Loading...
HomeMy WebLinkAboutRES 4547 CITY OF RENTON, WASHINGTON RESOLUTION NO. 4547 A RESOLUTION OF THE CITY OF RENTON, WASHINGTON, AUTHORIZING THE EXTENSION OF THE TEMPORARY FULL STREET CLOSURE OF THE RENTON AVENUE SOUTH BRIDGE OVER 1-405. WHEREAS, the Washington State Department of Transportation (WSDOT) is constructing the 1-405, Renton to Bellevue Widening and Express Toll Lanes(ETL) project; and WHEREAS,this construction activity required a temporary street closure of the Renton Avenue South Bridge (the "Bridge")over 1-405; and WHEREAS, by Resolution 4514, the City Council previously authorized temporary closure of the Bridge for a period of time not to exceed three hundred (300) days between the dates of Monday,January 8, 2024 and Friday, February 28, 2025; and WHEREAS, the project now requires an extension of the temporary street closure of the Bridge over 1-405 to allow the contractor,design team and WSDOT to resolve design issues; and WHEREAS, pursuant to the City Code section 9-9-3, such street closures require City Council authorization by means of a resolution; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DO RESOLVE AS FOLLOWS: SECTION I.The City Council does hereby authorize an extension of the temporary closure of the Renton Avenue South Bridge to Thursday, May 22, 2025 for the purpose of extending the Bridge to accommodate widening of 1-405 which will increase capacity of the 1-405 freeway. 1 RESOLUTION NO. 4547 SECTION II. Notice of the closure shall be posted and published as required by RMC 9-9- 2 and 9-9-3. PASSED BY THE CITY COUNCIL the 3rd day of February, 2025. — 4-,fj J /if Jason I Seth, Ci Perk APPROVED BY THE MAYOR this 3rd day of February, 2025. 21�- Armon*Pavone, Mayor Approved as to form: of R E�,''%., Shane Moloney, City Attorney = - SEAL i _ Date of Publication: 2/6/2025 (Summary) 0Qp RES- PW:25RES001:01/06/2025 ,,0 R4teosO,`�.��'``` lllll{1i111��� 2