HomeMy WebLinkAboutR-3693197O y J PIPE PILE I I BACKING RING I H I I I I I I r H SECTION STEEL PIPE I I I I I I I I I I I I /rr n n-R I I/ I I I I I I\ I PIPE PILE TIP REINFORCEMENT OR FIELD CJP PILE TIP NOTE: PIPE PILE I I I I I BACKING RING I I I I L--------------� I I I I I I I I I I I I I I I I �I I / v PILE SPLICE DETAIL SPLICE NOTES: 1. PROVIDE SPLICED SLEEVE MATERIAL SAME AS PILE MATERIAL. LET WELDS COOL TO AIR TEMPERATURE BEFORE DRIVING PILES. 3. SPLICE MUST DEVELOP THE YIELD STRENGTH OF THE PILE IN BEARING AND BENDING. THE CONTRACTOR SHALL FURNISH CONICAL PILE POINTS CONSISTING OF A SINGLE PIECE AS SHOWN. THE PILE POINTS SHALL BE CAST IN ONE PIECE STEEL ACCORDING TO ASTM A 148 RADE 90-60 (A.A.S.H.T.O. M 103 GRADE 65-35) AND SHALL PROVIDE FULL BEARING OVER THE FULL CIRCUMFERENCE OF THE PILE. THE PILE POINT SHALL HAVE TAPERED LEADS TO ASSURE PROPER ALIGNMENT AND FITTING AND SHALL BE SECURED TO THE PILE WITH A CIRCUMFERENCE WELD. FEDAID: STPUL-127 HPP-1276(005) 005) BergerABAM RECORD SOME DATA ON RECORD DRAWINGS IS BASED UPON INFORMATION DRAWING PROVIDED BY THE CONSTRUCTION 33301 9th Avenue South, Suite 300 CONTRACTOR TO THE CITY OF RENTON, THE CORRECTNESS TO THIS Federal Way, Washington 98003-2600 nnrn unc wnT PPPM VPPIFIM (206) 431-2300 Fax: (206) 431-2250 NO. REVISION BY I DATE I APPR NOTES: 1. PILES SHALL MEET THE MATERIAL REQUIREMENTS OF ASTM A252. GRADE 3 WITH A MINIMUM YIELD STRENGTH OF 50 KSI OR APPROVED EQUIVALENT AND SHALL BE DRIVEN IN ACCORDANCE WITH PROJECT SPECIFICATIONS AND THESE NOTES. 2. STEEL CONICAL PILE POINTS WITH DULL TIP SHALL BE WELDED ONTO WALL PILES. REINFORCED TIP SHALL BE FLUSH WITH OUTSIDE OF THE PILE. THE CONTRACTOR SHALL ANTICIPATE OBSTRUCTIONS CONSISTING OF COBBLES, BOULDERS AND LOGS DURING THE PILE INSTALLATION. 3. THE CONTRACTOR SHALL FOLLOW ANY NOISE ORDINANCE ESTABLISHED BY THE CITY OF RENTON. A TIME LIMITATION ON PILE DRIVING ACTIVITY MAY BE IMPLEMENTED AND THE CONTRACTOR MAY BE REQUIRED TO PROVIDE A SOUND SHIELD DURING PILE DRIVING ACTIVITIES IF THE THE NOISE ORDINANCE CANNOT BE MET. 4. THE CONTRACTOR SHALL MONITOR FOR VIBRATION AND LOCAL GROUND SETTLEMENT WITHIN 20 FT OF THE PILE BEING DRIVEN. THE CONTRACTOR IS RESPONSIBLE FOR ANY VIBRATION INDUCED DAMAGE TO ALL ADJACENT STRUCTURES SUCH AS RAILROADS AND UTILITIES. 5. THE CONTRACTOR SHALL FURNISH THE MANUFACTURER'S SPECIFICATIONS AND CATALOG FOR THE PILE DRIVING HAMMER PROPOSED. AT A MINIMUM THE CONTRACTOR SHALL FURNISH THE INFORMATION ON THE PILE DRIVING EQUIPMENT DATA SHEET FOUND IN THE SPECIAL PROVISIONS. IF THE PROPOSED HAMMER IS FOUND INSUFFICIENT BY THE OWNER, RE -MOBILIZING AND REPLACING EQUIPMENT SHALL BE AT THE CONTRACTOR'S EXPENSE. 