HomeMy WebLinkAboutRS_Preliminary_Technical_Information_Report_170503_v1Cedar Ridge Short Plat
Renton, Washington
Preliminary Technical Information Report
May 03, 2017 Pacific Engineering Job No. 17006
PRELIMINARY TECHNICAL INFORMATION REPORT
FOR
Cedar Ridge Short Plat
RENTON, WASHINGTON
May o3, 207
PREPARED FOR
Satwant Singh,
Cedar Ridge, LLC.
24419 10511 Place SE
Kent, WA 98030
Phone: (206) 391-3311
E-mail: pmvrsingh@gmail.com
Pacific Engineering Design, LLC.
15445 53rd Avenue S
Seattle, WA 98188
Phone: (206) 431-7970
'325
�£ST�
�I'AL
TABLE OF CONTENTS
I. PROJECT OVERVIEW...............................................................................................3
Figure 1 Technical Information Worksheet to Follow...................................................4
Figure 2 Site Location Map to Follow...........................................................................5
Figure 3 Drainage Basin, Subbasin and Site Characteristics.......................................6
Figure4 Soils...............................................................................................................7
II. CONDITIONS AND REQUIREMENTS SUMMARY .................................................... 8
III. OFF SITE ANALYSIS...............................................................................................15
Task 1 Study Area Definition and Maps.....................................................................16
Task 2 Resource Review...........................................................................................17
Task 3 Field Inspection..............................................................................................18
Task 4 Drainage System Description and Potential Problems...................................19
Task 5 Mitigation of Existing or Potential Problems...................................................19
IV. FLOW CONTROL AND WATER QUALITY FACILITY ANALYSIS AND DESIGN ...20
Part A Existing Site Hydrology...................................................................................22
Part B Developed Site Hydrology...............................................................................23
Part C Performance Standards.................................................................................. 32
Part D Flow Control System.......................................................................................33
Part E Water Quality System.....................................................................................57
V. CONVEYANCE SYSTEM ANALYSIS AND DESIGN (REVISED 6/26/2012).......6
.... 58
VI. SPECIAL REPORTS AND STUDIES.......................................................................59
VII. OTHER PERMITS...................................................................................................60
VIII. CSWPPP ANALYSIS AND DESIGN......................................................................61
X.
BOND QUANTITIES, FACILITY SUMMARIES AND DECLARATION OF
COVENANT................................................................................................................... 64
X. OPERATIONS AND MAINTENANCE MANUAL ....................................................... 65
2
I. Project Overview
The proposed project will develop 6 single-family lots. The site is located at the southwest
corner of the intersection of 156th Avenue SE and SE 2nd Place in the Renton Highlands
north of the Cedar River. The address of the site is 13609 156th Avenue SE. The site
area is 1.69 acres before Right of way dedication and 1.67 acres after Right of way
dedication along 156th Avenue SE. The site consists of two existing parcels that form an
overall rectangular piece of property that is approximately 484' x 152' with frontage on its
eastern short side along 156th Avenue SE and frontage on its northern long side along
SE 2nd Place. The project site includes both on-site development area and off-site
improvements along 156th Ave SE and SE 2nd Place. The site is located in the City of
Renton R4 zone. The surrounding parcels are all single-family residential also zoned R-
4. The site is located in the Lower Cedar River drainage basin. The site is located in the
Duration with Forested conditions flow control area (Duration flow control with Forested
site conditions) and Basic water quality control area.
There are single-family residences and various outbuildings on the two existing parcels.
All existing buildings will be demolished and removed for the proposed development. The
remainder of the property is covered with grass and trees. The site is hilly with average
slope of 11 % slopes westerly toward Grant Avenue South. There is no sensitive area on
the site and no difficult conditions for the proposed development.
For the onsite improvement, Restricted footprint and Basic dispersion for downspouts are
used for each lots as Flow control BMPs. New plus replaced impervious area is
approximately 0.49 acres before applying flow control BMP credits, new pervious area is
approximately 1. 18 acres. A detention vault is proposed to provide the required Duration
standard forested site conditions flow control.
The offsite frontage improvements along SE 2�d Place and 156th Avenue SE remove
approximately 4,390 square feet of existing impervious area and create approximately
6,090 square feet of new / replaced impervious area (1,632 square feet of it is pollution
generating impervious area) and no new or replaced pervious area. For flow control, the
new impervious area created by the SE 2nd Place offsite improvement is routed to the
onsite detention vault and new impervious area created by the 156th Ave SE offsite
improvement is counted as bypassed target area Per KCSWDM Section 1.2.3.2.E. The
onsite detention vault is oversized, so that the developed onsite detained runoff plus the
onsite and offsite bypassed runoffs meets the required Duration standard forested site
conditions flow control requirements at the point of compliance (Near the intersection of
149th Place SE and SE 142nd Street).
For water quality treatment, total new and replace pollution generating area (onsite plus
offsite) is only 4,690 square feet (less than 5,000 square feet) and is counted as untreated
discharge per 2017 Renton SWDM Section 1.2.8.2.D. No water quality treatment facility
is required.
3
Figure 1 Technical Information Worksheet to Follow
CITY OF RENTON SURFACE WATER DESIGN MANUAL
9
❑ECHNICAL INFORMATION REPORT (TIR)
WORKSHEET
Part 1 PROJECT OWNER AND
PROJECT ENGINEER
Project Owner S5 K DeVBGvdmemV r GL C
Phone .206) 391 —331!
Address Z �+1F1 °� I �S (� EGova S L
Kent , WLR 180350
Project Engineer v P/
Company is %
Phone 7476 t3f-700o
Part 3 TYPE OF PERMIT APPLICATION
© Land Use (e.g., SubdivisionSh&SFR
© Building (e.g., M/F / Commercial
® Grading
® Right -of -Way Use
❑ Other
Part 2 PROJECT LOCATION AND
DESCRIPTION
Project Name Cpoky Rtriee • Aolot i
CED Permit #
Location Township 13
Range D,5
Section 14
Site Address 1360° 156 to AVe
Part 4 .:OTHER REVIEWS AND PERMITS
❑ DFW HPA ❑ Shoreline
❑ COE 404 Management
❑ DOE Dam Safety ❑ StructurW
Rocker cult/
❑ FEMA Floodplain Ll Section 7
❑ COE Wetlands
❑ Other.
Part 5 PLAN AND REPORT INFORMATION
Technical Information
Report
Site Improvement
Plan
(Engr. Plans)
0
Full
Type of Drainage Review ❑
Targeted
Plan Type (check
®
Full
(check one):
F]
Simplified
one):
Ll
Modified
❑
Large Project
❑
Simplified
Date (include revision ❑
Directed
Date (include revision
dates):
dates):
Date of Final:
Date of Final:
2017 City of Renton Surface Water Design Manual
12/12/2016
REFERENCE 8: PLAN REVIEW FORMS AND WORKSHEET
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
Part 6 SWDM ADJUSTMENT APPROVALS
Type (circle one): Standard / Blanket
Description: (include conditions in TIR Section 2)
Approved Adjustment No. Date of Approval:
Part 7 MONITORING REQUIREMENTS
Monitoring Required: Yes / No
Start Date:
Completion Date:
Describe:
Re: SWDM Adjustment No.
Part 8 SITE COMMUNITY AND DRAINAGE BASIN
Community Plan: iV$Wc�s-t(�
Special District Overlays:
v v p
Drainage Basin: LOW'P/1/
Stormwater Requirements:
Part 9 ONSITE AND ADJACENT SENSITIVE AREAS 'I
❑River/Stream Ll Steep
Slope
❑ Lake ❑ Erosion Hazard
❑ Wetlands ❑ Landslide Hazard
❑ Closed Depression ❑ Coal Mine Hazard
❑ Floodplain ❑ Seismic Hazard
❑ Other ❑ Habitat Protection
El None,
12/12/2016
2017 City of Renton Surface Water Design Manual
Part 10 SOILS
Soil Type
Ij
� qG
REFERENCE &A: TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
Slopes
6 1.5 /U
❑ High Groundwater Table (within 5 feet) ❑ Sole Source Aquifer
❑ Other ❑ Seeps/Springs
❑ Additional Sheets Attached
Part 11 DRAINAGE DESIGN LIMITATIONS
Erosion Potential
REFERENCE LIMITATION /SITE CONSTRAINT
® Core 2 — Offsite Analysis
❑ Sensitive/Critical Areas
❑ (Z
EPA
❑ LID Infeasibility
❑ Other
❑ Additional Sheets Attached
Part 12 TIR SUMMARY SHEET
(provide one TIR Summary Sheet
per Threshold Discharge Area)
Threshold Discharge Area:
SfrPcvw, +hpvt otYo1i%Yu5 io GOWP�✓
(name or description)
Core Requirements (all 8 apply):
Discharge at Natural Location
Number of Natural Discharge Locations: 2�
Offsite Analysis
Level: 0/ 2 / 3 dated: J
V Zv
Flow Control (include facility
Standard: f2Gl Y4j�tn ah �Ff',oW Coyt.eYr(
Forest Site,
summary sheet)
or Exemption Number:
Gvilp,{� -f�v►� )
On-site BMPs: d to i
&mza d+5 eY5i01
Conveyance System
Spill containment located at:
Erosion and Sediment Control /
CSWPP/CESCL/ESC Site Supervisor:
Construction Stormwater Pollution
Contact Phone:
Prevention
After Hours Phone:
2017 City of Renton Surface Water Design Manual
Ref 8-A-3
12/12/2016
REFERENCE 8: PLAN REVIEW FORMS AND WORKSHEET
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
Part 12 TIR SUMMARY SHEET
(provide one TIR Summary Sheet
per Threshold Discharge Area)
Maintenance and Operation
Responsibility (circle one): Private / Public
If Private, Maintenance Log Required: Yes / No
Financial Guarantees and Liability
Provided: (D/ No
Water Quality (include facility
Type (circle one): Basic / Sens. Lake / Enhanced Basic / Bog
summary sheet)
or Exemption No.
Special Requirements (as applicable):
Area Specific Drainage
Type: SDO / MDP / BP / Shared Fac. /G)
Requirements
Name:
Floodplain/Floodway Delineation
Type (circle one): Major / Minor / Exemption / one
100 -year Base Flood Elevation (or range):
Datum:
Flood Protection Facilities
Describe:
Source Control
Describe land use:
(commercial / industrial land use)
Describe any structural controls:
Oil Control
High -Use Site: Yes /oNo
Treatment BMP:
Maintenance Agreement: Yes / No
with whom?
Other Drainage Structures
Describe:
12/12/2016
2017 City of Renton Surface Water Design Manual
REFERENCE 8-A: TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
Part 13 EROSION AND SEDIMENT CONTROL REQUIREMENTS
MINIMUM ESC REQUIREMENTS
Type/Description
MINIMUM ESC REQUIREMENTS
DURING CONSTRUCTION
Type/Description
AFTER CONSTRUCTION
Clearing Limits
❑ Retaining Wall
❑ Stabilize exposed surfaces
Cover Measures
❑ Rockery > 4' High
© Remove and restore Temporary ESC Facilities
Perimeter Protection
❑ Structural on Steep Slope
© Clean and remove all silt and debris, ensure
❑ Traffic Area Stabilization
❑ Other.
operation of Permanent BMPs/Facilities, restore
tX C?A
operation of BMPs/Facilities as necessary
Sediment Retention
® Flag limits of sensitive areas and open space
® Surface Water Collection
preservation areas
® Dewatering Control
❑ Other
© Dust Control
0 Flow Control
© Control Pollutants
© Protect Existing and Proposed
BMPs/Facilities
® Maintain Protective BMPs / Manage
Project
Part 14 STORMWATER FACILITY DESCRIPTIONS (Note: Include Facility Summary and Sketch)
Part 15 EASEMENTS/TRACTS Part
Flow Control
Type/Description
A Drainage Easement
Water Quality
Type/Description
® Detention
❑ Infiltration
❑ Regional Facility
❑ Shared Facility
® On-site BMPs
❑ Other
014YN' N0v%Tlow
(ur-b�rol,
❑ Retaining Wall
❑ Vegetated Flowpath
❑ Wetpool
❑ Filtration
❑ Oil Control
❑ Spill Control
❑ On-site BMPs
❑ Other
❑ Rockery > 4' High
❑ Tract
❑ Structural on Steep Slope
❑ Other
RESi�--Evo�pY'
Fnr is cG►Tp,rSiov.
❑ Other.
tX C?A
2017 City of Renton Surface Water Design Manual
Ref 8-A-5
12/12/2016
16 STRUCTURAL ANALYSIS
A Drainage Easement
91 Cast in Place Vault
❑ Covenant
❑ Retaining Wall
❑ Native Growth Protection Covenant
❑ Rockery > 4' High
❑ Tract
❑ Structural on Steep Slope
❑ Other
❑ Other.
2017 City of Renton Surface Water Design Manual
Ref 8-A-5
12/12/2016
REFERENCE 8: PLAN REVIEW FORMS AND WORKSHEET
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
Part 17 SIGNATURE OF PROFESSIONAL ENGINEER
I, or a civil engineer under my supervision, have visited the site. Actual site conditions as observed were
incorporated into this worksheet and the attached Technical Information Report. To the best of my
knowledge the information provided here is accurate.
