STRUCTURE EXCAVATION
; ;F CLASS A INCL. HAUL -
13 BNSF BRIDGE
t9
{ SINUGIUHL LXGAVAIIUN
1 CLASS A INCL HAUL — t
CONIC RETAINING WALL
(SEE DWG SX-2)
J I I I INI IID M
III
FEDAID: STPUL-1276(004)
HPP-1276(005)
T SOME DATA ON RECORD DRAWINGS
IS BASED UPON INFORMATION
PROVIDED BY THE CONSTRUCTION
in CONTRACTOR TO THE CITY OF
.. RENTON, THE CORRECTNESS TO THIS
DATA HAS NOT BEEN VERIFIED.
STRUCTURE EXCAVATION
CLASS A INCL. HAUL - M
BNSF BRIDGE
WEST
BNSF
ROW
I
I
A PLAN - BNSF FOUNDATION
SX-1 SCALE: 1 = 20
ROADWAY
SUBGRADE
ELEVATION
EX MAIN 2 PHASE 1B MAIN 1 PHASE 1B
PHASE 1A PHASE 1A EX MAIN 1 I MAIN 2
MAIN 1 MAIN 2 1 i/
FINISHED GRADE ELEVATION......'......\'"-------------
ROADWAY EXCAVATION
3:1 SIDE SLOPE
INCLUDING HAUL
.................................................................................................................:
EXCAVATION
CLASS A - BNSF
RRII1f:F ***
TO BE BACKFILLED W/
GRAVEL BORROW INCLUDING
HAUL - ROADWAY
***SEE WSDOT STANDARD
SPECIFICATION 2-09.5
PHASE 1A
MAIN 1
ROADWAY EXCAVATION
INCLUDING HAUL
SHORING OR EXTRA EXCAVATION
CLASS A - BNSF BRIDGE ***
TO BE BACKFILLED W/
GRAVEL BORROW INCLUDING
HAUL - ROADWAY
***SEE WSDOT STANDARD
SPECIFICATION 2-09.5
LIMITS OF STRUCTURE EXCAVATION CLASS A INCL. HAUL - BNSF BRIDGE''
iB� TYPICAL SECTION - STRUCTURE EXCAVATION LIMITS
SX-1 SCALE: N.T.S.
PHASE 1A EX MAIN 1
MAIN 2
EX MAIN 2 PHASE 1B MAIN 1 PHASE 1B
I I MAIN 2
.................................................................................................................................
...........................................................................................................................................................
...........................................................................................................................................................
....:::::.......:::(:LIMITS OF STRUCTURE EXCAVATION CLASS A INCL. HAUL - BNSF BRIDGE:
.; 1;
f 7771
a. �....:.::.:..:
.......................
::.....,.::...::. . ...... . ..... �.....:.:
......................... ..d
STAGE 1 BNSF d: STAGE 2 BNSF
a::::::....:
FOUNDATION SLAB: FOUNDATION SLAB:
%: (SEE RA DWGS) ::::(:((::::( (( :('(i: :(:(( ?:'::((::r:(:((;:: (SEE RA DWGS) ::( ?..:.::iQ::::
r: r: r;rr: .;:. p: v: v:.. v: ::'::::.�:: :::::. ::r:. :: rr: v: r; rr......: ....................
. . .. ..:..:.: . c.:..
BergerABAM RECORD AS SHOWN "D9"'BB CITY OF
DRAWING RENTON
BEE Public Works Department
DATUM
33301 9th Avenue South, Suite 300 E Approved For Construction
Federal Way, Washington 98003-2600 KK Nns
(206) 431-2300 Fax: (206) 431-2250 N0. REVISION BY DATE APPR _ ""Rohert M. Hanson P.F. r.
EAST
BNSF
ROW
---1 ---- J----- 7--- __
ROADWAY EXCAVATION
INCLUDING HAUL
EXCAVATION
CLASS A - BNSF
RRIII(:F ***
EAST
BNSF
ROW
TO BE BACKFILLED
W/ GRAVEL BORROW
INCLUDING HAUL -
ROADWAY
i
ROADWAY EXCAVATION
INCLUDING HAUL
-ROADWAY
SUBGRADE
ELEVATION
SHORING OR EXTRA EXCAVATION
CLASS A - BNSF BRIDGE ***
'---TO BE BACKFILLED W/
GRAVEL BORROW
INCLUDING HAU' -
ROADWAY R-3693192
STRANDER BOULEVARD EXTENSION 5/20/15
PHASE 1, SEGMENT 2A
LIMITS OF STRUCTURE EXCAVATION CLASS A SX-1
BNSF FOUNDATION SLAB