Loading...
HomeMy WebLinkAboutT-369307Co rn Cl? O 't LU I— (y) o') co C) IL rr a Eel I 0 FEDAID: STPUL-1276(004) HPP-1276(005) a -' IS BASED UPON INFORMATION PROVIDED BY THE CONSTRUCTION in CONTRACTOR TO THE CITY OF .. RENTON, THE CORRECTNESS TO THIS DATA HAS NOT BEEN VERIFIED. GENERAL NOTES: 1. SEE DRAWING F-1 THRU F-4 FOR CONFIGURATION OF CONDUITS AND CASING BEHIND ABUTMENTS. 2. SEE AT&T PLANS FOR DETAILS CONCERNING INSTALLATION OF AT&T FIBER OPTIC LINES. 3. SEE CS DRAWINGS FOR CONSTRUCTION SEQUENCING OF FIBER OPTIC LINES. 4. STATIONING AND OFFSETS ON THIS DRAWING REFER TO "BNSF ROW" LINE. SEE ALIGNMENT PLANS. I I I I TRANSFORMER PAD. SEE PUMP STATION DRAWINGS FOR DETAILS a a- a 291 LF CONSTRUCTION q "BNSF I 3 5 n PWR PWR- PWR PWR PWR WR PWR PWR PWR PWR PWR PWR I PWR PWR PWR PWR PWR PWR MATCH LINE (SEE SHEET UT-3) 10 - Im I I0 m LINES o 29 2LF I m I I I� m I OIMAATE .68 I WEST SHOOFLY I ,3:1 I Im STA 1025+78.86 Pi 56.08' LT A I EXISTING I m BURIED POWER I I BP BP —BP —BP Im I I BBP P BP —BP —BP io m NOTES: EXTEND EXISTING 36" CMP CULVERT TO LIMITS OF SHOOFLY EMBANKMENT. SEE DWG DD-5 FOR DETAILS. APPROXIMATE LOCATION I I Pi INSTALL PSE PROVIDED VAULT TYPE 5106, BY OTHERS STA 1025+49.22 37.33' LT I o EXISTING I I m POWER POLE I Q INSTALL 1-2" & 1-4" SCHEDULE 40 PVC COND ITS IN UTILITY TRENCH. — — — — — — — — FOR UTILITY TRENCH DETAILS SEE 1 MAT U T6 A2 NOT USED I A NOT USED I COORDINATE WITH BNSF CONTRACTOR FOR INSTALLATION OF CONDUIT. CITY CONTRACTOR SHALL PROVIDE SURVEYING. INSTALL CONDUITS AND WARNING TAPE IN POND UTILITY TRENCH, BY A OTHERS. CONTRACTOR TO PROVIDE TRENCH, EXCAVATION AND BACKFILL. SEE SPECIAL PROVISIONS. FOR UTILITY TRENCH SEE 1 I UT7 I I 6 0 PUMP STATION POWER LINE TO BE INCLUDED IN LUMP SUM ITEM FOR PUMP STATION. PSE TO PROVIDE CONDUIT AND CONDUCTORS. FOR �I UTILITY TRENCH DETAIL SEE 1 I UT7 I I I I I I I I I 20 0 20 40 scale feet BergerABAM 33301 9th Avenue South, Suite 300 Federal Way, Washington 98003-2600 (206) 431-2300 Fax: (206) 431-2250 RECORD D RAW I N G NO. REVISION BY DATE APPR M� W 11 �i�_ -11-1- NE (SEE SHEET UT-8) WAS SHOWN CITY OF FXNTON BEE DATUM Public Works Department CH—MMAS � Approved For Construction — Kuc kco�ixcw Rohert M. Hanson P.F. F o BY OTHERS I PROP BNSF ROW (100' RT BNSF MT1) 6I I I I a TIN o I EXISG BNSF MANHOLES FIELD LOCATE. APPROX CO I STA 1026+92.38 I 45.92' RT m EXISTING OVERHEAD DISTRIBUTION POWER LINE. SEE SPECIAL PROVISIONS FOR REQUIREMENTS TO DEENERGIZE LINE. I I I I 1 I 1 PROTECT EXISTING I POWER POLE I 1 I I i r- I II I 1 I m 11 I I II EAST SHOOFLY I.-- I -- I --- STRANDER BOULEVARD EXTENSION PHASE 1, SEGMENT 2A UTILITY RELOCATION PLAN SHEET R-369373 T-369307 F­51201