S�
Signed/Date
12/12/2016 2017 City of Renton Surface Water Design Mamial
8-A-6
Fit4ure 2 Site Location Map to Follow
s
36th Sl
� ' E88th 1 9E8gth
Li wc A t I e
m IN 30th St g
`
�P � SE 95th WaY a Va
N71t '~••
•�
Lake Washington �. ;r �—• NE26tt St
` ~�+ ', •1• NE 241h St
o `f•
Seat e
a o E 9ttcgt°c �t� a a` •� •
b� m
m
s
NE SLm
S 114th t • rte•
m 0th Ln
¢' • g NE 1SE 1161h St
^ a m a m NE 9fh 51
•
S 1201h St w �
m • w m
¢' NE 7th St
S 1241 St N 61 St E NE 6th •r� '
n I°'�
9P 13I•,
/ m
J• S128th St %a s/ E ..•' .J m I
U11NE 4th St - SE 1281h SI
3d t x ■
�
S132nd �•P heterUNW NEgtd St 1n rm
HE tl Sf I
0 5135th Sl •W m E1st PI
~ANN... `\ SE yrd Gt 9 A•I N '. L• • •� 1E 135 hSt
•�..�+ S�nae s3rd st st1 !! �..m.y 1..
` feh SE htb -' i•� IN W
SE 1381h PI`•
�• , " Cedar River
D Wish Waterway I SF Slh 3I ! tss, SITE
SW 7th St t 'M Ise �.J•ti
• c SfcOtrQ aa/ ya//,, '..i• • i SE 1451h
6cadYWa SE 121h St
Hh Pl
m - SE 1461h St
1405 rw a
515th St SE 16th PI
-5`N oy'r � •� Renton
N v
T QJo frr
Petle•�•� �.� ••~•�. tiPy'
sfnan Walk
1 0` SE /581h Sl •�•�r•
Gr ver
j s ..J
(/ • •r'•30 mok 760th PI
Stra dere d I SE 1641h $1
SE 1647.57 SF Fa7�O
SW 27th St �0
S7vd
- S MINIM
T k w i I i >< N 5F
m 15
H V• I ¢ 5th P/
SE 168th St
E 1701h St
I m R-
a v�
v
134th Ave SE
0 a
¢
• SE I 5F
S180th SSW 43 SI S 180th SI y Peo-Ovf7skyRtl _ St
f
y S 47th St SE 1841h St
3 �3j ydrq•� 184th PI SE
K e n t 5192nd f
•1I SE 192nd St
- L e Youn
S 196th St ; rSEtSt
Department of Community Street Classification for Live Work Docket #11
,�, &Economic Development
Alex Pietsch, Administrator Zoning Designations Road Classification
Data/GIS Analysis Services CN Commercial Neighborhood — Freeway
AdrianaA, Johnson, Patrick Roduin R14 parcels adjacent arterials — Primary
April 15, 2009 — Minor
0 11950 3,900 "
Feet — Collector
1:50,000 Local
Produced by City of Renton (c) 2009, the City of Renton all rights File Name: H:\CED\Plannin \GIS\GIS ro ects\docket items\
reserved. No warranties of any sort, including but not limited to 9 _p I
accuracy, fitness or merchantability, accompany this productlive_work_D11\mxds\live work D11 selected_parcels.mxd
Figure 3 Drainage Basin, Subbasin and Site Characteristics
0
Figure 4 Soils
Reference 11-C
Ago
IIIIIININNIIIIIJ ANIM
1IalitEB EVB t
f P< ? ~
C InC FEvO
BFC ECD Pn Pn'Pn
4� -
I w
_ , ` EK IFITS
E
, E c 1t
�• • NoId, 11
PITS AI F._ 'l l7
eoD T Ba� -"IE=-�uF,�F ,fi -
% AF %
�y� E B
BIG
i
� n tR
D \ - 9D Ft %
D P9 \ _ F
L - A4F -`
Ago
eec
PY
d"g
TU Mc
I
r— Ev
UW So B _ t -
Sk o
a no pgc
% No
Bk Sk
N Ago FMB Sk
Z Ago AI Sk Sk
ANI I
�I PmB PmB 00
, .
EVB
rI PITS PmB rO
f ^9° /
PyD
/5D PGB AI To/
i f 140"M
IN
w...
a
SITE
City o f R e n t o n Soil Survey Map Groundwater Protection A ea Boundary
Aquifer Protection Area Zone 1
PublicWorks0 Q,CJ 1 Aquifer Protection Area Zone 1 Modified
Surface Water Utility r city of , ( y I�..m
G. Del ROSaf10 f !J���`JJ f '' Miles ILMur Renton City Limits
12/22/2009
II. Conditions and Requirements Summary
CORE REQUIREMENTS - SECTION 1.2 OF KCSWDM
1.2.1 CORE REQUIREMENT #1: Discharge at the Natural I_ocatlon
Overall topography throughout the drainage basin generally conveys flows from
northeast4o-southwest and north -to -south. Streets and manmade conveyance systems
within the vicinity of the site have broken up these flows, directing them in various
directions that eventually flow to the same, original natural discharge point of the overall
basin, which is a series of wooded ravines located on the south side of SE 142nd Street
approximately 2,600 feet south of the project site. These ravines convey flows south off
the Maplewood Heights / Renton Highlands to the valley below and connect to the
Cedar River.
Existing micro -topography on the project site generally slopes northeast to southwest in
the general overall pattern of the drainage basin, directing surface flows from the site
across neighboring downstream residential parcels toward 154th Ave SE. Surface flows
in this direction are eventually collected by manmade conveyance systems in 154th Ave
SE and directed south.
There are several issues associated with releasing flows at the southwest corner of the
site as a developed project:
• This project will require installation of a detention vault and water quality facility.
• There is no existing conveyance system located at the southwest corner of the
site.
• There is not adequate distance on-site to disperse flows from the detention vault
to the surface toward the southwest corner of the site.
• Parcels south and west of this site prohibit our ability to convey flows via pipe or
swale C1 direction without easements across those parcels.
• Emerging groundwater is already an existing problem on parcels immediately
south of us along 156th Ave SE (see downstream analysis).
• Conveyance systems in 154th Ave SE further south (outside city of Renton) are
documented by homeowners in the area as overwhelmed in heavy and
prolonged rain events. The overall topography in this area is virtually flat.
For these reasons, we propose connecting our storm drainage system (post detention
and water quality) to the piped conveyance system located in SE 2nd Place which flows
west to Maplewood Park. At this location, the piped conveyance system discharges to an
open conveyance channel / stream that flows west and south through the park before re-
entering apiped conveyance system at SE 148tHPlace, travelling south along the 148tH /
149th rights-of-way to eventual discharge to the same wooded ravine south of SE 142nd
that overland course from the site connects to. This is the natural discharge point of the
overall basin. See' Fig.X included in section III, Task 3 for a map of the two drainage
courses.
1.2.2 CORE REQUIREMENT #2: Off-site Analysis
This core requirement has been addressed in Section III of this report.
1.2.3. CORE REQUIREMENT #3: Flow Control
Per SWDM section 1.2.3.3 and 5. 2, Flow Control BMPs are required for the onsite
development. See 1.2.9 CORE REQUIREMENT #9 of this report for Flow Control BMPs.
Onsite flow control facility is provided by a detention vault to provide the required Duration
standard forested site conditions flow control.
1.2.4 CORE REQUIREMENT #4: Conveyance System
The new conveyance piping will be installed as needed. The new conveyance piping has
been checked to confirm compliance with chapter 4 of the 2017 Renton SWDM.
Per City of Renton 2017 SWDM Section 1.2.4.1:
1. New pipe system shall be designed with sufficient capacity to convey and contain (at
the minimum) the 25 -year peak flow with minimum 6 inches of free board, assuming
developed conditions for onsite tributary areas and existing conditions for any offsite
tributary areas.
2. Pipe system structures may overtop for runoff that exceed the 25 -year design capacity,
provided the overflow from a 100 -year runoff event does not create or aggravate a severe
flooding problem or severe erosion problem as described in Core Requirement #2. Any
overflow occurring onsite for runoff events up to and including the 100 -year event must
discharge at the natural location for the project site. In residential subdivision, this
overflow must be contained within an onsite drainage easement, tract, covenant, or public
right-of-way.
3. The upstream end of a pipe system that receives runoff from an open drainage feature
(pond, ditch, etc.) shall be analyzed as a culvert.
The new conveyance system is designed to convey and contain the 25 -
year peak flow
with 6 inches of free board and the 100 -year peak flow and thus meets the requirements
listed above. KCBW is used for Back water analysis following the requirements of City of
Renton 2017 SWDM 4.2.1.2 and designed for the 100 -year peak flow.
1.2.5 CORE REQUIREMENT #5: Erosion and Sediment Control
Erosion control will be installed as necessary for the frontage improvements and the on-
site improvements.
1.2.6 CORE REQUIREMENT #6: Maintenance and Operations
Any necessary maintenance of the onsite drainage system will be the responsibility of the
property owner and manager.
60
1.2.7 CORE REQUIREMENT #7: Bonds and Liability
Necessary bonds will be provided at the time the building permit plans are approved
and the construction started.
1. 2.8 CORE REQUIREMENT #8: Water Quality
The project site includes onsite improvement and frontage improvement (curb, gutter,
sidewalk, planter strip) along both 156th Avenue SE and SE 2nd Place. Due to
topography and existing drainage improvements, off-site flows do not drain onto the site
and will not connect to the onsite detention vault. New sidewalk improvements along
both 156th Ave SE and SE 2nd Place will drain to their adjacent streets and their
respective existing conveyance systems. Total pollution generating area is 4,450
square feet and is counted as untreated discharge per 2017 Renton SWDM Section
1.2.8.2.D., no water quality treatment facility is required.
1.2.9 CORE REQUIREMENT #9: Flow Control BMPs
Average lot size of this project is approximately 10,900 square feet, Small lot BMP
requirements per 2007 Renton SWDM Section 1.2.9.2.1 apply to this project. BMPs must
be implemented, at minimum, for an impervious area equal to at least 10% of the site/lot
for site/lot size up to 11,000 square feet and at least 20% of the site/lot for site/lot size
between 11,000 and 22,000 square feet.
The feasibility and applicability of full dispersion was studied first. The study found full
dispersion is not suitable for this site to fully disperse the new impervious areas and new
non-native pervious areas because long native flow path is not available due to the
dimensions of the overall site. Full infiltration is also not suitable for this site because
onsite soil is till soil (Alderwood gravelly sandy loam, 6 to 15% slopes, AgC) according to
City of Renton Soils Map.
The following flow control BMPs are used to meet the requirements:
1. Restricted footprint. Impervious area coverage in each lots will be restricted to
maximum 34% of their lot sizes for lots 1 through 5 and maximum 25% for lot 6.
2. Tree retention. 4 trees along the south property lines are preserved.
3. Basic dispersion for downspouts. Downspouts of the southeast corners of the
houses on lots 1 through 5 up to 700 square feet per house are treated by Basic
dispersion. Down spouts of the southeast and southwest corners of the house on
lot 6 up to 1,400 square feet total are treated by Basic dispersion.
Til
SPECIAL REQUIREMENTS - SECTION 1.3 OF KCSWDM
1.3.1 Special Requirement #1: Other Adopted Area Specific Requirements
No other area specific requirements are applicable. The site is not within a CDA, MDP,
BP, SCP, SWCP, LMP, FHRPU or SFDP.
1. 3.2 Special Requirement #2: Flood Plain / Floodway Delineation
Not applicable to this site. There is no flood hazard area in the site. The site is not
within a floodplain or floodway. The site is not subject to inundation by the base flood or
N
hannel migration.
1.3.3 Special Requirement #3: Flood Protection Facilities
Not applicable to this site. There is no flood hazard area in the site. The site does not
rely on any flood protection measures.
1.3.4 Special Requirement #4: Source Controls
This project is a single family short plat project. Source Controls are not required.
1.3.5 Special Requirement #5: Oil Control
This project is a single family short plat project in R-4 zone and this site is not a high
used site. Oil Control is not required.
City of Renton Special Requirement #6: Aquifer Protection Area
Not applicable to this site. The site is not located in the Aquifer Protection Areas
(zone1, zone 1 modified and zone 2) shown on the City of Renton Aquifer Protection
Zones Map.
III. Off Site Analysis
�5
Task 1 Study Area Definition and Maps
The site is located on the east side of 156th Avenue Stand on the south side of SE Z"
Place. The address of the site is 13609 156th Avenue SE. The parcel numbers of the 2
parcels making up the overall project site are 146340-0045 and 146340-0049. The
onsite area is 1.67 acres. The site is located in the Lower Cedar River drainage basin.
See attached Site Map and Topographical Map.
Task 2 Resource Review
The following resources have been reviewed for existing /potential problems in the
study area.
1) Critical Drainage Area maps
Do not apply in the City of Renton per City of Renton Surface Water Design Manual.
2) DNRP Drainage complaints and studies
None.
3) Road drainage problems
See description of downstream drainage system (King County) in 154th Avenue SE in
Task 3 — Field Inspection.
4) U.S. Department of Agriculture, King County Soils Survey
The King County Soils Survey map and City of Renton Soils Map show Alderwood soil
on the site (AgD on the west portion of the site and AgC on the east portion of the site).
See attached Soils map.
5) Wetland Inventory
There is no wetland on the site and its adjacent areas.
