Loading...
HomeMy WebLinkAboutR-3693162CY) d) (D M O LLI F_ Future Main Main 1 It Main 2 Main 3 Notes: 1. Provide protection sheath over partially 17'-9, embedded woterstops prior to bockfilling. 2. Provide protection sheath over full height 4'-1I«4" 13'-734' Ifwoterstops construction oand hthe awestern stern dedge ge foftage Stage Il construction. 4 - 4E1 @ ±12" cts. 14 - 4E1 @ ± 12" cts. e 4 B 4 - 1010-4 @ 14-1009-1 @ 12" cts. (B.F.) 3. The field fit cap plate shall fully cover the top opening of the protection sheath. ±12' cts. (B.F. of Backwall) - EIev. 33.32 (B.F.) 4. The protection sheath shall be of continuous one-piece construction above elevation 24.0. + o 503 @ mid -thickness. M {� TYD• Elev. 31.97 iT1 —'T —(\�.— — — — — — — — — — — — — — — — - 1� v 503-9 IE!F. )� III I I I jII 18-507-10� @ 12" cts. (F.F. of backwall only) i j j Eastern edge of Stage I — — — — — — — — — — — — — — — — — — — — — — — — I Western edge of Stage II of backwol I Waterstop w/ �II� L4-517 6 JLJField fit 16 gage Protection 3" dio.x1'-012tleeD II galvanized sheet 6« Sheath I blackout for anchor bolt. i I I I Waterstop metal custom cop N Adjust reinforcement as i I plate. Tack weld t necessary Blackout clear I I I I to secure in the blackout. Blackout form I � (- � Waterstop. shall be removed before I I I field. 1 _ Typ. N 110, B I anchor bolt is set. Typ. j l 18-5E1 @ 12" cts. I I I I I 2"X12" Keyed I , I 2 x12 J Keyed Secure to foundation with 1,4" Construction I I Construction I J dip.. hex washer head corrosion r Joint I I I Joint I I 16 gage galvanized resistant. self topping concrete I I I I I sheet. Typ. screws at 6" cts.. Typ. 36 -827-1 @ 6" cts. IF.F.) II 16 Gage bent galvanized I X o x 136-1427-1 @ 6" cts. (B.F.) I I I ~ram sheet metal protection 1 sheet. Install to protect 0 o u g I; I I I M partially embedded U, I I I I waterstop WATERSTOP PROTECTION DETAIL SECTION J—J I �4 -827-1 1 i 1 U I II I I.F- M, z S I I I I x =a I 18 - 14J2 @ 12' cts. I I I + l l 1 18 - 14J1 @ 12" cts. X I I 11 '- - - - - -_ - - - - - - - - - - - - - - - - -_ - - - _ ..==-ram=r-r�-r.�.r-r r. t---- =t --«--=" X:-1'-I-_= -- — 14J5 @ 6" cts. �14JG @ 6 cts.1 I N 8x18- 5G1 @ 12" cts. II I I Notes: ti = ull�1 _ — — — — — - - ----------------IT �- - - 1. Slope area around bearings a minimum 608-6 @ 18 -14J1 @ 12" cts. _ `- ` I .o w I of 2' per foot to drain. Bearing areas 0 6" cts. 0 I I o + I i N to be level. a N M ItII 18--14J2 @ 12" cts. II I I ., 2, Provide 1y" chamfer on all exposed _ _ 14J5 @ 6" cts. 14J6 @ 6" cts•II I edges and corners. II I Y - 1I L = — o 1----------------------- 3. The following bars shall be mechanically —--------- . 4 bar spliced —. :z M M '..'.i'..'....... E3 , Elev. -1.00 " V 1 ' '� :��6 1L = 1450 to 14J1 and 14J2 ''„"�<� '��„"` . ao t4J3 to 14J5 517-6 (Typ. c 4- 537-6 14J4 to 14J6 between piles) (Typ. between piles) 41-2 to 17-6 64t-2 to 617-6 T U cc 4 r 4. For detail of waterstop see sheet RA-1 6. �/L---'--�i o�i �s 24" Dia pipe 5. For Section B-B see sheet RA-27. 2"X12" Keyed pile. (Typ.) 2"x12" Keyed Construction Joint 2 Spaces @ 6'-0" = 12'-0" 3'-p" Construction Joint ELEVATION — ABUTMENT #1 ( STAGE I I) Woterstop (Looking RY North) R -3693 1 62 (Temporary Shoring Not Shown) FEDAID: STPUL-1276(004) HPP-1276(005) �) BergerABAM �/ 333019thAvenueSouth,Suite300 Federal Way, Washington 98003-2600 206 431-2300 Fax: 206 431-2250 ( ) ( ) <0!HANSON OCopYrght Honson Professional Services Inc. 2011 f° °�'HNG`AsS�.�w"-...0'RENTON w�.ivinn CITY OF Public works Department apprc ed For Construction Robert M. Hanson P.E. Date STRANDER BOULEVARD EXTENSION PHASE I, SEGMENT2A., BNSF BRIDGE N0. 11.07 L.S. 0051 ELEVATION -ABUTMENT #1 (STAGE II) "'12/05/11 CALL 48 HOURS BEFORE YOU DIG 1-800-424-5555 RECORD DRAWINGS 7/31/2014 .� °�." COP I- N � � ° ".1 nay= anN RA-17 REVISION BY W'TE APPR i<ar 173 °'231