HomeMy WebLinkAboutR-4337003NDEX OF DRAVV NGS
DRAWING NO. DRAWING TITLE DATE DRAWING NO. DRAWING TITLE DATE DRAWING NO. DRAWING TITLE DATE DRAWING NO. DRAWING TITLE DATE
GENERAL MECHAN CAL MECHANICAL CONT. ELECTR CAL CONT.
04-088-GO COVER SHEET 01.24.25 04-088-MO MECHANICAL LEGEND 01.24.25
04-088-G1 SYMBOLS & GENERAL NOTES 01.24.25 04-088-M1 GENERAL NOTES AND ABBREVIATIONS 01.24.25
04-088-G2 DRAWING INDEX 01.24.25 04-088-M2A EQUIPMENT SCHEDULES 01.24.25
04-088-M2B EQUIPMENT SCHEDULES 01.24.25
04-088-M2C VENTILATION SCHEDULE 01.24.25
\ / 04-088-1M10R FIRST FLOOR MECHANICAL PLANS - REMOVAL 01.24.25
C V L 04-088-1 M11 OR FIRST FLOOR PLUMBING PLANS - REMOVAL 01.24.25
C2-1 CIVIL NOTES 01.24.25 04-088-RFM10R ROOF MECHANICAL PLANS - REMOVAL 01.24.25
C3 TESC PLAN 01.24.25 04-088-1 M26OR FIRST FLOOR FIRE PROTECTION PLAN - REMOVAL 01.24.25
C80 SITE PLAN 01.24.25 04-088-1 M10 FIRST FLOOR MECHANICAL PLANS 01.24.25
C150 GRADING PLAN 01.24.25 04-088-1 M11 FIRST FLOOR MECHANICAL PLANS 01.24.25
C220R PAVING & STRIPING REMOVAL PLAN 01.24.25 04-088-1 M110 FIRST FLOOR PLUMBING PLANS 01.24.25
C220 PAVING & STRIPING REMOVAL 01.24.25 04-088-1 M111 FIRST FLOOR PLUMBING PLANS 01.24.25
C290R UTILITY & DRAINAGE REMOVAL PLAN 01.24.25 04-088-1 M260 FIRST FLOOR FIRE PROTECTION PLAN 01.24.25
C290 PARTIAL SITE UTILITY PLAN 01.24.25 04-088-1 M261 FIRST FLOOR FIRE PROTECTION PLAN 01.24.25
C300 DRAINAGE PROFILES 01.24.25 04-088-RFM10 ROOF MECHANICAL PLANS 01.24.25
C500 TESC DETAILS 01.24.25 04-088-RFM11 ROOF MECHANICAL PLANS 01.24.25
C501 PAVING DETAILS 01.24.25 04-088-M301 VARIABLE REFRIGERANT FLOW CONTROLS 01.24.25
C502 GRADING ENLARGEMENT 01.24.25 04-088-M302 SEQUENCE OF OPERATIONS 01.24.25
C503 GRADING ENLARGEMENT 01.24.25 04-088-M303 VARIABLE REFRIGERANT FLOW SYSTEM DIAGRAM 01.24.25
04-088-M41OA RISER DIAGRAMS 01.24.25
04-088-M504 MECHANICAL DETAILS 01.24.25
04-088-M505 FIRE PROTECTION DETAILS 01.24.25
ELECTRICAL
A R C H T E CT U RA 04-088-E1 GENERAL NOTES, SYMBOLS AND SHEET INDEX 01.24.25
04-088-CC1 CODE COMPLIANCE PLAN 01.24.25 04-088-E2 LIGHTING FIXTURE SCHEDULE 01.24.25
04-088-1A10R FLOOR PLAN - REMOVAL 01.24.25 04-088-E3 MECHANICAL EQUIPMENT CONNECTION SCHEDULE 01.24.25
04-088-1A28OR REFLECTED CEILING PLAN - REMOVAL 01.24.25 04-088-E4R ONE -LINE DIAGRAM - REMOVAL 01.24.25
04-088-1A10 FLOOR PLAN 01.24.25 04-088-E4 ONE -LINE DIAGRAM 01.24.25
04-088-1A280 REFLECTED CEILING PLAN 01.24.25 04-088-E8 LIGHTING ZONING PLAN 01.24.25
04-088-RFA160 ROOF PLAN 01.24.25 04-088-1 E10R LIGHTING PLAN - REMOVAL 01.24.25
04-088-A60 EXTERIOR ELEVATIONS 01.24.25 04-088-1 E10 LIGHTING PLAN 01.24.25
04-088-A201 WALL SECTIONS 01.24.25 04-088-1 E11 LIGHTING PLAN 01.24.25
04-088-A350 DOOR SCHEDULE, ELEVATIONS AND DETAILS 01.24.25 04-088-1 E60R 208Y/120V POWER PLAN - REMOVAL 01.24.25