6. ALL PILES SHALL BE DRIVEN TO THE MINIMUM PILE TIP ELEVATION SPECIFIED AND TO THE REQUIRED FINAL DRIVING RESISTANCE AS DETERMINED BY WAVE EQUATION ANALYSIS FOR PILE DRIVING (WEAP) WITHIN THE LAST FOOT. IN THE EVENT THE PILE DRIVING RESISTANCE AT THE MINIMUM PILE TIP ELEVATION ARE LESS THAN THE MINIMUM VALUES OBTAINED UNDER CONTINUOUS DRIVING CONDITIONS. THE CONTRACTOR SHALL CONTINUE DRIVING UNTIL THE REQUIRED DRIVING RESISTANCE IS MET. EXCEPT FOR PILES THAT ARE WITHIN 6" OF FINAL CUTOFF. FOR PILES THAT ARE WITHIN 6" OF FINAL CUTOFF DRIVING SHALL BE DISCONTINUED FOR AT LEAST 24 HOURS AND REDRIVEN TO THE LESSER OF THE FINAL 6" OR UNTIL DRIVING RESISTANCE IS ACHIEVED. IF THE RESTRIKE RESISTANCE DOES NOT ACHIEVE THE SPECIFIED VALUES. THE ENGINEER WILL DETERMINE THE SUBSEQUENT PROCEDURES TO BE TAKEN. SHOULD THE MINIMUM PILE DRIVING RESISTANCE BE ACHIEVED ABOVE THE MINIMUM PILE TIP ELEVATION. THE PILES SHALL BE DRIVEN TO "REFUSAL" WITHIN THE SPECIFIED NON -LIQUIFIABLE LAYER. TO THE REQUIRED DEPTH, WITHOUT OVERSTRESSING THE PILE SECTION. "REFUSAL" WILL BE DETERMINED BY THE ENGINEER. 7. A TEST PILE PROGRAM BY PERFORMING DYNAMIC PILE TESTING WITH A PDA (PILE DRIVING ANALYZER) AND CAPWAP ANALYSES (CASE PILE WAVE ANALYSIS PROGRAM) SHALL BE UNDERTAKEN TO ESTABLISH DRIVING CRITERIA AND DETERMINE LENGTHS FOR PRODUCTION PILES. 8. CHECK ALL PILES FOR POSSIBLE HEAVE PRIOR TO CUTOFF BY SURVEYING THE ELEVATION OF EACH PILE BUTT AFTER A PILE IS DRIVEN WITH THE GROUP. THE HEAVE DATA SHOULD BE PROVIDED TO THE ENGINEER TO DETERMINE IF REDRIVE IS REQUIRED. IN GENERAL, IF THE HEAVE IS GREATER THAN 0.25 INCH THE PILE SHOULD BE REDRIVEN TO THE ORIGINAL PILE TIP ELEVATION. 9. NO SPLICES WILL BE PERMITTED IN THE UPPER 30 FEET OF THE PILES. MEASURED FROM THE PILE CUTOFF ELEVATION. DRIVE SPLICES ARE NOT PERMITTED AT ANY LOCATION. 10. ALL WELDING SHALL CONFORM TO THE REQUIREMENTS OF THE STRUCTURAL WELDING CODE AWS D1.5. 11. NONDESTUCTIVE TESTING - THE ENTIRE LENGTH OF THE COMPLETE JOINT PENETRATION GROOVE BUTT WELDS OF PILE SPLICES SHALL BE EXAMINED BY ULTRASONIC TESTING. THESE INSPECTIONS SHALL BE IN ACCORDANCE WITH THE STRUCTURAL WELDING CODE AWS D1.5. R-3693197 o� AS SHOWN °^°7°° CITY OF STRANDER BOULEVARD EXTENSION 5/20/15 mess FXNTON PHASE 1, SEGMENT 2A MJE DATUM Public Works Department c.- wEw � Approved For Construction STRUCTURAL RETAINING WALL SSW-4 Rahert M. Hanson P.F. Mote PILE DETAILS 1