEEP
THE TESTING EQUIPMENT IN POSITION.
3. THE TEST LOAD SHALL BE MONITORED WITH A PRESSURE GAUGE.
A REFERENCE GAUGE SHALL BE PLACED IN A SERIES WITH THE
PRE55ME GAUGE DURING EACH PERFORMANCE TEST. IF THE
REFERENCE PRESSURE GAUGE AND THE PRESSURE GAUGE READINGS
DIFFER BY MORE THAN 10 PERCENT: THE JACK, PRESSURE CAUGE.
AND REFERENCE GAUGE SHALL BE RECALIaRATED. AT LOAD
INCREMENTS OTHER THAN THE MAXIMUM LOAD. THE LOAD SHALL BE
HELD JUST LONG ENOUGH TO OBTAIN THE MOVEMENT READING, BUT NO
MORE THAN ONE MINUTE.
4. THE PUMP SHALL BE CAPABLE OF APPLYING EACH LOAD INCREMENT IN
LESS THAN 60 SECONDS.
5. THE WIMUM TEST LOAD 1N A PERFORMANCE TEST SHALL BE HELD
FOR 10 MINUTES. THE ANCHOR MOVEMENT WITH RESPECT TO A FIXED
REFERENCE SHALL BE MEASURED AND RECORDED AT 1 MINUTE, 2, 3,
4. 5. 6 AND 10 MINUTES. IF THE ANCHOR MOVEMENT BETNEENI
MINUTE AND 10 MINUTES EXCEEDS 0.04 INCHES, THE MAXIMUM TEST
LOAD SHALL BE HELD FOR AN ADDITIONAL 50 MINUTES. IF THE
LOAD HOLD IS EXTENDED. THE ANCHOR MOVEMENT SHALL BE RECORDED
AT 15 MINUTES. 20, 25. 30, 45 AND 60 MINUTES. THE LOAD HOLD
114E SHALL BEGIN WHEN THE PUMP STARTS TO RAISE THE LOAD
FROM THE 1.200L LOAD INCREMENT TO THE 1.330E LOAD
INCREMENT,
6. LOCK -OFF THE LOAD AT 100% OF THE DESIGN LOAD UNLESS NOTED
OTHERWISE. (SEE THE GROIN ANCHOR SUMMARY TABLE,)
7. PLOT THE ANCHOR MOVEMENT VERSUS LOAD FOR EACH LUAU
INCREMENT MARKED WITH AN ASTERISK Is) IN THE PERFORMANCE
TEST SCHEDULE AND PLOT THE RESIDUAL MOVEMENT OF THE ANCHOR
AT EACH ALIGNMENT LOAD VERSUS THE HIGHEST PREVIOUSLY APPLIED
LOAD. GRAPH FORMAT SHALL BE APPROVED BY THE ENGINEER PRIOR
TO USE,
8. A PERFORMANCE TESTED GROUND ANCHOR WITH A 10 MINUTE LOAD
HOLD IS ACCEPTABLE IF:
a. THE ANCHOR WILL CARRY THE MAXIMUM TEST LOAD WITH
LESS THAN 0.04 INCHES OF MOVEMENT OETNEEN 1 MINUTE
AND 10 MINUTES, AND
b. THE TOTAL MOVEMENT AT THE MAXIMUM TEST LOAD EXCEEDS
80 PERCENT OF THE THEORETICAL ELASTIC ELONGATION
OF THE UNBONDEO LENGTH. AND
c. THE TOTAL MOVEMENT AT THE MAXIMUM TEST LOAD DOES NOT
EXCEED THE THEORETICAL ELASTIC ELONGATION OF THE
UNBOWED LENGTH PLUS 50% OF THE THEORETICAL ELASTIC
ELONGATION OF THE 813NDED LENGTH.