04-088-A351 STOREFRONT DETAILS 01.24.25 04-088-1 E60 208Y/120V POWER PLAN 01.24.25
04-088-A370 CASEWORK ELEVATIONS 01.24.25 04-088-1E61 208Y/120V POWER PLAN 01.24.25
04-088-A371 INTERIOR ELEVATIONS 01.24.25 04-088-1 E260R FIRE ALARM PLAN - REMOVAL 01.24.25
04-088-A450 1 /4" ENLARGED PLAN - EXISTING BUILDING 01.24.25 04-088-1 E260 FIRST FLOOR FIRE PROTECTION PLAN 01.24.25
04-088-A451 1 /4" ENLARGED PLAN - NEW ADDITION 01.24.25 04-088-1 E261 FIRST FLOOR FIRE PROTECTION PLAN 01.24.25
04-088-A503 CEILING DETAILS 01.24.25 04-088-1 E41 OR COMMUNICATION PLAN - REMOVAL 01.24.25
04-088-A504 STAIR AND RAMP DETAILS 01.24.25 04-088-1 E410 COMMUNICATION PLAN 01.24.25
04-088-A505 MISCELLANEOUS DETAILS 01.24.25 04-088-1 E411 COMMUNICATION PLAN 01.24.25
04-088-RFE60R ROOF 208Y/120V POWER PLAN - REMOVAL 01.24.25
04-088-RFE60 ROOF 208Y/120V POWER PLAN 01,24.25
04-088-RFE61 ROOF 208Y/120V POWER PLAN 01.24.25
04-088-E504-1 DETAILS 01.24.25
04-088-E504-2 COMMUNICATION DETAILS 01.24.25
04-088-E504-3 COMMUNICATION DETAILS 01.24.25
04-088-RFE61 ROOF 208Y/120V POWER PLAN 01.24.25
STRUCTURAL 04-088-RFE61 ROOF 208Y/120V POWER PLAN 01.24.25
04-088-S2 STRUCTURAL NOTES 01.24.25 04-088-RFE61 ROOF 208Y/120V POWER PLAN 01.24.25
04-088-S2-1 STRUCTURAL NOTES 01.24.25 04-088-RFE61 ROOF 208Y/120V POWER PLAN 01.24.25
04-088-S2-2 SPECIAL INSPECTIONS SCHEDULE 01.24.25 04-088-RFE61 ROOF 208Y/120V POWER PLAN 01.24.25
04-088-S2-3 SPECIAL INSPECTIONS SCHEDULE 01.24.25 04-088-E514R FIRE ALARM SYSTEM DETAILS 01.24.25
04-088-S110R FIRST FLOOR FRAMING PLAN - REMOVAL 01.24.25 04-088-E514 FIRE ALARM SYSTEM DETAILS 01.24.25
04-088-S10 FOUNDATION PLAN 01.24.25
04-088-S110 FIRST FLOOR FRAMING PLAN 01.24.25
04-088-RFS160 ROOF FRAMING PLAN 01.24.25
04-088-S210 EXTERIOR ELEVATIONS 01.24.25
04-088-S280 CONCRETE DETAILS 01.24.25
04-088-S400 STEEL DETAILS 01.24.25
04-088-S400-1 STEEL DETAILS 01.24.25
04-088-S503 FOUNDATION DETAILS 01.24.25
04-088-S504 WOOD FRAMING DETAILS 01.24.25
04-088-S504-1 WOOD FRAMING DETAILS 01.24.25
rolluda architects
architecture planning interior design
SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE ACCEPTABILITY HS
ORIG. RELCATE MEDICAL CENTER 42657 HS/RAI EAC 01.24.25 t6604 THISDESIGN AND/OR EACGISTERED SPECIFICATION IS APPROVED""A, A HITECT ENG
APPROVED BY DEPT. DATE
RIC C TCHE
TE O WWASHINGT NN APP
a,IE SUBTITLE
08.28.24 DRAWING INDEX
08.28.24
TITLE RELCATE MEDICAL CENTER
BUILDING 45-802
ARCHITECTURAL MASTER
105 South Main Street, Suite 323, Seattle, WA 98104 206.624.4222 R - 4 3 3 7 0 3
ISSUE FOR CONSTRUCTION
JANUARY 24, 2025
CURRENT REVISION SYMBO DATE
42657 0 RIG 01.24.25
SHEET
G2 G2
JOB NO. COMP N0.
42657 -
RENTON, WA DWG N0. 04-088-G2
`,
E