6) Migrating river studies
There is no migrating river within the study area.
City of Renton Sensitive Areas
Flood Hazard
Public Works Department
G. Zimmerrnan, Administrator
Technical Services
R. MacOnie, D.�lsneski
Printed on May 21, 2009
Data Source: Public Warks, Utiliti
es Systems, Technical Services
��D �ctryor,
a r,mo s,eco
(1_ ae rm, Cb
Hazard Condition
Flood Hazard
Critical Infrastructure
�� Police Department
_= Fire Stations
V Valley Medical Center
� Schools
City of Renton Sensitive Areas
Erosion Hazards
Public Works Department
G. Zimmerman, Administrator
Technical Services
Donnaann Visneski, ES3
Printed on May 21, 2009
Data Source: Public Works, Utilities Systems, Technical Services
0 1,500 3,000'
i r i
ardpo+wmaaM�� m,asbn.aeeb
�Jri rsMms crr w+e
L.
HAZARD CONDITION
Critical Infrastructure
" Police Department
Fire Stati
ons
V Valley Medical Center
� Schools
City of Renton Sensitive Areas
Public works Department Steep Slopes Percentage Range
G. Zimmerman, Administrator ° td00 2800'
Technical Services r >15% & <=25°/
R. MacOnie, D. �sneski
Printed on May 21, 2009 a d".A :.«� TM.... d m >25°/ & <=a0%
Data Source: Public Works, Utilities Systems, Technical Services
� acrry°t
�
LJ� Renton City Limits
City of Renton Sensitive Areas
Landslide Hazard
Public Works Department
G. Zimmerman, Administrator
Technical Services
R. MaGunie, D. Vsneski
Printed on May 21, 2009
Data Source: Public Works, Utilities Systems, Technical Services
city Ofr
l
l
l
l
° t,zso 2,5°°' LANDSLIDE HAZARD CRITICAL FACILITIES
Very High _ Police Department
Hig_ •.
tz r' Renton City Limits - Moderate � Fire Stations
Mod
Unclassified V Valley Medical Center
Schools
Task 3 Field Inspection
Upstream Tributary Area
Based on the general neighborhood layout and topography, there are no significant
upstream flows that enter the site. Upstream runoff to the east is intercepted by the
existing conveyance system (CBs and underground pipes on the east side of the street)
in 156th Ave. SE and conveyed south past the project site. Upstream runoff to the north
is intercepted by the existing conveyance system (ditch along the north side / CBs and
underground pipe on the south side) in SE 2nd Place and conveyed west past the
project site toward Maplewood Park.
Downstream Analysis
Surface runoff from the site currently travels overland in a southwesterly direction
toward SE 3rd Place / 154th Ave. SE. While no standing water or water flows were
observed on the project site, surface water (likely excess groundwater) was observed
flowing off parcels on the east side of 154th Ave SE south of SE 3rd Place
(approximately 350 feet downstream of the project site). A portion of this flow was
crossing 154th Avenue SE in a wide band to the gutter on the west side of 154th Avenue
SE where it was channeled to existing CBs in that flowline. The remainder of that flow
was travelling south on the east side of 154th Avenue SE in a shallow to non-existent
flowline to a CB located near the end of the paved portion of 154th Avenue SE
(approximately 520 feet downstream of the property). Both pipe systems continue south
through an unopened section of 154th Avenue SE where they connect to an existing
series of shallow, grass -lined conveyance swales, roadside ditches and culverts
(beginning approximately 1200 feet downstream of the site) in the southerly open
portion of 154th Avenue SE.
This open conveyance system continues south within the right-of-way for approximately
670 feet to the intersection of SE 142nd St. and 154th Ave. SE where it turns and
continues west in SE 142nd Street (approximately 1870 feet downstream of site). This
portion of downstream in 154th Avenue SE and SE 142nd Street is more completely
described in the downstream analysis prepared for MeadowVue (LUA17-000106) by
CPH Consultants.
m
IN
o�
s 0*1
Eu
F ' 1
5�--PINTO a pi
Ole _ i
NJ
UP
■ d
NO NO03
UP �Mm
__-• - Y - _Z. • irt
r WN
ININ '��t� -'
' AL
ALP y�
•sr _ �
WIN
Tau
1 r: p
in
':Oc
AMR: limmmirmilm" Now; a No r LOP
JJ
iron
fit• .:. �-:� . •J3 A
�'�-°7 �,
� , ' r, ''
IL
,
POP
1; too
AN m =j '�
.�! t -o
L
b
IN
o�
s 0*1
Eu
F ' 1
5�--PINTO a pi
Ole _ i
NJ
UP
■ d
NO NO03
UP �Mm
__-• - Y - _Z. • irt
r WN
ININ '��t� -'
' AL
ALP y�
•sr _ �
WIN
Tau
1 r: p
in
':Oc
AMR: limmmirmilm" Now; a No r LOP
JJ
iron
fit• .:. �-:� . •J3 A
�'�-°7 �,
� , ' r, ''
IL
,
POP
1; too
AN m =j '�
.�! t -o
L
�—�• , I r r+i y 1 h I M1 `'rarm, _,; ', r°7 1 — �r� t r
1.4 1 Ali
Alto
�..r - Ai'% f r �.
iAE
I oz
a LF
pity Of Renton' t 'r.. �l� '� •�,i z Ij ~-a + . . r 1',`. F r •■` ri fS �1was
_ _
It
vim''
FF
Will
a lii iil V'r ii. il}'?I.�ti�=�r "-
Kin Count .. � rte.
9 Y Low I_LLLLL t - L FF
::
-i `'6 . id_', 4 - I OF
_ 0 At T �•., '�' , - _ F, 1 .. r .`, '� -iieTh .-- `�IS� • F•aGO
AD
ML dqr
Oro
%;x a. r .IIx+,��.. , 7 : ? .. % _ IND .. �4 i fir•.
r.
ML A MAL
` i
4 �11 1 . Stream - ,�l
t2 �: �,
IV '.
6 At 4 MAL} ry+�►, ��d
,� 4 ` 1�,e?�_ - v .Y dF _ r .. _ , t -FF 0#7 to I� - �' I r Is wo • •`��, __ - j .^ . `,r` .iT37
Oka
LK
- y�'
Y + 6. �` 4 , �' _ 11110
4 r ;' -¢� ;' ' lY4 ix` AV
aMC - i ��e; I i i 1 �J
NA
OF I f� _A 11h '''����{ �,�1; F� Site i
•�:; trtyi 5.� milt �b�` + ', -dam'' j� f r'• ��� T' T tom•
all *ISs �„ >, y1
alsolir 101 k y IV 11 r I. It F P f r fx1m
m MAL AM ff
sit
J� +� • _ ` 'rIf
+ 'rte cFILM _ ' it
MW
4*
IF FF L I IF
tir• • / I
LU
,.
AV ir 9 MAIN V) IF IS
Task
ilizwk 's..,r. - M+
C ■
:. SOLVED
—}.'_- -I• ' _ - '.I `f4 .,�ntMal
't _ 1
sold 1- v.y' .� _
e � - S E 138t I ,. Vis._ — .
-�Sol
�.'
ALI
FlatJa AD in 111 LDso a
€ z ;' _ Fall 1 TV IDIOM; Mal ";Zjix.�Lwaamt
.AV SAW o a ,•i 154th Ave SE F1 rt.Jim -�r
A ;� .� , Overland Sheet Floi
,_ y r 4 ,.. _— .L 4
", x`'_ w 11T � a,� Pipes [CBs :.�WEI
twill f ILIst`` '� I -; Grass -Lined Swales / .CIrierts
_.
S,into ¢ a r' LL to
,: . - '•. ,4 :..' •,=-L• _ d� -i, ij_ .�
i P
a r
SE 2nd Place FI h� w I i
a IMF
ri a
i As
+a' h r1. 1Vi s r7 r zr
(All. Pipe I CBs)., ,.'�,�i ' WISI
IF - - _ r
Fall F
�. r ky- r
h- tDo, 14 AV • :{ ,
�y .■1 _ 5 , y.4 _ -IV
LA
4 Who
Z�r� AM '� 4F !I FILLs . i . :f X11 ��1Is
AM
•, _ _
OL
' •.-'1�.�' R .. �4 ._1,e1 1��'11a� !' ! �" t''• r -'� r_ - - • 7 ,
OF to
I Irl
-
_ .: , r . I
r
ALL
- —s — -s
a . .
i r I •�{ � a ?� •
SEES[ a
n_i�7 t
�r _ _
r,
_
It
_. 1 n
T .
n
1
0 At Mal I JF
ABC 17
lial
Is# A to me_To
OF �,
SOF
OF
1- w _
it I IS r
ka�i� 1 Iilk
sFF& ,• J t, v 1 r• 04
q i at ; '� � + �' , : Swales I Culverts) _ ; i `' _ , :_ i
All�k_ �..• — _ DO � _ r' fir:
i + i
FF
,7�+ !'�• ' ,.j� -•.' �1 •� 'MI A Aso I Do �MI
�
so'1y�
r`r` 'iz'i. s". ys,•r — er i- l - _ 11 Jt s e*
' 1'l 1 i - .t 4,�.• - iOL - r I I the let AM SO Is
�R J- __•i i •'•l '� V a �:�" ''�7J' �. '.�, FFF �L i� _,`�-
,` _Ir - - Y''
.106 1
or a
MAL Ar
A a is SAO To, A fall
A sit
Sao
I I All 144
r. 'r ; -• Irk -- ; ,r
"_- Crr
!:�F' '' *3r'. ... 1, a _'1; } -7.4 �O .•, s, _.;t r f
Gra i,-1 , i L �, } f,—;• ' -1 ' 3 5 •� }'� 1+ ''`. r, !�^
So r IS 1_r igF L
.01
It
r-vI all 11 1
,r' ,.tw ° i�-. �a t' 1j yrAT
MM
. :t aft
ai �?�` ?; I From
{, 9�..i r '�, ••s.7•t.i:i.. i 4 P17 01 +
�i'
FF iSo Alt
DWI .• '. r ,a .• a5 i� 'Iki ar•.1.` AOL
c'a '}, t. 1 ; , ti -. r - IL�,�:L'�' . -.! ' a d� ■�s`
DOWNSTREAM CONDITIONS
i,uuxui� �vu�ii aivu� i��r r-vvc. ter,
(approximately 530 feet downstream of site).
PACIFIC ENGINEERING
DESIGN, LLC
15445 53RD AVE. S., #100
Seattle, WA. 98188
(206) 431-7970
www.p
aceng com
Cedar Ridge Short Plat Downstream
13609 156th Avenue SE
Renton, WA 98059
SCALE: None I DATE: 3/20/17 1
SHEET: 4 OF 12
JOB NUMBER: FILE NAME:
BY: LEL 17006 Photobase 4
DOWNSTREAM CONDITIONS
>r
t - -
to It—
.
t Y.
x r;
A
`jr
foo food a
1 to of'
;t
- _
,Fhti14,
TF
- off
-
foo off.
-
of
I:r
` toot.,
AL
s1, 1% 1 ot
I I
V�p '.
_ _
Wo
of
of to
Iwo� of
off
r F
I off
.. .. r „k
r foo,
I or
�ooI If or I of
Looking south along the gutter on the west side of 154th Ave. SE
(approximately 680 feet downstream of site).
PACIFIC ENGINEERING
DESIGN, LLC
000000000
15445 53RD AVE. S., #100
Seattle, WA. 98188
(206) 431-7970
www.pacen _
Cedar Ridge Short Plat Downstream
13609 156th Avenue SE
Renton, WA 98059
SCALE: None DATE: 3/20/17 SHEET: 6 OF 12
JOB NUMBER: FILE NAME:
BY: LEL 17006 Photobase 6
DOWNSTREAM CONDITIONS
LVVlilll� SVULll 0.1Vllb' L11G WGSL S1UG Vl 1J`t LyVG. JL'
(approximately 1680 feet downstream from site)
PACIFIC ENGINEERING
DESIGN, LLC
15445 53RD AVE. S.,
#100
Seattle, WA. 98188
(206) 431-7970
www.pacen.a
.com
Cedar Ridge Short Plat Downstream
13609 156th Avenue SE
Renton, WA 98059
SCALE:
one
DATE: 3/20/17 SHEET: 10 OF 12
JOB NUMBER: FILE NAME:
BY: LEL 17006 Photobase 10
or A
`- A I
A AT
A JI
. - _.`
iff I
c i-
` `-- -ISIOF�III I All L
_ro S TA
MAIL A"A,
+y_
r'll'
ALL L
VIA Add,
-, ,Ad
ALL Ar
kLAL
tj. .-� \ —pe,eF -
IT
I�t f'!• ceA.l Vw, 1 r�,/, ,]}'Afl. orf
_ t�
k, tAim
�
Ar
-':
AWAL V. av
' ,,_
Ad
iAIA A �f
I,
I Aij ALL do A—
L IVA dr
7 LI
A ' `, , ' t
At TV
"I Ad di A #Ad AV TJ I
- =_
I AT TO A
` / Y?.
A
VA It V) k
r j' (dd I < 7 z.4
i- r , i.. ! i.i / ..A JA
x;.� z2'y .mak ,.:Al 11't`.'r '= A IT
Y 's,. A
DOWNSTREAM CONDITIONS
Lvvnui� �vu�u aivii� uic ww� �iuc vl l�-r rvvc. aL
(approximately 1950 feet downstream of site).
