HomeMy WebLinkAboutR-3693159rn
m
CY)
O
LU
I —
To Tacoma
MY South)
Abut.
Face of Pcropet---�
DP100 or DP101
ABUT. #3
Iran Tlon it
Pone)
It Pier
4"
2
End of beam
i1' /
PIER #2
ELEVATION
(Looking Railway West)
(Handrails not shown for clarity)
acTlon Ireaa
me I
To Seattle
MY North)
Abut.
2"
Face of Parapet
r OP100 or DP101
ABUT. #1
NOTE:
See sheet RA-38 for bearing BP11.07-1 & BP11.07-2
details.
If jacking of bearings is required, position jacks
under each girder in front of bearings. Jocks shall
be centered under each girder and lifted simultaneously
R-3693159
x FECAID: STPUL-1273(004) CITY OF STRANDER BOULEVARD EXTENSION u�12/05/11
HPP-1276(0�,.) S AS SHOWN
r �i BergerABAM<q!HANSONRECORD DRAWINGS 7/31 /2014 {N� RENTON PHASE 1, SEGMENT 2A �°°
CALL 48 HOURS �� ouw CDP PublicW. rks Deportment
BEFORE YOU DIG 333019Lh Avenue South, Suite 300 pep DATUM Approved For Construction
N Federal Way, Washington 98003-2600 pcooydyht Hanson Pr-te.;ionai Services Inc. eon aaN BNSF BRIDGE EL VAT( L.S. DD51 RA-14
J 1-800-424-55555 (206) 431-2300 Fax: (205) 431-2250 N0. RE iSION BY LATE <PPR ... � Robert M. Honson P.E. Date BEARING ELEVATIONS y`e11 70 231