9. A PERFORMANCE TESTED GROUND ANCHOR WITH A 60 MINUTE LOAD
HOLD IS ACCEPTABLE IF:
a. THE ANCHOR WILL CARRY THE MAXIMUM TEST LOAD WITH LESS
THAN 0.00 INCHES OF MOVEMENT BETWEEN 6 MINUTES AND 60
MINUTES, AND
b, THE TOTAL MOVEMENT AT THE MAXIMUM TEST LOAD EXCEEDS
80 PERCENT OF THE THEORETICAL ELASTIC ELONGATION OF THE
UNDONOED LENGTH, AND
c. THE TOTAL MOVEMENT AT THE MAXIMUM TEST LOAD DOES NOT
EXCEED THE THEORETICAL ELASTIC ELONGATION OF THE
UNBONOED tENGTH PLUS 50% OF THE THEORETICAL ELASTIC
ELONGATION OF THE BONDED LENGTH.
IO. SEE GROUND ANCHOR SPECIFICATION 6-17 AMA 6-19 IN THE SPECIAL
PROVISIONS FOR COMPLETE GROUND ANCHOR REQUIREMENTS AND
PROCEDURES REGARDING ANCHORS THAT HAVE UNACCEPTABLE MOVEMENTS.
11, 5% OR A MINIMUM OF 3 GROUNO ANCHORS SHALL OF PERFORMANCE
TESTED AND CREEP TESTED.
PROOF TEST PROCEDURE ANCHOR NO.:
I. THE PROOF TEST SHALL BE MADE BY IRCREMENTALLY DESIGN LOAD:
LOADING THE GROUND ANCHORS IN ACCORDANCE WITH
THE FOLLOWING SCHEDULE -
PROOF TEST SCHEDULE
AL
0.250L
0.500L
0.75UL
I,OODL
1.20DL
1.330L
REDUCE TO LOCK -OFF LOAD
2. THE ANCHOR MOVEMENTS SHALL BE MEASURED FROM THE INITIAL
ALIGNMENT LOAD AND RECORDED TO THE NEAREST .001 INCHES
WITH RESPECT TO AN INDEPENDENT FIXED REFERENCE POINT AT THE
ALIGNMENT LOAD AND AT EACH INCREMENT OF LOAD. THE ALIGNMENT
LOAD IS A NOMINAL LOAD MAINTAINED ON THE ANCHOR TO KEEP THE
TESTING EQUIPMENT IN POSITION.
3. THE TEST LOAD SHALL BE MONITORED WITH A PRESSURE GAUGE.
AT LOAD INCREMENTS OTHER THAN THE MANIMUM TEST LOAD, THE
LOAD SHALL BE HELD JUST LONG ENOUGH TO OBTAIN THE MOVEMENT
READING, BUT NOT MORE THAN DNE MINUTE.
A. THE PUMP SHALL BE CAPABLE OF APPLYING EACH LOAD INCREMENT
IN LESS THAN 60 SECOHOS.
5. THE MAXIMUM TEST LOAD IN A PROOF TEST SHALL BE HELD FOR 10
MINUTES, THE ANCHOR MOVEMENT WITH REPPECT TO A FIXED
REFERENCE SHALL BE MEASURED AND RECORDED AT 1 MINUTE. 2. 3.
4. 5. 6 AND 10 MINUTES. IF THE ANCHOR MOVEMENT BETWEEN 1
MINUTE AND 10 MINUTES EXCEEDS 0.04 INCHES, THE MAXIMUM TEST
LOAD SHALL BE HELD FOR AN ADDITIONAL 50 MINUTES. IF THE
LOAD HOLD 15 EXTENDEOI THE ANCHOR MOVEMENT SHALL RE RECORDED
AT 15 MINUTES, 20, 25, 30, 45 AND 60 MINUTES. THE LOAD HOLD
TIME SHALL BEGIN WHEN THE PUMP STARTS TO RAISE THE LOAD FROM
THE 1.20DL LOAD INCREMENT TO THE 1.33DL LOAD INCREMENT.
