Loading...
HomeMy WebLinkAboutR-3693169rn cm M O LLI F_ Main 3 18'-01, ,d, Elev. 28.39 U teFI o-uo-7 z Main 2 14'-3 Main 1 17' -9" 18'-0" Future Main 3" dio. x V-01,2" deep 3 ^517-6 i i 2"x12" Keyed blockout for anchor bolt. Construction Adjust reinforcement as I Joint necessary to clear I blockout. Blockout form m CD c1 I shall be removed before R anchor bolt is set. Typ. o t } R o o I 18-5E2 @ 12" cts. k I 65 i o a m n N t �____ _____________ V _ ` N n N I I a U O U O N I 24 18 -1127 @ 12" cts. (E.F.) h N Q x II Ii a � �� o II t t II o u O I ^^ I I a w I� II ± 18 - 5F1 @ 12" cts. (Each Bump -out) II I1450 @ 6" cts. ----------- I =' ------ N �I ILL. I r------- ------ T-.� j ^ x U 14J6 @ 6" cts. 614cts. K w - I °r = _________________ _ I —I------ 60B-6 @—�-1 M = e 1 6" cts. L I 4x18 - 5G1 @ 12" cis. 14J5 @ 114J6 @ 6" cts. 1450 @ 6" cts. 6" cts. N + U o L — . . ........ — ; N Elev. -1 DO x 1 I 4- 537-6 I 517-6 (Typ. ao b E tO(Typ. between piles) d-` between piles) Notes: m a1 1. Slope area around bearings a minimum L2'xl2' Keyed 0 of z per foot to drain. Bearing areas 24" Dia. pipe o _ Construction Joint to be level. 2"x12" Keyed pile. (Typ.) -1 Waterstop w/ Protection Sheath - I 2. Provide 3,4' chamfer On oil exposed Construction Joint 3'-0" 2 Spaces @ 6'-0" = 12'-0" 3'-13�4' edges and corners. s Waterstop 3' Docetl The r spI ing bars shall be mechanically ELEVATION — PIER #2 ( STAGE I I ) a 1450 to 140 and 14,12 (Looking RY South) 14,13 to 14J5 m 14J4 to 14,16 r 517-6 to 532-11 /Z Q CJ G 517-6 to 541-2 9 0 4. For detail of waterstop see sheet RA-16. etc/ a UU �G" 5. For detail of waterstop protection see sheet RA-17. gF! V 0U R-369 3 1 69 0 FEDAID: STPUL-1276(004) :o..r,e :v°t CITY OF STRANDER BOULEVARD EXTENSION 12/05/11 HPP-1276(005) ...,. A- SHOWN �� BergerABAM HAN50N RECORD DRAWINGS 7/31/2014 n� RENTON PHASE I, SEGMENT2A CALL 48 HOURS `/ °"" coP Public Works oepo tment BNSF BRIDGE NO. L.S. 0051 0 33301 9th Avenue South, Suite 300 DATUM A rc ed For C'nstruction RA— 24 BEFORE YOU DIG PP Federal Way, Washington 98003-2600 °AN i..m wr �.w 1-800-424-5555 206 431-2300 Fax: 206 431-225D 0C°DYri9nt Han Professiarol Servzes Inc. 2011 N0. REVISION BY DATE APPR ELEVATION - PIER q2 (STAGE II) � ( ) � ) AInF Robert M. Hanson P.E. Dote 1807231