PACIFIC ENGINEERING
DESIGN, LLC
15445 53RD AVE. S., #100
Seattle, WA. 98188
(206) 431-7970
www.12aceng.co
Ridge Short Plat Downstream
13609 156th Avenue SE
Renton, WA 98059
SCALE: None DATE: 3/20/17 SHEET: 12 OF 12
JOB NUMBER: FILE NAME:
BY: LEL 17006 Photobase 12
Task 4 Drainal4e System Description and Potential Problems
There are no unsolved existing and potential drainage problems within 0.25 mile
downstream of the site other than the observed groundwater surface flows along 154th
Ave SE. Further south in the King County portion of 154th Ave SE (gravel road surface)
approaching SE 142nd Street (0.25 — 0.36 miles downstream), the topography is quite
flat with roadside swales and culverts. Discussions with residents in this unincorporated
area of the county indicate minor flooding issues with this system during intense and /or
prolonged rain / snowmelt events.
Task 5 Mitigation of Existing or Potential Problems
There are no unsolved existing and potential drainage problems within 0.25 mile
downstream of the site.
For the onsite improvement, Restricted footprint and Basic dispersion for downspouts are
used for each lots as Flow control BMPs. New plus replaced impervious area is
approximately 0.49 acres before applying flow control BMP credits, new pervious area is
approximately 1.18 acres. A detention vault is proposed to provide the required Duration
standard forested site conditions flow control.
The offsite frontage improvements along SE 2nd Place and 156th Avenue SE remove
approximately 4,390 square feet of existing impervious area and create approximately
63090 square feet of new / replaced impervious area (1,632 square feet of it is pollution
generating impervious area) and no new or replaced pervious area. For flow control, the
new impervious area created by the SE 2nd Place offsite improvement is routed to the
onsite detention vault and new impervious area created by the 156th Ave SE offsite
improvement is counted as bypassed target area Per KCSWDM Section 1.2.3.2.E. The
onsite detention vault is oversized, so that the developed onsite detained runoff plus the
onsite and offsite bypassed runoffs meets the required Duration standard forested site
conditions flow control requirements at the point of convergence (Near the intersection of
149th Place SE and SE 142nd Street).
For water quality treatment, total new and replace pollution generating area (onsite plus
offsite) is only 4,690 square feet (less than 5,000 square feet) and is counted as
untreated discharge per 2017 Renton SWDM Section 1.2.8.2.D. No water quality
treatment facility is required.
With connection to the piped conveyance system in SE 2nd Place, the proposed
development will not create any adverse impact on the downstream drainage system in
either direction between the site and the wooded ravine south of SE 142nd Street where
the two downstream systems re -converge.
19
Downstream maps and Photos
20
V. Flow Control and Water Quality Facility Analysis
and Design
21
Part A Existing Site Hydrology
Duration standard forested site conditions flow control requires matching developed flow
duration from 50% of pre -developed 2 -year peak to full 50 -year peak and matching
peak discharge rates of developed 2 and 10 -year peaks with the existing 2 and 10 year
peaks. Existing site condition is forest condition per City of Renton Flow Control
Application Map.
Offsite frontage improvement along SE 2"d Place
This is an existing developed street Right of way.
Total drainage area = 0.334 acres (the south half right of way along the frontage of the
site)
Total existing impervious area = 0.229 acres
Total existing pervious area = 0.105 acres (till grass, soil group C)
Offsite frontage improvement along 156t" Avenue SE
This is an existing developed street Right of way.
Total disturbed area = 0.050 acres
Total existing impervious area = 0.005 acres
Total existing pervious area = 0.045 acres
The 156th Avenue SE drainage system has a different drainage path from the SE 2"d
Place drainage system and the onsite drainage system. All three drainage path joins to
a stream that drains to the Lower Cedar River approximately 0.75 miles downstream
from the site (Point of compliance).
Onsite improvements
Scale factor = 1.167 (Seatac)
Total onsite area = 1.67 acres (assume till forest, soil group C)
22
4V4VHM2Q12 SatwantRenton
File Edit View Zoom Help
❑ u��ws-0or'aaa
23
ltr4NHM2012 SatwantRenton
File Edit View Help Summar/ Report
REM
IC If LW ;IID
:Surface I nterflow Ca raundwaker
Flows To IChannell -----� Channel 1 -----1
Area in Basin f' Show Only Selected
Available Pervious Acres ,available Impervious Acres _
r; A113, Forest, Flat 0 r ROADS/FLAT 10
'A1B. Forest, Mod + ROADSIMOD 10
r A113, Forest, Soep j ROADS/STEEP 10 _
" AIB, Pasture, Flat 10 r ROOF TOPS/F 10 -- -
AIB, Pasture, Mod 0 r DRIVEWAYS/FLAT 10
F' A1B. Pasture, Skeep 10 DRIVEWAYSi 10
I—' A1B. Lawn, Flat' 10 DRIVEWAYS/ 10
A1B, Lawn, Mod 0 SIDEWALKS/FLA T 0
A113, Lawn, Steep 0� SIDEWALKSlMOD 0
C. Forest, Flat 10 r SIDEWALKS/STEEP 10
r: C, Forest, Mod 11.67 r PARKING/FLAT 10
• C, Forest, Steep 0 r PARKING1MaD .__
• C, Pasture, Flat 10 r PARKINGISTEEP 10
F' C, Pasture, Mod 0 r POND 1
r C. Pasture, Steep r Porous Pavemenk10
C Lawn Flat
C. Lawn. Mod
r' C. Lawn, Steep
" SAT, Forest, Flat
PerviousTotal 1.67 _J Acres
Impervious Total 0 Acres
Basin Total 1.ta7 Acres
DeselectZer0 Select By. CO
24
ij VAUHtv12012 SatvrantRenton
File Edit VieW Help Summary Report
ry6�9 Eb Oft
=) E
.
ubbasin Name_
Surface lnterFlow Groundwater
Flows To: IChannell HChannell -----------
Area in Basin r Show Only Selected
Available Pervious Acres
I—
Iv
r
r
r
r
1—
r
r
I
I—
I'
r
r
o
r
r
AIB, Forest, Flak D
VB, Forest, Mod
ASB, Forest, Steep
V13, Pasture, Flak
ASB, Pasture, Mod
AIB, Pasture, Steep
VB, Lawn, Flat'
ASB, Lawn, Mod
VB, Lawn, Steep
C, Forest, Flat
C, Forest, Mod
C, Forest, Steep
C. Pasture, Flak
C, Pasture, Mod
C, Pasture, Steep
C, Lawn, Flat
C, Lawn, Mod 14
C, Lawn, Steep 10
Available Impervious
ROADS/FLAT
ROADS}MOD
ROADS/STEEP
ROOF TOPS/FLAT
DRIVEWAYSN T 10
DRIVEWAYSlMOD 10
j— DRIVEWAYS/STEEP'
SIDEWALKS/FLAT
SIDEWALKS/MOD
SIDEWALKS/STEEP
PARKING/FLAT 0
"
PARKING/MOD
PARKING/STEEP
POND
Porous Pavement
Acres
0
225
a
�
0 --
0 0
--
�
0
105
r SAT, Forest, Flat 0
PerviousTotal 0.10 Acres
Impervious Total
Basin Total
D eseleGk Zero
ti^1
Acres
flares
25
Available Impervious
Acres
0
225
a
�
0 --
0 0
--
�
0
105
r SAT, Forest, Flat 0
PerviousTotal 0.10 Acres
Impervious Total
Basin Total
D eseleGk Zero
ti^1
Acres
flares
25
'- krtWHM2012 SatwantRenton
File Edit View Help Summary Report
iso
Suhhasin Name_
Surface Interflow Groundwater
Flows To IChannell IlChannell
Area in Basin r Show Only Selected
Available Pervious Acres Available Impervious Acres
Emi
0 r A}B, Forest,
'
AIB, Forest, Mod
ASB, Forest, Steep
AIB, Pasture, Flak
j- A1B, Pasture, Mod
AIB, Pasture, Steep
J ' AIB, Lawn, Flat
' A/B, Lawn, Mod
j- A1B, Lawn, Stee
C, Forest, Flat
C, Forest, Mod
j� C, Forest, Steep
r
C. Pasture, Flat
C, Pasture, Mod
(C, Pasture, Steep
j-
C. Lawn, Flat
C, Lawn, Mod
j" C, Lawn, Steep
SAL Forest, Flat
PerviousTotal 0.045 Acres
Impervious Total O.Q05 Acres'
Basin Total O.D5 Acres
DeselectZ
ero
IItaTelta�.Y��GTi7
�' DRIVEWAYSIMOD Q
1— DRIVEWAYS/STEEP 0
SIDEWALKS/FLAT 0
SIDEWALKS/MOD 0
SIDEWALKSISTEEP 10 _
PARKING/FLAT 0 - --
PARKING/MOD 0
PARKING/STEEP 0
J- POND 0
Porous Pavement 0
select By.
� GO
Flow Frequency Return Periods for Predeveloped.
Return Period Flow(efs)
2 year 0.
If ear 193946
5 0.276802
10 year 0.339937
25 year 0.4297
50 year 0.504201
100 year 0.585572
POC #1
Flat
PerviousTotal 0.045 Acres
Impervious Total O.Q05 Acres'
Basin Total O.D5 Acres
DeselectZ
ero
IItaTelta�.Y��GTi7
�' DRIVEWAYSIMOD Q
1— DRIVEWAYS/STEEP 0
SIDEWALKS/FLAT 0
SIDEWALKS/MOD 0
SIDEWALKSISTEEP 10 _
PARKING/FLAT 0 - --
PARKING/MOD 0
PARKING/STEEP 0
J- POND 0
Porous Pavement 0
select By.
� GO
Flow Frequency Return Periods for Predeveloped.
Return Period Flow(efs)
2 year 0.
If ear 193946
5 0.276802
10 year 0.339937
25 year 0.4297
50 year 0.504201
100 year 0.585572
POC #1
POC #1
Part B Developed Site Hydrology
Offsite frontage improvement along SE 2"d Place
This is an existing developed street Right of way.
Total drainage area = 0.334 acres (the south half right of way along the frontage of the
site, this area will be collected and conveyed to the onsite detention vault)
Total existing impervious area to remain = 0.135 acres
Total new plus replaced impervious area = 0.116 acres
Total impervious area = 0.251 acres
Total pervious area = 0.083 acres (till grass, soil group C)
Offsite frontage improvement along 156t" Avenue SE
This is an existing developed street Right of way.
Total disturbed area = 0.05 acres (this area will be collected and conveyed to the
existing storm drainage system that runs along the east side of 156th Avenue SE and
bypass the onsite detention vault)
Total new and replaced impervious area = 0.02 acres
Total pervious area = 0.03 acres (till grass, group C)
Onsite improvement
Under developed condition, onsite runoffs will be collected and conveyed to the onsite
detention vault.
Onsite impervious area calculation (before applying Flow control BMP credits):
Roofs of lot 1 through lot 5 = 3,000 sf per lot.
Roofs of lot 6 = 2,400 sf.
Private, driveway, walkway and parking for 6 lots = 3,600 sf.
Driveway to detention vault = 480 sf.