G. LOCK -OFF THE LOAD AT 100% OF THE DESIGN LOAD UNLESS NOTED
OTHERWISE. SSEE THE GROUND ANCHOR SUMMARY TABLE.,
7. PLOT IRE ANCHOR MOVEMENT VERSUS LOAD FOR EACH LOAD INCREMENT
GRAPH FORMAT SHALL BE APPROVED BY THE ENGINEER PRIOR TO USE.
8. A PROOF TESTED GROUND ANCHOR WITH A 10 MINUTE LOAD HOLD IS
ACCEPTABLE IF:
a. THE ANCHOR WILL CARRY THE MAXIMUM TEST LOAD WITH LESS
THAN 0.94 INCHES OF MOVEMENT BETWEEN 1 MINUTE AND 10
MINUTES, AND
b. THE TOTAL MOVEMENT AT THE MAXIMUM TEST LOAD EXCEEDS
80 PERCENT OF THE THEORETICAL ELASTIC ELONGATION OF THE
UNBOWED LENGTH, AND
c. THE TOTAL MOVEMENT AT THE MAXIMUM TEST LOAD DOES NOT
EXCEED THE THEORETICAL ELASTIC ELONGATION OF THE
UNBONQEn LENGTH PLUS 50% OF THE THEORETICAL ELASTIC
ELONGATION OF THE BONDED LENGTH.
A PROOF TESTED GROUND ANCHOR WITH A 60 MINUTE LDAO HOLD
IS ACCEPTABLE IF:
a. THE ANCHOR WILL CARRY THE MAXIMUM TEST LOAD WITH LESS
THAN 0.08 INCHES OF MOVEMENT BETWEEN 6 MINUTES AND 60
MINUTES. AND
b. THE TOTAL MOVEMENT AT THE MAXIMUM TEST LOAD EXCEEDS
80 PERCENT OF THE THEORETICAL ELASTIC ELONGATION OF THE
UNBDNOED LENGTH. AND
c. THE TOTAL MOVEMENT AT THE MAXIMUM TEST LOAD DOES NOT
EXCEED THE THEORETICAL ELASTIC ELONGATION OF THE
UNBONDED LENGTH PLUS 50% OF THE THEORETICAL ELASTIC
ELONGATION OF THE BONDED LENGTH.
10. SEE GROUND ANCHOR SPECIFICATION 6-17 AND 6-19 IN THE SPECIAL
PROVISIONS FOR COMPLETE GROUND ANCHOR REQUIREMENTS AND
PROCEDURES REGARDING ANCHORS THAT HAVE UNACCEPTABLE MOVEMENTS.
11. EACH PRODUCTION ANCHOR SHALL BE PROOF TESTED.
■" 6" min. dia. cash,
&*& Prestressing
Steel Strands
with smooth
plastic sheathing
SECTION A -A
PERFORMANCE TEST REMARKS:
AL = AL{GNAENT LOAD
OIL = DESIGN LOAD, FOR GROUND ANCHOR
• GRAPH REQUIRED. SEE NOTE T OF TEST PROCEDURE
L.U. = LOCK -OFF LOAD. SEE NOTE 6 OF TEST PROCEDURE
ANCHDR NO.:
DESIGN LOAD:
&taMLTTAL G5'4
SL,L f3 r, tTrA L 0 -6 O
Q F T_ ❑0o36A
VFf 0Gr,55
at# 5pocer 6 centrOI i 2ers
alternating La 5'
maximum spaing
External grout
snot in ten5ionl
ails See Nate 3
SECTION B-B
External grout
I in terrsio 11
esfressing
Steel Strands
w�m
Front Fcce
-Spacer fl+;' minillum��,
F,n 7.,i.F 1 f• L� �.
centraIIzers at 5'
maxiHum spacing, Typ.
SHEET -PILE WAIL WITH TEMPORARY GROUND ANCHORS TEMPORARY GROUND ANCHORS
E 5f
D UNBONDEO
LENGTH
6 (FT.]
