HomeMy WebLinkAboutR-3693229I �
rn
co PSE GENERAL SPECIFICATIONS
4 Ipe of Work
oject Summary:
I City of Renton has a roadway improvement project on Strander Blvd under the BNSF RR tracks west
of Naches Ave for approximately 1200 feet. This project will include widening, curb/gutter, new sidewalks,
drainage. PSE has existing OH Feeder that is in conflict with construction activities including filling, grading,
pile driving and crane activities.
**** SCOPE ADDITION *** bws 6/20/13
Supply material to complete 6" conduit tie from east end of RR bridge (4-6" STL installed as part of bridge
work) to a new 5106 pull vault installed just west of 316988-165285. City contractor will trench and install
conduit/vault. PSE inspector to assist.
Tie the 3-6" Future conduits shown on UMAP into the new vault. Install 2-6" from new vault to existing pull
vault 316988-165285. Adjust 4" as required for future use if relocation is a issue.
Estimated quantity: (Atkinson's material estimate via e-mail 6/20/13)
1) 1,400LF of 6" PVC, Sch. 80 conduit
2) 12ea, 45 degree bends of 6", PCV, Sch. 80
3) 16ea, 22.5 degree bends of 6", PVC, Sch. 80
4) 8ea, 11 degree bends of 6", PVC, Sch. 80
5) couplers of 6", PVC, Sch. 80
6) 2ea Type 5106 Vaults
The second 5106 vault will be for the west side stopping/start point for the Tukwila phase of Strander Blvd
extension.
It may be possible that the existing shoe -fly will need to be removed/finalized under this notification to
complete this phase of project.
Complete adjustments to the single phase underground and conduits running south toward the single
phase padmount transformer serving the RR facility.
bws 6/20/13
General
- All work is to be completed per PSE Standards & Practices. Copies of all PSE Standards are available
upon request.
- Work sites shall be kept clear of debris and all construction materials; equipment and packing shall be
removed daily.
- Return all unused and removed poles, transformers and hardware to PSE, storeroom. All copper shall
be coiled and returned the day it is removed from the poles. Remove all unused pins and insulators.
- Return all streetlights, area lights and floodlights to Sumner yard.
Pre -Construction
- Notify appropriate city, County or DOT authorities 48 to 72 hours, or as required by permitting agency, in
advance of starting work in Right-of-way involving a Permit.
- All system switching shall be approved by System Operations (425-882-4652) a minimum of 48 hours in
advance.
- Notify customers of all outages 48 hours in advance.
Work Drawings & Documents
- PSE Project Manager or Engineer shall approve field design changes.
- Mark all field changes, equipment ID numbers and Underground cable information in red on Foreman's
copy of work sketch.
- Return one Foreman's copy of work sketch to Project Manger at completion of job.
- When permits are required, a copy of the permits shall be available on work site at all times.
Safety
- Refer to PSE standards 6275.3000 for requirements on System Grounding.
- Refer to PSE standards 6275.9000, 6275.9050 and 6275.9100 for personal protective grounding
requirements.
- Refer to PSE standards 6275.9150 for vehicle grounding and barricading requirements.
- Proper line clearances shall be taken at the beginning, and released at the end, of each workday, or as
otherwise instructed by the System Operator.
- Provide signs, barricades, and traffic control in conformance with permit regulations.
- Utilize flagging and other vehicle traffic control as necessary and in conformance with local traffic
regulations.
- Maintain traffic flow as required by permitting agency.
Erosion & Sediment Control
- Refer to PSE standards 0150.3200 for minimum requirements.
- Comply with all requirements of permitting agency.
- Installed erosion & sediment devices shall be maintained until vegetation has been re-established or
disturbed soil has been otherwise permanently stabilized.
Joint Facilities
- Coordinate with Communication Companies for transfers.
UNDERGROUND CONSTRUCTION
Excavation
- Trenching outside of the Right-of-way shall be of sufficient depth to provide a minimum of 36" of cover for
primary conductors and 24" of cover for secondary conductors.
- Road crossings and all trenches within the Right-of-way shall be of sufficient depth to provide a minimum
of 36" of cover for all conductors or as required by the permitting Agency.
- All conductors/conduits shall have a minimum of 3" of bed and 3" of clean sand cover.
- No rocks larger than 6" shall be included in backfill.
- Backfill in road crossings and within the Right-of-way shall be compacted to 95% density or as required by
the permitting Agency.
- Restore all excavated areas to original condition.
Vaults & Handholes
- Refer to PSE standard 6775.0040 "Vault and Handhole Installation"
- Vaults shall be placed level and 2" above final grade in landscaped areas and flush with final grade when
placed in hard surface areas.
- A minimum 6" bed of 5/8" crushed rock shall be placed under all vaults.