Total impervious area = 21,480 sf. = 0.493 acres
Total onsite area = 1.67 acres
Total onsite pervious area = 1.67 — 0.493 = 1.177 acres (till grass, group C soil)
WWHM2012 SaMantRentanDer
File Edit Viev Zoom Help
r•:
MVHM2012 SatwantRentonDev
File Edit View Help Summary
Summary Report
ti61196bft
IID
Flows Ta
T
Surface
Area in Basin
Inkerllow groundwater
Available Pervious Acres
r AIB, Forest, Flat 0
r AIB, Forest, Mod 0
r AIB, Forest, Steep 0
r AIB, Pasture, Flat 0
r AIB, Pasture, Mod F
r AIB, Pasture, Steep
r AIB, Lawn, Flat , 0
r AIB, Lawn, Mod 0
r AIB, Lawn, Steep
r C, Forest, Flat 0
jV C, Forest, Mod 0
r
C. Forest, Steep
r C, Pasture, Flat CI
r C, Pasture, Mod 0
r C; Pasture, Steep 0
r C, Lawn, Flat 0
(V C; Lawn, Mod 1.177
r
C. Lawn, Steep
r SAT, Forest, Flat j
PerviousTokal 1.177 Acres
Impervious Total 0.493: Acres
Basin Total 1.67 Acres
Deselect Zero _] Select By_
Show Only Selected
Available Impervious Acres
ROADS/FLAT
'ROADS/MOD 094
r
ROADS/STEEP C
ROOFTOPSIFLAT .399
r
DRIVEWAYS/FLAT I"
DRIVEWAYSIMOD IV
r
PARKINGIFLAT
r
PARKINGIMOD
r
PARKING/STEEP
POND
r
Porous
Pavement
29
Wd WtNHM2012 SatwantRentonDev
File Edit View Help Summary Report
D Gi 6119
JP,a
Surface Interflow Groundwater
Flows To : lChannell 1� (Channel 1
Area in Basin r Show Only Selected
Available Pervious
AIB, Forest, Flat
T
AIB, Foresk, Mod
r AIB, Forest, Steep
j- AIB, Pasture, Flat
r AIB, Pasture, Mo
f' AIB, Pasture, Steep
r AIB, Lawn, Flat
r AIB, Lawn, Mod
del
)— C, Pasture; Flat
j
Acres
C. Pasture, Mo
J— Co Pasture, Steep
j� C, Lawn, Flat
V C, Lawn, Mod
C. Lawn, Steep
j ;SAT, Forest, Flat
PerviousTotal �(
Impervious Total
Basin Total
Deselect Zero
Acres
Acres
Available Impervious
ROADS/FLAT �
ROADS/MOD
j-
ROADS/STEEP
ROOF TOPSIFLAT
DRIVEWAYS/FLAT
j
DRIVEWAYS/MOD
DRIVEWAYSISTEEP
SIDEWALKS/FLAT
Acres
]� PARKINGISTEEP
POND
J` PorousPavement
Selec# By_ � _GO
VANHM2012 SatwantRentonDe%t
File Edit View Help SummaryReport
; 64 Yo a� � A
W WF5t, [Z ID
Subbasin Name: lflMMMMM= — I h Designate as Bypass for POC:'
Surface Interflow Groundwater
Flows To: IChannel 1 IChannell I
Area in Basin Show Only Selected
Available Pervious Acres Available Impervious Acres
. r AIB, Forest, Flat 0 r ROADS/FLAT 10
F AIB, Forest, Mod 0 ROADSIMOD 02
r AIB, Forest, Steep )- ROADS/STEEP 10
AIB, Pasture, Flat 'ROOF TOPS/FLAT 0
r AIB, Pasture, Mod 0 r DRIVEWAYS/FLAT
� C, Foresk, Mod
]
DRIVEWAYSIMOD'i
C, Forest, steep 0�
r C; Pasture, Flat 0
r
C. Pasture, Mod
r C; Pasture, Steep , 0
C Lawn, Flat
� C, Lawn, Mod ,03
r C, Lawn, Steep 0
r SAT, Forest, Flat
r` .Porous Pavement �"
PerviousTotal q.03 Acres
Impervious Total 0.02 Acres
Basin Total 0.05 Acres
Deselect Zero Select By. GD
Flow Frequency Return Periods for Developed condition. POC #1 (No detention
and no flow control BMPs)
Return Period
Flow(efs)
2
year
0.553387
5
year
0.76618
10
year
0.918046
25
year
1.122584
50
year
1.284265
100
year
1.454035
31
Part C Performance Standards
The site is located in Duration NOW Control Area (Forest existing condition). Since no
problem has been identified within the site and its downstream area, level 2 flow control
(forest existing condition) is required.
Per SWDM section 1.2.3.3 and 5.2, Flow Control BMPs are required for the onsite
development. Flow control BMP's for more than 10% of each lot area is required for lots
1 through 5 and Flow control BMP's for more than 20% of the lot area is required for lot
6. The feasibility and applicability of full dispersion is studied first, the study found full
dispersion is not suitable for this site to fully disperse the new impervious areas and new
non-native pervious areas because long native flow path is not available. Full infiltration
is also not suitable for this site because onsite soil is till soil (Alderwood gravelly sandy
loam, 6 to 15% slopes, AgC) according to City of Renton Soils Map.
The following flow control BMPs are used:
1. Restricted footprint. Impervious area coverage in each lots will be restricted to
maximum 34% of their lot sizes for lots 1 through 5 and maximum 25% for lot 6.
2. Tree retention. 4 trees along the south property lines are preserved.
3. Basic dispersion for downspouts. Downspouts of the southeast corners of the
houses on lots 1 through 5 up to 700 square feet per house are treated by Basic
dispersion. Down spouts of the southeast and southwest corners of the house on
lot 6 up to 1,400 square feet total are treated by Basic dispersion.
For lots 1 through 5:
Average lot size 10,655 sf.
10% of the lot size = 1,066 sf.
Total impervious area in each lot is restricted to 3,600 sf.
Total impervious area treated by Restricted foot print = 4,000 — 3,600 = 400 sf.
Total impervious area treated by Basic dispersion for downspouts = 700 sf.
Total impervious area treated by Flow control BMPs = 1,100 sf. > 1,066 sf., o.k.
For lot 6:
Lot size = 12,019 sf.
20% of the lot size = 2,404 sf.
Total impervious area in this lot is restricted to 2,996 sf.
Total impervious area treated by Restricted foot print = 4,000 — 2,996 = 1,004 sf.
Total impervious area treated by Basic dispersion for downspouts = 1,400 sf.
Total impervious area treated by Flow control BMPs = 2,404 sf., o.k.
Final signed Flow Control BMP Covenant is required prior permit is issued and will be
recorded with the Final Short Plat map.
Onsite flow control facility is provided by a detention vault to provide the required Duration
Flow Control (Forest existing condition) for onsite area and offsite improvement along SE
2nd Place.
32
Since total new plus replaced pollution generating impervious area is less than 5,000
square feet, water quality treatment facility is not required. The proposed detention
vault provides 1' dead storage and 0.5' sediment storage which provides enough
sediment control.
See Section 2 of this report regarding special requirements, the only special
requirement applicable to this site is special requirement 1.3.4 for source control.
Dumpsters and recycle bins will be stored in the garages of each houses. Since the site
is not a high use site, oil control is not required.
The new onsite conveyance system is designed per chapter 4 of the 2017 Renton
SWDM to convey the 25 -year peak with 6 inches of free board and the 100 -year peak
flows.
For offsite frontage improvement along 156th Avenue SE, as discussed in Section 1 of
this report, no flow control or water quality treatment is required.
33
Part D Flow Control System
Offsite frontage improvement along SE 2"d Place
This is an existing developed street Right of way.
Total drainage area = 0.334 acres (the south half right of way along the frontage of the
site, this area will be collected and conveyed to the onsite detention vault)
Total existing impervious area to remain = 0.135 acres
Total new plus replaced impervious area = 0.116 acres
Total impervious area = 0.251 acres
Total pervious area = 0.083 acres (till grass, soil group C)
Offsite frontage improvement along 156t" Avenue SE
This is an existing developed street Right of way.
Total disturbed area = 0.05 acres (this area will be collected and conveyed to the
existing storm drainage system that runs along the east side of 156th Avenue SE and
bypass the onsite detention vault)
Total new and replaced impervious area = 0.02 acres
Total pervious area = 0.03 acres (till grass, group C)
Onsite improvement
Total onsite area = 1.67 acres
Total impervious area = 21,480 sf. = 0.493 acres (before applying Flow control BMP
credits)
Total impervious area treated by Basic dispersion of downspouts = 7* 700
= 4,900 sf. (credited as 909/o impervious area, 10% grass)
For lots 1 and 2, dispersed flow from their southeast downspout and the back yards of
these two lots sheet flow to the west adjacent lot bypassing the onsite detention vault.
After apply the Flow control BMP credits, onsite drainage area draining to the detention
vault = 1.408 acres
Impervious area = 21,480 — 43900 + (5 * 700) * 0.9 = 19,730 sf. = 0.453 acres
Pervious area = 1.408 — 0.453 = 0.955 acres (till grass, group C soil)
Onsite bypassed area = 0.262 acres
Impervious area = 2 * 700 * 0.9 = 1,260 sf. = 0.029 scres
Pervious area = 0.262 — 0.029 = 0.233 acres (till grass, group C soil)
Flow control facility:
A detention vault is used to provide the required Level 2 flow control (forest existing
condition). 2012 WWHM method with 15 -minute time step is used to size the detention
vault.
34
The proposed detention vault (74' long x 36 wide x t live storage) actuary provides
Level 3 Flow control (forest existing condition) performance.
VVWHM1r12612 SatwantRenton
File Edit View Zoom Help
35
MVHM2012 SatwantRenton
File Edit View Help Summary Report
D 0 6119 % oft
(M Ar 1-�l KID
�1 L%10 1C & I
Subbasin Name_ ® ! mu' 1 Designate as Bypass for POC:
Flows To
T
Surface
Channel 1
Interflow Groundwater
Channell 11 1
Available Pervious Acres
J` A1B, Forest, Fla 0
j Ale, Forest, Mod 0
J— AB, Forest, Steep
A16, Pasture, Flat
A1B, Pasture, Mod j
j A1B, Pasture, Steep
C— A1B, Lawn, Flat 0
(� A1B, Lawn, Mod 0
A1B, Lawn, Steep 0
C Forest, Flat 0
]V C; Forest, Mod
C; Forest, Steep 0
J�
C. Pasture, Flak
j� C, Pasture, Mod 0
j-
C. Pasture, Steep 0
l— C, Lawn, Flat 1
V C, Lawn, Mod .233
J-
C. Lawn, Steep 0
F SAT, Forest, Flat
PerviousTotal Acres
Impervious Total 0.029 ' Acres
Basin Total 0.262 Acres
DeseleckZero ( Select By:
t—` Show Only Selected
Available Impervious Acres
ROADSNLAT 0
ROADSlMOD 10
J'
ROADS/STEEP (o
r ROOF TOPSIFLAT 1.029
j
DRIVEWAYS/FLAT D
DRIVEWAYSIMOD 0
'DRIVEWAYS/STEEP
SIDEWALKSIFLAT D
1— SIDEWALKSIM0D
SIDEWALKSISTEEP O
PARKING/FLAT D
`PARKINGIMOD - 10
i— PARKINGISTEEF
F `POND 1
Porous Pavement 0
36
VAVHlv12012 SatwantRenton
File Edit View Help SummaryReport
;Q1 0% % oft
I 01 �a LW.I [Nil If I
Subbasin Name: -
Surface
Flows To ; lVault 1
Area in Basin
Available Pervious
y AIB, Forest, Flak
J— AIB, Forest, Mod
J" AIB, Forest, Steep
r AIB, Pasture, Flat
j- AIB, Pasture, Mod
j- AIB, Pasture, Steep
r AIB, Lawn, Flat
AIB, Lawn, Mod
AIB, Lawn, Steep
iC, Forest, Flat
lv C, Forest, Mod
r C, Forest, Steep
J— C, Pasture, Flat
j— C, Pasture, Mod
JJ C, Pasture, Steep
j C, Lawn, Flat
r ;C, Lawn, Mod
r' 'C, Lawn, Steep
T r ;SAT, Forest, Flat
Designate as Bypass foj
I nterflow 6 roundwater
Vault 1
r Show Only Selected
Avilable Impervi
Acres
aous
ROADSIFLAT
ROADSIMOD
ROADUSTEEP
ROOF TOPS/FLAT
DRIVEWAYS/FLAT
DRIVEWAYS/MOD
]— DRIVEWAYS/STEEP
SIDEWALKS/FLAT
SIDEWALKS/MOD
(" SIDEWALKS/STEEP
J � f
Acres
�' Porous Pavement:
PerviousTotal 0.955:: Acres
Impervious Total D.453 Acres
Basin Total 1.4D8 Acres
Deselect Zero Select By: � �� GO
'` MVHN12012 SatwantRenton
File Edit View Help Summary Report
;611x
Subbasin Name:
Surface
Flows To
Area in Basin
Available Pervious
r AtB, Forest, Flat
r A/8, Forest, Mod
I- A/B, Forest, Steep
r' AIB, Pasture, Flak
r AtB, Pasture, Mod
r AJB, Pasture, Steep
r A/B, Lawn, Flat
r• AJB, Lawn, Mod
F A/B, Lawn, Steep
r C, Forest, Flat
I✓ C,Forest, Mod
r C. Forest, Steep
Acres
1 1 L
I- Designate as Bypass for POC:::
Interflow Ciraundwater
Vault i1
—I
j— Show Only Selected
Available Impervious Acres
jJ 'C, Lawn, Mod � .083
Lawn, Steep
T r SAT, Forest, Flat 1
PerviousTotal
Impervious Total
Basin Total
Deselect Zero
0.083.: Acres
0.251 Acres
0.334 Acres
Select By.
