Loading...
HomeMy WebLinkAboutR-36931780) c0 M O W F_ End of Beam C C ti N CC: N L 1- oiN CC � C P N � < O N G)_. . 1 O N Bearing Bearing End of Beam 9" 41'-11" 9° 10'-5IT 10'-6" 10'-6' 10'-51'z Intermediate Diaphragms on this side to be provided r W40xl99, r and installed with Main 1 r + Typ. ' Bridge only .::.............................-,---•----...----........-•------=------.....-------•----•---•--=4................_..............'-�- 1 1 1 5 V V 1 V 1 ................................ ------------------------------- ------------------------------ 'k`�.-----------.---.----.-------..}. V 1 V L ----------- --------------------- 11 ....................................-1................................. .1 --------------------------------- 1 1 1 1 1 V •+........... ------•......... ---•--•................................ g............................... Ell5dr...............................}. 1 V 1 1 4 1 1 1 1 . ........... .:*e ............ -- ------------.---E�................ .................... s................. -i=-----------. -t;..................k� r r r r r r r r r r r r r r r r r r r r r r r r r r r r r W4Ox199. TYp• :Y8- ! 5'-1 9 End of Beam Bearing 5'-3" 5'-3" 5'-3" 5'-3" 5'-3" 5'-3" 41'-11" FRAMING PLAN (Main 2 shown. Main 1 opposite & similar) 43'-5" out -to -out of Beam 41'-11" WA n..t 00 5'-1 fib- 1/" 9" End of Bearing Beam 5uhr&4 0-73.L BEAM ELEVATION 9„ g a a m N FEDAID: STPUL-1276(004) HPP-1276(005) 9i BergerABAM �/ 33301 9th Avenue South, Suite 300 Federal Way, Washington 98003-2600 (206) 431-2300 Fax: (206) 431-2250 I���� HANSON 9 Copyright Hanson Professi rcl Services Inc. 2011 AS SHOWN DATUM CITY OF �+ RENTON Public Works Deportment Appr .?d For construction Robert M. Hanson P.E. Dote RECORD DRAWINGS 7/31/2014N�f CALL 48 HOURS BEFORE YOU DIG 1-800-424-5555 °'""" CUP ova A"N ra.�.s.. N0. REVISION BY DATE APPR iwkr MOMENT & SHEAR TABLE FOR STEEL DECK BEAMS DESCRIPTION MOMENT SHEAR Dead Load 254 "'" 24 " Live Load 790 "" 82 k Iffpact 376 L-ft. 39 k Total 1.420 `'" 145' Steel A.S.T.M. A709.Gr. 50 T2 Net 1 14.135 in Net 5 (Bottom) 728 in 3 fst (Bottom) 23.0 Gross 1 14.900 in4 Gross 5 (Top) 770 in 3 fsc (Top) 22.1 ksi I -Moment of Inertia of the Section S-Section Modulus fs-Max. unfactored stress in the net section due to D.L. + L.L + Impact STEEL NOTES: DEAD LOAD: (ASSUMED) RAIL 200 BALLAST IINCL. TIE) 2046 STEEL DECK & CURB 514 WATERPROOFING 75 WALKWAYS 35 FUTURE BALLAST a 1860 STEEL 1351 CONDUIT 35 TOTAL 6116 LBS. PER LIN FT. OF TRACK PROPERTIES: IW40099) d = 38.7" bf = 15.8" if = 1.Total Design tw = 0.650" 50Bollost Depth = 2'-6" R-3693178 STRANDER BOULEVARD EXTENSION 12/05/11 PHASE 1, SEGMENT2A BNSF BRIDGE NO. 11.07 L.S. 0051 RA-33 FRAMING PLAN - SPAN 2 (MAIN 1 & 2) — 1 89 "231