HomeMy WebLinkAboutAddendum - 1GCB 2433 Amendment No. 1 Page 1 of 2
GCB 2433
Coordinator Agreement
City of Renton
I-405 – Renton to Bellevue Corridor Widening and Express Toll Lanes Project
Amendment No. 1
THIS Amendment No. 1 is made and entered into by the City of Renton (CITY) and the Washington State
Department of Transportation (WSDOT), collectively referred to as the “Parties” and individually referred
to as “Party.”
Recitals
A. The Parties entered into the Design-Build Coordinator and City Staff Review Agreement (“GCB
2433”) on March 11, 2019, which provided CITY expedited services and WSDOT to reimburse the
CITY for costs directly related to services for the project known as the I-405 – Renton to Bellevue
Corridor Widening and Express Toll Lanes Project (“Project”).
B. GCB 2433 Section 7.1 allows for the Parties to adjust or increase the number of hours based on the
Project contract duration as mutually agreed by both Parties.
C. The Project contract duration has been extended to a later date than anticipated at the signing of
GCB 2433.
D. In consideration of the change in the Project contract duration, GCB 2433 estimate does not reflect
the actual number of hours for CITY services in GCB 2433 and it is necessary to amend GCB
2433 to reflect the current estimate and the maximum Agreement amount agreed to by the Parties.
Now therefore, pursuant to Revised Code of Washington (RCW) 39.34.080, which authorizes a public
agency to contract with another public agency to perform any governmental service that each public
agency is authorized to perform, and in consideration of the terms, conditions, covenants, and
performances contained herein, it is mutually agreed as follows:
1. The dates in the first sentence of Section 5.2 “June 2019 and December 2024”, are hereby
replaced with “June 2019 and December 2025”.
2. The number of hours in the third to last sentence in Section 7.1 “three thousand (3000)”, is hereby
replaced with “five thousand five hundred (5500)”.
3. Section 7.4 is hereby deleted in its entirety and replaced with the following:
7.4 The maximum amount payable by WSDOT to the CITY under this Agreement is Four Hundred
Forty Thousand Dollars ($440,000).
CAG-19-059, Adden #1-25
GCB 2433 Amendment No. 1 Page 2 of 2
4. All other terms and conditions of the original Agreement shall remain in full force and effect, except
as modified by this Amendment No. 1.
In witness whereof, the Parties hereto have executed this Amendment No. 1 as of the latest date
written below:
CITY WASHINGTON STATE
DEPARTMENT OF TRANSPORTATION
By:By:
Armondo Pavone Lisa Hodgson
Mayor I-405/SR 167 Program Administrator
Date:Date:
APPROVED AS TO FORM APPROVED AS TO FORM
By: By:
Not required per WSDOT process.
Printed:Printed:
Not required per WSDOT process.
Title:Assistant Attorney General
Not required per WSDOT process.
Date:Date:
Not required per WSDOT process.
1/24/2025
Cheryl Beyer
Approved by Cheryl Beyer via memo 11/27/2024
11/27/2024
Senior Assistant City Attorney
Attest:_______________________________
Jason A. Seth, City Clerk
1/31/2025