J� ; ROOF TOPSJFLAT
r DRIVEWAYS/FLAT
r DRIVEWAYSJMOD
(—
;PARKINGIFLAT
r
PARKING/MOD
r
'PARKING/STEEP
r
POND
r
Porous
Pavement
ka kNNVHM2012 SatwantRenton
File Edit View Help SummaryReport
D ti
Subbasin Mame:(— Designake as Bypass for PQC:'
Surface Interflow Groundwater
Flows To lChannell lChannell
Area in Basin Show Only Selected
Available Pervious Acres Available Impervious Acres
+� A?B, Forest, Flat 0 r ROADS/FLAT 0
g ' uo
0
�` A1B, Pasture, 5keep
� C; Forest, Mod
C. Forest, Steep
j—
C. Pasture, Flat
(- C, Pasture, Mod
J" SATs Forest, Flat � 0
PerviousTotal 0.03 Acres
Impervious Total 0.02 Acres
Basin Total 0.05 Acres
Deselect Zero Select By: GO
1+ ROOF TOPSIFLAT
'iDFiIVE1NAYSlMOD �
j'
DRIVEWAYS/STEEP
j� SIDEWALKSND T
SIDEWALKS}MOD
SIDEWALKS/STEEP
39
MHM2012 SatwantRenton
File Edit View Help Summary Report
ry ( UV
lil
Facility Name
Downs#ream Connection
!Facility Dimensions
Length [ft) 74
Width (ft] 36
Effective Depth (ft) I`
Outlet 1 Outle# 2 Outlet 3
Channell 10 1
Auto Vault Quick V_ cult
(- Fixed Width ForAuto Vault
Facility Dimension Diaqram
Outlet Structure Data j
Riser Height (ft) ! f
Riser Diameter (in)
Riser Type Flat 0.7
Notch Type
Infiltration N0 ;� Orifice Diameter Height
Number (in) eft)
1 11,25 Fb '-
2 1.5 �v 3.ti
3 1.875 ' 4.7
Vault Volume at Riser Head (ac4t) .433
Show Vault Table Open Table
Initial Stage (ft)j
Tide Gate Time Series Demand
u
VMHM2012 SahvantRenton
File Edit View Help SummaryRepart
00®11Eha
r
1
t0E-4 10E3 t0E-2 1OE9 1 10
Pc+rcani Time Exceetling
raatim ( UD Duration Fbvi Freouenw Water Qua'
Evap + POC1__- _POC 2_�
Al Datasets Fbw Staga Precip
WVlHM2012 SaMiantRenton
File Edit View Hdp Summary Report
W1 ��' ID
f.0
Cumulative ProbabilAy
1.0
`xx
x x
,+, +++
_..+ + +
+ 501
tl x x x - E01
0.01 0.01
0.6 1 2 5 10 20 30 W 70 80 90 95 98 9999.51
SUeam Rded'wn Draatbn � LID Owalion Fb,w Frxxx.riru � Water Qua4v � HwLowach
Analyze datasets CompactWDM
Evap POC1 POC2
Al Datasets Fbw Stage Prec�
Facility PASSP.D h
Flox (c£s) Predev Mit Percentage Pass/Pail
0.0970
2945
F
65
Pass
040
0
1695
67
Pass
0.1052
0.30
O
71
J
0.1093
1929
0.20
1
t0E-4 10E3 t0E-2 1OE9 1 10
Pc+rcani Time Exceetling
raatim ( UD Duration Fbvi Freouenw Water Qua'
Evap + POC1__- _POC 2_�
Al Datasets Fbw Staga Precip
WVlHM2012 SaMiantRenton
File Edit View Hdp Summary Report
W1 ��' ID
f.0
Cumulative ProbabilAy
1.0
`xx
x x
,+, +++
_..+ + +
+ 501
tl x x x - E01
0.01 0.01
0.6 1 2 5 10 20 30 W 70 80 90 95 98 9999.51
SUeam Rded'wn Draatbn � LID Owalion Fb,w Frxxx.riru � Water Qua4v � HwLowach
Analyze datasets CompactWDM
Evap POC1 POC2
Al Datasets Fbw Stage Prec�
Facility PASSP.D h
Flox (c£s) Predev Mit Percentage Pass/Pail
0.0970
2945
1934
65
Pass
0.1011
2502
1695
67
Pass
0.1052
2182
3.564
71
Pass
0.1093
1929
1447
75
Pass
0.1134
1703
1324
77
Pass
0.1175
2503
1228
81
Pass
0.1217
1309
1128
86
Pass
0.1258
1178
1039
88
Pass
0.1299
1055
943
89
Pass
0.1340
945
849
89
Pass
0.1381
800
749
93
Pass
0.1422
708
665
93
Pass
0.1463
612
532
95
Pass
0.1504
544
506
93
Pass
7.1546
484
440
90
Pass
7.1587
440
366
83
Pass
7.1628
396
298
75
..Pass
7.1669
357
250
70
Pass
0.1710
314
198
63
Pass
7.1751
277
173
62
Pass
0.1792
::245
154
62
Pass
].1834
224
149
56
Pass
].1875
::203
136
66
. Pass
].1916
155
128
69
Pass
].1957
163
119
73
Pass
].1998
.146
116
79
Pass
).2039
134
110
82
Pass
].2080
116
103
'88
Pass
].2121
111
98
88
Pass
].2163
104
92
88
: Pass
1.2204
95
87
91
Pass
].2245
:86
85
98
Pass
).2286
79
ED
101
.Pass
).2327
76
77
101
Pass v
Plox Fregpenay
Plox (ofs)
Predeveloped
Mitigated
2 Year -
::0.1939
0.1132
5 Year -
0.2768
0.1633
LO Year =
0.3399
0.2009
25 Year =
0.4297
0.2538
50 Year -
0.5042
0.2972
L00 Year =
0.5856
0.3442
4nnna1 Peaks
1949
0.2992
.0.1462
1950
0.2690
0.1510
1951
0.2085
0.1844
1952
0.1273
0.0752
1953
0.1029
0.0686
1954
0.1585
0.0896
1955
0.1638
'0.3007
1956
0.1911
0.1054
1957
.0.2114
0.1267
1958
0.1369 '..0.0788
1959
0.1277 :.
0.0750
1960
0.2375
0.1789
1961
0.1676
0.1055
1962
0.1012
0.0621
1963
0.1742
0.0987
1964
0.1798
0.1009
3965
0.1960
0.1067
1966
0.1380
0.0772
1967
0.2969
0.1542
3968
0.2205
0.1206
1969
.0.1654
0.1167
1970
0.1821
.0.1033
1971
0.1977
0.1274
1972
0.2382
0.1352
1973
0.1173
0.0746
1974
0.2130
0.1087
1975
0.2274
0.1345
197b
0.1810
0.1001 v
41
VNYMM2012 SatwantRenton
File Edit Yew Help SummaryRepart
CGo®1yoEheft
DM M 0111 11.
10.0 Z-
Cumulative Probabililj
0.1
0.5 1 7
25 Year 5.2430
Stream Protection Duation
Stage Fregaenay
10.0 (feet) 1001
2 Year - 2.3245
5 Year - 3.4168
10 Year = 4.1969
5
10
20
30 b0 70 84
W 95 98
9999.5
LID
Dwation
1999
.Flow Freouer
I Waley Qua€ty
I Hyc
WWHM2012
PROJECT REPORT
Project Name: SatwantRenton
Site Name: SE 2nd Pl Short Plat
Site Address: 13609 156th Ave SE
City 0Renton
Report Date: 5/1/2017
Gage &Seatac
Data Start : 1948/10/01
Data End 2009/09/30
Precip Scale: 1.17
Version 2013/11/20
0.1
=
50 Year =
6.0646
L00 Year =
6.9213
Annna1 Peaks
1999
1.9492
1950
2.5722
1951
4.6324
1952
1.3771
1953
1.5089
1954
2.1788
1955
" 2.8071
1956
2.8218
1957
2.2144
1958
2.1719
1959
1.7973
1960
4.2545
1961
2.0844
1962
1.1768
1963
2.1187
1969
2.0016
1965
2.1971
1966
1.6352
1967
2.6043
1968
1.6684
1969
1.8640
1970
.1.9086
1971
2.4726
1972
3.6844
1973
1.7330
1979
2.0196
1975
2.6451
1976
2.3297
Low Flow Threshold for POC 1 50 Percent of the 2 Year
High Flow Threshold for POC 1: 50 year
PREDEVELOPED LAND USE
Name Onsite
Bypass: No
Groundwater: No
Pervious Land Use
Acres
42
C, Forest, Mod 1.67
Pervious Total 1.67
Impervious Land Use Acres
Impervious Total 0
Basin Total 1.67
Element Flows To:
Surface
Channel 1
Interflow
Channel 1
Name SE 2nd Pl Frontage
Bypass: No
GroundWater: No
Pervious Land Use Acres
C, Lawn, Mod .105
Pervious Total 0.105
Impervious Land Use Acres
ROADS MOD 0.229
Impervious Total
0.229
Basin Total
0.334
Element Flows To:
Surface
Channel 1
Interflow
Channel 1
Name 156 Ave SE Front
Bypass: No
GroundWater: No
Pervious Land Use Acres
C, Lawn, Mod .045
Pervious Total 0.045
Impervious Land Use Acres
ROADS MOD 0.005
Impervious Total 0.005
Groundwater
Groundwater
43
Basin Total
Element
Surface
Channel
Flows To:
1
0.05
Interflow
Channel 1
Name Channel 1
Bottom Length: 10.00 ft.
Bottom Width: 5.00 ft.
Manning's n: 0.03
Channel bottom slope l:
0
Channel Left side slope
Channel right side slope
Discharge Structure
Riser Height: 0 ft.
Riser Diameter: 0 in.
.025 To 1
0: 3 To 1
2: 3 To 1
Element Flows To:
Outlet 1 Outlet 2
Channel Hydraulic Table
Groundwater
Stage(ft)
Area(ac)
Volume(ac-ft)
Discharge(cfs)
Infilt(cfs)
0.0000
0.001
0.000
0.000
0.000
0.0222
0.001
0.000
0.069
0.000
0.0444
0.001
0.000
0.220
0.000
0.0667
0.001
0.000
0.435
0.000
0.0889
0.001
0.000
0.706
0.000
0.1111
0.001
0.000
1.028
0.000
0.1333
0.001
0.000
1.400
0.000
0.1556
0.001
0.000
1.818
0.000
0.1778
0.001
0.000
2.282
0.000
0.2000
0.001
0.000
2.791
0.000
0.2222
0.001
0.000
3.343
0.000
0.2444
0.001
0.000
3.938
0.000
0.2667
0.001
0.000
4.576
0.000
0.2889
0.001
0.000
5.257
0.000
0.3111
0.001
0.000
5.979
0.000
0.3333
0.001
0.000
6.743
0.000
0.3556
0.001
0.000
7.550
0.000
0.3778
0.001
0.000
8.398
0.000
0.4000
0.001
0.000
9.288
0.000
0.4222
0.001
0.000
10.22
0.000
0.4444
0.001
0.000
11.19
0.000
0.4667
0.001
0.000
12.21
0.000
0.4889
0.001
0.000
13.26
0.000
0.5111
0.001
0.000
14.36
0.000
0.5333
0.001
0.000
15.51
0.000
0.5556
0.001
0.000
16.69
0.000
0.5778
0.001
0.000
17.92
0.000
0.
6000
0.002
0.000
19.20
0.000
0.6222
0.002
0.001
20.51
0.000
0.6444
0.002
0.001
21.87
0.000
0.6667
0.002
0.001
23.28
0.000
0.6889
0.002
0.001
24.73
0.000
0.7111
0.002
0.001
26.22
0.000
0.7333
0.002
0.001
27.76
0.000
0.7556
0.002
0.001
29.34
0.000
0.7778
0.002
0.001
30.97
0.000
0.8000
0.002
0.001
32.64
0.000
0.8222
0.002
0.001
34.36
0.000
0.8444
0.002
0.001
36.13
0.000
0.8667
0.002
0.001
37.94
0.000
0.8889
0.002
0.001
39.81
0.000
0.9111
0.002
0.001
41.71
0.000
0.9333
0.002
0.001
43.67
0.000
0.9556
0.002
0.001
45.67
0.000
0.9778
0.002
0.001
47.73
0.000
1.0000
0.002
0.001
49.83
0.000
1.0222
0.002
0.001
51.98
0.000
1.0444
0.002
0.002
54.18
0.000
1.0667
0.002
0.002
56.43
0.000
1.0889
0.002
0.002
58.72
0.000
1.1111
0.002
0.002
61.07
0.000
1.1333
0.002
0.002
63.47
0.000
1.1556
0.002
0.002
65.92
0.000
1.1778
0.002
0.002
68.43
0.000
1.2000
0.002
0.002
70.98
0.000
1.2222
0.002
0.002
73.59
0.000
1.2444
0.002
0.002
76.24
0.000
1.2667
0.002
0.002
78.95
0.000
1.2889
0.002
0.002
81.72
0.000
1.3111
0.003
0.002
84.53
0.000
1.3333
0.003
0.002
87.41
0.000
1.3556
0.003
0.002
90.33
0.000
1.3778
0.003
0.002
93.31
0.000
1.4000
0.003
0.003
96.34
0.000
1.4222
0.003
0.003
99.43
0.000
1.4444
0.003
0.003
102.5
0.000
1.4667
0.003
0.003
105.7
0.000
1.4889
0.003
0.003
109.0
0.000
1.5111
0.003
0.003
112.3
0.000
1.5333
0.003
0.003
115.7
0.000
1.5556
0.003
0.003
119.1
0.000
1.5778
0.003
0.003
122.6
0.000
1.6000
0.003
0.003
126.1
0.000
1.6222
0.003
0.003
129.7
0.000
1.6444
0.003
0.003
133.4
0.000
1.6667
0.003
0.003
137.1
0.000
1.6889
0.003
0.003
140.9
0.000
1.7111
0.003
0.004
144.7
0.000
1.7333
0.003
0.004
148.6
0.000
1.7556
0.003
0.004
152.5
0.000
1.7778
0.003
0.004
156.5
0.000
1.8000
0.003
0.004
160.6
0.000
1.8222
0.003
0.004
164.8
0.000
1.8444
0.003
0.004
169.0
0.000
1.8667
0.003
0.004
173.2
0.000
1.8889
0.003
0.004
177.5
0.000
1.9111
ft.
12
in.
Orifice
0.003
0.004
Orifice
2 Diameter:
181.9
1.
0.000
3 Diameter:
1.9333
1.
