Loading...
HomeMy WebLinkAboutT-369320c>7 0')I co C7 r � O Irr ° o-) CD CO o N C .0-) II o C/-)�II BFO BFO Rrnl (n W #4010 = BFO I.E. ®Center of Sewer Structure (Correlates with #400101 & #4002) = 6.8 SSMH Alignment"BNSF MT1" C/') Sto 1029+88.59 Off 88.68' d b u L N 169929392.60 I I Foo I m I I Q Cal T� I I 10 I I I --_ r, ___ I on I m 0 m N E 1192392.60699 •• �, i � o I I I a I W+ T I `, % L #4009 0 Q '_ I a Ca Top of High Pressure Gas Line (12"??) = 15.2 "BNSF I I ¢Pothol I I o < < Alignment MT1" Sta 1030+11.99 N Off 66.13' RT� ac Q N 169989.92 I W O O E 1292370.93 I -f I r 0 6)a) I `- 0 0 d0 do- T - -----1-------------------- ----------- --_--- Did- w -Oj 1- BNSF EAST SHOOFL Y = 77 of -------- - _ Z M BNSF EAST SHOOFL Y STAGE I BNSF w - N 8 BRIDGE < #40144 331 (CONSTRUCTED)32.8 33.1 X 0 MSX #4013 1 1030+00 - 1 STAGE 1 LIMLTq - - - - 34.7 Msx 1029+00 9 --- ___----ao1s� ------ F-4 STAGE 2 BNSF 1 33.1 1028+00 M N 33.6 F-4 ------- MSX BRIDGE 012 ,y -----#4004 33.9 2 Top of 6" Steel Pipe w/Fiber Optic = 27.4 _ MSX ° BNSF WEST - � SHOOFLY Alignment "BNSPathale F MT1" o - Sta 1029+52.85 + - - - - c� o OLT Off 24.66' #A001 N 169934.15 31.6 X #4016 ��33.9 31.6 BNSF WEST SHOOFLY c 0 Top of 48" or 42" Sewer Main = 8.6 Top of 6" Steel Pipe w/Fiber Optic = 27.0 o Poth Alignment "BNSF MT1 Pothole "BNSF o - N Stu 1029+90.21 w )( _ _ #4011 Alignment MT1" b d Off 42.83' LT 30.4 #4017 - - 34.2 Sta 1028+21.93 1 - N 169972.16 33•9 MSX Off 32.68' LT q " E 1292261.24 MSX pd 30.0 N E 1129265.92265. 20 Od 0, a LL Od -#4006 c Top of 6" Steel Pipe w/Fiber Optic = 27.0 T- a Pothole - Od8 Alignment "BNSF MT1" I Sta 1028+22.06 #4003.`. Off 32.61' LT LL Top of High Pressure Gas Line (12"9?) = 11 8---------- - .r N 169803.85 Pothole---------------- E 1292262.27 d Alignment "BNSF MT1" -- -T------------ / - Sto 1030+13.00 pff 44.56' LT #4008 Top of 6" Steel Pipe w/Fiber Optic =23.1 ----------- " Y- - Ode Ode - - - --#4007 0�8 - 2 N 169994.99 E 1292260.35 Pothole "BNSF �..� Top of 6" Steel Pipe w/Fiber Optic = 25.5----------_ N 14002 Alignment MT1" � Pothole N a Top of 48" or 42" Sewer Main - 9.1 Sta 1028+52.92 Alignment "BNSF MT1" 0 Pothole Off 30.60' LT I T� r Sta 1028+21.69 Alignment "BNSF MT1" N 169934.44 Off 38.11' LT N Sto 1029+91.21 E 1292272.09 I N 169803.58 Off 50.88' LT E 1292259.76 m N 169973.45 10 0 10 20 E 1292253.23 s°°le T-369320 it E d 12 FEDAID: STPUL-1276(004) RECORD HPP-1276(005) ') BergerABAM gym_ AS SHOWN "` Y CITY OF '� STRANDER BOULEVARD EXTENSION 5/20/15 SOME DATA ON RECORD DRAWINGS RENTON PHASE 1, SEGMENT 2A � IS BASED UPON INFORMATION DRAWING �� NAS Public Works Department oriuC-3 PROVIDED BY THE CONSTRUCTION 33301 9th Avenue South, Suite 300 E� KK RAS DATUM Approved For Construction in .. CONTRACTOR TO THE CITY OF Federal Way, Washington 98003-2600 RENTON, THE CORRECTNESS TO THIS NO. REVISION BY DATE APPR scut xco�xcEY BRIDGE STAGE II UTILITY PLAN r 206 431-2300 Fax: 206 431-2250 DATA HAS NOT BEEN VERIFIED. ) ( ) - Robert M. Hanson P.E. Date 204� 23