ESTIMATED
BONDED
[FT.?
75
RS
75
20
75
15
40
29
25
18
90
15
90
90
15
15
15
15
40
29
40
37
25
18
25
- 9Q
22
- Tl
75
28
40
43
25
32
1. ALL 0.6" DIAMETER 7-WIRE. LOW RELAXATION 270 ksi PRESTRESSING STEEL STRANDS SHALL BE ASTM A416.
2. FOR DETAILS OF WALER A BRACKET ASSEMBLY, SEE SHEET NO. RA-10, AND RA-45, 1
3. CONTRACTOR SHALL FURNISH AND INSTALL GROUND ANCHORS MEETING THE REOUIREMENTS FOR OESICN LOAD,
UHBDNDEO LENGTH, AND LDCK-OFF LOAD SHOWN IN THE GROUND ANCHOR SUMMARY TABLE. ITEMS INDICATED W1TH 3
ASTERISK I*"I SHALL BE DESIGNED OR SELECTED BY THE CONTRACTOR, ALL MATERIALS AND WORK SHALL BE IN
COMPLIANCE KITH THE PERFORMANCE SPECIPICATION FOR GROUND ANCHORS ISEE SPECIAL PROVISIONS).
4. AFTER THE SHEET PILE 15 DRIVEN TO ITS FINAL LOCATION, NO EXCAVATION IN FRONT OF THE WALL SHALL
BE MADE IN EXCESS OF 1'-6" BELOW THE GROUND ANCHOR ROLE LOCATION IN THE SHEET PILE UNTIL THE GROUND
ANCHOR. WALERS, ETC. HAVE PEEN INSTALLED. TESTED, AND APPROVED.
S. ANCHOR DESIGN LOADS S4 M ARE SERVICE LOADS. ESTIMATED BONOED LENGTH SHOWN. THE CONTRACTOR SHALL
DETERMINE THE BONDED LENGTH NECESSARY TO SATISFY THE TEST LOAD REQUIREMENTS AND THE DESIGN LOAD
REQUIREMENTS,
6. REFERENCE NOTE 161 OF THE PERFORMANCE TEST PROCEDURE AND NOTE 161 OF THE PROOF TEST PROCEDURE.
LOCK -OFF THE LOAD AT 20% OF THE DESIGN LOAD FOR ANCHORS 47A-SOA AND 57A-60A, LOCK�FF THE LOAD AT
box OF THE DESIGN LOAD FOR ANCHORS 4TC-50C AND SIC-60C. R - 3 6 93 1 54
FEDNDP STPUI_-127C(004)
HI P-1276(005)
�� BergerA.I3AM
�w
33301 9th Avenue South, SL to 3U0
Fed&WWay, Wafiingtnn990o3-250U
206 431-2300 FaK; (206 431-2250
I } ]
HANSOM
n00 9ht Hcnsan Pralessiwad San Des Inc. 2911
1 TEMPORARY RETAINING WALL_.: CONTRACTOR TJHj
❑ SEOUENCE PREFERENCE MAF
6--24-
2013
�A- SHOWN
,�, „po4 q,
OAYUN
CITY OF
� P! PI
RE'` TO
Pu6e. works Cnnstructio
rwc rr .ed Fvr Cnttstt lion
Rasher[ M. Munson A.E. Dote
STRANDER BOULEVARD EXTENSION
PHASE 1, SEGMENT 2A
6NSFBRIL1Gi=NO. 11.07 L.S.0451
GROUND ANCHOR DETAILS
s�2s�13
�vPT
CAI_f_48 HOURS
BEFORE YOU DIG
1-$00-424-5555
RECORD DRAWINGS 7/31/2014
- - ----'-------.- .-.
NO } REV610N gf DAME APR'R
`�.v�
�> �
RA'-��
iu
ur r esaw.
�165'231