- All conduit entrances shall be grouted.
r fell I r 11
id' I:rb I
%ILE TV= tw
'mom
A-PCpeC�enr�tJ�1t�fR?pJt1Poe
Conductors & Conduit
- Refer to PSE standard 6800.6000 "PVC Conduit Installation".
- Unless splices are called for, or otherwise noted or approved, conduit risers shall be plumbed directly to road
crossing conduits.
- Install insulating caps on all unused primary bushings.
- All "spare" conduits shall be capped at each end.
Cable Tags and Pulling
- Primary Underground Cable Identification Tag installation shall conform to PSE standards 6825.6050.
- Cable Pulling shall conform to PSE standards 6825.6100 and 6825.6150
OVERHEAD CONSTRUCTION
Poles & Structures
- Poles are to be installed or relocated as staked. Unless otherwise noted, all pole location measurements are
from the center of the pole.
- All new poles set shall be the class indicated on the sketch, or better. Do not set a lower class pole than
specified.
- Install ground plate assembly on all new poles. Install Switch Ground Assembly per standard specification
6014.1000 at new gang operated switch locations.
- Install grid numbers on all new and existing poles as shown on sketch.
- Straighten existing poles as indicated or as necessary.
- Treat all field -drilled poles with copper napthenate wood preservative.
- Remove old poles after communication companies have transferred off and return to PSE storeroom. Fill and
crown pole holes and restore the area similar to adjacent landscaping.
RESPONSIBILITIES OF THE CITY
Documentation
- The city and their contractor shall attend a pre -construction meeting specifically for installation of bare duct and
vault system.
- PSE will provide to the city contractor with construction plans for the installation of PSE duct and vault system.
- All installations shall conform to specifications contained in this document and all relevant PSE standards.
Safety
- Field changes shall be pre -approved by PSE or designated representative prior to construction with proof of
acceptance required prior to PSE acceptance of completed duct and vault system.
- The city contractor shall not access energized power vaults without the assistance of PSE line workers.
Trench and Excavation
- The city contractor shall not expose energized power conductors (direct buried or in conduit) without the
assistance of PSE line workers.
- The city shall provide all trench excavation and backfill for the installation of new or modified PSE underground
distribution system within the construction area.
- All trench excavation shall conform to PSE standards 6790.0075, 6790.0130, 6790.0140, 6790.0250, and
6790.3050.
- Construct the shared utility trench where the various utilities can transition in and out of the trench line in an
orderly fashion without altering duct bank alignments of other utility. Separation of crossing utilities sharing the
common utility trench is 6".
- After the new underground system is installed an energized, additional excavation may be necessary to re-train
existing underground cables into the new vaults. This excavation will be provided by the city with 48 hours notice.
- Placement of other utility vaults within the trench line alignment encumbering access to PSE facilities is not
allowed.
4'-8" x 7' Hand hole ( 575) w/adjustable Cover
Tubes for 1"
adjustable bolts( 4) —
(2) 3' Square
Plate Doors
8"
Cover
2,490 Ibs T
Top Section
1,835 Ibs
Base
4,760 Ibs
MID#: 7663206
5'I8"
A
1 V-0" —
I i
TOP VIEW
F- 2„
4'-0" _
.� �\ 1
000 0❑❑0
❑❑❑ ❑❑❑
Crushed
ODD ���
Rock
SIDE VIEW
Excavation - 20 cubic yards
NOTE: For Installations in pavement or sidewalks with adjustable cover
3-piece handhole, increase excavation Depth to &.6" and 24cubic yards.
VAULT & EXCAVATION DETAIL
Not to scale
6051.1500
6" Minimum above common neutral.
even with the common neutral for secondary.
20'
DB 120
Conduit
5"
Min.
Common Neutral
/
Note: Schedule 80 conduit shall
10' (Overall)
///
4 8' Schedule 80 extend a minimum of 8' above
and 12" below ground line.
Min. Conduit
Ground Line
gpAlind Line
CL.
-..
2 36"Prima birection of VehWar Traffic
24" Secondary
k
iilllilip
------------- --�--- _. Climbm9 '.i�ll.11 illlli/il,�
Schedule 80 Bend / Road Face'IField Face/
!Quadrant t Quadrant / 5" Min.
%%/ /
Conduit) Standoff Bracket
Conduit Clamp 1 15" Min Length
TYPICAL POLE WITH RISER DETAIL
NOT TO SCALE
Height adjustable bolts
6,600 Ibs �
8,430 Ibs
11,000 Ibs
Three 3' sq. std. plate doors, or
Three 3' sq. Anti -Skid doors.