0.003
0.004
186.4
0.000
1.9556
0.003
0.004
190.9
0.000
1.9778
0.003
0.005
195.4
0.000
2.0000
0.003
0.005
200.1
0.000
2.0222
0.004
0.005
204.8
0.000
MITIGATED LAND USE
Name Onsite to vault
Bypass: No
Groundwater: No
Pervious Land Use Acres
C, Lawn, Mod .955
Pervious Total 0.955
Impervious Land Use Acres
ROADS MOD 0.094
ROOF TOPS FLAT 0.359
Impervious Total 0.453
Basin Total 1.408
Element
Surface
Vault 1
Flows To:
Name Vault 1
Width 36 ft.
Length : 74 ft.
Depth: 7 ft.
Discharcre Structure
Riser Height: 7
Riser Diameter:
25
ft.
12
in.
Orifice
1 Diameter:
1.
Orifice
2 Diameter:
1.
Orifice
3 Diameter:
1.
Element Flows To:
Outlet 1
Channel 1
Interflow
Vault 1
Groundwater
in. Elevation: 0 ft.
5 in. Elevation: 3.6 ft.
875 in. Elevation: 4.7 ft.
Outlet 2
Vault Hydraulic Table
Stage(ft) Area(ac) Volume(ac-ft) Diacharge(efa) Infilt(efa)
0.0000 0.061 0.000 0.000 0.000
0.0778 0.061 0.004 0.011 0.000
0.1556
0.061
0.009
0.016
0.000
0.2333
0.061
0.014
0.019
0.000
0.3111
0.061
0.019
0.022
0.000
0.3889
0.061
0.023
0.025
0.000
0.4667
0.061
0.028
0.028
0.000
0.5444
0.061
0.033
0.030
0.000
0.6222
0.061
0.038
0.032
0.000
0.7000
0.061
0.042
0.034
0.000
0.7778
0.061
0.047
0.036
0.000
0.8556
0.061
0.052
0.038
0.000
0.9333
0.061
0.057
0.039
0.000
1.0111
0.061
0.061
0.041
0.000
1.0889
0.061
0.066
0.042
0.000
1.1667
0.061
0.071
0.044
0.000
1.2444
0.061
0.076
0.045
0.000
1.3222
0.061
0.080
0.047
0.000
1.4000
0.061
0.085
0.048
0.000
1.4778
0.061
0.090
0.049
0.000
1.5556
0.061
0.095
0.051
0.000
1.6333
0.061
0.099
0.052
0.000
1.7111
0.061
0.104
0.053
0.000
1.7889
0.061
0.109
0.054
0.000
1.8667
0.061
0.114
0.056
0.000
1.9444
0.061
0.118
0.057
0.000
2.0222
0.061
0.123
0.058
0.000
2.1000
0.061
0.128
0.059
0.000
2.1778
0.061
0.133
0.060
0.000
2.2556
0.061
0.137
0.061
0.000
2.3333
0.061
0.142
0.062
0.000
2.4111
0.061
0.147
0.063
0.000
2.4889
0.061
0.152
0.064
0.000
2.5667
0.061
0.157
0.065
0.000
2.6444
0.061
0.161
0.066
0.000
2.7222
0.061
0.166
0.067
0.000
2.8000
0.061
0.171
0.068
0.000
2.8778
0.061
0.176
0.069
0.000
2.9556
0.061
0.180
0.070
0.000
3.0333
0.061
0.185
0.071
0.000
3.1111
0.061
0.190
0.072
0.000
3.1889
0.061
0.195
0.073
0.000
3.2667
0.061
0.199
0.074
0.000
3.3444
0.061
0.204
0.075
0.000
3.4222
0.061
0.209
0.075
0.000
3.5000
0.061
0.214
0.076
0.000
3.5778
0.061
0.218
0.077
0.000
3.6556
0.061
0.223
0.092
0.000
3.7333
0.061
0.228
0.100
0.000
3.8111
0.061
0.233
0.107
0.000
3.8889
0.061
0.237
0.112
0.000
3.9667
0.061
0.242
0.117
0.000
4.0444
0.061
0.247
0.121
0.000
4.1222
0.061
0.252
0.126
0.000
4.2000
0.061
0.256
0.129
0.000
4.2778
0.061
0.261
0.133
0.000
4.3556
0.061
0.266
0.137
0.000
4.4333
0.061
0.271
0.140
0.000
4.5111
0.061
0.275
0.143
0.000
4.5889
0.061
0.280
0.146
0.000
4.6667
0.061
0.285
0.149
0.000
47
4.7444
0.061
0.290
0.172
0.000
4.8222
0.061
0.294
0.187
0.000
4.9000
0.061
0.299
0.199
0.000
4.9778
0.061
0.304
0.209
0.000
5.0556
0.061
0.309
0.218
0.000
5.1333
0.061
0.313
0.226
0.000
5.2111
0.061
0.318
0.234
0.000
5.2889
0.061
0.323
0.242
0.000
5.3667
0.061
0.328
0.249
0.000
5.4444
0.061
0.333
0.255
0.000
5.5222
0.061
0.337
0.262
0.000
5.6000
0.061
0.342
0.268
0.000
5.6778
0.061
0.347
0.274
0.000
5.7556
0.061
0.352
0.280
0.000
5.8333
0.061
0.356
0.285
0.000
5.9111
0.061
0.361
0.291
0.000
5.9889
0.061
0.366
0.296
0.000
6.0667
0.061
0.371
0.301
0.000
6.1444
0.061
0.375
0.307
0.000
6.2222
0.061
0.380
0.312
0.000
6.3000
0.061
0.385
0.316
0.000
6.3778
0.061
0.390
0.321
0.000
6.4556
0.061
0.394
0.326
0.000
6.5333
0.061
0.399
0.331
0.000
6.6111
0.061
0.404
0.335
0.000
6.6889
0.061
0.409
0.340
0.000
6.7667
0.061
0.413
0.344
0.000
6.8444
0.061
0.418
0.349
0.000
6.9222
0.061
0.423
0.353
0.000
7.0000
0.061
0.428
0.357
0.000
7.0778
0.061
0.432
0.573
0.000
7.1556
0.000
0.000
0.963
0.000
Name Onsite Dispersed
Bypass: No
Groundwater: No
Pervious Land Use Acres
C, Lawn, Mod .233
Pervious Total 0.233
Impervious Land Use Acres
ROOF TOPS FLAT 0.029
Impervious Total 0.029
Basin Total 0.262
Element Flows
Surface
Channel 1
To:
Interflow
Channel 1
Groundwater
Name SE 2nd Pl Front
Bypass: No
Groundwater: No
Pervious Land Use Acres
C, Lawn, Mod .083
Pervious Total 0.083
Impervious Land Use Acres
ROADS MOD 0.251
Impervious Total 0.251
Basin Total 0.334
Element Flows To:
Surface
Vault 1
Interflow
Vault 1
Name 156th AVE SE Front
Bypass: No
Groundwater: No
Pervious Land Use Acres
C, Lawn, Mod .03
Pervious Total 0.03
Impervious Land Use Acres
ROADS MOD 0.02
Impervious Total 0.02
Basin Total 0.05
Element Flows To:
Surface
Channel 1
Interflow
Channel 1
Name Channel 1
Bottom Length: 10.00 ft.
Bottom Width: 5.00 ft.
Manning's n: 0.03
Channel bottom slope 1: 0.025 To 1
Channel Left side slope 0: 3 To 1
Groundwater
Groundwater
Channel right side slope 2: 3 TO 1
Discharge Structure
Riser Height: 0 ft.
Riser Diameter: 0 in.
Element Flows To:
Outlet 1 Outlet 2
Channel Hydraulic Table
Stage(ft) Area(ac) Volume(ac-ft) Discharge(cfs) Infilt(cfs
0.0000
0.001
0.000
0.000
0.000
0.0222
0.001
0.000
0.069
0.000
0.0444
0.001
0.000
0.220
0.000
0.0667
0.001
0.000
0.435
0.000
0.0889
0.001
0.000
0.706
0.000
0.1111
0.001
0.000
1.028
0.000
0.1333
0.001
0.000
1.400
0.000
0.1556
0.001
0.000
1.818
0.000
0.1778
0.001
0.000
2.282
0.000
0.2000
0.001
0.000
2.791
0.000
0.2222
0.001
0.000
3.343
0.000
).2444
0.001
0.000
3.938
0.000
0.2667
0.001
0.000
4.576
0.000
0.2889
0.001
0.000
5.257
0.000
0.3111
0.001
0.000
5.979
0.000
0.3333
0.001
0.000
6.743
0.000
0.3556
0.001
0.000
7.550
0.000
0.3778
0.001
0.000
8.398
0.000
0.4000
0.001
0.000
9.288
0.000
0.4222
0.001
0.000
10.22
0.000
0.4444
0.001
0.000
11.19
0.000
0.4667
0.001
0.000
12.21
0.000
0.4889
0.001
0.000
13.26
0.000
0.5111
0.001
0.000
14.36
0.000
0.5333
0.001
0.000
15.51
0.000
0.5556
0.001
0.000
16.69
0.000
0.5778
0.001
0.000
17.92
0.000
0.6000
0.002
0.000
19.20
0.000
0.6222
0.002
0.001
20.51
0.000
0.6444
0.002
0.001
21.87
0.000
0.6667
0.002
0.001
23.28
0.000
0.6889
0.002
0.001
24.73
0.000
0.7111
0.002
0.001
26.22
0.000
0.7333
0.002
0.001
27.76
0.000
0.7556
0.002
0.001
29.34
0.000
0.7778
0.002
0.001
30.97
0.000
0.8000
0.002
0.001
32.64
0.000
0.8222
0.002
0.001
34.36
0.000
0.8444
0.002
0.001
36.13
0.000
0.8667
0.002
0.001
37.94
0.000
0.8889
0.002
0.001
39.81
0.000
0.9111
0.002
0.001
41.71
0.000
0.9333
0.002
0.001
43.67
0.000
0.9556
0.002
0.001
45.67
0.000
0.9778
0.002
0.001
47.73
0.000
50
1.0000
0.002
0.001
49.83
0.000
1.0222
0.002
0.001
51.98
0.000
1.0444
0.002
0.002
54.18
0.000
1.0667
0.002
0.002
56.43
0.000
1.0889
0.002
0.002
58.72
0.000
1.1111
0.002
0.002
61.07
0.000
1.1333
0.002
0.002
63.47
0.000
1.1556
0.002
0.002
65.92
0.000
1.1778
0.002
0.002
68.43
0.000
1.2000
0.002
0.002
70.98
0.000
1.2222
0.002
0.002
73.59
0.000
1.2444
0.002
0.002
76.24
0.000
1.2667
0.002
0.002
78.95
0.000
1.2889
0.002
0.002
81.72
0.000
1.3111
0.003
0.002
84.53
0.000
1.3333
0.003
0.002
87.41
0.000
1.3556
0.003
0.002
90.33
0.000
1.3778
0.003
0.002
93.31
0.000
1.4000
0.003
0.003
96.34
0.000
1.4222
0.003
0.003
99.43
0.000
1.4444
0.003
0.003
102.5
0.000
1.4667
0.003
0.003
105.7
0.000
1.4889
0.003
0.003
109.0
0.000
1.5111
0.003
0.003
112.3
0.000
1.5333
0.003
0.003
115.7
0.000
1.5556
0.003
0.003
119.1
0.000
1.5778
0.003
0.003
122.6
0.000
1.6000
0.003
0.003
126.1
0.000
1.6222
0.003
0.003
129.7
0.000
1.6444
0.003
0.003
133.4
0.000
1.6667
0.003
0.003
137.1
0.000
1.6889
0.003
0.003
140.9
0.000
1.7111
0.003
0.004
144.7
0.000
1.7333
0.003
0.004
148.6
0.000
1.7556
0.003
0.004
152.5
0.000
1.7778
0.003
0.004
156.5
0.000
1.8000
0.003
0.004
160.6
0.000
1.8222
0.003
0.004
164.8
0.000
1.8444
0.003
0.004
169.0
0.000
1.8667
0.003
0.004
173.2
0.000
1.8889
0.003
0.004
177.5
0.000
1.9111
0.003
0.004
181.9
0.000
1.9333
0.003
0.004
186.4
0.000
1.9556
0.003
0.004
190.9
0.000
1.9778
0.003
0.005
195.4
0.000
2.0000
0.003
0.005
200.1
0.000
2.0222
0.004
0.005
204.8
0.000
ANALYSIS RESULTS
Stream Protection Duration
Predeveloped Landuse Totals for POC #1
Total Pervious Area:1.82
51
Total Impervious Area:0.234
Mitigated Landuse Totals for POC #1
Total Pervious Area:1.301
Total Impervious Area:0.753
Flow Frequency Return
Return Period
2 year
5 year
10 year
25 year
50 year
100 year
Periods for
Flow (cfs)
0.193946
0.276802
0.339937
0.4297
0.504201
0.585572
Predeveloped. POC #1
Flow Frequency Return Periods for Mitigated.
