Loading...
HomeMy WebLinkAboutR-3693159rn m CY) O LU I — To Tacoma MY South) Abut. Face of Pcropet---� DP100 or DP101 ABUT. #3 Iran Tlon it Pone) It Pier 4" 2 End of beam i1' / PIER #2 ELEVATION (Looking Railway West) (Handrails not shown for clarity) acTlon Ireaa me I To Seattle MY North) Abut. 2" Face of Parapet r OP100 or DP101 ABUT. #1 NOTE: See sheet RA-38 for bearing BP11.07-1 & BP11.07-2 details. If jacking of bearings is required, position jacks under each girder in front of bearings. Jocks shall be centered under each girder and lifted simultaneously R-3693159 x FECAID: STPUL-1273(004) CITY OF STRANDER BOULEVARD EXTENSION u�12/05/11 HPP-1276(0�,.) S AS SHOWN r �i BergerABAM<q!HANSONRECORD DRAWINGS 7/31 /2014 {N� RENTON PHASE 1, SEGMENT 2A �°° CALL 48 HOURS �� ouw CDP PublicW. rks Deportment BEFORE YOU DIG 333019Lh Avenue South, Suite 300 pep DATUM Approved For Construction N Federal Way, Washington 98003-2600 pcooydyht Hanson Pr-te.;ionai Services Inc. eon aaN BNSF BRIDGE EL VAT( L.S. DD51 RA-14 J 1-800-424-55555 (206) 431-2300 Fax: (205) 431-2250 N0. RE iSION BY LATE <PPR ... � Robert M. Honson P.E. Date BEARING ELEVATIONS y`e11 70 231