7'-6" 8,
1 V-4" Min
11'-10" Max 5'-10" Min
.6'-4" Max
TOP VIEW
PUGET
SOUND
ENERGY
DESIGNED BY I:DPOTELCOINC
A Quanta Services Company
ELECTRIC SYMBOL LEGEND
aPROPOSED
750MCM PULL VAULT
®
PROPOSED 110 CNJK J-BOX VAULT
aEXISTING
750MCM PULL VAULT
EXISTING 1/0 CNJK J-BOX VAULT
O
EXISTING POLE
—�
EXISTING DOWN GUY
REMOVE EXISTING POLE
AND/OR TERMINATION & RISER
�D
EXISTING 3-PHASE OH TO UG
TERMINATION AND RISER
NEW CONSTRUCTION
-3-750 KCMIL (12 KV)
— —
— -1/0 UG (12 KV) PRI CABLES, OR UG'
— — — —
— -SECONDARY TRIPLEX IN OB120 PVC
—444z----
EXISTING 12kV3-PHASE
- —
EXISTING 12kV 1-PHASE
Standoff Bracket
15" Min Length
Conduit Clamp��5" Min
7�1
Field Faced Road Fac(
Quadrant Quadrant
Climbing
Space
Direction of Vehicular Traffic
Climbing
Space
CONDUIT RISER PLACEMENT DETAIL
NOT TO SCALE
AUG
TOP VIEW
PL_ACF STRAW MULCH ON
AREA
PEA GRAVEL
(MID 9995892)
EDIMENT TRAP
DD DITCH OR SENSITIVE AREA DD DD
TYPICAL AUGERED WORK SITE - 0150.320 0
TECHNIQUES FOR EROSION AND SEDIMENT CONTROL
FOREMAN (CHECK BOX WHEN COMPLETED)
❑ PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
❑ Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
❑ Field Changes RED -LINED on As -built.
❑ Material VERIFIED and CHANGES noted on Paperwork.
❑ Total PRIMARY Cable noted on As -built.
❑ Company ID#'s RECORDED in correct location on As -built.
❑ Indicate correct FUSE SIZE on As -built & VERIFY proper PHASE.
❑ Deviations noted on the As -built and their reason.
❑ 1 certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
Foreman's Signature
Print Name Date
Vicinity Map
Thomas Guide Page 655,656
PROJECT PHASE NOTIF# ORDER# f " it
PWR Superior 11040012 101077744'
2 Removal 108077780
OH Expense 593133185
UG Expense 101077745
°❑� °o°o°a Temporary
o� x
,\ g'_g° Project Manager Contact Information:
6'
a� o00
o00 00o Chris Tobin
Crushed °O° El°°n (253) 548-4516 Cell Phone
Rock chdstopher.tobin@PSE.com E-Mail Contact Info.
MPC: Kathy Johnson - (206) 240-2482 office
EOA: Michael Ramirez - (206) 604-6450 office
SIDE VIEW City of Renton
Excavation - 50-1 /2 cubic yards Contact: Bob Hanson - (425) 430-7223 office
PM: Keith Woolley - (425) 430-7318 office
VAULT & EXCAVATION DETAIL
Not to scale 6051.2000
INDEX TO SHEETS:
Page 1: Cover (Notes / Notification)
Page 2-3: Site (Construction Notes)
Page 4: Maps
POTELCO DESIGN AND
QUALITY ASSURANCE
❑ This design complies with PSE
Design/Engineering Standards.
Any/all variations have been
pre-approved/documented by the
appropriate PSE Representative.
Signature
Print Name
Date
"Locates Required" IYESJ No
For contacts below dial 1-888-CALL PSE (225-5773)
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
"Outages Required" Ye No
"Flagging Required" Yes No
REAL ESTATE/EASEMENT
REDT#: (085536)
PERMIT
Renton, BNSF, UPRR
3
FUNCTION
CONTACT
PHONE NO
DATE
2
PROJECT MGR
C. Tobin
(253) 548-4516
7/11/13
1
ENGR - POWER
L. Brown
(253) 606-4745
7/11/13
REV#
DATE
BY
DESCRIPTION
ENGR - GAS
COUNTY
KING
Emer Sect
Gas Wk Ctr
POWER WK CTR
QCSOKE
DRAWN BY
L. Brown
(253) 606-4745
7/11/13
CHECKED BY
�s
1/4 SEC
NW25 - 23N - 04E
OP MAP
PLAT MAP
APPROVED BY
FOREMAN #1
U-MAP NO (POWER)
2304EO98
OH CKT MAP
2305E124
UG CKT MAP
2304EO98
�CIRCUITNO
RJN-27
FOREMAN #2
MAPPING
JOINT FACILITIES ARRANGEMENTS
UTILITIES
Berger ABAM
CONTACT
Naomi Selove
PHONE#
206-431-2279
INCIDENT
PUGET
SOUND RENTON - Strander Blvd. Ph.3 N/A
Strander Blvd.- from W. Valle Hwy. to Naches Ave. Elect Order
ENERGY y y 101077744
Renton, WA R-3693229 SCALE PAGE
DESIGNED BY POTELCO, INC. 1"=20' 1 of 4