Return Period
Flow(efs)
Protection Duration
2 year
0.113206
Peaks for
Predeveloped
and
5 year
0.163253
Predeveloped Mitigated
1949
10 year
0.200891
0.146
25 year
0.253786
0.270
0.151
50 year
0.297213
0.209
100 year
0.344213
1952
0.127
Stream
Protection Duration
Annual
Peaks for
Predeveloped
and
Mitigated
Year
Predeveloped Mitigated
1949
0.299
0.146
1950
0.270
0.151
1951
0.209
0.184
1952
0.127
0.075
1953
0.103
0.069
1954
0.158
0.090
1955
0.164
0.101
1956
0.191
0.105
1957
0.211
0.127
1958
0.137
0.079
1959
0.128
0.075
1960
0.238
0.179
1961
0.168
0.105
1962
0.101
0.062
1963
0.174
0.099
1964
0.180
0.101
1965
0.196
0.107
1966
0.138
0.077
1967
0.297
0.154
1968
0.220
0.121
1969
0.165
0.117
1970
0.182
0.103
1971
0.198
0.127
1972
0.238
0.135
1973
0.117
0.075
1974
0.213
0.109
1975
0.227
0.134
1976
0.181
0.100
1977
0.144
0.075
POC #1
POC #1
52
1978
0.187
Mitigated
0.094
1
1979
0.193
0.3434
0.076
2
1980
0.429
0.2898
0.175
3
1981
0.172
0.2845
0.107
4
1982
0.311
0.2541
0.239
5
1983
0.184
0.2388
0.102
6
1984
0.135
0.2127
0.073
7
1985
0.138
0.2034
0.100
8
1986
0.215
0.1936
0.126
9
1987
0.207
0.1844
0.142
10
1988
0.112
0.1789
0.067
11
1989
0.169
0.1765
0.060
12
1990
0.596
0.1751
0.254
13
1991
0.376
0.1638
0.203
14
1992
0.164
0.1542
0.089
15
1993
0.131
0.1510
0.073
16
1994
0.102
0.1503
0.055
17
1995
0.150
0.1462
0.096
18
1996
0.347
0.1417
0.213
19
1997
0.230
0.1352
0.177
20
1998
0.183
0.1345
0.108
21
1999
0.430
0.1280
0.194
22
2000
0.179
0.1274
0.100
2001
0.156
0.086
2002
0.239
0.164
2003
0.298
0.128
2004
0.344
0.284
2005
0.184
0.115
2006
0.178
0.108
2007
0.498
0.290
2008
0.447
0.343
2009
0.255
0.150
Stream Protection Duration
Ranked Annual Peaks for Predeveloped and Mitigated
Rank
Predeveloped
Mitigated
1
0.5958
0.3434
2
0.4981
0.2898
3
0.4469
0.2845
4
0.4296
0.2541
5
0.4290
0.2388
6
0.3761
0.2127
7
0.3473
0.2034
8
0.3443
0.1936
9
0.3106
0.1844
10
0.2992
0.1789
11
0.2978
0.1765
12
0.2969
0.1751
13
0.2698
0.1638
14
0.2546
0.1542
15
0.2390
0.1510
16
0.2382
0.1503
17
0.2375
0.1462
18
0.2304
0.1417
19
0.2274
0.1352
20
0.2205
0.1345
21
0.2154
0.1280
22
0.2130
0.1274
POC #1
53
23
0.2114
0.1267
24
0.2085
2182
0.1264
1564
25
0.2069
0.1206
26
0.1977
1324
0.1167
1503
27
0.1960
0.1151
28
0.1931
1178
0.1087
1039
29
0.1911
0.1079
30
0.1871
849
0.1076
800
31
0.1841
0.1075
32
0.1839
0.1067
33
0.1832
0.1055
34
0.1821
0.1054
35
0.1810
0.1033
36
0.1798
0.1023
37
0.1793
0.1009
38
0.1784
0.1007
39
0.1742
0.1001
40
0.1717
0.1001
41
0.1693
0.0996
42
0.1676
0.0987
43
0.1654
0.0964
44
0.1639
0.0940
45
0.1638
0.0896
46
0.1585
0.0890
47
0.1561
0.0860
48
0.1498
0.0788
49
0.1437
0.0772
50
0.1380
0.0764
51
0.1377
0.0752
52
0.1369
0.0750
53
0.1348
0.0746
54
0.1312
0.0746
55
0.1277
0.0732
56
0.1273
0.0725
57
0.1173
0.0686
58
0.1116
0.0670
59
0.1029
0.0621
60
0.1024
0.0605
61
0.1012
0.0548
Stream Protection Duration
POC #1
The Facility PASSED
The Facility PASSED.
Flow(cfs)
0.0970
Predev Mit
0.1011
0.1052
0.1093
0.1134
0.1175
0.1217
0.1258
0.1299
0.1340
0.1381
2945
1934
2502
1695
2182
1564
1929
1447
1703
1324
1503
1228
1309
1128
1178
1039
1055
943
945
849
800
749
Percentage
65
67
71
75
77
81
86
88
89
89
93
Pass/Fail
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
54
0.1422
708
665
93
Pass
0.1463
612
582
95
Pass
0.1504
544
506
93
Pass
0.1546
484
440
90
Pass
0.1587
440
366
83
Pass
0.1628
396
298
75
Pass
0.1669
357
250
70
Pass
0.1710
314
198
63
Pass
0.1751
277
173
62
Pass
0.1792
245
154
62
Pass
0.1834
224
149
66
Pass
0.1875
203
136
66
Pass
0.1916
185
128
69
Pass
0.1957
163
119
73
Pass
0.1998
146
116
79
Pass
0.2039
134
110
82
Pass
0.2080
116
103
88
Pass
0.2121
111
98
88
Pass
0.2163
104
92
88
Pass
0.2204
95
87
91
Pass
0.2245
86
85
98
Pass
0.2286
79
80
101
Pass
0.2327
76
77
101
Pass
0.2368
70
71
101
Pass
0.2409
60
64
106
Pass
0.2451
57
58
101
Pass
0.2492
51
51
100
Pass
0.2533
47
48
102
Pass
0.2574
45
42
93
Pass
0.2615
40
31
77
Pass
0.2656
39
24
61
Pass
0.2697
36
17
47
Pass
0.2738
33
12
36
Pass
0.2780
32
9
28
Pass
0.2821
30
8
26
Pass
0.2862
29
5
17
Pass
0.2903
29
4
13
Pass
0.2944
29
3
10
Pass
0.2985
25
2
8
Pass
0.3026
23
2
8
Pass
0.3068
23
2
8
Pass
0.3109
22
2
9
Pass
0.3150
20
2
10
Pass
0.3191
17
1
5
Pass
0.3232
17
1
5
Pass
0.3273
14
1
7
Pass
0.3314
14
1
7
Pass
0.3356
14
1
7
Pass
0.3397
14
1
7
Pass
0.3438
14
1
7
Pass
0.3479
12
0
0
Pass
0.3520
11
0
0
Pass
0.3561
11
0
0
Pass
0.3602
10
0
0
Pass
0.3643
10
0
0
Pass
0.3685
10
0
0
Pass
0.3726
10
0
0
Pass
0.3767
9
0
0
Pass
0.3808
8
0
0
Pass
55
0.3849
and Volume for
8
0
0
Pass
0.3890
8
0
0
Pass
0.3931
7
0
0
Pass
0.3973
7
0
0
Pass
0.4014
7
0
0
Pass
0.4055
7
0
0
Pass
0.4096
7
0
0
Pass
0.4137
7
0
0
Pass
0.4178
7
0
0
Pass
0.4219
7
0
0
Pass
0.4260
7
0
0
Pass
0.4302
5
0
0
Pass
0.4343
5
0
0
Pass
0.4384
5
0
0
Pass
0.4425
5
0
0
Pass
0.4466
5
0
0
Pass
0.4507
4
0
0
Pass
0.4548
4
0
0
Pass
0.4590
3
0
0
Pass
0.4631
3
0
0
Pass
0.4672
3
0
0
Pass
0.4713
3
0
0
Pass
0.4754
3
0
0
Pass
0.4795
3
0
0
Pass
0.4836
3
0
0
Pass
0.4877
3
0
0
Pass
0.4919
2
0
0
Pass
0.4960
2
0
0
Pass
0.5001
1
0
0
Pass
0.5042
1
0
0
Pass
Water Quality BMP Flow
and Volume for
POC #1
On-line
On-line
Adjusted
Off-line
Adjusted
facility volume:
facility target
for 15 min: 0.0284
facility target
for 15 min: 0.0189
0.0563 acre-feet
flow: 0.0284
cfs.
flow: 0.0189
cfs.
cfs.
cfs.
LID Report
LID Technique Used for Total Volumn
Percent Water Quality Percent Comment
Treatment? Needs
Volumn Water Quality
Treatment
Infiltrated
Treated
(ac -ft
Channel 1 POC N 255 18
0.00
Vault I
0.00
Total Volume Infiltrated
0.00 0.00 0%
Compliance with LID Standard 8
Duration Analysis Result = Failed
.
N 221.44
Volumn Infiltration Cumulative
Through Volumn Volumn
Facility (ac -ft) Infiltration
ac -ft) Credit
N
QN1
476.62 0.00 0.00
No Treat. Credit
56
Flow Frequency Return Periods for
Return Period
Flow(cfs)
2
year
0.193946
5
year
0.276802
10
year
0.339937
25
year
0.4297
50
year
0.504201
100
year
0.585572
Predeveloped. POC #1
Flow Frequency Return Periods for Mitigated. POC #1
Return Period
Flow(efs)
2 year
0.113206
5 year
0.163253
10 year
0.200891
25 year
0.253786
50 year
0.297213
100 year
0.344213
Part E Water Quality System
Total new plus replaced pollution generating impervious area is less than 5,000 square
feet, no water quality treatment facility is required. All onsite driveways are treated by
pervious concrete pavement Flow control BMP and can be consider treated. For offsite
improvements total pollution generating impervious area is reduced and no new pervious
area is created, no mitigation is required.
s7
V. Conveyance System Analysis and Design
Conveyance system calculation will be provided at the phase of construction design.
VI. Special Reports and Studies
Special Reports related to this project:
• Geotechnical Report. Limited Stormwater &Geologic Hazard Evaluation
prepared by Cobalt Geosciences, August 22, 2016 - updated April 12, 2017.
• Arborist Report. Greenforest Incorporated, April 14, 2017
59
Vu. Other Permits
Water Service through King County Water District #90
Sewer Service through City of Renton
Right -of -Way permits through City of Renton
Franchised utilities (power, cable, gas, etc.) through individual utility purveyors
NPDES Permit Through WA State Department of Ecology
VIII. CSWPPP Analysis and Design
ESC Plan Analysis and Design (Part A)
TEMPORARY EROSION AND SEDIMENT CONTROL
1. The grading for this project is limited to the onsite improvement and offsite frontage
improvement. Temporary Erosion and Sedimentation Control will be provided by
utilizing BMPs selected from the 2017 Renton Surface Water Design Manual.
These BMPS will likely include, but are not necessarily limited to construction
entrance for traffic stabilization, silt fencing for parameter protection, plastic
sheeting of stockpiles, straw mulch, hydro -seeding of exposed areas, catch basin
protection, etc. All new impervious areas and new pervious areas will be treated
by a detention vault for Duration flow control (forest existing condition). At the
beginning of the construction, construction entrance and silt fence along the
grading limit will be installed. Then, combined detention/wet vault will be installed.
Temporary erosion and sediment control facilities will be maintained during
construction period and will be removed after construction is finished. Temporary
erosion and sediment control plan, notes and details to be provided at construction
plan stage. A Stormwater Pollution Prevention and Spill (SWPPS) plan will also be
provided at construction plan stage.
2. The site is sloped, no sensitive area exists onsite. No special measure is
proposed.
Temporary sediment trap sizing:
Q2y using WWHM method with 15 -minute time step:
Flow Frequency Return Periods for Mitigated. POC #1 (Before detention)
Return Period Flow(cfs)
2 year 0.419887
5 0.591157
0.712288
year
10
year
25
year
50
year
100
year
Qty = 0.42 cfs
Required surface area = 2080 *Q2y = 2080 * 0.42 = 874 sf.
The proposed temporary sediment trap is located at the northwest corner of the site. A
temporary overflow path is provided to over flow to the existing 12 storm that runs along
SE 2nd Place.
EROSION AND SEDIMENT CONTROL STANDARDS:
ESC measures shall be applied and maintained to prevent, to the maximum extent
practicable, the transport of sediment from the project site to downstream drainage
systems or surface waters. This performance is intended to be achieved through proper
61
0.873986
1.000687
1.132724
Qty = 0.42 cfs
Required surface area = 2080 *Q2y = 2080 * 0.42 = 874 sf.
The proposed temporary sediment trap is located at the northwest corner of the site. A
temporary overflow path is provided to over flow to the existing 12 storm that runs along
SE 2nd Place.
EROSION AND SEDIMENT CONTROL STANDARDS:
ESC measures shall be applied and maintained to prevent, to the maximum extent
practicable, the transport of sediment from the project site to downstream drainage
systems or surface waters. This performance is intended to be achieved through proper
61
selection, installation, and operation of the above ESC measures as detailed in the ESC
Standard (detached Appendix D) and approved by the City of Renton.
PERMANENT EROSION AND SEDIMENT CONTROL
For Permanent Erosion and Sedimentation Control, driveways and walkways will be
paved. Landscape areas will be covered with grass, trees and ground covers. All onsite
new imaervious areas and new oervious areas will be treated by the detention vault for
Flow control (Duration, forest existing condition).
62
STORMWATER POLLUTION PREVENTION AND SPILL (SWPPS) PLAN (Part B)
63
X. Bond Quantities, Facility Summaries and
Declaration of Covenant
X. Operations and Maintenance Manual
The onsite storm facilities will be maintained by the property owner and manager.