Loading...
HomeMy WebLinkAboutR-3693192WEST BNSF ROW I I I STRUCTURE EXCAVATION ; ;F CLASS A INCL. HAUL - 13 BNSF BRIDGE t9 { SINUGIUHL LXGAVAIIUN 1 CLASS A INCL HAUL — t CONIC RETAINING WALL (SEE DWG SX-2) J I I I INI IID M III FEDAID: STPUL-1276(004) HPP-1276(005) T SOME DATA ON RECORD DRAWINGS IS BASED UPON INFORMATION PROVIDED BY THE CONSTRUCTION in CONTRACTOR TO THE CITY OF .. RENTON, THE CORRECTNESS TO THIS DATA HAS NOT BEEN VERIFIED. STRUCTURE EXCAVATION CLASS A INCL. HAUL - M BNSF BRIDGE WEST BNSF ROW I I A PLAN - BNSF FOUNDATION SX-1 SCALE: 1 = 20 ROADWAY SUBGRADE ELEVATION EX MAIN 2 PHASE 1B MAIN 1 PHASE 1B PHASE 1A PHASE 1A EX MAIN 1 I MAIN 2 MAIN 1 MAIN 2 1 i/ FINISHED GRADE ELEVATION......'......\'"------------- ROADWAY EXCAVATION 3:1 SIDE SLOPE INCLUDING HAUL .................................................................................................................: EXCAVATION CLASS A - BNSF RRII1f:F *** TO BE BACKFILLED W/ GRAVEL BORROW INCLUDING HAUL - ROADWAY ***SEE WSDOT STANDARD SPECIFICATION 2-09.5 PHASE 1A MAIN 1 ROADWAY EXCAVATION INCLUDING HAUL SHORING OR EXTRA EXCAVATION CLASS A - BNSF BRIDGE *** TO BE BACKFILLED W/ GRAVEL BORROW INCLUDING HAUL - ROADWAY ***SEE WSDOT STANDARD SPECIFICATION 2-09.5 LIMITS OF STRUCTURE EXCAVATION CLASS A INCL. HAUL - BNSF BRIDGE'' iB� TYPICAL SECTION - STRUCTURE EXCAVATION LIMITS SX-1 SCALE: N.T.S. PHASE 1A EX MAIN 1 MAIN 2 EX MAIN 2 PHASE 1B MAIN 1 PHASE 1B I I MAIN 2 ................................................................................................................................. ........................................................................................................................................................... ........................................................................................................................................................... ....:::::.......:::(:LIMITS OF STRUCTURE EXCAVATION CLASS A INCL. HAUL - BNSF BRIDGE: .; 1; f 7771 a. �....:.::.:..: ....................... ::.....,.::...::. . ...... . ..... �.....:.: ......................... ..d STAGE 1 BNSF d: STAGE 2 BNSF a::::::....: FOUNDATION SLAB: FOUNDATION SLAB: %: (SEE RA DWGS) ::::(:((::::( (( :('(i: :(:(( ?:'::((::r:(:((;:: (SEE RA DWGS) ::( ?..:.::iQ:::: r: r: r;rr: .;:. p: v: v:.. v: ::'::::.�:: :::::. ::r:. :: rr: v: r; rr......: .................... . . .. ..:..:.: . c.:.. BergerABAM RECORD AS SHOWN "D9"'BB CITY OF DRAWING RENTON BEE Public Works Department DATUM 33301 9th Avenue South, Suite 300 E Approved For Construction Federal Way, Washington 98003-2600 KK Nns (206) 431-2300 Fax: (206) 431-2250 N0. REVISION BY DATE APPR _ ""Rohert M. Hanson P.F. r. EAST BNSF ROW ---1 ---- J----- 7--- __ ROADWAY EXCAVATION INCLUDING HAUL EXCAVATION CLASS A - BNSF RRIII(:F *** EAST BNSF ROW TO BE BACKFILLED W/ GRAVEL BORROW INCLUDING HAUL - ROADWAY i ROADWAY EXCAVATION INCLUDING HAUL -ROADWAY SUBGRADE ELEVATION SHORING OR EXTRA EXCAVATION CLASS A - BNSF BRIDGE *** '---TO BE BACKFILLED W/ GRAVEL BORROW INCLUDING HAU' - ROADWAY R-3693192 STRANDER BOULEVARD EXTENSION 5/20/15 PHASE 1, SEGMENT 2A LIMITS OF STRUCTURE EXCAVATION CLASS A SX-1 BNSF FOUNDATION SLAB